CN205526360U - Prefab conveyer - Google Patents

Prefab conveyer Download PDF

Info

Publication number
CN205526360U
CN205526360U CN201620096945.2U CN201620096945U CN205526360U CN 205526360 U CN205526360 U CN 205526360U CN 201620096945 U CN201620096945 U CN 201620096945U CN 205526360 U CN205526360 U CN 205526360U
Authority
CN
China
Prior art keywords
prefabricated component
lifting
mast
component conveying
arrangements according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620096945.2U
Other languages
Chinese (zh)
Inventor
王安徽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Minsheng Zhuyou Co Ltd
Original Assignee
China Minsheng Zhuyou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Minsheng Zhuyou Co Ltd filed Critical China Minsheng Zhuyou Co Ltd
Priority to CN201620096945.2U priority Critical patent/CN205526360U/en
Application granted granted Critical
Publication of CN205526360U publication Critical patent/CN205526360U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a prefab conveyer, including prefab travelling bogie, prefab hoisting trolley and walking track, prefab travelling bogie and prefab hoisting trolley are in move on the walking track, the prefab travelling bogie is used for the transportation of prefab, prefab hoisting trolley is used for arriving the prefab handling on the prefab travelling bogie, the prefab travelling bogie includes and bears the weight of a device and a running gear, a running gear sets up in the bottom of bearing the weight of the device, a running gear, including a drive arrangement and at least two sets of walking wheel, drive arrangement drive is the motion of at least a set of walking wheel wherein, the top of bearing the device is provided with the hoisting accessory track. Like this, reduced the hoist and mount transportation time, practiced thrift production line place area occupied.

