CN201281184Y - 顶管纠偏辅助接头 - Google Patents
顶管纠偏辅助接头 Download PDFInfo
- Publication number
- CN201281184Y CN201281184Y CNU2008201525153U CN200820152515U CN201281184Y CN 201281184 Y CN201281184 Y CN 201281184Y CN U2008201525153 U CNU2008201525153 U CN U2008201525153U CN 200820152515 U CN200820152515 U CN 200820152515U CN 201281184 Y CN201281184 Y CN 201281184Y
- Authority
- CN
- China
- Prior art keywords
- joint
- pipe
- round pipe
- deviation
- stop ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Joints Allowing Movement (AREA)
Abstract
本实用新型涉及金属的刚性管接头或管件领域,具体为一种顶管纠偏辅助接头。一种顶管纠偏辅助接头,包括接头甲,接头乙,垫板和止水圈,其特征是:接头甲和接头乙都是一段圆管,接头乙的一端呈大圆管和小圆管之间通过肩部连接的阶梯型,小圆管的外径略小于接头甲的内径并与之形成间隙配合,大圆管的外径和接头甲的外径相同,接头乙呈阶梯状的一端其小圆管端面上安放垫板并且外圆周面套上止水圈后插入接头甲。本实用新型结构简单,密封性好,张角大。使用本实用新型作业可以防止管子变形、接口脱开、管子报废,省时省料。
Description
技术领域
本实用新型涉及金属的刚性管接头或管件领域,具体为一种顶管纠偏辅助接头。
背景技术
顶管施工是继盾构施工之后发展起来的一种地下管道施工方法,顶管施工的基本原理为:从地面开挖两个基坑井,管节从工作井安放,通过顶推机械的顶进推动管节从工作井预留口穿出,穿越土层到达接收井的预留口边,然后通过接收井的预留口穿出,完成底下贯通管道的施工。由于顶管施工技术不通过开挖土方就能进行管道施工,能穿越各种障碍物,非常适用于城市改造建设、环境污染治理和其它工程建设,近几年随着城市化建设加速发展和环境污染治理的迫切需要,顶管施工技术应用越来越普及。顶管施工常用的管材有钢管、混凝土管等。钢管顶管施工与混凝土顶管施工最大的区别在于:钢管顶管施工时,钢管的接头是焊接的,这种刚性连接有利之处是如能在初始顶进中掌握好顶进的方向,则在以后的顶进中,管子一般不会产生较大偏差,顶进会非常顺利。但不利之处是如果顶进方向掌握不好就不易纠正。如果纠正力度过于剧烈,还可能出现管子变形、接口脱裂等问题,甚至管子报废,造成不必要的浪费。
发明内容
为了克服现有技术的缺陷,提供一种既容易实施顶进作业,又方便纠正偏差,且使用寿命长的顶管,本实用新型公开了一种顶管纠偏辅助接头。
本实用新型通过如下技术方案达到发明目的:
一种顶管纠偏辅助接头,包括接头甲,接头乙,垫板和止水圈,其结构在于:接头甲和接头乙都是一段圆管,接头乙的一端呈大圆管和小圆管之间通过肩部连接的阶梯型,小圆管的外径略小于接头甲的内径并与之形成间隙配合,大圆管的外径和接头甲的外径相同,接头乙呈阶梯状的一端其小圆管端面上安放垫板并且外圆周面套上止水圈后插入接头甲。
所述的顶管纠偏辅助接头,其结构在于:止水圈的数量是2个、3个或更多。
使用本实用新型时,将接头甲和接头乙的一端相互套接后,另一端分别与钢管连接,一般选用焊接,即可开始顶管作业。
本实用新型结构简单,密封性好,张角大。采用本实用新型作业,可以防止在纠正钢管顶进偏差时易出现的管子变形、接口脱开等弊端,更杜绝了管子报废的恶果,避免了误工误时和材料消耗。
附图说明
图1是本实用新型的结构示意图;
图2是本实用新型中接头乙的主视图的剖视图;
图3是本实用新型使用时的结构示意图;
图4是使用了两个止水圈的本实用新型使用时的结构示意图。
具体实施方式
以下通过具体实施例进一步说明本实用新型。
实施例1
一种顶管纠偏辅助接头,如图1所示,包括接头甲1,接头乙2,垫板3和止水圈4,具体结构是:接头甲1和接头乙1都是一段圆管,接头乙2的结构如图2所示,一端呈大圆管和小圆管之间通过肩部连接的阶梯型,小圆管的外径略小于接头甲1的内径并与之形成间隙配合,大圆管的外径和接头甲1的外径相同,接头乙2呈阶梯状的一端其小圆管端面上安放垫板3并且外圆周面套上止水圈4后插入接头甲1。止水圈4采用了吸水后体积会膨胀橡胶材料以填充接头缝隙,起到防止漏水的作用。
使用时,如图3所示,将接头甲1和接头乙2的一端相互套接后,另一端分别与钢管51和钢管52焊接,即可开始顶管作业。
实施例2
为了进一步提高密封性能,止水圈4可以安装多个,如图4所示,顶管纠偏辅助接头中使用了两个止水圈,分别是止水圈4和止水圈41,这样接头甲1、和接头乙2之间的配合间隙在可以加大以提高接头纠偏转角,但接头仍能保持良好密封性。其他结构都和实施例1同。
Claims (2)
1.一种顶管纠偏辅助接头,包括接头甲(1),接头乙(2),垫板(3)和止水圈(4),其特征是:接头甲(1)和接头乙(1)都是一段圆管,接头乙(2)的一端呈大圆管和小圆管之间通过肩部连接的阶梯型,小圆管的外径略小于接头甲(1)的内径并与之形成间隙配合,大圆管的外径和接头甲(1)的外径相同,接头乙(2)呈阶梯状的一端其小圆管端面上安放垫板(3)并且外圆周面套上止水圈(4)后插入接头甲(1)。
2.如权利要求1所述的顶管纠偏辅助接头,其特征是:止水圈(4)的数量是2个、3个或更多。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201525153U CN201281184Y (zh) | 2008-08-29 | 2008-08-29 | 顶管纠偏辅助接头 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201525153U CN201281184Y (zh) | 2008-08-29 | 2008-08-29 | 顶管纠偏辅助接头 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201281184Y true CN201281184Y (zh) | 2009-07-29 |
