CN201254385Y - Roller conveying apparatus for belt conveyor maintenance - Google Patents

Roller conveying apparatus for belt conveyor maintenance Download PDF

Info

Publication number
CN201254385Y
CN201254385Y CNU2008201100280U CN200820110028U CN201254385Y CN 201254385 Y CN201254385 Y CN 201254385Y CN U2008201100280 U CNU2008201100280 U CN U2008201100280U CN 200820110028 U CN200820110028 U CN 200820110028U CN 201254385 Y CN201254385 Y CN 201254385Y
Authority
CN
China
Prior art keywords
dolly
belt conveyer
track
rope
roller arrangement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008201100280U
Other languages
Chinese (zh)
Inventor
黄文林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Yueji Industry Co., Ltd.
Original Assignee
Beijing Yueji Tongli Machine Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Yueji Tongli Machine Manufacturing Co Ltd filed Critical Beijing Yueji Tongli Machine Manufacturing Co Ltd
Priority to CNU2008201100280U priority Critical patent/CN201254385Y/en
Application granted granted Critical
Publication of CN201254385Y publication Critical patent/CN201254385Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Escalators And Moving Walkways (AREA)

Abstract

The utility model discloses a roller transporting device for maintaining a belt conveyer. The roller transporting device comprises an orbit made of H-shaped steel, an endless rope hoister, a trolley towed by the endless rope hoister, a roller basket hung on the trolley, a plurality of support rope rollers supporting steel wire ropes, a towing rope, a tension device, and the like. Transported rollers are placed in the roller basket to run in the air, the structure is simple, the running is safe, and the energy consumption is saved. The utility model is used for transporting idler rollers for a blast furnace of an iron mill when a feeding belt conveyer or other belt conveyer is maintained.