Description

A kind of prefabricated component conveying arrangement
Technical field
This utility model relates to construction engineering technical field, particularly to a kind of prefabricated component conveying arrangement.
Background technology
Along with the development of building trade, current various precast concretes have been widely used in various building In.Producing of precast concrete typically uses production line and the mode of supply line combination.In preform production During, due to prefabricated component quality weight, volume greatly, transport process is wasted time and energy, it is often necessary to use driving Or the crane lifting such as crane, then it is transported through by prefabricated component transport vehicle.But, use driving or lifting The hoisting prefabricated part of machine, not only occupied ground, lifting efficiency is relatively low, and existing prefabricated component transport vehicle is also required to Designing special transport channel, it is also desirable to occupied ground, therefore, design one lifting efficiency is high, place accounts for With the low prefabricated component conveying arrangement of rate, become those skilled in the art and be badly in need of solving the technical problem that.
Summary of the invention
This utility model solves the technical problem that and is: providing a kind of prefabricated component conveying arrangement, it can improve prefabricated The lifting efficiency of part, saves place area occupied.
Solution of the present utility model is achieved in that a kind of prefabricated component conveying arrangement, including prefabricated component Travelling bogie, prefabricated component lifting trolley and walking track, described prefabricated component travelling bogie and prefabricated component lifting are little Car runs on described walking track, and described prefabricated component travelling bogie is for the transport of prefabricated component, described prefabricated Part lifting trolley is used for prefabricated component handling to described prefabricated component travelling bogie;Described prefabricated component travelling bogie, Including bogey and the first walking mechanism, described first walking mechanism is arranged on the bottom of bogey, institute Stating the first walking mechanism, including the first driving means and at least two group road wheels, described first driving means is driven The one group of road wheel motion of dynamic at least a part of which;The top of described bogey is provided with boom hoisting track.So, Described prefabricated component travelling bogie and prefabricated component lifting trolley run on described walking track, and prefabricated component lifting is little Car is for by prefabricated component handling to described prefabricated component travelling bogie, prefabricated component travelling bogie and prefabricated component lifting Dolly runs on same track, decreases the lifting transhipment time, has saved production line place area occupied, with Time production line and material flow line are integrated conllinear, not only solve material line floor space problem, and can also keep away Exempt from occur material report to the leadship after accomplishing a task blocking problem.It addition, after the top of bogey is provided with boom hoisting track, Boom hoisting can move forward and backward along the track on bogey top, and boom hoisting is not take up around bogey Space, improves the utilization rate in place, beneficially prefabricated component and is lifted on bogey, and, it is lifted into Prefabricated component on bogey may also operate as the effect of counterweight so that it is will not shake in lifting, transportation Shaking and swing, stability is more preferable.
Another technical scheme of the present utility model is that, on above-mentioned basis, described bogey includes two Longitudinal bracing frame and at least two cross-brace framves, the two ends of described cross-brace frame are indulged with described two respectively Connect to bracing frame.So, when bogey includes two longitudinal bracing framves and at least two cross-brace framves, When the two ends of described cross-brace frame are connected with described two longitudinal bracing framves respectively, at boom hoisting by prefabricated After part lifts and is placed on bogey, contacting between prefabricated component with bogey is linear contact lay, not only Save weight and the material of bogey, also can lay according to its force way, effectively prevent prefabricated component from rolling over Breakdown is bad.
Another technical scheme of the present utility model is on above-mentioned basis, and described road wheel is arranged on described The bottom of longitudinal bracing frame.So, when road wheel is arranged on the bottom of described longitudinal bracing frame, carrying dress Put and the load of prefabricated component can be handed on road wheel by straight-line transmitting, decrease the moment of torsion of road wheel wheel shaft, can Prevent its deformed damaged under big load effect.
Another technical scheme of the present utility model is on above-mentioned basis, and described cross-brace frame is arch Or it is trapezoidal.So, when cross-brace frame be arch or trapezoidal time, its arch or trapezoidal bottom are reserved with one Fixed space, such prefabricated component travelling bogie, in running, can directly stride across from prefabricated component.
Another technical scheme of the present utility model is, on above-mentioned basis, described bogey to be provided with Adjusting means, described adjusting means is for regulating the length of bogey.So, when arranging on bogey There is adjusting means, when described adjusting means is for regulating the length of bogey, for the different length of prefabricated component Degree size, can be adapted therewith by the length adjusting bogey, facilitate application.
Another technical scheme of the present utility model is that, on above-mentioned basis, described adjusting means is for being arranged on Sliding rail on described longitudinal bracing frame, described cross-brace frame is by sliding rail and described longitudinal bracing Frame is slidably connected, and described sliding rail is arranged on the inner side of longitudinal bracing frame relative to described boom hoisting track. So, being regulated by sliding rail, easy to operate simple, the amplitude of accommodation is easily controlled, and is conducive to Improve the security reliability of prefabricated component travelling bogie.
Another technical scheme of the present utility model is that, on above-mentioned basis, described adjusting means is for being arranged on Multiple locating grooves on described longitudinal bracing frame, described cross-brace frame is by locating groove and described longitudinal direction Bracing frame connects.So, when regulating device is the multiple locating grooves being arranged on described longitudinal bracing frame, institute State cross-brace frame when being connected with described longitudinal bracing frame by locating groove, propped up with horizontal by locating groove Support location fixes, easy to operate simple, is conducive to improving the security reliability of prefabricated component travelling bogie.
Another technical scheme of the present utility model is on above-mentioned basis, and described longitudinal bracing frame is at least One end is provided with alignment pin or hole, location.So, at least one end at longitudinal bracing frame be provided with alignment pin or Behind hole, location, prefabricated component travelling bogie can connect with other traction apparatuss or multiple travelling bogie easily Traction, facilitate that production line is longer, prefabricated component more in the case of use, particularly prefabricated component travelling bogie and The docking of boom hoisting platform is fixing and is accurately positioned, can be accurate by orbital docking easily so that it is can be smooth Ground smoothly transits walking on boom hoisting platform and bogey.
Another technical scheme of the present utility model is on above-mentioned basis, and described first driving means is for driving Dynamic motor or driving motor;Or described road wheel is track rolling wheel or pneumatic tire.So, first drive When dynamic device is for driving motor or driving motor, prefabricated component travelling bogie controls simple, and technology realizes difficulty Spend relatively low, it is simple to operative;Described road wheel is track rolling wheel or pneumatic tire, then can basis Practical situation selects road wheel, it is possible to relatively easily meet the application in various different place.
Another technical scheme of the present utility model is that, on above-mentioned basis, the end of described carrying platform is also Being provided with partition deployment mechanism, described partition deployment mechanism is used for depositing preform production line and cuts off.So, After the end of bogey is additionally provided with partition deployment mechanism, during preform production, can be by fortune The transport of reinforcing bar, reinforced mesh, reinforcing bar or steel skeleton is made a reservation for by defeated dolly and partition deployment mechanism to production line Position, and put down one by one, so, advantageously reduce hand labor intensity, improve production efficiency, fall Low preform production cost.
Another technical scheme of the present utility model is on above-mentioned basis, described prefabricated component lifting trolley bag Including hanging apparatus and the second walking mechanism, described second walking mechanism is arranged on the bottom of hanging apparatus, described Hanging apparatus, including mast-up and hook assembly, described mast-up is cantilever design, and described hook assembly can The cantilever of described mast-up moves;Described second walking mechanism, including the second driving means and at least two Group lifting road wheel, described driving means drives at least a part of which one group lifting road wheel motion.So, use Above-mentioned cantilevered prefabricated component lifting trolley comes hoisting prefabricated part, tool compared with traditional driving or crane loading Having following advantage, sling height is low, range ability is little, simple to operate flexible and low power consumption and other advantages, with Time, using the self-propelled wheel-type mode operation across production line both sides, its work flow is short, and particularly it is along raw Produce the lifting of line direction and the operating type of movement so that it is in operation process, prefabricated component does not have and significantly puts Dynamic, can prevent lifting trolley from toppling, drastically increase the security performance of operation.
