CN205526358U - Prefab production conveyor system - Google Patents

Prefab production conveyor system Download PDF

Info

Publication number
CN205526358U
CN205526358U CN201620096604.5U CN201620096604U CN205526358U CN 205526358 U CN205526358 U CN 205526358U CN 201620096604 U CN201620096604 U CN 201620096604U CN 205526358 U CN205526358 U CN 205526358U
Authority
CN
China
Prior art keywords
prefabricated component
lifting
preform production
track
production transportation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620096604.5U
Other languages
Chinese (zh)
Inventor
俞大有
彭海辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Minsheng Zhuyou Co Ltd
Original Assignee
China Minsheng Zhuyou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Minsheng Zhuyou Co Ltd filed Critical China Minsheng Zhuyou Co Ltd
Priority to CN201620096604.5U priority Critical patent/CN205526358U/en
Application granted granted Critical
Publication of CN205526358U publication Critical patent/CN205526358U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a prefab production conveyor system, including at least one prefab production supply line, prefab production supply line includes prefab travelling bogie, prefab hoisting trolley and walking track, prefab travelling bogie and prefab hoisting trolley are in move on the walking track, the prefab travelling bogie is used for the transportation of prefab, prefab hoisting trolley is used for arriving the prefab handling on the prefab travelling bogie, the prefab travelling bogie includes and bears the weight of a device and a running gear, a running gear sets up in the bottom of bearing the weight of the device, a running gear, including a drive arrangement and at least two sets of walking wheel, drive arrangement drive is the motion of at least a set of walking wheel wherein, the top of bearing the device is provided with the hoisting accessory track. Like this, reduced the hoist and mount transportation time, practiced thrift production line place area occupied.