Description

The fortune roller arrangement of belt conveyer maintenance usefulness
Technical field
The utility model relates to a kind of fortune roller arrangement of belt conveyer maintenance usefulness.
Background technology
Belt conveyer is a mechanical equipment commonly used in the commercial production.Generally do not transport the roller dolly for long and bevelled belt conveyer.If need to change Idler roller, all be a dead lift when maintenance, labor content is bigger.To the material loading belt conveyer of some iron-smelter blast furnace, because its captain reaches 400m, the inclination angle reaches about 11 degree, is to shorten maintenance time, also have to add motor-driven fortune roller dolly.
In the prior art, fortune roller dolly is by the endless rope winch traction, along being erected at ground and two aerial orbital motions respectively.
There is following shortcoming at least in above-mentioned prior art:
The parallelism of upper and lower two tracks is difficult to guarantee.Track has a branch on ground, is collided and is out of shape through regular meeting, and safety in operation and reliability are low.
Summary of the invention
The purpose of this utility model provides the fortune roller arrangement of the high belt conveyer maintenance usefulness of a kind of simple in structure, safety in operation and reliability.
The purpose of this utility model is achieved through the following technical solutions:
The fortune roller arrangement of belt conveyer maintenance usefulness of the present utility model, comprise track, described track is provided with dolly, described dolly is connected with draw gear, described draw gear comprises hauling rope, endless rope winch, the two ends of described hauling rope all are connected on the described dolly, and the middle part of described hauling rope is walked around behind the changed course pulley of described rail end on described endless rope winch.
The technical scheme that is provided by above-mentioned the utility model as can be seen, the fortune roller arrangement of belt conveyer maintenance usefulness described in the utility model, because the two ends of hauling rope all are connected on the described dolly, the middle part of hauling rope is walked around behind the changed course pulley of rail end on endless rope winch.Have simple in structure, safety in operation and high reliability features.
Description of drawings
Fig. 1 is the planar structure scheme drawing of the fortune roller arrangement of belt conveyer maintenance usefulness of the present utility model;
Fig. 2 is the facade structures scheme drawing of the fortune roller arrangement of belt conveyer maintenance usefulness of the present utility model;
Fig. 3 is that the A-A of Fig. 2 is to scheme drawing.
The specific embodiment
The fortune roller arrangement of belt conveyer maintenance usefulness of the present utility model, its preferable specific embodiment comprises track 1 as shown in Figure 1 and Figure 2, track 1 is provided with dolly 2, dolly 2 is connected with draw gear, and by the traction of draw gear, dolly 2 is walked on track 1.
Concrete draw gear comprises hauling rope 4, endless rope winch 8, and the two ends of hauling rope 4 all are connected on the dolly 2, and hauling rope 4 is walked around changed course pulley 11 backs of rail end on endless rope winch 8.
The rear end of track 1 is provided with the changed course pulley 11 of two vertical directions, and endless rope winch 8 is located at the below of changed course pulley 11.
After hauling rope 4 is walked around the changed course pulley 11 of track front end, between the changed course pulley 11 of track rear end after down, on endless rope winch 8.When endless rope winch 8 rotates, by 2 operations of hauling rope 4 pulling dollies.
Also comprise take-up device, take-up device comprises weight 6, and weight 6 is provided with tension sheave 7, and hauling rope 4 is strained hauling rope 4 by the weight of weight on tension sheave 7.
The two ends of track 1 are respectively equipped with dolly end position positioning plate 9 and limit switch, carry out spacing to the stroke of dolly 2.Limit switch is an inductance approach switch.
As shown in Figure 3, the transversal surface of track 1 is " H " font, and dolly 2 is suspended on the track 1.The top of track 1 is provided with a plurality of fixed connecting plates 12, is used for track is fixed.
The top of track 1 is provided with a plurality of holder rope rollers 5, is used for supporting traction rope 4.Hauling rope 4 is a steel rope.
The below of dolly 2 is hung with roller basket 3, is used to load roller.Dolly 2 is hinged with roller basket 3, and the direction of hinge is perpendicular to the service direction of dolly 2.
Roller basket 3 one side openings, conveniently assemble and disassemble, other three sides are provided with frame, are used to block roller.
In the specific embodiment of the utility model, track is made by H shaped steel, is welded on the metal construction frame of conveyor gallery side, and is parallel with vestibule ground.
Dolly is suspended on the edge of a wing of H shaped steel, high about 1.3 meters apart from ground of roller baskets.The dolly two ends connect with haulage cable, and aloft back and forth travel along track under the traction of endless rope winch.
The roller basket is suspended on the dolly below, and the roller that need transport is placed in the basket and transports, and once can adorn 3~4 rollers.The roller basket is removed towards a up side not to be had outside the frame, and other three all have frame, also are provided with inhibiting device simultaneously, guarantees the nonvoluntary swing of roller basket and reverses, and guarantees that roller can not drop.
Haulage cable is strained by movement weight mass, to guarantee transmitting tractive power.Simultaneously haulage cable welds in orbit described holder rope roller support at a certain distance by several.Haulage cable forms closed circuit after walking around several changed course pulleys, its two ends are fixed on the dolly.
Endless rope winch is arranged on the ground near conveyer tail place.In when operation, a people holds interphone and walks with winch, treats that dolly arrives to desire to unload the roller place, sends cutoff command by interphone.After another people who treats at the endless rope winch place heard instruction, hand push button stopped.Then, top people moves down new roller, brings up to the bad roller of pulling down.Send the instruction of dolly inverted running once more.When dolly was got back near the winch, following people was manually stopped, and unloads bad roller, brings up to new roller, the next circulation of beginning.Simple in structure, be convenient to install, safe in utilization.
Specific embodiment:
Certain iron-smelter 3200m 3The charging of blast furnace belt conveyer, (10.2 ° of bandwidth B=1800mm, captain 395m, belt speed 2.0m/s, inclination angle) join the fortune roller arrangement that keeps in repair usefulness.
Again referring to Fig. 1, Fig. 2, Fig. 3, the fortune roller arrangement comprise track 1, dolly 2, roller basket 3, steel rope 4, holder rope roller 5, movement weight mass 6, tension sheave 7, endless rope winch 8, positioning plate 9, edger roll 10, changed course pulley 11, with part such as metal construction frame bonded assembly fixed connecting plate 12.
Track 1 is the H shaped steel of a 125X125X9, and it is welded in by connecting panel 12 on the metal bin of vestibule sidewall, and is parallel with vestibule ground, about 2m height apart from ground.End is welded with positioning plate 9 in orbit; In the track lower end, detouchable positioning plate 9 is housed.Simultaneously, near positioning plate 9, also be equipped with inductance type near switch etc., dolly arrives herein, sends cutoff command automatically.In the top flange of track, be welded with one group of holder rope roller 5 every 2m.
Dolly 2 has four rolling, and roller is walked on the lower flange of track 1.Steel rope 4 is after walking around endless rope winch 8, tension sheave 7, several changed course pulleys 11 and edger roll 10, and two ends are fixed on the dolly 2, form closed circuit.Two next and past strand steel wire rope branches are all by 5 supportings of holder rope roller.
Weight 6 with the steel rope tensioning, can drive steel rope 4 to guarantee endless rope winch 8 by tension sheave 7, thus 2 operations of pulling dolly.The running velocity of dolly is 0.8m/s.
Roller basket 3 is hinged on dolly 2 belows, and the direction of hinge is perpendicular to the service direction of dolly 2, can guarantee that the roller basket can not locate the situation that now swings or reverse.The roller basket has 3~4 layers of dividing plate, puts a roller for every layer.Dividing plate does not have side plate towards the side of up direction, and its excess-three face all has side plate, loads and unloads to prevent that roller from dropping and being convenient to roller.
The above only is the preferable specific embodiment of the utility model.But protection domain of the present utility model is not limited thereto.Anyly be familiar with those skilled in the art in the disclosed technical scope of the utility model, the variation that can expect easily or replacement all should be encompassed within the protection domain of the present utility model.