Another technical scheme of the present utility model is on above-mentioned basis, and described mast-up top is cantilever Frame, described cantilever shalving is provided with ceiling mounted tracks, and described hook assembly moves on described ceiling mounted tracks.This Sample, mast-up is provided with ceiling mounted tracks, and described hook assembly moves on ceiling mounted tracks on described, rises Good stability during device for hoisting hoisting prefabricated part, will not wave and topple, and has fully ensured that the safety of operation.With Time, owing to described mast-up top is cantilever shalving, the scope of such hook assembly movement on cantilever shalving can be big Width bottom mast-up, it is possible to achieve in the case of not moving bottom mast-up, carries out cantilever lifting, Improve lifting efficiency.
Another technical scheme of the present utility model is on above-mentioned basis, and described lifting road wheel is arranged on The bottom of described mast-up.So, when road wheel is arranged on the bottom of described mast-up, lifting trolley weight The heart is low, and it is along the lifting of production line direction and the operating type of movement so that it is in operation process, prefabricated Part does not have and significantly swings, and can prevent lifting trolley from toppling, improve the security performance of operation.
Another technical scheme of the present utility model is on above-mentioned basis, bottom described hanging apparatus End is provided with built-in fitting placement mechanism, and described built-in fitting placement mechanism is for placing produce needed for prefabricated component pre- Embedded part;Or at least side bottom described hanging apparatus is provided with limit mould fixed mechanism, described limit mould fixes machine Structure picks and places for limit mould.So, during preform production, can be by lifting trolley by reinforcing bar, steel Muscle mesh sheet, reinforcing bar, steel skeleton or limit mould transport to production line precalculated position, and are put down one by one, as This, advantageously reduce hand labor intensity, improves production efficiency, reduces preform production cost.
Another technical scheme of the present utility model is on above-mentioned basis, and described mast-up is inverted trapezoidal knot Structure, described mast-up is additionally provided with buttress brace, and described buttress brace forms multiple triangle with the skeleton of mast-up Shape structure.So, when mast-up is inverted trapezoidal structure, described mast-up is additionally provided with buttress brace, described When the skeleton of buttress brace and mast-up forms multiple triangular structure, significantly increase the stroke of boom hoisting, Make it lift by crane amplitude expanded, be conducive to lifting by crane the prefabricated component of ultra-wide, overlength;Further, triangular structure There is the most excellent stability so that it is be unlikely to deform in hoisting process.
Another technical scheme of the present utility model is on above-mentioned basis, the bottom of described mast-up or side Face is provided with counterweight device for hoisting.So, when the bottom of mast-up or side are provided with counterweight device for hoisting, Pass through counterweight so that the single-piece lifting weight of lifting trolley is greatly improved, meanwhile, its operation amplitude, Run span and the speed of service, stability and safety have also been obtained reinforcement further.
Another technical scheme of the present utility model is on above-mentioned basis, described hook assembly include suspension hook, Lifting rope and motor, described motor drives suspension hook to move up and down by lifting rope.So, use motor as lifting During actuating unit, hoisting prefabricated part controls simple, and it is relatively low that technology realizes difficulty, it is simple to operative.
Another technical scheme of the present utility model is that, on above-mentioned basis, described hook assembly includes two Suspension hook and two motors, said two suspension hook interval layout, two motors individually drive on two suspension hooks Lower movement;Or described hook assembly includes that two suspension hooks and a motor, said two suspension hook interval are arranged, Described motor drives two suspension hooks to move up and down.So, suspension hook interval is used to arrange, when hoisting prefabricated part, Can lift by flat condition, improve the translation stability of lifting trolley, be particularly prone to flat board and pile up, make plate body It is not easily susceptible to damage, and so that the relatively low height i.e. Liftable that lifts by crane of prefabricated component completes.
Another technical scheme of the present utility model is that, on above-mentioned basis, the bottom of described mast-up is extremely Few one end is provided with alignment pin or hole, location, described prefabricated component travelling bogie and prefabricated component lifting trolley by fixed Position pin or hole, location are fixed.So, at least one end in the bottom of mast-up is provided with alignment pin or hole, location After, prefabricated component travelling bogie and prefabricated component lifting trolley are fixed by alignment pin or hole, location, and prefabricated component lifts Dolly can connect traction with other traction apparatuss or multiple travelling bogie easily, facilitate production line longer, Using in the case of prefabricated component is more, particularly prefabricated component lifting trolley and the docking of prefabricated component travelling bogie is fixing And be accurately positioned, can be accurate by orbital docking easily so that it is can be successfully at boom hoisting platform and holding Carry and put the walking that smoothly transits.
Another technical scheme of the present utility model is on above-mentioned basis, and described second driving means is for driving Dynamic motor or driving motor;Or described lifting road wheel is track rolling wheel or pneumatic tire.So, institute State the second driving means for driving motor or driving motor;Prefabricated component lifting trolley controls simple, technology Realize difficulty relatively low, it is simple to operative;When described lifting road wheel is track rolling wheel or pneumatic tire, Then can select lifting road wheel according to practical situation, it is possible to relatively easily meet various different place Application.
Another technical scheme of the present utility model is on above-mentioned basis, described prefabricated component lifting trolley bag Including travelling platform and hanging apparatus, described travelling platform is arranged on the bottom of hanging apparatus, described travelling platform Lifting road wheel including two longitudinal mobile roof supports, the second driving means and at least two groups, described second drives Device drives at least a part of which one group lifting road wheel motion, and described lifting road wheel is arranged on described longitudinally walking The bottom of support;It is described that described hanging apparatus includes that mast-up and hook assembly, described hook assembly are arranged on The top of mast-up, the bottom of described mast-up is provided with lifting walking mechanism, and described lifting walking mechanism can The most described travelling platform moves, after described prefabricated component travelling bogie and prefabricated component lifting trolley dock and fix, Described lifting walking mechanism can move along described boom hoisting track.So, above-mentioned prefabricated component is used to lift Dolly carrys out hoisting prefabricated part, has the advantage that, sling height compared with traditional driving or crane loading Low, range ability is little, simple to operate flexibly and low power consumption and other advantages, so, use self-propelled wheel-type across The mode operation of production line both sides, its work flow is short, and particularly it is along the lifting of production line direction and movement Operating type so that it is in operation process, prefabricated component will not produce and significantly swing, and can prevent lifting trolley Topple, drastically increase the security performance of operation.And, lifting walking mechanism can be put down in the most described walking Platform moves, and hanging apparatus is not take up bogey surrounding space, improves the utilization rate in place, is conducive to pre- Product is lifted on bogey, and, the prefabricated component being lifted on bogey may also operate as counterweight Effect so that it is will not rock swing in lifting, transportation, stability is more preferable.And, lifting walking Mechanism can move by the most described travelling platform, and hanging apparatus is not take up bogey surrounding space, improves field The utilization rate on ground, beneficially prefabricated component is lifted on bogey, and, be lifted on bogey is pre- Product may also operate as the effect of counterweight so that it is will not rock swing, stability in lifting, transportation More preferably.
Another technical scheme of the present utility model is on above-mentioned basis, described mast-up be door type or Triangular structure.So, when mast-up is door type or triangular structure, triangular structure has very Excellent stability so that it is be unlikely to deform in hoisting process.
Another technical scheme of the present utility model is on above-mentioned basis, bottom described hanging apparatus End is provided with built-in fitting placement mechanism, and described built-in fitting placement mechanism is for placing produce needed for prefabricated component pre- Embedded part;And/or, at least side bottom described hanging apparatus is provided with limit mould fixed mechanism, and described limit mould is solid Determine mechanism's transhipment for limit mould.So, during preform production, can by lifting trolley by reinforcing bar, Reinforced mesh, reinforcing bar, steel skeleton or limit mould transport to production line precalculated position, and are put down one by one, So, advantageously reduce hand labor intensity, improve production efficiency, reduce preform production cost.