Description

A kind of preform production transportation system
Technical field
This utility model relates to construction engineering technical field, particularly to a kind of preform production transportation system.
Background technology
Along with the development of building trade, current various precast concretes have been widely used in various building.Mesh Front prefabricated components production and transport system uses production line, component conveying line and reinforcing bar to transport separate mode mostly.This prefabricated The feature of component production and transport system is: will arrange 4 production lines in a standdle carrier, and transport at production line intermediate layout component Defeated railway line, is transferred to stockyard for component.The advantage of this prefabricated components production and transport system is: layout is relatively easy, pipe Manage relatively easy.But existing and produce interval floor space relatively greatly, prefabricated part hanging needs to stride across material flow line, production line, lifting The problems such as the time is longer.Therefore, design and a kind of lift the preform production transportation system that efficiency is high, floor space is little, become this Skilled person is badly in need of solving the technical problem that.
Summary of the invention
This utility model solves the technical problem that and is: providing a kind of preform production transportation system, it can improve prefabricated component Lifting efficiency, save place area occupied.
Solution of the present utility model is achieved in that a kind of preform production transportation system, including at least one Preform production supply line, described preform production supply line includes prefabricated component travelling bogie, prefabricated component lifting trolley and walking Track, described prefabricated component travelling bogie and prefabricated component lifting trolley run on described walking track, and the transport of described prefabricated component is little Car is used for prefabricated component handling to described prefabricated component travelling bogie for the transport of prefabricated component, described prefabricated component lifting trolley; Described prefabricated component travelling bogie, including bogey and the first walking mechanism, described first walking mechanism is arranged on bogey Bottom, described first walking mechanism, including the first driving means and at least two group road wheels, described first driving means drives One group of road wheel motion of at least a part of which;The top of described bogey is provided with boom hoisting track.So, described prefabricated component is raw Produce supply line and include prefabricated component travelling bogie, prefabricated component lifting trolley and walking track, described prefabricated component travelling bogie and prefabricated Part lifting trolley runs on described walking track, and prefabricated component lifting trolley is for transporting prefabricated component handling to described prefabricated component On dolly, prefabricated component travelling bogie and prefabricated component lifting trolley run on same track, decrease the lifting transhipment time, save Production line place area occupied, integrates conllinear by production line and material flow line simultaneously, not only solves material line floor space problem, and And can also avoid occur material report to the leadship after accomplishing a task blocking problem.It addition, after the top of bogey is provided with boom hoisting track, Boom hoisting can move forward and backward along the track on bogey top, and boom hoisting is not take up bogey surrounding space, improves The utilization rate in place, beneficially prefabricated component are lifted on bogey, and, the prefabricated component being lifted on bogey also may be used To play the effect of counterweight so that it is will not rock swing in lifting, transportation, stability is more preferable.Additionally, prefabricated component lifting Dolly only takes up walking track width or the width wider than walking track, compared with traditional purlin car lifting, in equal face In long-pending place, at least can improve the production line of 50 percent production capacity, the utilization rate in place is greatly improved, be conducive to Prefabricated component is lifted on prefabricated component travelling bogie.
Another technical scheme of the present utility model is on above-mentioned basis, and described bogey includes that two longitudinal directions are propped up Support and at least two cross-brace framves, the two ends of described cross-brace frame are connected with described two longitudinal bracing framves respectively.This Sample, when bogey includes two longitudinal bracing framves and at least two cross-brace framves, the two ends of described cross-brace frame are respectively When being connected with described two longitudinal bracing framves, after prefabricated component is lifted and is placed on bogey by boom hoisting, prefabricated component It is linear contact lay with contacting between bogey, has not only saved weight and the material of bogey, also can be according to its stress side Formula is laid, and effectively prevents prefabricated component from fractureing damage.
Another technical scheme of the present utility model is that, on above-mentioned basis, described road wheel is arranged on described longitudinal direction and props up The bottom of support.So, when road wheel is arranged on the bottom of described longitudinal bracing frame, the load of bogey and prefabricated component can It is handed on road wheel by straight-line transmitting, decreases the moment of torsion of road wheel wheel shaft, its deformed damaged under big load effect can be prevented.
Another technical scheme of the present utility model is on above-mentioned basis, and described cross-brace frame is arch or ladder Shape.So, when cross-brace frame be arch or trapezoidal time, its arch or trapezoidal bottom are reserved with certain space, the most pre- Product travelling bogie, in running, can directly stride across from prefabricated component.
Another technical scheme of the present utility model is on above-mentioned basis, and described bogey is provided with regulation dress Putting, described adjusting means is for regulating the length of bogey.So, when being provided with adjusting means on bogey, described tune When regulating device is for regulating the length of bogey, for the different length size of prefabricated component, can be by adjusting bogey Length adapt therewith, facilitate application.
Another technical scheme of the present utility model is on above-mentioned basis, and described adjusting means is described vertical for being arranged on Sliding rail on bracing frame, described cross-brace frame is slidably connected with described longitudinal bracing frame by sliding rail, described Sliding rail is arranged on the inner side of longitudinal bracing frame relative to described boom hoisting track.So, regulated by sliding rail, Easy to operate simple, the amplitude of accommodation is easily controlled, and is conducive to improving the security reliability of prefabricated component travelling bogie.
Another technical scheme of the present utility model is on above-mentioned basis, and described adjusting means is described vertical for being arranged on Multiple locating grooves on bracing frame, described cross-brace frame is connected with described longitudinal bracing frame by locating groove.So, When regulating device is the multiple locating grooves being arranged on described longitudinal bracing frame, described cross-brace frame passes through locating groove and institute When stating the connection of longitudinal bracing frame, fixed with cross-brace frame location by locating groove, easy to operate simple, be conducive to carrying The security reliability of high prefabricated component travelling bogie.
Another technical scheme of the present utility model is on above-mentioned basis, and at least one end of described longitudinal bracing frame sets It is equipped with alignment pin or hole, location.So, after at least one end of longitudinal bracing frame is provided with alignment pin or hole, location, prefabricated component is transported Defeated dolly can connect traction with other traction apparatuss or multiple travelling bogie easily, facilitates that production line is longer, prefabricated component Using in the case of more, particularly prefabricated component travelling bogie and the docking of boom hoisting platform is fixed and is accurately positioned, Ke Yifang Just orbital docking is accurate so that it is can successfully smoothly transit on boom hoisting platform and bogey walking.
Another technical scheme of the present utility model is on above-mentioned basis, and described first driving means is for driving motor Or driving motor;Or described road wheel is track rolling wheel or pneumatic tire.So, the first driving means for drive motor or When driving motor, prefabricated component travelling bogie controls simple, and it is relatively low that technology realizes difficulty, it is simple to operative;Described walking Take turns and take turns or pneumatic tire for track rolling, then can select road wheel according to practical situation, it is possible to relatively easily meet The application in various different places.
Another technical scheme of the present utility model is that, on above-mentioned basis, the end of described carrying platform is additionally provided with Cutting off deployment mechanism, described partition deployment mechanism is used for depositing preform production line and cuts off.So, in the end of bogey also After being provided with partition deployment mechanism, during preform production, travelling bogie can be passed through and cut off deployment mechanism by reinforcing bar, steel Muscle mesh sheet, reinforcing bar or steel skeleton transport to production line precalculated position, and are put down one by one, so, advantageously reduce artificial Labor intensity, improves production efficiency, reduces preform production cost.
Another technical scheme of the present utility model is on above-mentioned basis, and described prefabricated component lifting trolley includes lifting Device and the second walking mechanism, described second walking mechanism is arranged on the bottom of hanging apparatus, and described hanging apparatus, including lifting Frame and hook assembly, described mast-up is cantilever design, and described hook assembly can move on the cantilever of described mast-up;Described Second walking mechanism, lifts road wheel including the second driving means and at least two groups, and described driving means drives at least a part of which one Group lifting road wheel motion.So, use above-mentioned cantilevered prefabricated component lifting trolley come hoisting prefabricated part, with traditional driving or Crane loading is compared and is had the advantage that, sling height is low, range ability is little, simple to operate flexibly and energy consumption is low etc. excellent Point, meanwhile, uses the self-propelled wheel-type mode operation across production line both sides, and its work flow is short, and particularly it is along production line side To lifting and the operating type of movement so that it is in operation process, prefabricated component does not have and significantly swings, and can prevent lifting trolley Topple, drastically increase the security performance of operation.
Another technical scheme of the present utility model is on above-mentioned basis, and described mast-up top is cantilever shalving, institute Stating and be provided with ceiling mounted tracks on cantilever shalving, described hook assembly moves on described ceiling mounted tracks.So, mast-up is provided with Upper ceiling mounted tracks, described hook assembly moves on ceiling mounted tracks on described, good stability during boom hoisting hoisting prefabricated part, no Can wave and topple, fully ensure that the safety of operation.Simultaneously as described mast-up top is cantilever shalving, such suspension hook group The scope of movement can be more than the width bottom mast-up on cantilever shalving for part, it is possible to achieve situation about not moving bottom mast-up Under, carry out cantilever lifting, improve lifting efficiency.
Another technical scheme of the present utility model is on above-mentioned basis, described lifting road wheel be arranged on described in hang The bottom shelved.So, when road wheel is arranged on the bottom of described mast-up, lifting trolley center of gravity is low, and it is along producing The lifting of line direction and the operating type of movement so that it is in operation process, prefabricated component does not have and significantly swings, can prevent lifting Dolly topples, and improves the security performance of operation.