Claims (9)

1, a kind of fortune roller arrangement of belt conveyer maintenance usefulness, comprise track, described track is provided with dolly, it is characterized in that, described dolly is connected with draw gear, described draw gear comprises hauling rope, endless rope winch, and the two ends of described hauling rope all are connected on the described dolly, and the middle part of described hauling rope is walked around behind the changed course pulley of described rail end on described endless rope winch.
2, the fortune roller arrangement of belt conveyer maintenance usefulness according to claim 1, it is characterized in that, the rear end of described track is provided with the changed course pulley of two vertical directions, described endless rope winch is located at the below of the changed course pulley of described two vertical directions, described hauling rope between the changed course pulley of described two vertical directions after down, on described endless rope winch.
3, the fortune roller arrangement of belt conveyer maintenance usefulness according to claim 1 is characterized in that it also comprises take-up device, and described take-up device comprises weight, and described weight is provided with tension sheave, and described hauling rope is on described tension sheave.
4, the fortune roller arrangement of belt conveyer maintenance usefulness according to claim 1 is characterized in that the two ends of described track are respectively equipped with dolly end position positioning plate and limit switch.
5, the fortune roller arrangement of belt conveyer maintenance usefulness according to claim 4 is characterized in that described limit switch is an inductance approach switch.
6, the fortune roller arrangement of belt conveyer maintenance usefulness according to claim 1 is characterized in that described track is made by H shaped steel, and described dolly is suspended on the described track, and the top of track is provided with a plurality of fixed connecting plates.
7, the fortune roller arrangement of belt conveyer maintenance usefulness according to claim 1 is characterized in that the top of described track is provided with a plurality of holder rope rollers.
8, the fortune roller arrangement of belt conveyer maintenance usefulness according to claim 1 is characterized in that the below of described dolly is hung with the roller basket, and described dolly and described roller basket are hinged, and the direction of hinge is perpendicular to the service direction of described dolly.
9, according to the fortune roller arrangement of each described belt conveyer maintenance usefulness of claim 1 to 8, it is characterized in that described hauling rope is a steel rope.
CNU2008201100280U 2008-08-14 2008-08-14 Roller conveying apparatus for belt conveyor maintenance Expired - Lifetime CN201254385Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201100280U CN201254385Y (en) 2008-08-14 2008-08-14 Roller conveying apparatus for belt conveyor maintenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201100280U CN201254385Y (en) 2008-08-14 2008-08-14 Roller conveying apparatus for belt conveyor maintenance