Another technical scheme of the present utility model is on above-mentioned basis, two described longitudinal mobile roof supports Being connected by least one vertical door-shaped frame, described door-shaped frame is higher than mast-up.So, door shape is used Framework connects as mobile roof support, can improve the stability in the large of prefabricated component lifting trolley, prevents it in lifting During deformed damaged.
Another technical scheme of the present utility model is on above-mentioned basis, described longitudinally walking frame upper Being provided with boom hoisting track, described lifting walking mechanism moves along described upper boom hoisting track.So, When longitudinally walking frame upper is provided with upper boom hoisting track, and described lifting walking mechanism is along described upper lifting Device track moves, during hoisting prefabricated part, after prefabricated component is lifted by boom hoisting, and Ke Yitong Crossing track to move to carrying platform, particularly it is along the lifting of production line direction and the operating type of movement, makes It is in operation process, and prefabricated component does not have and significantly swings, and can prevent lifting trolley from toppling, greatly carry The high security performance of operation.
Another technical scheme of the present utility model is on above-mentioned basis, and described lifting walking mechanism is rail Road formula scroll wheel.So, lifting walking mechanism is track rolling wheel, and reducible doing up hangs walking mechanism in-orbit Move forward and backward on road, it is not necessary to consider that the situation of direction skew occurs, reduce operation easier, improve peace Quan Xing.
Another technical scheme of the present utility model is on above-mentioned basis, described hook assembly include suspension hook, Lifting rope and motor, described motor drives suspension hook to move up and down by lifting rope.So, use motor as lifting During actuating unit, hoisting prefabricated part controls simple, and it is relatively low that technology realizes difficulty, it is simple to operative.
Another technical scheme of the present utility model is that, on above-mentioned basis, described hook assembly includes two Suspension hook and two motors, said two suspension hook interval layout, two motors individually drive on two suspension hooks Lower movement;Or described hook assembly includes that two suspension hooks and a motor, said two suspension hook interval are arranged, Described motor drives two suspension hooks to move up and down.So, suspension hook interval is used to arrange, when hoisting prefabricated part, Can lift by flat condition, improve the translation stability of lifting trolley, be particularly prone to flat board and pile up, make plate body It is not easily susceptible to damage, and so that the relatively low height i.e. Liftable that lifts by crane of prefabricated component completes.
Another technical scheme of the present utility model is that, on above-mentioned basis, the bottom of described mast-up is extremely Few one end is provided with alignment pin or hole, location.So, at least one end in the bottom of mast-up is provided with location Pin or location hole after, prefabricated component lifting trolley can easily with other traction apparatuss or multiple travelling bogie Connect traction, facilitate that production line is longer, prefabricated component more in the case of use, particularly prefabricated component lifting is little Car and the docking of prefabricated component travelling bogie are fixed and are accurately positioned, can be accurate by orbital docking easily so that it is Successfully can be smoothly transitted on boom hoisting platform and bogey walking.
Another technical scheme of the present utility model is on above-mentioned basis, and described second driving means is for driving Dynamic motor or driving motor;Or described lifting road wheel is track rolling wheel or pneumatic tire.So, When two driving means are for driving motor or driving motor, prefabricated component lifting trolley controls simple, and technology is real Existing difficulty is relatively low, it is simple to operative;Described lifting road wheel is track rolling wheel or pneumatic tire, then Road wheel can be selected, it is possible to relatively easily meet the application in various different place according to practical situation.
Accompanying drawing explanation
The accompanying drawing constituting a part of the present utility model is further appreciated by of the present utility model for providing, this The schematic description and description of utility model is used for explaining this utility model, is not intended that this practicality new The improper restriction of type.
Fig. 1 is the structure chart of the prefabricated component conveying arrangement involved by a kind of embodiment of this technology;
Fig. 2 is the structure chart of the prefabricated component conveying arrangement involved by this technology another embodiment;
Fig. 3 is a kind of embodiment of the prefabricated component lifting trolley shown in Fig. 1 in prefabricated component conveying arrangement Front view;
Fig. 4 is a kind of embodiment of the prefabricated component lifting trolley shown in Fig. 1 in prefabricated component conveying arrangement Side view;
Fig. 5 is partial enlarged drawing at the B of prefabricated component lifting trolley shown in Fig. 4;
Fig. 6 is the another embodiment of the prefabricated component lifting trolley shown in Fig. 2 in prefabricated component conveying arrangement Front view;
Fig. 7 is the another embodiment of the prefabricated component lifting trolley shown in Fig. 2 in prefabricated component conveying arrangement Side view;
Fig. 8 is another embodiment of the prefabricated component lifting trolley shown in Fig. 2 in prefabricated component conveying arrangement Front view;
Fig. 9 is a kind of embodiment of the prefabricated component travelling bogie shown in Fig. 1 in prefabricated component conveying arrangement Structure chart;
Figure 10 is the another embodiment of the prefabricated component travelling bogie shown in Fig. 1 in prefabricated component conveying arrangement Local structural graph;
Figure 11 is the front view of the prefabricated component conveying arrangement involved by this technology another embodiment;
Figure 12 is the another kind of embodiment party of the prefabricated component lifting trolley shown in Figure 11 in prefabricated component conveying arrangement The front view of formula;
Figure 13 is a kind of embodiment of the prefabricated component lifting trolley shown in Figure 11 in prefabricated component conveying arrangement Side view.
In figure:
1 hanging apparatus 11 mast-up 12 hook assembly
13 buttress brace 14 ceiling mounted tracks 20 second walking mechanisms
2 travelling platform 21 second driving means 22 lift road wheel
23 longitudinal mobile roof supports 24 lift by crane boom hoisting track in walking mechanism 221
3 door-shaped frames
101 cross-brace frame 102 longitudinal bracing frame 103 first driving means
104 road wheel 105 boom hoisting track 106 sliding rails
107 cut off deployment mechanism
Detailed description of the invention
Being described in detail this utility model below in conjunction with the accompanying drawings, the description of this part is only exemplary reconciliation The property released, should not have any restriction effect to protection domain of the present utility model.Additionally, people in the art Feature in embodiment in presents and in different embodiment, according to the description of presents, can be carried out by member Respective combination.
This utility model embodiment is as follows, refers to Fig. 1 to Figure 13, a kind of prefabricated component conveying arrangement, especially Can be used for the transport of prestressed slab, it includes prefabricated component travelling bogie, prefabricated component lifting trolley and walking track, Described prefabricated component travelling bogie and prefabricated component lifting trolley run on described walking track, and described prefabricated component is transported Defeated dolly is used for prefabricated component handling to described prefabricated for the transport of prefabricated component, described prefabricated component lifting trolley On part travelling bogie;Described prefabricated component travelling bogie, including bogey and the first walking mechanism, described One walking mechanism is arranged on the bottom of bogey, and described first walking mechanism, including the first driving means 103 At least two group road wheels 104, described first driving means 103 drives one group of road wheel 104 of at least a part of which Motion;The top of described bogey is provided with boom hoisting track 105.So, described prefabricated component transport Dolly and prefabricated component lifting trolley run on described walking track, and prefabricated component lifting trolley is for by prefabricated component Handling is on described prefabricated component travelling bogie, and prefabricated component travelling bogie and prefabricated component lifting trolley are on same track Run, decrease the lifting transhipment time, saved production line place area occupied, simultaneously by production line and thing Streamline integrates conllinear, not only solves material line floor space problem, and can also avoid occurring material to report to the leadship after accomplishing a task The problem of blocking.It addition, after the top of bogey is provided with boom hoisting track 105, boom hoisting Can move forward and backward along the track on bogey top, boom hoisting is not take up bogey surrounding space, carries The high utilization rate in place, beneficially prefabricated component are lifted on bogey, and, it is lifted into bogey On prefabricated component may also operate as the effect of counterweight so that it is swing will not be rocked in lifting, transportation, Stability is more preferable.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figure 1, Figure 2, Fig. 9 Shown in Figure 10, described bogey can include two longitudinal bracing framves 102 and at least two cross-brace Frame 101, the two ends of described cross-brace frame 101 are connected with described two longitudinal bracing framves 102 respectively.This Sample, when bogey includes two longitudinal bracing framves 102 and at least two cross-brace framves 101, described horizontal stroke When being connected with described two longitudinal bracing framves 102 respectively to the two ends of bracing frame 101, will be pre-at boom hoisting After product lifts and is placed on bogey, contacting between prefabricated component with bogey is linear contact lay, no But save weight and the material of bogey, also can lay according to its force way, effectively prevent prefabricated component Fracture damage.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figure 1, Figure 2, Fig. 9 Shown in Figure 10, described road wheel 104 can be arranged on the bottom of described longitudinal bracing frame 102.So, When road wheel 104 is arranged on the bottom of described longitudinal bracing frame 102, bogey and the load of prefabricated component Can be handed on road wheel by straight-line transmitting, decrease the moment of torsion of road wheel wheel shaft, can prevent it from making in big load Use lower deformed damaged.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figure 1, Figure 2 and Fig. 9 Shown in, described cross-brace frame 101 can be arch or trapezoidal.So, when cross-brace frame 101 is for encircleing Shape or trapezoidal time, its arch or trapezoidal bottom be reserved with certain space, and such prefabricated component travelling bogie exists In running, can directly stride across from prefabricated component.