Another technical scheme of the present utility model is on above-mentioned basis, and the one end bottom described hanging apparatus is arranged Having built-in fitting placement mechanism, described built-in fitting placement mechanism is for placing the built-in fitting produced needed for prefabricated component;Or described lifting At least side of bottom of device is provided with limit mould fixed mechanism, and described limit mould fixed mechanism picks and places for limit mould.So, in advance In product production process, by lifting trolley, reinforcing bar, reinforced mesh, reinforcing bar, steel skeleton or limit mould can be transported to production line Precalculated position, and put down one by one, so, advantageously reduce hand labor intensity, improve production efficiency, reduce prefabricated component raw Produce cost.
Another technical scheme of the present utility model is on above-mentioned basis, and described mast-up is inverted trapezoidal structure, institute Stating and be additionally provided with buttress brace on mast-up, described buttress brace forms multiple triangular structure with the skeleton of mast-up.So, when hanging Shelving as inverted trapezoidal structure, described mast-up is additionally provided with buttress brace, described buttress brace is formed multiple with the skeleton of mast-up During triangular structure, significantly increase the stroke of boom hoisting so that it is lifting amplitude expanded, be conducive to lifting by crane ultra-wide, The prefabricated component of overlength;Further, triangular structure has the most excellent stability so that it is be unlikely to deform in hoisting process.
Another technical scheme of the present utility model is on above-mentioned basis, and the bottom of described mast-up or side are arranged There is counterweight device for hoisting.So, when the bottom of mast-up or side are provided with counterweight device for hoisting, counterweight is passed through so that hang The single-piece lifting weight of dress dolly is greatly improved, and meanwhile, it runs amplitude, runs span and the speed of service, stability Reinforcement further is have also been obtained with safety.
Another technical scheme of the present utility model is that, on above-mentioned basis, described hook assembly includes suspension hook, lifting rope And motor, described motor drives suspension hook to move up and down by lifting rope.So, when using motor as lifting power machine structure, lifting Prefabricated component controls simple, and it is relatively low that technology realizes difficulty, it is simple to operative.
Another technical scheme of the present utility model is on above-mentioned basis, described hook assembly include two suspension hooks and Two motors, said two suspension hook interval layout, two motors individually drive two suspension hooks to move up and down;Or described suspension hook Assembly includes that two suspension hooks and a motor, said two suspension hook interval are arranged, described motor drives two suspension hooks to move up and down. So, use suspension hook interval to arrange, when hoisting prefabricated part, can lift by flat condition, improve the translation stability of lifting trolley, Particularly it is prone to flat board pile up, makes plate body be not easily susceptible to damage, and so that the relatively low height i.e. Liftable of lifting of prefabricated component Complete.
Another technical scheme of the present utility model is on above-mentioned basis, at least one end of the bottom of described mast-up It is provided with alignment pin or hole, location, described prefabricated component travelling bogie and prefabricated component lifting trolley by alignment pin or location Kong Gu Fixed.So, after at least one end of the bottom of mast-up is provided with alignment pin or hole, location, prefabricated component travelling bogie and prefabricated component Lifting trolley is fixed by alignment pin or hole, location, prefabricated component lifting trolley can easily with other traction apparatuss or multiple Travelling bogie connects traction, facilitate that production line is longer, prefabricated component more in the case of use, particularly prefabricated component lifting trolley and The docking of prefabricated component travelling bogie is fixing and is accurately positioned, can be accurate by orbital docking easily so that it is can be successfully in lifting Smoothly transit on apparatus platform and bogey walking.
Another technical scheme of the present utility model is on above-mentioned basis, and described second driving means is for driving motor Or driving motor;Or described lifting road wheel is track rolling wheel or pneumatic tire.So, described second driving means is for driving Dynamic motor or driving motor;Prefabricated component lifting trolley controls simple, and it is relatively low that technology realizes difficulty, it is simple to operative;Institute Stating lifting road wheel is track rolling wheel or during pneumatic tire, then can select lifting road wheel, energy according to practical situation Enough application relatively easily meeting various different place.
Another technical scheme of the present utility model is on above-mentioned basis, and described prefabricated component lifting trolley includes walking Platform and hanging apparatus, described travelling platform is arranged on the bottom of hanging apparatus, and described travelling platform includes two longitudinally walkings Support, the second driving means and at least two groups lifting road wheel, described second driving means drives at least a part of which one group lifting row Travelling wheel moves, and described lifting road wheel is arranged on the bottom of described longitudinal mobile roof support;Described hanging apparatus include mast-up and Hook assembly, described hook assembly is arranged on the top of described mast-up, and the bottom of described mast-up is provided with lifting vehicle with walking machine Structure, described lifting walking mechanism can be moved by the most described travelling platform, when described prefabricated component travelling bogie and prefabricated component lift little After car docking is fixing, described lifting walking mechanism can move along described boom hoisting track.So, above-mentioned prefabricated component is used to hang The dress hoisting prefabricated part of dolly, has the advantage that compared with traditional driving or crane loading, sling height is low, run away from From little, simple to operate flexible and low power consumption and other advantages, so, use the self-propelled wheel-type mode operation across production line both sides, Its work flow is short, and particularly it is along the lifting of production line direction and the operating type of movement so that it is in operation process, prefabricated component Will not produce and significantly swing, can prevent lifting trolley from toppling, drastically increase the security performance of operation.And, play hanging Walking mechanism can move by the most described travelling platform, hanging apparatus is not take up bogey surrounding space, improves the utilization in place Rate, beneficially prefabricated component are lifted on bogey, and, the prefabricated component being lifted on bogey may also operate as counterweight Effect so that it is will not rock swing in lifting, transportation, stability is more preferable.And, lifting walking mechanism can be relatively described Travelling platform moves, and hanging apparatus is not take up bogey surrounding space, improves the utilization rate in place, beneficially prefabricated component and hangs Install on bogey, and, the prefabricated component being lifted on bogey may also operate as the effect of counterweight so that it is lifting, Will not rock swing in transportation, stability is more preferable.
Another technical scheme of the present utility model is on above-mentioned basis, and described mast-up is door type or triangle Structure.So, when mast-up is door type or triangular structure, triangular structure has the most excellent stability so that it is Hoisting process is unlikely to deform.
Another technical scheme of the present utility model is on above-mentioned basis, and the one end bottom described hanging apparatus is arranged Having built-in fitting placement mechanism, described built-in fitting placement mechanism is for placing the built-in fitting produced needed for prefabricated component;And/or, described At least side bottom hanging apparatus is provided with limit mould fixed mechanism, and described limit mould fixed mechanism is for the transhipment of limit mould.So, During preform production, can be by lifting trolley by the most raw for the transport of reinforcing bar, reinforced mesh, reinforcing bar, steel skeleton or limit mould Produce line precalculated position, and put down one by one, so, advantageously reduce hand labor intensity, improve production efficiency, reduce prefabricated Part production cost.
Another technical scheme of the present utility model is on above-mentioned basis, and two described longitudinal mobile roof supports are by least One vertical door-shaped frame connects, and described door-shaped frame is higher than mast-up.So, door-shaped frame is used to connect as walking Frame, can improve the stability in the large of prefabricated component lifting trolley, prevents its deformed damaged in hoisting process.
Another technical scheme of the present utility model is on above-mentioned basis, and described longitudinally walking frame upper is provided with Upper boom hoisting track, described lifting walking mechanism moves along described upper boom hoisting track.So, when on longitudinal mobile roof support Portion is provided with boom hoisting track, and described lifting walking mechanism moves, at hoisting prefabricated part along described upper boom hoisting track During, after prefabricated component is lifted by boom hoisting, can be moved to carrying platform by track, particularly it is along producing The lifting of line direction and the operating type of movement so that it is in operation process, prefabricated component does not have and significantly swings, can prevent lifting Dolly topples, and drastically increases the security performance of operation.
Another technical scheme of the present utility model is on above-mentioned basis, and described lifting walking mechanism is rail mounted rolling Driving wheel.So, lifting walking mechanism is track rolling wheel, and reducible doing up is hung walking mechanism and moved forward and backward in orbit, is not required to The situation of direction to be considered skew occurs, reduces operation easier, improves safety.
Another technical scheme of the present utility model is that, on above-mentioned basis, described hook assembly includes suspension hook, lifting rope And motor, described motor drives suspension hook to move up and down by lifting rope.So, when using motor as lifting power machine structure, lifting Prefabricated component controls simple, and it is relatively low that technology realizes difficulty, it is simple to operative.
Another technical scheme of the present utility model is on above-mentioned basis, described hook assembly include two suspension hooks and Two motors, said two suspension hook interval layout, two motors individually drive two suspension hooks to move up and down;Or described suspension hook Assembly includes that two suspension hooks and a motor, said two suspension hook interval are arranged, described motor drives two suspension hooks to move up and down. So, use suspension hook interval to arrange, when hoisting prefabricated part, can lift by flat condition, improve the translation stability of lifting trolley, Particularly it is prone to flat board pile up, makes plate body be not easily susceptible to damage, and so that the relatively low height i.e. Liftable of lifting of prefabricated component Complete.
Another technical scheme of the present utility model is on above-mentioned basis, at least one end of the bottom of described mast-up It is provided with alignment pin or hole, location.So, after at least one end of the bottom of mast-up is provided with alignment pin or hole, location, prefabricated Part lifting trolley can connect traction with other traction apparatuss or multiple travelling bogie easily, facilitates production line longer, pre- Using in the case of product is more, particularly prefabricated component lifting trolley and the docking of prefabricated component travelling bogie is fixed and is accurately positioned, Can be accurate by orbital docking easily so that it is can successfully smoothly transit on boom hoisting platform and bogey walking.