Publications (1)

Publication Number Publication Date
CN201254385Y true CN201254385Y (en) 2009-06-10

Family

ID=40737702

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201100280U Expired - Lifetime CN201254385Y (en) 2008-08-14 2008-08-14 Roller conveying apparatus for belt conveyor maintenance

Country Status (1)

Country Link
CN (1) CN201254385Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103693395A (en) * 2013-12-07 2014-04-02 衡阳运输机械有限公司 Electric support roller carrying device for belt conveyor
CN104003131A (en) * 2014-06-13 2014-08-27 山东电力建设第一工程公司 Rail-type reciprocating conveying trolley
CN110654789A (en) * 2019-09-09 2020-01-07 中国葛洲坝集团机械船舶有限公司 Sliding conveying rail in arc tunnel and using method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103693395A (en) * 2013-12-07 2014-04-02 衡阳运输机械有限公司 Electric support roller carrying device for belt conveyor
CN103693395B (en) * 2013-12-07 2016-08-03 衡阳运输机械有限公司 Ribbon conveyer Electric support roller Handling device
CN104003131A (en) * 2014-06-13 2014-08-27 山东电力建设第一工程公司 Rail-type reciprocating conveying trolley
CN104003131B (en) * 2014-06-13 2015-11-18 山东电力建设第一工程公司 The reciprocating transport trolley of track
CN110654789A (en) * 2019-09-09 2020-01-07 中国葛洲坝集团机械船舶有限公司 Sliding conveying rail in arc tunnel and using method

Similar Documents

Publication Publication Date Title
EP2596173B1 (en) Rail conveyor system
CN203021268U (en) Combination device utilizing light-type railway to carry heavy device
CN107878474A (en) A kind of pipeline
CN201254385Y (en) Roller conveying apparatus for belt conveyor maintenance
CN103192740A (en) Rigid movable overhead line system below electrified railway coal hopper bunker
CN102602398B (en) Quick-transporting method and quick-transport device for foldable temporary cableways
CN205998561U (en) Kiln car automatic traction device
CN203033294U (en) Container wood floor automatic material trimming and feeding conveying device
CN207416835U (en) A kind of stream carrier vehicle with door type structure
CN207469856U (en) Vehicle conveying equipment
CN203439725U (en) Door type bucket wheel reclaimer
CN205526360U (en) Prefab conveyer
CN206171450U (en) Dual -rope pulls overhead monorail system
CN203173281U (en) Retractable belt conveyor
CN215798047U (en) Special crane for grinding roller
CN201457366U (en) Connecting device for overhead passenger device
CN110329970B (en) Loading and unloading transporting device for truck
CN207617724U (en) A kind of stream carrier vehicle of handling goods
CN207416830U (en) A kind of running gear and stream carrier vehicle
CN203173272U (en) Tensional descending belt conveyor
CN203612502U (en) Ore conveying device
CN205526358U (en) Prefab production conveyor system
CN108049676A (en) Vehicle conveying equipment
CN212449374U (en) Bilateral bearing roller handling device of blast furnace owner belt feeder
CN219136117U (en) Triaxial cargo conveying equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: BEIJING YUEJI INDUSTRY CO., LTD.

Free format text: FORMER NAME: BEIJING YUEJI TONGLI MACHINERY MANUFACTURING CO., LTD.

CP03 Change of name, title or address

Address after: 101100, Beijing, Zhongguancun Tongzhou District science and Technology Park, Tongzhou Park light mechanical and electrical integration industry base, Jia Chuang Road, No. 10, block C4

Patentee after: Beijing Yueji Industry Co., Ltd.

Address before: 101100 Beijing City, Tongzhou District Zhongguancun Tongzhou Science Park light mechanical and electrical integration industry base light Hing St. 5

Patentee before: Beijing Yueji Tongli Machine Manufacturing Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20090610