CN102602398B - Quick-transporting method and quick-transport device for foldable temporary cableways - Google Patents

Quick-transporting method and quick-transport device for foldable temporary cableways Download PDF

Info

Publication number
CN102602398B
CN102602398B CN201210097879.7A CN201210097879A CN102602398B CN 102602398 B CN102602398 B CN 102602398B CN 201210097879 A CN201210097879 A CN 201210097879A CN 102602398 B CN102602398 B CN 102602398B
Authority
CN
China
Prior art keywords
ropeway
temporary
cableway
transportation
interim
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210097879.7A
Other languages
Chinese (zh)
Other versions
CN102602398A (en
Inventor
朱道付
刘文凯
刘瑞国
罗东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201210097879.7A priority Critical patent/CN102602398B/en
Publication of CN102602398A publication Critical patent/CN102602398A/en
Application granted granted Critical
Publication of CN102602398B publication Critical patent/CN102602398B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a quick-transport device for foldable temporary cableways, which consists of an independent-rod temporary cableway bracket, a door-shaped temporary cableway bracket, a bearing cable, traction cables, a return sheave, a guide sheave, a traction driving grinding winch, a bearing cable anchoring pier, transporting running carts, chain blocks and a cargo shelf (15). A quick-transport method for the foldable temporary cableways includes: firstly, selecting temporary cableway transporting lines and erecting temporary cableways; secondly, setting the transporting running carts and the cargo shelf; and thirdly transporting equipment materials. By the quick-transport device and the quick-transport method which are convenient and reliable, difficulty in transporting of equipment and materials on steep mountains is reduced, the number of the temporary cableways is reduced, and transporting efficiency of the temporary cableways is improved.