Another technical scheme of the present utility model is on above-mentioned basis, and described second driving means is for driving motor Or driving motor;Or described lifting road wheel is track rolling wheel or pneumatic tire.So, the second driving means is for driving horse When reaching or drive motor, prefabricated component lifting trolley controls simple, and it is relatively low that technology realizes difficulty, it is simple to operative;Described Lifting road wheel is track rolling wheel or pneumatic tire, then can select road wheel according to practical situation, it is possible to more hold Change places and meet the application in various different place.
Another technical scheme of the present utility model is on above-mentioned basis, and described preform production supply line also includes Preform production platform film, described preform production platform film is arranged in walking track.So, produce relative to topotype, use platform Molding makees prefabricated component, has mold clean, maintenance and easy to control, and preform production platform film is arranged in walking track, prefabricated Part lifting trolley and the mode operation across production line both sides of the prefabricated component travelling bogie, its work flow is short, and particularly it is along raw Produce the lifting of line direction and the operating type of movement so that it is in operation process, prefabricated component does not have and significantly swings, and can prevent from hanging Dress dolly topples, and drastically increases the security performance of operation;And prefabricated component lifting trolley is sling after prefabricated component, prefabricated component is relative Prefabricated component lifting trolley and prefabricated component travelling bogie do axis and move in parallel, and will not produce significantly to rotate and wave, improve The stability of system.
Another technical scheme of the present utility model is on above-mentioned basis, and described preform production transportation system includes Article two, preform production supply line more than, between described preform production supply line, spacing parallel arranging is arranged or continuous and parallel is arranged. So, prefabricated component lifting trolley only takes up walking track width or the width wider than walking track, rises with traditional purlin car Hang and compare, in the place of same homalographic, at least can improve the production line of 50 percent production capacity, place is greatly improved Utilization rate, beneficially prefabricated component is lifted on prefabricated component travelling bogie, and, prefabricated component lifting trolley is sling after prefabricated component, Prefabricated component may also operate as the effect of counterweight so that it is will not rock swing in lifting, transportation, stability is more preferable.
Another technical scheme of the present utility model is on above-mentioned basis, at least two adjacent described preform production At least one end of supply line is provided with ferry-boat track, and described ferry-boat track is provided with ferry-boat dolly, and the transport of described prefabricated component is little Car and/or prefabricated component lifting trolley carry out orbital transfer by ferry-boat dolly.So, raw at least two adjacent described prefabricated components At least one end producing supply line is provided with ferry-boat track, and described ferry-boat track is provided with ferry-boat dolly, and described prefabricated component transports Dolly and/or prefabricated component lifting trolley carry out orbital transfer by ferry-boat dolly so that prefabricated component travelling bogie and/or prefabricated component Lifting trolley carries out track Fast transforms by ferry-boat dolly, improves prefabricated component travelling bogie and the profit of prefabricated component lifting trolley By rate, reduce equipment cost.Simultaneously, it is possible to achieve a plurality of preform production supply line share a prefabricated component travelling bogie and Prefabricated component lifting trolley, reduce further equipment cost.
Another technical scheme of the present utility model is on above-mentioned basis, and the upper surface of described ferry-boat dolly is provided with and turns Fortune track, described transhipment track with walking track under predetermined state, the two end part aligning connecting and connecting.So, pendulum is worked as The upper surface crossing dolly is provided with transhipment track, and described transhipment track and walking track are under predetermined state, and the two connects and connects End part aligning, prefabricated component travelling bogie and/or prefabricated component lifting trolley can directly move to ferry-boat dolly by conveying track, Described prefabricated component travelling bogie and/or prefabricated component lifting trolley are locked on ferry-boat dolly during ferry-boat, it is achieved steady mistake Cross, fully ensured that the safety of production operation.
Accompanying drawing explanation
The accompanying drawing constituting a part of the present utility model is further appreciated by of the present utility model for providing, and this practicality is new The schematic description and description of type is used for explaining this utility model, is not intended that improper restriction of the present utility model.
Fig. 1 is the preform production supply line in the preform production transportation system involved by a kind of embodiment of this technology Structure chart;
Fig. 2 is the structure chart of the preform production transportation system involved by this technology another embodiment;
Fig. 3 is the master of a kind of embodiment of the prefabricated component lifting trolley shown in Fig. 1 in preform production transportation system View;
Fig. 4 is the side of a kind of embodiment of the prefabricated component lifting trolley shown in Fig. 1 in preform production transportation system View;
Fig. 5 is partial enlarged drawing at the B of prefabricated component lifting trolley shown in Fig. 4;
Fig. 6 is the another embodiment of the prefabricated component lifting trolley shown in Fig. 2 in preform production transportation system Front view;
Fig. 7 is the another embodiment of the prefabricated component lifting trolley shown in Fig. 2 in preform production transportation system Side view;
Fig. 8 is another embodiment of the prefabricated component lifting trolley shown in Fig. 2 in preform production transportation system Front view;
Fig. 9 is the knot of a kind of embodiment of the prefabricated component travelling bogie shown in Fig. 1 in preform production transportation system Composition;
Figure 10 is the another embodiment of the prefabricated component travelling bogie shown in Fig. 1 in preform production transportation system Local structural graph;
Figure 11 is the front view of the preform production transportation system involved by this technology another embodiment;
Figure 12 is the another embodiment of the prefabricated component lifting trolley shown in Figure 11 in preform production transportation system Front view;
Figure 13 is a kind of embodiment of the prefabricated component lifting trolley shown in Figure 11 in preform production transportation system Side view;
Figure 14 is the topology view of the preform production transportation system involved by this technology another embodiment.
In figure:
1 hanging apparatus 11 mast-up 12 hook assembly
13 buttress brace 14 ceiling mounted tracks 20 second walking mechanisms
2 travelling platform 21 second driving means 22 lift road wheel
23 longitudinal mobile roof supports 24 lift by crane boom hoisting track in walking mechanism 221
3 door-shaped frames
101 cross-brace frame 102 longitudinal bracing frame 103 first driving means
104 road wheel 105 boom hoisting track 106 sliding rails
107 cut off deployment mechanism
100 preform production supply line 200 preform production platform films
Track transported by 300 ferry-boat tracks 400 dollies 500 of ferrying
Detailed description of the invention
Being described in detail this utility model below in conjunction with the accompanying drawings, the description of this part is only exemplary and explanatory, Protection domain of the present utility model should there be is not any restriction effect.Additionally, those skilled in the art's retouching according to presents State, the feature in embodiment in presents and in different embodiment can be carried out respective combination.
This utility model embodiment is as follows, refers to Fig. 1 to Figure 13, a kind of preform production transportation system, the most available In the production and transport of prestressed slab, including a preform production supply line, described preform production supply line includes prefabricated component Travelling bogie, prefabricated component lifting trolley and walking track, described prefabricated component travelling bogie and prefabricated component lifting trolley are at described row Walking and run on track, described prefabricated component travelling bogie is for the transport of prefabricated component, and described prefabricated component lifting trolley is for by prefabricated Part handling is on described prefabricated component travelling bogie;Described prefabricated component travelling bogie, including bogey and the first walking mechanism, institute State the first walking mechanism and be arranged on the bottom of bogey, described first walking mechanism, including the first driving means 103 and at least Two groups of road wheels 104, described first driving means 103 drives one group of road wheel 104 of at least a part of which to move;Described bogey Top is provided with boom hoisting track 105.So, described preform production supply line includes prefabricated component travelling bogie, prefabricated component Lifting trolley and walking track, described prefabricated component travelling bogie and prefabricated component lifting trolley run, in advance on described walking track Product lifting trolley is for by prefabricated component handling to described prefabricated component travelling bogie, prefabricated component travelling bogie and prefabricated component lifting Dolly runs on same track, decrease lifting the transhipment time, saved production line place area occupied, simultaneously by production line with Material flow line integrate conllinear, not only solve material line floor space problem, and can also avoid occur material report to the leadship after accomplishing a task blocking ask Topic.It addition, after the top of bogey is provided with boom hoisting track 105, boom hoisting can be along bogey top Track moves forward and backward, and boom hoisting is not take up bogey surrounding space, improves the utilization rate in place, beneficially prefabricated component and hangs Install on bogey, and, the prefabricated component being lifted on bogey may also operate as the effect of counterweight so that it is lifting, Will not rock swing in transportation, stability is more preferable.Additionally, prefabricated component lifting trolley only takes up walking track width or ratio The width that walking track is the widest, compared with traditional purlin car lifting, in the place of same homalographic, at least can improve percent The production line of 50 production capacities, is greatly improved the utilization rate in place, beneficially prefabricated component and is lifted on prefabricated component travelling bogie.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figure 1, Figure 2, shown in Fig. 9 and Figure 10, Described bogey can include two longitudinal bracing framves 102 and at least two cross-brace framves 101, described cross-brace frame The two ends of 101 are connected with described two longitudinal bracing framves 102 respectively.So, two longitudinal bracing framves 102 are included when bogey Article at least two, cross-brace frame 101, the two ends of described cross-brace frame 101 are respectively with described two longitudinal bracing framves 102 even When connecing, after prefabricated component is lifted and is placed on bogey by boom hoisting, contacting between prefabricated component with bogey is Linear contact lay, has not only saved weight and the material of bogey, also can lay according to its force way, effectively prevent prefabricated component from rolling over Breakdown is bad.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figure 1, Figure 2, shown in Fig. 9 and Figure 10, Described road wheel 104 can be arranged on the bottom of described longitudinal bracing frame 102.So, it is arranged on described longitudinal direction when road wheel 104 During the bottom of bracing frame 102, the load of bogey and prefabricated component can be handed on road wheel by straight-line transmitting, decrease road wheel The moment of torsion of wheel shaft, can prevent its deformed damaged under big load effect.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figure 1, Figure 2 with shown in Fig. 9, described horizontal stroke Can be arch or trapezoidal to bracing frame 101.So, when cross-brace frame 101 be arch or trapezoidal time, its arch or trapezoidal Bottom is reserved with certain space, and such prefabricated component travelling bogie, in running, can directly stride across from prefabricated component.