On the basis of above-described embodiment, in another embodiment of this utility model, described bogey is arranged Having adjusting means, described adjusting means is for regulating the length of bogey.So, when setting on bogey It is equipped with adjusting means, when described adjusting means is for regulating the length of bogey, for the difference of prefabricated component Length dimension, can be adapted therewith by the length adjusting bogey, facilitate application.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Fig. 1 and Fig. 9, Described adjusting means can be the sliding rail 106 being arranged on described longitudinal bracing frame 102, described laterally Bracing frame 101 is slidably connected with described longitudinal bracing frame 102 by sliding rail 106, described sliding rail 106 are arranged on the inner side of longitudinal bracing frame 102 relative to described boom hoisting track 105.So, pass through Sliding rail 106 regulates, and easy to operate simple, the amplitude of accommodation is easily controlled, and is conducive to improving in advance The security reliability of product travelling bogie.
On the basis of above-described embodiment, in another embodiment of this utility model, described adjusting means is for arranging Multiple locating grooves on described longitudinal bracing frame 102, described cross-brace frame 101 passes through locating groove It is connected with described longitudinal bracing frame 102.So, when regulating device is for being arranged on described longitudinal bracing frame 102 Multiple locating grooves, described cross-brace frame 101 is by locating groove with described longitudinal bracing frame 102 even When connecing, fixed with cross-brace frame 101 location by locating groove, easy to operate simple, be conducive to Improve the security reliability of prefabricated component travelling bogie.
On the basis of above-described embodiment, in another embodiment of this utility model, described longitudinal bracing frame 102 At least one end can be provided with alignment pin or location hole.So, at least one end of longitudinal bracing frame 102 After being provided with alignment pin or hole, location, prefabricated component travelling bogie can easily with other traction apparatuss or many Individual travelling bogie connects traction, facilitate that production line is longer, prefabricated component more in the case of use, the most in advance Product travelling bogie and the docking of boom hoisting platform are fixed and are accurately positioned, can be accurate by orbital docking easily Really so that it is can successfully smoothly transit on boom hoisting platform and bogey walking.
On the basis of above-described embodiment, in another embodiment of this utility model, described first driving means 103 Can be to drive motor or drive motor;Or described road wheel 104 is track rolling wheel or pneumatic tire. So, when the first driving means 103 is for driving motor or driving motor, prefabricated component travelling bogie controls simple Easy, it is relatively low that technology realizes difficulty, it is simple to operative;Described road wheel 104 for track rolling wheel or Pneumatic tire, then can select road wheel according to practical situation, it is possible to relatively easily meets various difference The application in place.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figure 10, hold described in The end of carrying platform is also provided with cutting off deployment mechanism 107, and described partition deployment mechanism 107 is used for depositing Put preform production line to cut off.So, after the end of bogey is additionally provided with partition deployment mechanism 107, During preform production, can by travelling bogie and cut off deployment mechanism 107 by reinforcing bar, reinforced mesh, Reinforcing bar or steel skeleton transport to production line precalculated position, and are put down one by one, so, advantageously reduce Hand labor intensity, improves production efficiency, reduces preform production cost.
On the basis of above-described embodiment, in another embodiment of this utility model, as is illustrated by figs. 11 and 12, Described prefabricated component lifting trolley can include hanging apparatus 1 and the second walking mechanism 20, described second vehicle with walking machine Structure 20 is arranged on the bottom of hanging apparatus 1, and described hanging apparatus 1, including mast-up 11 and hook assembly 12, described mast-up 11 is cantilever design, and described hook assembly 12 can be on the cantilever of described mast-up 11 Mobile;Can be provided with ceiling mounted tracks 14 on described cantilever, described hook assembly 12 is on ceiling mounted tracks 14 Run, described second walking mechanism 20, lift road wheel 22 including the second driving means 21 and at least two groups, Described driving means drives at least a part of which one group lifting road wheel 22 to move.So, use above-mentioned cantilevered pre- Product lifting trolley carrys out hoisting prefabricated part, has the advantage that compared with traditional driving or crane loading, Sling height is low, range ability is little, simple to operate flexible and low power consumption and other advantages, meanwhile, uses wheeled From walking the mode operation across production line both sides, its work flow is short, and particularly it lifts by crane along production line direction Operating type with movement so that it is in operation process, prefabricated component does not have and significantly swings, and can prevent from hanging Dress dolly topples, and drastically increases the security performance of operation.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Figure 11, Figure 12 and Tu Shown in 13, described mast-up 11 top can be cantilever shalving, and described cantilever shalving is provided with ceiling mounted tracks 14, Described hook assembly 12 moves on described ceiling mounted tracks 14.So, mast-up 11 is provided with lifting rail Road 14, described hook assembly 12 moves on described ceiling mounted tracks 14, steady during the hoisting prefabricated part of boom hoisting Qualitative good, will not wave and topple, fully ensure that the safety of operation.Simultaneously as described mast-up 11 Top is cantilever shalving, and the scope of movement can be more than bottom mast-up 11 on cantilever shalving for such hook assembly 12 Width, it is possible to achieve in the case of not moving bottom mast-up 11, carry out cantilever lifting, improve lifting Efficiency.
On the basis of above-described embodiment, in another embodiment of this utility model, as is illustrated by figs. 11 and 12, Described lifting road wheel 22 can be arranged on the bottom of described mast-up 11.So, set when lifting road wheel Putting when the bottom of described mast-up 11, lifting trolley center of gravity is low, and it along the lifting of production line direction and moves Dynamic operating type so that it is in operation process, prefabricated component does not have and significantly swings, can prevent from lifting little Car topples, and improves the security performance of operation.
On the basis of above-described embodiment, in another embodiment of this utility model, bottom described hanging apparatus 1 One end can be provided with built-in fitting placement mechanism, described built-in fitting placement mechanism is used for placing production prefabricated component Required built-in fitting;Or at least side bottom described hanging apparatus 1 is provided with limit mould fixed mechanism, described Limit mould fixed mechanism picks and places for limit mould.So, during preform production, lifting trolley can be passed through Reinforcing bar, reinforced mesh, reinforcing bar, steel skeleton or limit mould are transported to production line precalculated position, and one by one will It puts down, and so, advantageously reduces hand labor intensity, improves production efficiency, reduces preform production and becomes This.
On the basis of above-described embodiment, in another embodiment of this utility model, as is illustrated by figs. 11 and 12, Described mast-up 11 can be inverted trapezoidal structure, and described mast-up 11 is additionally provided with buttress brace 13, described Buttress brace 13 forms multiple triangular structure with the skeleton of mast-up 11.So, when mast-up 11 is for falling ladder Shape structure, described mast-up 11 is additionally provided with buttress brace 13, described buttress brace 13 and mast-up 11 When skeleton forms multiple triangular structure, significantly increase the stroke of boom hoisting so that it is lifting amplitude obtains To expand, be conducive to lifting by crane the prefabricated component of ultra-wide, overlength;Further, triangular structure has the most excellent Stability so that it is be unlikely to deform in hoisting process.
On the basis of above-described embodiment, in another embodiment of this utility model, the bottom of described mast-up 11 Or side is also provided with counterweight device for hoisting.So, it is provided with hangs when bottom or the side of mast-up 11 During dress counter weight device, pass through counterweight so that the single-piece lifting weight of lifting trolley is greatly improved, with Time, its operation amplitude, operation span and the speed of service, stability and safety have also been obtained reinforcement further.
On the basis of above-described embodiment, in another embodiment of this utility model, described hook assembly 12 is permissible Including suspension hook, lifting rope and motor, described motor drives suspension hook to move up and down by lifting rope.So, electricity is used When machine is as lifting power machine structure, hoisting prefabricated part controls simple, and it is relatively low that technology realizes difficulty, it is simple to Operative.