Description

A kind of folding interim cableway quick transportation method and device thereof
Technical field
The invention belongs to material, equipment conveying method that physical features drop is larger, especially relate to the transportation resources of construction material, equipment on dangerously steep massif.
Background technology
At present, while carrying out engineering construction on the larger massif of physical features drop, the conveying of material, equipment progressively adopts the mode of interim cableway transport, the principle of interim cableway transport route setting is to select the route of mountain shape transportation sighting condition the best, with minimum interim cableway quantity, arrange as far as possible, complete the requirement of material, equipment conveying.But some massif transportation environment more complicated, interim cableway transport the best of often selecting arranges on route, because the whole sighting condition of massif is substantially all under satisfied prerequisite, only have local obstacle gear to hinder interim cableway transport cargo channel problem, make this region originally adopt the interim cableway transport of wall scroll to arrange because there being local obstacle cannot realize the transportation of the interim cableway straight line of wall scroll, can only adopt two and above interim cableway transport can realize the transportation of material installation.But arranging of many interim cableway transports must drop into the corresponding traction of configuration and guide device, and between interim cableway transport operating personal and cableway, cargo transfer personnel must synchronously increase, and just can complete material, equipment conveying.This kind of form not only drops into artificial many, and between many interim cableways the turn round time longer, traction and the guide device of setting up interim cableway drop into increase, have not only increased engineering cost input and have also caused whole equipment and materials conveying efficiency not high, are directly restricting the construction speed of engineering.
Summary of the invention
The object of the invention is to propose a kind of folding interim cableway quick transportation method and device thereof, realized interim cableway when partial barriers gear hinders, the transportation that does not need to increase interim cableway number and can complete material, equipment, reduce the turn round time midway of material installation and many interim aerial cableways of construction and personnel's input, reduce engineering cost, improve interim cableway transport efficiency.
The object of the present invention is achieved like this: a kind of folding interim cableway quick transportation method and device thereof are on the interim comparatively ideal massif of cableway sighting condition, only have partial barriers gear to hinder on interim cableway transport goods route, temporary ropeway support is set at this position and does not adopt conventional door pattern temporary ropeway support, and adopt only bar temporary ropeway support, to reach interim cableway, at partial barriers position, realize break, finishing equipment, during transport of materials, the gear of avoiding obstacles hinders, these all the other ropeway supporting trestles of interim cableway all adopt a pattern temporary ropeway support (concrete layout seen Fig. 1).After interim cableway is set up, adopt special transportation shelf and on ropeway carrying-rope, transport sport car and be connected with chain block, by traction drive, twist that mill winch drives trailing cable on connection transportation sport car to move to realize material, equipment conveying arrives upper station object, and at partial barriers position because adopting only bar temporary ropeway support inclined to support, according to the principle of material, equipment center of gravity automatic alignment center of gravity, the function of avoiding partial barriers while completing material, equipment conveying to this place, realizes the interim cableway transport of folding.
The interim cableway quick transportation method of this folding, its construction procedure is: 1, select interim cableway transport route and set up interim cableway, 2, transportation sport car shelf are set, 3, equipment and materials transportation.
Wherein:
1) select interim cableway transport route and set up interim cableway:
Press Fig. 1, Fig. 2, Fig. 3: the position needs of material requested, equipment during according to engineering construction, again in conjunction with physical features discrepancy in elevation condition, the length of interim cableway is set, selects load transported to meet the minimum haulway of partial barriers on the longest as far as possible and transport channel within the scope of interim cableway designing requirement.
According to the pattern in figure, select haulway and set up interim cableway (it is example that the wall scroll of take has an obstacle material, equipment conveying cableway), selecting temporary ropeway support point and support number and rack form.Temporary ropeway support 1, temporary ropeway support 2 have been installed, and temporary ropeway support 1 is taked diagonal-bracing type setting as shown in Figure 2, to reach the object of avoiding obstacles on material, equipment removal path space.Draw and established temporary ropeway support 1, the cable rope 11 of temporary ropeway support 2, cable rope 11 is fixed on massif by anchor pile 12, the all temporary ropeway supports 1 of fixation, temporary ropeway support 2, lay ropeway carrying-rope 3 and trailing cable 4, install and improve traction return sheave 5, traction track adjusting wheel 6, traction drive strand mill winch 7, and the interim cableway ropeway carrying-rope 3 of tensioning is fixed on the anchoring pier 8 of standing up and down, after ropeway carrying-rope 3 tensionings, arrive the condition of interim cableway transport carrying, interim cableway trailing cable 4 is realized and driven forward and reverse traction under 7 effects of strand mill winch, drive transportation sport car 13 up-and-down movements, realize condition and the function (as there being two obstacles just at each obstacle place, diagonal-bracing type temporary ropeway support 1 to be set respectively on passage) of interim cableway transport.