On the basis of above-described embodiment, in another embodiment of this utility model, described bogey is provided with regulation Device, described adjusting means is for regulating the length of bogey.So, when being provided with adjusting means on bogey, described When adjusting means is for regulating the length of bogey, for the different length size of prefabricated component, can be by adjusting carrying dress The length put adapts therewith, facilitates application.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Fig. 1 and Fig. 9, described regulation dress Putting the sliding rail 106 that can be to be arranged on described longitudinal bracing frame 102, described cross-brace frame 101 passes through sliding rail 106 are slidably connected with described longitudinal bracing frame 102, and described sliding rail 106 is arranged on relative to described boom hoisting track 105 The inner side of longitudinal bracing frame 102.So, being regulated by sliding rail 106, easy to operate simple, the amplitude of accommodation is easy Control, be conducive to improving the security reliability of prefabricated component travelling bogie.
On the basis of above-described embodiment, in another embodiment of this utility model, described adjusting means is described for being arranged on Multiple locating grooves on longitudinal bracing frame 102, described cross-brace frame 101 is by locating groove and described longitudinal bracing frame 102 connect.So, when regulating device is the multiple locating grooves being arranged on described longitudinal bracing frame 102, described cross-brace frame 101 when being connected with described longitudinal bracing frame 102 by locating groove, by the fixing of locating groove and cross-brace frame 101 location, Easy to operate simple, be conducive to improving the security reliability of prefabricated component travelling bogie.
On the basis of above-described embodiment, in another embodiment of this utility model, at least the one of described longitudinal bracing frame 102 End can be provided with alignment pin or hole, location.So, at least one end at longitudinal bracing frame 102 is provided with alignment pin or hole, location After, prefabricated component travelling bogie can connect traction with other traction apparatuss or multiple travelling bogie easily, facilitates production line Using in the case of longer, prefabricated component is more, particularly prefabricated component travelling bogie and the docking of boom hoisting platform is fixing and accurate Location, can be accurate by orbital docking easily so that it is can successfully smoothly transit on boom hoisting platform and bogey Walking.
On the basis of above-described embodiment, in another embodiment of this utility model, described first driving means 103 can be Drive motor or drive motor;Or described road wheel 104 is track rolling wheel or pneumatic tire.So, the first driving means 103 for drive motor or drive motor time, prefabricated component travelling bogie control simple, it is relatively low that technology realizes difficulty, it is simple to work People operates;Described road wheel 104 is track rolling wheel or pneumatic tire, then can select road wheel according to practical situation, Can relatively easily meet the application in various different place.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figure 10, described carrying platform End is also provided with cutting off deployment mechanism 107, and described partition deployment mechanism 107 is used for depositing preform production line and cuts off. So, after the end of bogey is additionally provided with partition deployment mechanism 107, during preform production, can be by transport Reinforcing bar, reinforced mesh, reinforcing bar or steel skeleton are transported to production line precalculated position by dolly and partition deployment mechanism 107, and by Individual put down, so, advantageously reduce hand labor intensity, improve production efficiency, reduce preform production cost.
On the basis of above-described embodiment, in another embodiment of this utility model, as is illustrated by figs. 11 and 12, described prefabricated Part lifting trolley can include that hanging apparatus 1 and the second walking mechanism 20, described second walking mechanism 20 are arranged on hanging apparatus 1 Bottom, described hanging apparatus 1, including mast-up 11 and hook assembly 12, described mast-up 11 is cantilever design, described suspension hook Assembly 12 can move on the cantilever of described mast-up 11;Ceiling mounted tracks 14, described suspension hook group can be provided with on described cantilever Part 12 runs on ceiling mounted tracks 14, described second walking mechanism 20, lifts row including the second driving means 21 and at least two groups Travelling wheel 22, described driving means drives at least a part of which one group lifting road wheel 22 to move.So, above-mentioned cantilevered prefabricated component is used Lifting trolley carrys out hoisting prefabricated part, has the advantage that compared with traditional driving or crane loading, and sling height is low, operation Apart from little, simple to operate flexible and low power consumption and other advantages, meanwhile, the self-propelled wheel-type mode across production line both sides is used to make Industry, its work flow is short, and particularly it is along the lifting of production line direction and the operating type of movement so that it is in operation process, in advance Product does not have and significantly swings, and can prevent lifting trolley from toppling, drastically increase the security performance of operation.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figure 11, Figure 12 and Figure 13, institute Stating mast-up 11 top can be cantilever shalving, and described cantilever shalving is provided with ceiling mounted tracks 14, and described hook assembly 12 is described Move on ceiling mounted tracks 14.So, mast-up 11 being provided with ceiling mounted tracks 14, described hook assembly 12 is at described ceiling mounted tracks Move on 14, good stability during boom hoisting hoisting prefabricated part, will not wave and topple, fully ensured that the safety of operation.With Time, owing to described mast-up 11 top is cantilever shalving, the scope of movement can be more than lifting on cantilever shalving for such hook assembly 12 Width bottom frame 11, it is possible to achieve in the case of not moving bottom mast-up 11, carries out cantilever lifting, improves lifting effect Rate.
On the basis of above-described embodiment, in another embodiment of this utility model, as is illustrated by figs. 11 and 12, described lifting Road wheel 22 can be arranged on the bottom of described mast-up 11.So, it is arranged on the end of described mast-up 11 when lifting road wheel During portion, lifting trolley center of gravity is low, and it is along the lifting of production line direction and the operating type of movement so that it is in operation process, Prefabricated component does not have and significantly swings, and can prevent lifting trolley from toppling, improve the security performance of operation.
On the basis of above-described embodiment, in another embodiment of this utility model, the one end bottom described hanging apparatus 1 can To be provided with built-in fitting placement mechanism, described built-in fitting placement mechanism is for placing the built-in fitting produced needed for prefabricated component;Or institute Stating at least side bottom hanging apparatus 1 and be provided with limit mould fixed mechanism, described limit mould fixed mechanism picks and places for limit mould.This Sample, during preform production, can be transported reinforcing bar, reinforced mesh, reinforcing bar, steel skeleton or limit mould extremely by lifting trolley Production line precalculated position, and put down one by one, so, advantageously reduce hand labor intensity, improve production efficiency, reduce pre- Product production cost.
On the basis of above-described embodiment, in another embodiment of this utility model, as is illustrated by figs. 11 and 12, described lifting Frame 11 can be inverted trapezoidal structure, and described mast-up 11 is additionally provided with buttress brace 13, described buttress brace 13 and mast-up 11 Skeleton forms multiple triangular structure.So, when mast-up 11 is inverted trapezoidal structure, described mast-up 11 is additionally provided with reinforcement Beam 13, when the skeleton of described buttress brace 13 and mast-up 11 forms multiple triangular structure, significantly increases boom hoisting Stroke so that it is lifting amplitude expanded, is conducive to lifting by crane the prefabricated component of ultra-wide, overlength;Further, triangular structure has very Excellent stability so that it is be unlikely to deform in hoisting process.
On the basis of above-described embodiment, in another embodiment of this utility model, the bottom of described mast-up 11 or side It is also provided with counterweight device for hoisting.So, when the bottom of mast-up 11 or side are provided with counterweight device for hoisting, pass through Counterweight so that the single-piece lifting weight of lifting trolley is greatly improved, meanwhile, it runs amplitude, runs span and operation Speed, stability and safety have also been obtained reinforcement further.
On the basis of above-described embodiment, in another embodiment of this utility model, described hook assembly 12 can include hanging Hook, lifting rope and motor, described motor drives suspension hook to move up and down by lifting rope.So, use motor as lifting power machine structure Time, hoisting prefabricated part controls simple, and it is relatively low that technology realizes difficulty, it is simple to operative.
On the basis of above-described embodiment, in another embodiment of this utility model, described hook assembly 12 can include two Individual suspension hook and two motors, said two suspension hook interval layout, two motors individually drive two suspension hooks to move up and down;Or Described hook assembly 12 includes that two suspension hooks and a motor, said two suspension hook interval are arranged, described motor drives two and hangs Hook moves up and down.So, use suspension hook interval to arrange, when hoisting prefabricated part, can lift by flat condition, improve lifting trolley Translation stability, is particularly prone to flat board and piles up, and makes plate body be not easily susceptible to damage, and so that the lifting of prefabricated component is relatively low It is highly that Liftable completes.
On the basis of above-described embodiment, in another embodiment of this utility model, the bottom of described mast-up 11 is at least One end is also provided with alignment pin or hole, location, described prefabricated component travelling bogie and prefabricated component lifting trolley by alignment pin or Hole, location is fixed.So, after at least one end of the bottom of mast-up 11 is provided with alignment pin or hole, location, prefabricated component transport is little Car and prefabricated component lifting trolley are fixed by alignment pin or hole, location, and prefabricated component lifting trolley can fill with other tractions easily Put or multiple travelling bogie connect traction, facilitate that production line is longer, prefabricated component more in the case of use, particularly prefabricated component Lifting trolley and the docking of prefabricated component travelling bogie are fixed and are accurately positioned, can be accurate by orbital docking easily so that it is can be suitable Smoothly transit on boom hoisting platform and bogey walking sharply.