On the basis of above-described embodiment, in another embodiment of this utility model, described hook assembly 12 is permissible Including two suspension hooks and two motors, said two suspension hook interval is arranged, two motors individually drive two Individual suspension hook moves up and down;Or described hook assembly 12 includes two suspension hooks and a motor, said two suspension hook Interval is arranged, described motor drives two suspension hooks to move up and down.So, use suspension hook interval to arrange, hanging During dress prefabricated component, can lift by flat condition, improve the translation stability of lifting trolley, be particularly prone to flat board Pile up, make plate body be not easily susceptible to damage, and so that the height i.e. Liftable that the lifting of prefabricated component is relatively low is complete Become.
On the basis of above-described embodiment, in another embodiment of this utility model, the bottom of described mast-up 11 At least one end be also provided with alignment pin or location hole, described prefabricated component travelling bogie and prefabricated component lifting Dolly is fixed by alignment pin or hole, location.So, at least one end in the bottom of mast-up 11 is provided with and determines After position pin or hole, location, prefabricated component travelling bogie and prefabricated component lifting trolley are fixed by alignment pin or hole, location, Prefabricated component lifting trolley can connect traction with other traction apparatuss or multiple travelling bogie easily, convenient In the case of production line is longer, prefabricated component is more, use, particularly prefabricated component lifting trolley and prefabricated component are transported Dolly docking is fixing and is accurately positioned, can be accurate by orbital docking easily so that it is can be successfully in lifting Smoothly transit on apparatus platform and bogey walking.
On the basis of above-described embodiment, in another embodiment of this utility model, described second driving means 21 Can be to drive motor or drive motor;Or described lifting road wheel 22 is track rolling wheel or inflated wheel Tire.So, described second driving means 21 is for driving motor or driving motor;Prefabricated component lifting trolley controls Simple, it is relatively low that technology realizes difficulty, it is simple to operative;Described lifting road wheel 22 rolls for rail mounted When driving wheel or pneumatic tire, then can select lifting road wheel 22 according to practical situation, it is possible to be relatively easy to Ground meets the application in various different place.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figures 1 to 4, Described prefabricated component lifting trolley can include that travelling platform 2 and hanging apparatus 1, described travelling platform 2 are arranged In the bottom of hanging apparatus 1, described travelling platform 2 includes that two longitudinal mobile roof supports 23, second drive dress Put 21 and at least two group lifting road wheel 22, described second driving means 21 drives at least a part of which one group lifting Road wheel 22 moves, and described lifting road wheel 22 is arranged on the bottom of described longitudinal mobile roof support 23;Described Hanging apparatus 1 includes that mast-up 11 and hook assembly 12, described hook assembly 12 are arranged on described mast-up The top of 11, the top of described mast-up 11 can be provided with ceiling mounted tracks 14, and described hook assembly is hanging Running on dress track 14, the bottom of described mast-up 11 is provided with lifting walking mechanism 24, described hanging Walk mechanism 24 can move by the most described travelling platform 2, when described prefabricated component travelling bogie and prefabricated component lift little After car docking is fixing, described lifting walking mechanism 24 can move along described boom hoisting track 105.So, Above-mentioned prefabricated component lifting trolley is used to come hoisting prefabricated part, tool compared with traditional driving or crane loading Having following advantage, sling height is low, range ability is little, simple to operate flexible and low power consumption and other advantages, this Sample, uses the self-propelled wheel-type mode operation across production line both sides, and its work flow is short, and particularly it is along raw Produce the lifting of line direction and the operating type of movement so that it is in operation process, prefabricated component will not produce significantly Swing, can prevent lifting trolley from toppling, drastically increase the security performance of operation.And, lifting walking Mechanism 24 can move by the most described travelling platform 2, and hanging apparatus 1 is not take up bogey surrounding space, carries The high utilization rate in place, beneficially prefabricated component are lifted on bogey, and, it is lifted into bogey On prefabricated component may also operate as the effect of counterweight so that it is swing will not be rocked in lifting, transportation, Stability is more preferable.And, lifting walking mechanism 24 can be moved by the most described travelling platform 2, hanging apparatus 1 It is not take up bogey surrounding space, improves the utilization rate in place, beneficially prefabricated component and be lifted into carrying dress Put, and, the prefabricated component being lifted on bogey may also operate as the effect of counterweight so that it is lifting, Will not rock swing in transportation, stability is more preferable.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figures 1 to 8, Described mast-up 11 can be door type or triangular structure.So, it is door type or three when mast-up 11 During angular structure, triangular structure has the most excellent stability so that it is be unlikely to deform in hoisting process.
On the basis of above-described embodiment, in another embodiment of this utility model, bottom described hanging apparatus 1 One end be also provided with built-in fitting placement mechanism, it is prefabricated that described built-in fitting placement mechanism is used for placing production Built-in fitting needed for part;And/or, at least side bottom described hanging apparatus 1 is provided with limit mould fixed mechanism, Described limit mould fixed mechanism is for the transhipment of limit mould.So, during preform production, can be by lifting Reinforcing bar, reinforced mesh, reinforcing bar, steel skeleton or limit mould are transported to production line precalculated position by dolly, and by Individual put down, so, advantageously reduce hand labor intensity, improve production efficiency, reduce prefabricated component raw Produce cost.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figure 2 and Figure 8, Article two, described longitudinal mobile roof support 23 can be connected by least one vertical door-shaped frame 3, described door shape frame Frame 3 is higher than mast-up 11.So, use door-shaped frame 3 to connect as mobile roof support, prefabricated component can be improved The stability in the large of lifting trolley, prevents its deformed damaged in hoisting process.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figure 1, Figure 2, Fig. 4, Shown in Fig. 5 and Fig. 8, described longitudinal mobile roof support 23 top can be provided with boom hoisting track 221, Described lifting walking mechanism 24 moves along described upper boom hoisting track 221.So, when longitudinal mobile roof support 23 tops are provided with boom hoisting track 221, and described lifting walking mechanism 24 is along described upper boom hoisting rail Road 221 moves, and during hoisting prefabricated part, after prefabricated component is lifted by boom hoisting, can pass through Track moves to carrying platform, and particularly it is along the lifting of production line direction and the operating type of movement so that it is In operation process, prefabricated component does not have and significantly swings, and can prevent lifting trolley from toppling, be greatly enhanced The security performance of operation.
On the basis of above-described embodiment, in another embodiment of this utility model, described lifting walking mechanism 24 It can be track rolling wheel.So, lifting walking mechanism 24 is track rolling wheel, reducible does up hanging Walk mechanism 24 to move forward and backward in orbit, it is not necessary to consider that the situation of direction skew occurs, reduce operation difficulty Degree, improves safety.
On the basis of above-described embodiment, in another embodiment of this utility model, the bottom of described mast-up 11 At least one end can be provided with alignment pin or location hole.So, at least one end of the bottom of mast-up 11 After being provided with alignment pin or hole, location, prefabricated component lifting trolley can easily with other traction apparatuss or many Individual travelling bogie connects traction, facilitate that production line is longer, prefabricated component more in the case of use, the most in advance Product lifting trolley and the docking of prefabricated component travelling bogie are fixed and are accurately positioned, can be easily by orbital docking Accurately so that it is can successfully smoothly transit on boom hoisting platform and bogey walking.
On the basis of above-described embodiment, in another embodiment of this utility model, described second driving means 21 Can be to drive motor or drive motor;Or described lifting road wheel 22 is track rolling wheel or inflated wheel Tire.So, when the second driving means 21 can be to drive motor or drive motor, prefabricated component lifting trolley control Making simple, it is relatively low that technology realizes difficulty, it is simple to operative;Described lifting road wheel 22 is rail mounted Scroll wheel or pneumatic tire, then can select lifting road wheel according to practical situation, it is possible to relatively easily Meet the application in various different place.
The above is only preferred implementation of the present utility model, it is noted that for the art For those of ordinary skill, on the premise of without departing from this utility model principle, it is also possible to make some improvement And retouching, these improvements and modifications also should be regarded as protection domain of the present utility model.

Claims (30)

1. a prefabricated component conveying arrangement, it is characterized in that: include prefabricated component travelling bogie, prefabricated component lifting trolley and walking track, described prefabricated component travelling bogie and prefabricated component lifting trolley run on described walking track, described prefabricated component travelling bogie is used for prefabricated component handling to described prefabricated component travelling bogie for the transport of prefabricated component, described prefabricated component lifting trolley;
Described prefabricated component travelling bogie, including bogey and the first walking mechanism, described first walking mechanism is arranged on the bottom of bogey, described first walking mechanism, including the first driving means and at least two group road wheels, described first driving means drives one group of road wheel motion of at least a part of which;The top of described bogey is provided with boom hoisting track.
Prefabricated component conveying arrangement the most according to claim 1, it is characterised in that described bogey includes two longitudinal bracing framves and at least two cross-brace framves, the two ends of described cross-brace frame are connected with described two longitudinal bracing framves respectively.
Prefabricated component conveying arrangement the most according to claim 2, it is characterised in that described road wheel is arranged on the bottom of described longitudinal bracing frame.
Prefabricated component conveying arrangement the most according to claim 2, it is characterised in that described cross-brace frame is arch or trapezoidal.
Prefabricated component conveying arrangement the most according to claim 2, it is characterised in that be provided with adjusting means on described bogey, described adjusting means is for regulating the length of bogey.
Prefabricated component conveying arrangement the most according to claim 5, it is characterized in that, described adjusting means is the sliding rail being arranged on described longitudinal bracing frame, described cross-brace frame is slidably connected with described longitudinal bracing frame by sliding rail, and described sliding rail is arranged on the inner side of longitudinal bracing frame relative to described boom hoisting track.
Prefabricated component conveying arrangement the most according to claim 5, it is characterised in that described adjusting means is the multiple locating grooves being arranged on described longitudinal bracing frame, described cross-brace frame is connected with described longitudinal bracing frame by locating groove.
Prefabricated component conveying arrangement the most according to claim 2, it is characterised in that at least one end of described longitudinal bracing frame is provided with alignment pin or hole, location.
Prefabricated component conveying arrangement the most according to claim 1, it is characterised in that described first driving means is for driving motor or driving motor;Or described road wheel is track rolling wheel or pneumatic tire.
Prefabricated component conveying arrangement the most according to any one of claim 1 to 9, it is characterised in that the end of described carrying platform is additionally provided with partition deployment mechanism, described partition deployment mechanism is used for depositing preform production line and cuts off.
11. prefabricated component conveying arrangements according to any one of claim 1 to 9, it is characterized in that, described prefabricated component lifting trolley includes hanging apparatus and the second walking mechanism, described second walking mechanism is arranged on the bottom of hanging apparatus, described hanging apparatus, including mast-up and hook assembly, described mast-up is cantilever design, and described hook assembly can move on the cantilever of described mast-up;Described second walking mechanism, lifts road wheel including the second driving means and at least two groups, and described driving means drives at least a part of which one group lifting road wheel motion.
12. prefabricated component conveying arrangements according to claim 11, it is characterised in that described mast-up top is cantilever shalving, described cantilever shalving is provided with ceiling mounted tracks, and described hook assembly moves on described ceiling mounted tracks.
13. prefabricated component conveying arrangements according to claim 11, it is characterised in that described lifting road wheel is arranged on the bottom of described mast-up.
14. prefabricated component conveying arrangements according to claim 11, it is characterised in that the one end bottom described hanging apparatus is provided with built-in fitting placement mechanism, described built-in fitting placement mechanism is for placing the built-in fitting produced needed for prefabricated component;Or at least side bottom described hanging apparatus is provided with limit mould fixed mechanism, described limit mould fixed mechanism picks and places for limit mould.
15. prefabricated component conveying arrangements according to claim 11, it is characterised in that described mast-up is inverted trapezoidal structure, described mast-up is additionally provided with buttress brace, and described buttress brace forms multiple triangular structure with the skeleton of mast-up.
16. prefabricated component conveying arrangements according to claim 11, it is characterised in that bottom or the side of described mast-up are provided with counterweight device for hoisting.
17. prefabricated component conveying arrangements according to claim 11, it is characterised in that described hook assembly includes suspension hook, lifting rope and motor, described motor drives suspension hook to move up and down by lifting rope.
18. prefabricated component conveying arrangements according to claim 17, it is characterised in that described hook assembly includes that two suspension hooks and two motors, said two suspension hook interval are arranged, two motors individually drive two suspension hooks to move up and down;Or described hook assembly includes that two suspension hooks and a motor, said two suspension hook interval are arranged, described motor drives two suspension hooks to move up and down.
19. prefabricated component conveying arrangements according to claim 11, it is characterised in that at least one end of the bottom of described mast-up is provided with alignment pin or hole, location, described prefabricated component travelling bogie and prefabricated component lifting trolley and is fixed by alignment pin or hole, location.
20. prefabricated component conveying arrangements according to claim 11, it is characterised in that described second driving means is for driving motor or driving motor;Or described lifting road wheel is track rolling wheel or pneumatic tire.
21. prefabricated component conveying arrangements according to any one of claim 1 to 9, it is characterized in that, described prefabricated component lifting trolley includes travelling platform and hanging apparatus, described travelling platform is arranged on the bottom of hanging apparatus, described travelling platform includes two longitudinal mobile roof supports, the second driving means and at least two groups lifting road wheel, described second driving means drives at least a part of which one group lifting road wheel motion, and described lifting road wheel is arranged on the bottom of described longitudinal mobile roof support;Described hanging apparatus includes mast-up and hook assembly, described hook assembly is arranged on the top of described mast-up, the bottom of described mast-up is provided with lifting walking mechanism, described lifting walking mechanism can be moved by the most described travelling platform, after described prefabricated component travelling bogie and prefabricated component lifting trolley dock and fix, described lifting walking mechanism can move along described boom hoisting track.
22. prefabricated component conveying arrangements according to claim 21, it is characterised in that described mast-up is door type or triangular structure.
23. prefabricated component conveying arrangements according to claim 21, it is characterised in that the one end bottom described hanging apparatus is provided with built-in fitting placement mechanism, described built-in fitting placement mechanism is for placing the built-in fitting produced needed for prefabricated component;And/or, at least side bottom described hanging apparatus is provided with limit mould fixed mechanism, and described limit mould fixed mechanism is for the transhipment of limit mould.
24. prefabricated component conveying arrangements according to claim 21, it is characterised in that two described longitudinal mobile roof supports are connected by least one vertical door-shaped frame, and described door-shaped frame is higher than mast-up.
25. prefabricated component conveying arrangements according to claim 21, it is characterised in that described longitudinally walking frame upper is provided with boom hoisting track, and described lifting walking mechanism moves along described upper boom hoisting track.
26. prefabricated component conveying arrangements according to claim 25, it is characterised in that described lifting walking mechanism is track rolling wheel.
27. prefabricated component conveying arrangements according to claim 21, it is characterised in that described hook assembly includes suspension hook, lifting rope and motor, described motor drives suspension hook to move up and down by lifting rope.
28. prefabricated component conveying arrangements according to claim 27, it is characterised in that described hook assembly includes that two suspension hooks and two motors, said two suspension hook interval are arranged, two motors individually drive two suspension hooks to move up and down;Or described hook assembly includes that two suspension hooks and a motor, said two suspension hook interval are arranged, described motor drives two suspension hooks to move up and down.
29. prefabricated component conveying arrangements according to claim 21, it is characterised in that at least one end of the bottom of described mast-up is provided with alignment pin or hole, location.
30. prefabricated component conveying arrangements according to claim 21, it is characterised in that described second driving means is for driving motor or driving motor;Or described lifting road wheel is track rolling wheel or pneumatic tire.
CN201620096945.2U 2016-01-29 2016-01-29 Prefab conveyer Expired - Fee Related CN205526360U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620096945.2U CN205526360U (en) 2016-01-29 2016-01-29 Prefab conveyer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620096945.2U CN205526360U (en) 2016-01-29 2016-01-29 Prefab conveyer