2) transportation sport car shelf are set:
According to Fig. 2, Fig. 3, Fig. 4:
On the interim cableway ropeway carrying-rope 3 having installed, two sport cars 13 are set, by chain block 14, will transport shelf 15 is again connected with transportation sport car 13, in 13 two hangings place of transportation sport car, bundle respectively firm trailing cable 4 again, by trailing cable 4 and ropeway carrying-rope 3, realize the reciprocal transportation function of sport car 13.
3) equipment and materials transportation:
By the equipment of need transportation, material is placed on the transportation shelf 15 that possess transportation function, by cableway, drive strand mill winch 7 to drive, drive trailing cable 4 that transportation power is transferred on transportation sport car 13, by equipment, transport of materials is to the upper website of interim cableway, by chain block 14, transportation shelf 15 and goods integral body are dropped on ground again, material and facility on the complete transportation shelf 15 of a dead lift, re-use chain block 14 and transportation shelf 15 are risen to the height and position of interim cableway transport, now drive strand mill winch 7 reverse drive, drive trailing cable 4 that transportation power is transferred on transportation sport car 13, drive 13 counter motions of transportation sport car to lower station.Back and forth realize in proper order the transportation of material, equipment.
A kind of folding interim cableway quick transportation method device proposed by the invention, by temporary ropeway support (1), door type temporary ropeway support (2), ropeway carrying-rope (3), trailing cable (4), return sheave (5), track adjusting wheel (6), traction drive strand mill winch (7), ropeway carrying-rope anchoring pier (8), transportation sport car (13), chain block (14), shelf (15), formed, it is characterized in that:
1) as Fig. 1 selects the minimum interim cableway transport route of best obstacle;
2) as shown in Figure 2,3, on temporary ropeway support 2, be respectively equipped with two interim cableways supports 9 and support trailing cable 4; Temporary ropeway support 1 is provided with an interim cableway support 9 and the fixing fixed pulley 10 of mid-stent supports trailing cable 4.
3) as shown in Figure 2,3, 4, shelf 15 can be realized and be risen and decline by chain block 14.
4) as shown in Figure 1,2,3, 4, shelf 15 can twist mill winch 7 forward and reverse driving by driving, drive trailing cable 4 that transportation power is transferred on transportation sport car 13, drive transportation sport car 13 is forward and reverse to move to or lower station.
A kind of folding interim cableway quick transportation method and device thereof proposed by the invention, easy to use reliable, reduced the difficulty of equipment, transport of materials on dangerously steep massif, reduced interim cableway number has been set, reduce construction cost and drop into, improve interim cableway transport efficiency.
Now with example, a kind of folding interim cableway quick transportation method and device thereof are explained by reference to the accompanying drawings.
Accompanying drawing explanation
Fig. 1 is a kind of folding interim cableway quick transportation method and Plant arrangement schematic diagram thereof proposed by the invention.
Fig. 2 is the A-A cross-sectional schematic of Fig. 1.
Fig. 3 is that the B-B of Fig. 1 analyses and observe transportation schematic diagram.
Fig. 4 is that the C of Fig. 3 is to view.
Wherein: 1, only bar temporary ropeway support; 2, door type temporary ropeway support; 3, ropeway carrying-rope; 4, trailing cable; 5, return sheave; 6, track adjusting wheel; 7, traction drive strand mill winch; 8, ropeway carrying-rope anchoring is honest; 9, interim cableway supports; 10, fixed pulley; 11, ropeway supporting trestle cable rope; 12, anchor pile; 13, transport trolley hanging; 14, chain block; 15, shelf.
The specific embodiment
1. the new cloud valley cable in Mount Huang road installation work
1.1 project profile
New cloud valley cable road, Mount Huang went into operation in December, 2006, be completed in September, 2007, the ropeway line length of this project is 2476 meters, 740 meters of the discrepancy in elevation, the Austrian haulage cradle cableway technology of introducing, in order to ensure the steel structure at circuit and upper station, the transportation of equipment, utilize cableway line of centers to set up interim cableway, wherein in 5 interim transportation cableways, comprise 1 folding and transport interim cableway.
1.2 condition of construction
According to the actual conditions of engineering, select this construction method, in 2 months, completed whole aerial cableway transport, transport 230 tons of station, line facility and steel structures.
2 Jiuhuashan flower platform passenger ropeway project
2.1 project profile
Jiuhuashan flower platform passenger aerial ropeway went into operation in December, 2008, be completed in November, 2009, this project ropeway line length is 2756 meters, 860 meters of the discrepancy in elevation, many Bei Maya of Austria haulage cradle cableway technology of introducing, in order to meet the transportation of building materials, steel structure and the equipment of upper station, circuit, utilize cableway line of centers to set up interim cableway.Wherein in 4 interim transportation cableways, comprise 1 folding and transport interim cableway.2.2 condition of construction
According to the actual conditions of engineering, select this construction method, in 5 months, completed whole engineering of passenger cableways building materials, equipment conveying work, the building materials of transportation is 2900 tons, the steel structure of transportation and equipment are 210 tons.