On the basis of above-described embodiment, in another embodiment of this utility model, described second driving means 21 can be Drive motor or drive motor;Or described lifting road wheel 22 is track rolling wheel or pneumatic tire.So, described second drive Dynamic device 21 is for driving motor or driving motor;Prefabricated component lifting trolley controls simple, and it is relatively low that technology realizes difficulty, it is simple to Operative;When described lifting road wheel 22 is for track rolling wheel or pneumatic tire, then can select according to practical situation Lifting road wheel 22, it is possible to relatively easily meet the application in various different place.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figures 1 to 4, described prefabricated component Lifting trolley can include travelling platform 2 and hanging apparatus 1, and described travelling platform 2 is arranged on the bottom of hanging apparatus 1, described Travelling platform 2 include two longitudinal mobile roof support the 23, second driving means 21 and at least two groups lifting road wheel 22, described second Driving means 21 drives at least a part of which one group lifting road wheel 22 to move, and described lifting road wheel 22 is arranged on described longitudinally walking The bottom of support 23;Described hanging apparatus 1 includes that mast-up 11 and hook assembly 12, described hook assembly 12 hang described in being arranged on Shelving the top of 11, the top of described mast-up 11 can be provided with ceiling mounted tracks 14, and described hook assembly is at ceiling mounted tracks 14 Upper operation, the bottom of described mast-up 11 is provided with lifting walking mechanism 24, and described lifting walking mechanism 24 can the most described row Walk platform 2 to move, after described prefabricated component travelling bogie and prefabricated component lifting trolley dock and fix, described lifting walking mechanism 24 Can move along described boom hoisting track 105.So, above-mentioned prefabricated component lifting trolley is used to carry out hoisting prefabricated part, with tradition Driving or crane loading compare and have the advantage that, sling height is low, range ability is little, simple to operate flexibly and energy consumption The advantage such as low, so, uses the self-propelled wheel-type mode operation across production line both sides, and its work flow is short, and particularly it is along raw Produce the lifting of line direction and the operating type of movement so that it is in operation process, prefabricated component will not produce and significantly swing, and can prevent Lifting trolley topples, and drastically increases the security performance of operation.And, lifting walking mechanism 24 can the most described travelling platform 2 motions, hanging apparatus 1 is not take up bogey surrounding space, improves the utilization rate in place, beneficially prefabricated component and is lifted into and holds Carry and put, and, the prefabricated component being lifted on bogey may also operate as the effect of counterweight so that it is in lifting, transported Will not rock swing in journey, stability is more preferable.And, lifting walking mechanism 24 can be moved by the most described travelling platform 2, lifting dress Put 1 and be not take up bogey surrounding space, improve the utilization rate in place, beneficially prefabricated component and be lifted on bogey, and And, the prefabricated component being lifted on bogey may also operate as the effect of counterweight so that it is will not rock in lifting, transportation Swinging, stability is more preferable.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figures 1 to 8, described mast-up 11 can be door type or triangular structure.So, when mast-up 11 is door type or triangular structure, triangular structure has There is the most excellent stability so that it is be unlikely to deform in hoisting process.
On the basis of above-described embodiment, in another embodiment of this utility model, the one end bottom described hanging apparatus 1 is also Can be provided with built-in fitting placement mechanism, described built-in fitting placement mechanism is for placing the built-in fitting produced needed for prefabricated component;With/ Or, at least side bottom described hanging apparatus 1 is provided with limit mould fixed mechanism, described limit mould fixed mechanism turning for limit mould Fortune.So, during preform production, can be by lifting trolley by reinforcing bar, reinforced mesh, reinforcing bar, steel skeleton or limit mould Transport is to production line precalculated position, and is put down one by one, so, advantageously reduces hand labor intensity, improves production efficiency, Reduce preform production cost.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figure 2 and Figure 8, two described vertical Can be connected by least one vertical door-shaped frame 3 to mobile roof support 23, described door-shaped frame 3 is higher than mast-up 11.So, Use door-shaped frame 3 to connect as mobile roof support, the stability in the large of prefabricated component lifting trolley can be improved, prevent it from lifting Deformed damaged in journey.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in Figure 1, Figure 2, Fig. 4, Fig. 5 and Fig. 8 institute Showing, described longitudinal mobile roof support 23 top can be provided with boom hoisting track 221, and described lifting walking mechanism 24 is along described Upper boom hoisting track 221 moves.So, when longitudinal mobile roof support 23 top is provided with upper boom hoisting track 221, described Hanging walking mechanism 24 to move along described upper boom hoisting track 221, during hoisting prefabricated part, boom hoisting is by prefabricated component After lifting, can be moved to carrying platform by track, particularly it is along the lifting of production line direction and the operator of movement Formula so that it is in operation process, prefabricated component does not have and significantly swings, and can prevent lifting trolley from toppling, drastically increase behaviour The security performance made.
On the basis of above-described embodiment, in another embodiment of this utility model, described lifting walking mechanism 24 can be Track rolling is taken turns.So, lifting walking mechanism 24 for track rolling wheel, reducible do up hang walking mechanism 24 in orbit before Rear movement, it is not necessary to consider that the situation of direction skew occurs, reduce operation easier, improve safety.
On the basis of above-described embodiment, in another embodiment of this utility model, the bottom of described mast-up 11 is at least One end can be provided with alignment pin or hole, location.So, at least one end in the bottom of mast-up 11 is provided with alignment pin or fixed Behind hole, position, prefabricated component lifting trolley can connect traction with other traction apparatuss or multiple travelling bogie easily, convenient raw In the case of product line is longer, prefabricated component is more, use, particularly prefabricated component lifting trolley and prefabricated component travelling bogie docking is fixing And be accurately positioned, can be accurate by orbital docking easily so that it is can be successfully suitable on boom hoisting platform and bogey Profit transition walking.
On the basis of above-described embodiment, in another embodiment of this utility model, described second driving means 21 can be Drive motor or drive motor;Or described lifting road wheel 22 is track rolling wheel or pneumatic tire.So, second dress is driven Put 21 can be drive motor or drive motor time, prefabricated component lifting trolley control simple, it is relatively low that technology realizes difficulty, just In operative;Described lifting road wheel 22 is track rolling wheel or pneumatic tire, then can select according to practical situation Lifting road wheel, it is possible to relatively easily meet the application in various different place.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in figure 14, described preform production Supply line 100 also includes that preform production platform film 200, described preform production platform film 200 are arranged in walking track.So, Produce relative to topotype, use platform molding to make prefabricated component, there is mold clean, maintenance and easy to control, preform production platform film 200 are arranged in walking track, prefabricated component lifting trolley and the mode operation across production line both sides of the prefabricated component travelling bogie, its Work flow is short, and particularly it is along the lifting of production line direction and the operating type of movement so that it is in operation process, prefabricated component is not Have and significantly swing, can prevent lifting trolley from toppling, drastically increase the security performance of operation;And prefabricated component lifting trolley Slinging after prefabricated component, prefabricated component does axis relative to prefabricated component lifting trolley and prefabricated component travelling bogie and moves in parallel, and will not produce Significantly rotate and wave, improve the stability of system.
On the basis of above-described embodiment, in another embodiment of this utility model, described preform production transportation system wraps Including more than two preform production supply lines 100, as shown in figure 14, described preform production transportation system includes six prefabricated components Production and transport line 100, between described preform production supply line 100, continuous and parallel is arranged.So, prefabricated component lifting trolley only accounts for With walking track width or the width wider than walking track, compared with traditional purlin car lifting, in the place of same homalographic In, at least can improve the production line of 50 percent production capacity, the utilization rate in place, beneficially prefabricated component are greatly improved and hangs Install on prefabricated component travelling bogie, and, prefabricated component lifting trolley is sling after prefabricated component, and prefabricated component may also operate as the work of counterweight With so that it is will not rock swing in lifting, transportation, stability is more preferable.Certainly, according to design needs, described prefabricated component Can also arrange by spacing parallel arranging between production and transport line.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in figure 14, at least two adjacent institutes At least one end stating preform production supply line 100 can be provided with ferry-boat track 300, and described ferry-boat track 300 can set It is equipped with ferry-boat dolly 400, described prefabricated component travelling bogie and/or prefabricated component lifting trolley and carries out track by ferry-boat dolly 400 Conversion.So, at least one end at least two adjacent described preform production supply lines is provided with ferry-boat track, described ferry-boat It is provided with ferry-boat dolly, described prefabricated component travelling bogie and/or prefabricated component lifting trolley on track and carries out rail by ferry-boat dolly Road converts so that prefabricated component travelling bogie and/or prefabricated component lifting trolley carry out track Fast transforms by ferry-boat dolly, improve Prefabricated component travelling bogie and the utilization rate of prefabricated component lifting trolley, reduce equipment cost.Simultaneously, it is possible to achieve a plurality of prefabricated Part production and transport line shares a prefabricated component travelling bogie and prefabricated component lifting trolley, reduce further equipment cost.
On the basis of above-described embodiment, in another embodiment of this utility model, as shown in figure 14, described ferry-boat dolly The upper surface of 400 is provided with transhipment track 500, and described transhipment track 500 and walking track are under predetermined state, and the two connects and phase The end part aligning connect.So, when the upper surface of ferry-boat dolly is provided with transhipment track, and described transhipment track and walking track are predetermined Under state, the two end part aligning connecting and connecting, prefabricated component travelling bogie and/or prefabricated component lifting trolley can be directly by transporting Track moves to ferry-boat dolly, and described prefabricated component travelling bogie and/or prefabricated component lifting trolley are locked in during ferry-boat On ferry-boat dolly, it is achieved smooth transition, fully ensure that the safety of production operation.
The above is only preferred implementation of the present utility model, it is noted that for the common skill of the art For art personnel, on the premise of without departing from this utility model principle, it is also possible to make some improvements and modifications, these improve and Retouching also should be regarded as protection domain of the present utility model.