Publications (1)

Publication Number Publication Date
CN205526360U true CN205526360U (en) 2016-08-31

Family

ID=56773549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620096945.2U Expired - Fee Related CN205526360U (en) 2016-01-29 2016-01-29 Prefab conveyer

Country Status (1)

Country Link
CN (1) CN205526360U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638654A (en) * 2016-12-27 2017-05-10 宁波二十冶建设有限公司 Slippage type hoisting bracket and construction method thereof
CN114291518A (en) * 2022-01-05 2022-04-08 中国船舶重工集团公司七五0试验场 Loading and carrying device
CN114291518B (en) * 2022-01-05 2024-04-30 中国船舶重工集团公司七五0试验场 Filling and carrying device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638654A (en) * 2016-12-27 2017-05-10 宁波二十冶建设有限公司 Slippage type hoisting bracket and construction method thereof
CN114291518A (en) * 2022-01-05 2022-04-08 中国船舶重工集团公司七五0试验场 Loading and carrying device
CN114291518B (en) * 2022-01-05 2024-04-30 中国船舶重工集团公司七五0试验场 Filling and carrying device

Similar Documents

Publication Publication Date Title
US20210332533A1 (en) Novel track layer for urban track traffic engineering and its construction method
CN207498755U (en) A kind of traveling trolley adjusted with horizontal extension and vertical supporting
CN105668163A (en) Prefabricated part production and transportation system
CN105645057A (en) Prefabricated part production and transportation system
CN111502293B (en) Method and system for hoisting single peripheral component of assembly type building
CN102913260A (en) Quick duct piece pouring and transporting mechanism for subway shield tunnel construction
CN105501872A (en) Prefabricated part production and conveying system
CN205739198U (en) A kind of preform production transportation system
CN205526359U (en) Prefab conveyer
KR101160273B1 (en) Straddle carrier for bridge construction
CN205526360U (en) Prefab conveyer
CN205418901U (en) Prefab conveyer
CN205574936U (en) Prefab conveyer
CN203033294U (en) Container wood floor automatic material trimming and feeding conveying device
CN205574940U (en) Prefab conveyer
CN110065783B (en) Track crossing type transport vehicle
KR101373098B1 (en) Construction appratus for composit truss free cantilever bridge and construction method of composit truss free cantilever bridge using the same
CN105480662A (en) Fabricated part production and transport system
CN205526358U (en) Prefab production conveyor system
CN207469856U (en) Vehicle conveying equipment
CN205471273U (en) Prefab production conveyor system
CN106744244A (en) Many lifting component machines
CN202937278U (en) Rapid duct piece back conveying mechanism for subway shield tunnel construction
CN111661768B (en) Method and system for hoisting multiple peripheral components of assembly type building
CN205526362U (en) Prefab travelling bogie

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Zhongmin Zhuyou Technology Investment Co.,Ltd.

Assignor: Zhongmin Zhuyou Co.,Ltd.

Contract record no.: 2017430000027

Denomination of utility model: Prefab conveyer

Granted publication date: 20160831

License type: Exclusive License

Record date: 20171222

EC01 Cancellation of recordation of patent licensing contract
EC01 Cancellation of recordation of patent licensing contract

Assignee: Zhongmin Zhuyou Technology Investment Co.,Ltd.

Assignor: Zhongmin Zhuyou Co.,Ltd.

Contract record no.: 2017430000027

Date of cancellation: 20180801

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: China Civil Architecture Friends Technology (Jiaozhou) Co.,Ltd.

Assignor: Zhongmin Zhuyou Technology Investment Co.,Ltd.

Contract record no.: 2018430000023

Denomination of utility model: Prefab conveyer

Granted publication date: 20160831

License type: Common License

Record date: 20190102

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160831