Claims (2)

1. the interim cableway quick transportation method of folding, its construction procedure is:
(1), select interim cableway transport route and set up interim cableway:
The position needs of material requested, equipment during according to engineering construction, again in conjunction with physical features discrepancy in elevation condition, the length of interim cableway is set, selects load transported to meet the minimum haulway of partial barriers on the longest as far as possible and transport channel within the scope of interim cableway designing requirement;
According to selecting haulway and setting up interim cableway, select temporary ropeway support point and support number and rack form, only bar temporary ropeway support (1), door type temporary ropeway support (2) have been installed, and solely bar temporary ropeway support (1) is taked diagonal-bracing type setting, draw and established the only bar temporary ropeway support of support (1), the cable rope (11) of door type temporary ropeway support (2), cable rope (11) is fixed on massif by anchor pile (12), the all only bar temporary ropeway supports of fixation (1), door type temporary ropeway support (2), lay ropeway carrying-rope (3) and trailing cable (4), install and improve traction return sheave (5), traction track adjusting wheel (6), traction drive strand mill winch (7), and the interim cableway ropeway carrying-rope of tensioning (3) is fixed on the anchoring pier (8) of standing up and down, after ropeway carrying-rope (3) tensioning, arrive the condition of interim cableway transport carrying, interim cableway trailing cable (4) is realized and driven forward and reverse traction under strand mill winch (7) effect, drive sport car (13) up-and-down movement, realize condition and the function of interim cableway transport,
(2), sport car shelf are set:
On the interim cableway ropeway carrying-rope (3) having installed, two sport cars (13) are set, by chain block (14), will transport shelf (15) is again connected with sport car (13), in (13) two hangings place of sport car, bundle respectively firm trailing cable (4) again, by trailing cable (4) and ropeway carrying-rope (3), realize the reciprocal transportation function of sport car (13);
(3), equipment and materials transportation:
By the equipment of need transportation, material is placed on the transportation shelf (15) that possess transportation function, by cableway, drive strand mill winch (7) to drive, drive trailing cable (4) that transportation power is transferred on sport car (13), by equipment, transport of materials is to the upper website of interim cableway, by chain block (14), will transport shelf (15) again and goods integral body drops on ground, material and facility on the complete transportation shelf of a dead lift (15), re-use chain block (14) and will transport the height and position that shelf (15) rise to interim cableway transport, now drive strand mill winch (7) reverse drive, drive trailing cable (4) that transportation power is transferred on sport car (13), drive sport car (13) counter motion to lower station, back and forth realize in proper order material, the transportation of equipment.
2. a device that uses the interim cableway quick transportation method of folding as claimed in claim 1, by only bar temporary ropeway support (1), door type temporary ropeway support (2), ropeway carrying-rope (3), trailing cable (4), return sheave (5), track adjusting wheel (6), traction drive strand mill winch (7), ropeway carrying-rope anchoring pier (8), sport car (13), chain block (14), shelf (15) form, it is characterized in that: selecting on the minimum interim cableway transport route of obstacle, on door type temporary ropeway support (2), be respectively equipped with two interim cableways supports (9) and support trailing cable (4), only bar temporary ropeway support (1) is provided with an interim cableway support (9) and the fixing fixed pulley (10) of mid-stent supports trailing cable (4), shelf (15) can pass through chain block (14) to be realized rising and declines, shelf (15) can twist the forward and reverse driving of mill winch (7) by driving, drive trailing cable (4) that transportation power is transferred to sport car (13) upper, drive forward and reverse the moving to or lower station of sport car (13).
CN201210097879.7A 2012-04-06 2012-04-06 Quick-transporting method and quick-transport device for foldable temporary cableways Active CN102602398B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210097879.7A CN102602398B (en) 2012-04-06 2012-04-06 Quick-transporting method and quick-transport device for foldable temporary cableways

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210097879.7A CN102602398B (en) 2012-04-06 2012-04-06 Quick-transporting method and quick-transport device for foldable temporary cableways

Publications (2)

Publication Number Publication Date
CN102602398A CN102602398A (en) 2012-07-25
CN102602398B true CN102602398B (en) 2014-09-03

Family

ID=46520310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210097879.7A Active CN102602398B (en) 2012-04-06 2012-04-06 Quick-transporting method and quick-transport device for foldable temporary cableways

Country Status (1)