Claims (34)

1. a preform production transportation system, including at least one preform production supply line, it is characterised in that: described prefabricated Part production and transport line include prefabricated component travelling bogie, prefabricated component lifting trolley and walking track, described prefabricated component travelling bogie and Prefabricated component lifting trolley runs on described walking track, and described prefabricated component travelling bogie is for the transport of prefabricated component, described pre- Product lifting trolley is used for prefabricated component handling to described prefabricated component travelling bogie;
Described prefabricated component travelling bogie, including bogey and the first walking mechanism, described first walking mechanism is arranged on carrying The bottom of device, described first walking mechanism, including the first driving means and at least two group road wheels, described first driving means Drive one group of road wheel motion of at least a part of which;The top of described bogey is provided with boom hoisting track.
Preform production transportation system the most according to claim 1, it is characterised in that described bogey includes that two are indulged To bracing frame and at least two cross-brace framves, the two ends of described cross-brace frame are respectively with described two longitudinal bracing framves even Connect.
Preform production transportation system the most according to claim 2, it is characterised in that described road wheel is arranged on described vertical To the bottom of bracing frame.
Preform production transportation system the most according to claim 2, it is characterised in that described cross-brace frame be arch or Trapezoidal.
Preform production transportation system the most according to claim 2, it is characterised in that be provided with tune on described bogey Regulating device, described adjusting means is for regulating the length of bogey.
Preform production transportation system the most according to claim 5, it is characterised in that described adjusting means is for being arranged on Stating the sliding rail on longitudinal bracing frame, described cross-brace frame is slidably connected with described longitudinal bracing frame by sliding rail, Described sliding rail is arranged on the inner side of longitudinal bracing frame relative to described boom hoisting track.
Preform production transportation system the most according to claim 5, it is characterised in that described adjusting means is for being arranged on Multiple locating grooves on described longitudinal bracing frame, described cross-brace frame is by locating groove with described longitudinal bracing frame even Connect.
Preform production transportation system the most according to claim 2, it is characterised in that at least the one of described longitudinal bracing frame End is provided with alignment pin or hole, location.
Preform production transportation system the most according to claim 1, it is characterised in that described first driving means is for driving Motor or driving motor;Or described road wheel is track rolling wheel or pneumatic tire.
Preform production transportation system the most according to any one of claim 1 to 9, it is characterised in that described carrying is put down The end of platform is additionally provided with partition deployment mechanism, and described partition deployment mechanism is used for depositing preform production line and cuts off.
11. preform production transportation systems according to any one of claim 1 to 9, it is characterised in that described prefabricated component Lifting trolley includes hanging apparatus and the second walking mechanism, and described second walking mechanism is arranged on the bottom of hanging apparatus, described Hanging apparatus, including mast-up and hook assembly, described mast-up is cantilever design, and described hook assembly can be at described mast-up Cantilever on move;Described second walking mechanism, lifts road wheel including the second driving means and at least two groups, and described driving fills Put driving at least a part of which one group lifting road wheel motion.
12. preform production transportation system according to claim 11, it is characterised in that described mast-up top is cantilever Frame, described cantilever shalving is provided with ceiling mounted tracks, and described hook assembly moves on described ceiling mounted tracks.
13. preform production transportation system according to claim 11, it is characterised in that described lifting road wheel is arranged on The bottom of described mast-up.
14. preform production transportation systems according to claim 11, it is characterised in that bottom described hanging apparatus End is provided with built-in fitting placement mechanism, and described built-in fitting placement mechanism is for placing the built-in fitting produced needed for prefabricated component;Or institute Stating at least side bottom hanging apparatus and be provided with limit mould fixed mechanism, described limit mould fixed mechanism picks and places for limit mould.
15. preform production transportation systems according to claim 11, it is characterised in that described mast-up is inverted trapezoidal knot Structure, described mast-up is additionally provided with buttress brace, and described buttress brace forms multiple triangular structure with the skeleton of mast-up.
16. preform production transportation systems according to claim 11, it is characterised in that the bottom of described mast-up or side Face is provided with counterweight device for hoisting.
17. preform production transportation systems according to claim 11, it is characterised in that described hook assembly includes hanging Hook, lifting rope and motor, described motor drives suspension hook to move up and down by lifting rope.
18. preform production transportation systems according to claim 17, it is characterised in that described hook assembly includes two Suspension hook and two motors, said two suspension hook interval layout, two motors individually drive two suspension hooks to move up and down;Or institute Stating hook assembly and include that two suspension hooks and a motor, said two suspension hook interval are arranged, described motor drives on two suspension hooks Lower movement.
19. preform production transportation systems according to claim 11, it is characterised in that the bottom of described mast-up is extremely Few one end is provided with alignment pin or hole, location, described prefabricated component travelling bogie and prefabricated component lifting trolley by alignment pin or location Hole is fixed.
20. preform production transportation systems according to claim 11, it is characterised in that described second driving means is for driving Dynamic motor or driving motor;Or described lifting road wheel is track rolling wheel or pneumatic tire.
21. preform production transportation systems according to any one of claim 1 to 9, it is characterised in that described prefabricated component Lifting trolley includes that travelling platform and hanging apparatus, described travelling platform are arranged on the bottom of hanging apparatus, described travelling platform Lifting road wheel including two longitudinal mobile roof supports, the second driving means and at least two groups, described second driving means drives it The lifting road wheel motion of middle least one set, described lifting road wheel is arranged on the bottom of described longitudinal mobile roof support;Described lifting Device includes that mast-up and hook assembly, described hook assembly are arranged on the top of described mast-up, the bottom of described mast-up Being provided with lifting walking mechanism, described lifting walking mechanism can be moved by the most described travelling platform, when the transport of described prefabricated component is little After car and the docking of prefabricated component lifting trolley are fixed, described lifting walking mechanism can move along described boom hoisting track.
22. preform production transportation systems according to claim 21, it is characterised in that described mast-up be door type or Triangular structure.
23. preform production transportation systems according to claim 21, it is characterised in that bottom described hanging apparatus End is provided with built-in fitting placement mechanism, and described built-in fitting placement mechanism is for placing the built-in fitting produced needed for prefabricated component;With/ Or, at least side bottom described hanging apparatus is provided with limit mould fixed mechanism, described limit mould fixed mechanism turning for limit mould Fortune.
24. preform production transportation systems according to claim 21, it is characterised in that two described longitudinal mobile roof supports Being connected by least one vertical door-shaped frame, described door-shaped frame is higher than mast-up.
25. preform production transportation systems according to claim 21, it is characterised in that described longitudinally walking frame upper Being provided with boom hoisting track, described lifting walking mechanism moves along described upper boom hoisting track.
26. preform production transportation system according to claim 25, it is characterised in that described lifting walking mechanism is rail Road formula scroll wheel.
27. preform production transportation systems according to claim 21, it is characterised in that described hook assembly includes hanging Hook, lifting rope and motor, described motor drives suspension hook to move up and down by lifting rope.
28. preform production transportation systems according to claim 27, it is characterised in that described hook assembly includes two Suspension hook and two motors, said two suspension hook interval layout, two motors individually drive two suspension hooks to move up and down;Or institute Stating hook assembly and include that two suspension hooks and a motor, said two suspension hook interval are arranged, described motor drives on two suspension hooks Lower movement.
29. preform production transportation systems according to claim 21, it is characterised in that the bottom of described mast-up is extremely Few one end is provided with alignment pin or hole, location.
30. preform production transportation systems according to claim 21, it is characterised in that described second driving means is for driving Dynamic motor or driving motor;Or described lifting road wheel is track rolling wheel or pneumatic tire.
31. preform production transportation systems according to any one of claim 1 to 9, it is characterised in that described prefabricated component Production and transport line also includes that preform production platform film, described preform production platform film are arranged in walking track.
32. preform production transportation systems according to any one of claim 1 to 9, it is characterised in that described prefabricated component Production and transport system includes more than two preform production supply lines, and between described preform production supply line, spacing parallel arranging is arranged Or continuous and parallel layout.
33. preform production transportation systems according to claim 32, it is characterised in that at least two adjacent described prefabricated At least one end of part production and transport line is provided with ferry-boat track, and described ferry-boat track is provided with ferry-boat dolly, described prefabricated component Travelling bogie and/or prefabricated component lifting trolley carry out orbital transfer by ferry-boat dolly.
34. preform production transportation systems according to claim 33, it is characterised in that the upper surface of described ferry-boat dolly Be provided with transhipment track, described transhipment track and walking track under predetermined state, the two end part aligning connecting and connecting.
CN201620096604.5U 2016-01-29 2016-01-29 Prefab production conveyor system Expired - Fee Related CN205526358U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620096604.5U CN205526358U (en) 2016-01-29 2016-01-29 Prefab production conveyor system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620096604.5U CN205526358U (en) 2016-01-29 2016-01-29 Prefab production conveyor system

Publications (1)

Publication Number Publication Date
CN205526358U true CN205526358U (en) 2016-08-31

Family

ID=56773510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620096604.5U Expired - Fee Related CN205526358U (en) 2016-01-29 2016-01-29 Prefab production conveyor system

Country Status (1)

Country Link
CN (1) CN205526358U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105645057A (en) * 2016-01-29 2016-06-08 中民筑友有限公司 Prefabricated part production and transportation system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105645057A (en) * 2016-01-29 2016-06-08 中民筑友有限公司 Prefabricated part production and transportation system

Similar Documents

Publication Publication Date Title
CN105668163A (en) Prefabricated part production and transportation system
CN207498755U (en) A kind of traveling trolley adjusted with horizontal extension and vertical supporting
CN101475003B (en) Railway bed laying emergency stone self-discharging train
CN106627603B (en) A kind of multimodal transport intercommunication control system
CN105645057A (en) Prefabricated part production and transportation system
CN105501872A (en) Prefabricated part production and conveying system
CN111502293B (en) Method and system for hoisting single peripheral component of assembly type building
CN207498754U (en) A kind of novel track-laying machine of city track traffic engineering
CN205739198U (en) A kind of preform production transportation system
CN205574940U (en) Prefab conveyer
CN205526359U (en) Prefab conveyer
CN205526358U (en) Prefab production conveyor system
CN105480662A (en) Fabricated part production and transport system
CN205418901U (en) Prefab conveyer
CN205471273U (en) Prefab production conveyor system
CN205574936U (en) Prefab conveyer
CN205574937U (en) Prefab production conveyor system
CN205574938U (en) Prefab production conveyor system
CN205526357U (en) Prefab production conveyor system
CN201177983Y (en) Conveying and storing apparatus for radioactive or dangerous articles
CN205526360U (en) Prefab conveyer
KR20130015084A (en) Construction appratus for composit truss free cantilever bridge and construction method of composit truss free cantilever bridge using the same
CN203439725U (en) Door type bucket wheel reclaimer
CN105692093A (en) Fabricated part production and conveying system
CN205526362U (en) Prefab travelling bogie

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Zhongmin Zhuyou Technology Investment Co.,Ltd.

Assignor: Zhongmin Zhuyou Co.,Ltd.

Contract record no.: 2017430000027

Denomination of utility model: Fabricated part production and transport system

Granted publication date: 20160831

License type: Exclusive License

Record date: 20171222

EE01 Entry into force of recordation of patent licensing contract
EC01 Cancellation of recordation of patent licensing contract

Assignee: Zhongmin Zhuyou Technology Investment Co.,Ltd.

Assignor: Zhongmin Zhuyou Co.,Ltd.

Contract record no.: 2017430000027

Date of cancellation: 20180801

EC01 Cancellation of recordation of patent licensing contract
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160831

CF01 Termination of patent right due to non-payment of annual fee