Family
ID=40928059
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008201525153U Expired - Lifetime CN201281184Y (zh) | 2008-08-29 | 2008-08-29 | 顶管纠偏辅助接头 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201281184Y (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102661442A (zh) * | 2012-05-02 | 2012-09-12 | 宣伯民 | 装有纠偏翼板的顶管施工先导管 |
CN102889428A (zh) * | 2012-10-18 | 2013-01-23 | 北京隆科兴非开挖工程有限公司 | 顶管施工后管道中心线偏差的非开挖纠正方法及设备 |
CN105485426A (zh) * | 2016-01-22 | 2016-04-13 | 李闻勇 | 一种顶管专用校正装置 |
-
2008
- 2008-08-29 CN CNU2008201525153U patent/CN201281184Y/zh not_active Expired - Lifetime
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102661442A (zh) * | 2012-05-02 | 2012-09-12 | 宣伯民 | 装有纠偏翼板的顶管施工先导管 |
CN102889428A (zh) * | 2012-10-18 | 2013-01-23 | 北京隆科兴非开挖工程有限公司 | 顶管施工后管道中心线偏差的非开挖纠正方法及设备 |
CN102889428B (zh) * | 2012-10-18 | 2015-07-22 | 北京隆科兴非开挖工程股份有限公司 | 顶管施工后管道中心线偏差的非开挖纠正方法及设备 |
CN105485426A (zh) * | 2016-01-22 | 2016-04-13 | 李闻勇 | 一种顶管专用校正装置 |
CN105485426B (zh) * | 2016-01-22 | 2018-01-09 | 李闻勇 | 一种顶管专用校正装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108361050B (zh) | 一种用于公路隧道波纹钢初期支护结构的防水系统 | |
CN103437417B (zh) | 排水管道钢内衬局部修复结构 | |
CN103883797A (zh) | 一种钢丝网骨架塑料复合管的施工方法 | |
CN204004910U (zh) | 一种用于波纹钢管涵洞连接的波纹形管箍结构 | |
CN104314584A (zh) | 一种拼装式顶管管片结构及其拼装方法 | |
CN201281184Y (zh) | 顶管纠偏辅助接头 | |
CN207989887U (zh) | 内衬钢管式钢筋混凝土顶管 | |
CN108443612A (zh) | 钢筋混凝土顶管管节接头 | |
CN202769112U (zh) | 钢承口钢筋混凝土管道双密封止水接口 | |
CN204312088U (zh) | 一种拼装式顶管管片结构 | |
CN205839796U (zh) | 综合管廊节间连接结构 | |
CN112555522A (zh) | 一种钢承口复合钢筋混凝土内衬玻璃钢排水管及制备方法 | |
CN201599504U (zh) | 一种f型钢筋混凝土管道双密封防水接口 | |
CN210462146U (zh) | 圆形管道修复结构 | |
CN205101771U (zh) | 用于玻璃钢管线内穿插修复的连接接头 | |
CN210637591U (zh) | 一种钢质非开挖顶管 | |
CN204004911U (zh) | 一种用于波纹钢管涵洞连接的半波形管箍结构 | |
CN105971016A (zh) | 综合管廊节间连接结构 | |
CN205938218U (zh) | 一种纤维增强塑料混凝土复合管内衬结构 | |
CN209622218U (zh) | 双承插口钢筋混凝土顶管 | |
CN202416361U (zh) | 用于提高接口密封性的检查井及其连接的支管 | |
CN205714225U (zh) | 一种铁路涵洞、隧道病害金属波纹涵管内衬加固装置 | |
CN210766907U (zh) | 一种用于底板孔洞后封堵的防水构造 | |
CN212251523U (zh) | 一种增设橡胶内衬的城市运营污水管道 | |
CN203498985U (zh) | 排水管道钢内衬局部修复结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: MCC5 GROUP CORPORATION LIMITED (SHANGHAI) Free format text: FORMER NAME: SHANGHAI WUYE CONSTRUCTION OF ZHONGYE CHENGGONG CO.LTD |
|
CP01 | Change in the name or title of a patent holder |
Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2501 Patentee after: MCC5 Group Corporation Limited (Shanghai) Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2501 Patentee before: Shanghai Wuye Construction Of Zhongye Chenggong Co.Ltd |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20090729 |