Country Link
CN (1) CN102602398B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104674612A (en) * 2014-12-31 2015-06-03 国家电网公司 Support system for cargo ropeway
CN105416302B (en) * 2015-12-10 2017-08-29 四川电力送变电建设公司 Freight ropeway walking dolly aids in decable device
CN106114526A (en) * 2016-07-22 2016-11-16 巨力索具股份有限公司 Air transport deliverance apparatus
CN114362050A (en) * 2022-01-29 2022-04-15 北京城建集团有限责任公司 Method for mounting bracket
CN114633767A (en) * 2022-02-14 2022-06-17 北京城建集团有限责任公司 Construction method of temporary cargo cable

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3218988A (en) * 1961-11-18 1965-11-23 Gaston Theophile Mono cable transporting device
CN201494438U (en) * 2009-10-13 2010-06-02 中国石油天然气股份有限公司 Simple and fast installation cableway for maintenance and rush repair of mountain pipeline
CN102259649A (en) * 2011-05-27 2011-11-30 河南旭德隆电力设备有限公司 Curve cableway transporting system of double-cable circulating type
CN202063137U (en) * 2011-04-14 2011-12-07 河南旭德隆电力设备有限公司 Double-carrying-cable circulation-type freight cableway system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3135963B2 (en) * 1991-12-12 2001-02-19 日本ケーブル株式会社 Suspended transport equipment for both trolling and rail travel

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3218988A (en) * 1961-11-18 1965-11-23 Gaston Theophile Mono cable transporting device
CN201494438U (en) * 2009-10-13 2010-06-02 中国石油天然气股份有限公司 Simple and fast installation cableway for maintenance and rush repair of mountain pipeline
CN202063137U (en) * 2011-04-14 2011-12-07 河南旭德隆电力设备有限公司 Double-carrying-cable circulation-type freight cableway system
CN102259649A (en) * 2011-05-27 2011-11-30 河南旭德隆电力设备有限公司 Curve cableway transporting system of double-cable circulating type

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
刘丹清等.索道运输.《黑龙江科技信息》.2008,(第06期),第39页.
多支点循环索道运输在输电线路中的应用;靳义奎等;《青海电力》;青海电力编辑部;20091231;第28卷(第4期);第41-45页 *
索道运输;刘丹清等;《黑龙江科技信息》;20080228(第06期);第39页 *
靳义奎等.多支点循环索道运输在输电线路中的应用.《青海电力》.青海电力编辑部,2009,第28卷(第4期),第41-45页.

Also Published As

Publication number Publication date
CN102602398A (en) 2012-07-25

Similar Documents

Publication Publication Date Title
CN202864283U (en) Band type belt conveyor
CN202030294U (en) Multifunctional conveyor
CN102602398B (en) Quick-transporting method and quick-transport device for foldable temporary cableways
CN201494438U (en) Simple and fast installation cableway for maintenance and rush repair of mountain pipeline
CN102259649B (en) Curve cableway transporting system of double-cable circulating type
CN103661408B (en) Station for a cable railway system
CN101475003B (en) Railway bed laying emergency stone self-discharging train
CN202063137U (en) Double-carrying-cable circulation-type freight cableway system
CN202115510U (en) Double-cable circulation type curved cableway transport system
CN105858170A (en) Lifting device of pneumatic conveyer
CN104929000A (en) Sectional railway track laying machine set and assembling method thereof
CN102582631B (en) Fast transiting method for two or more temporary ropeways
CN208330406U (en) Mechanical be laid with of earth water-proof plate and two lining longitudinal reinforcements uses tunnel trolley
CN207469856U (en) Vehicle conveying equipment
CN201254385Y (en) Roller conveying apparatus for belt conveyor maintenance
CN201941770U (en) Curve transport cableway system
CN207957486U (en) A kind of mine lift Transportation Engineering mechanical equipment
CN201249761Y (en) High-tension transmission line mountain area construction two-way circulating freight cableway
CN111133172A (en) Transport and transport system for tunnel buildings
CN104386602A (en) Inclined roadway trackless auxiliary transportation method and device
CN108100586A (en) From lift cableway conveyor
CN205418901U (en) Prefab conveyer
CN205526360U (en) Prefab conveyer
CN203667819U (en) Large-dip angle lane monorail crane transporting device
CN202130917U (en) Cable moving device for mine shaft

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant