CN201172830Y - 塔式起重机锚杆静压桩基础 - Google Patents

塔式起重机锚杆静压桩基础 Download PDF

Info

Publication number
CN201172830Y
CN201172830Y CNU2008200659057U CN200820065905U CN201172830Y CN 201172830 Y CN201172830 Y CN 201172830Y CN U2008200659057 U CNU2008200659057 U CN U2008200659057U CN 200820065905 U CN200820065905 U CN 200820065905U CN 201172830 Y CN201172830 Y CN 201172830Y
Authority
CN
China
Prior art keywords
cushion cap
pile
anchor
concrete cushion
steel concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200659057U
Other languages
English (en)
Inventor
陈宽诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANHE CONSTRUCTION GROUP CO Ltd
Original Assignee
SHANHE CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANHE CONSTRUCTION GROUP CO Ltd filed Critical SHANHE CONSTRUCTION GROUP CO Ltd
Priority to CNU2008200659057U priority Critical patent/CN201172830Y/zh
Application granted granted Critical
Publication of CN201172830Y publication Critical patent/CN201172830Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

本实用新型公开了一种塔式起重机锚杆静压桩基础,它包括钢筋混凝土承台、锚杆静压桩。将塔吊基础承台底、面钢筋、拉结钢筋分别绑扎,预留压桩孔和预埋锚杆钢筋及塔吊基座预埋螺栓后,现场浇筑钢筋混凝土承台,养护至设计强度后,在锚杆钢筋上安装压桩机架,在压桩机架上用千斤顶将锚杆静压桩压入地下,用连接钢筋与锚杆钢筋交叉焊接并二次浇筑混凝土封桩头。通过采用上述方法,将钢筋混凝土承台与锚杆静压桩连接形成塔式起重机锚杆静压桩基础。本实用新型结构简单,使用方便,安全稳定可靠,成本低廉。

Description

塔式起重机锚杆静压桩基础
技术领域
本实用新型涉及起重机桩基础,更具体涉及一种塔式起重机锚杆静压桩基础。适用于大型机械已退场和人工挖孔桩又不能施工的地质条件下的塔式起重机桩基础。
背景技术
塔式起重机桩基础,在软弱土质的地基条件下,一般采用多桩混凝土承台基础。即先采用大型机械设备施工钻孔灌注桩、静压预制混凝土桩或人工挖土成孔的混凝土桩。在施工完塔吊基础桩后,在桩顶上浇筑钢筋混凝土承台,待养护达到设计强度后,塔式起重机直接安装在承台上预埋的高强螺栓上。
发明内容
本实用新型的目的是在于提供了一种塔式起重机锚杆静压桩基础,结构简单,使用方便,安全稳定可靠,成本低廉。锚杆静压桩基础是采用小型机具施工的桩基础,它可代替大型机械施工的桩基础,以及遭遇流砂和淤泥地质条件下人工不能成孔施工的人工挖孔桩基础。
本实用新型解决其技术问题采用的技术方案是:
一种塔式起重机锚杆静压桩基础,它采用现场浇筑混凝土形成钢筋混凝土承台1,通过压桩孔2内的锚杆静压桩3采用封桩后形成锚杆静压桩基础。其特征在于:将塔吊基础承台面钢筋4、塔吊基础承台底钢筋5、塔吊基础承台拉结钢筋6分别绑扎,绑扎完毕,预留压桩孔2和预埋锚杆钢筋8以及塔吊基座预埋螺栓11后,现场浇筑钢筋混凝土承台1。形成钢筋混凝土承台1后,在锚杆钢筋8上安装压桩机架,在压桩机架上用千斤顶逐根将锚杆静压桩3(长度2m左右,锚杆静压桩之间连接可采用硫磺胺泥接头或焊接头)压入地下至设计长度,拆卸压桩机架后,用连接钢筋10与锚杆钢筋8交叉焊接并二次浇筑混凝土封桩头7。通过采用上述方法后,将钢筋混凝土承台1与锚杆静压桩3上的锚杆静压桩与钢筋混凝土承台连接钢筋9形成完整的塔式起重机锚杆静压桩基础。塔式起重机直接安装在钢筋混凝土承台上预埋的高强螺栓上即可进行工作。
本实用新型的目的是提供一种塔式起重机锚杆静压桩基础来代替大型机械施工和人工挖孔施工的塔式起重机桩基础。其有益效果是:在复杂地质条件下不能实施人工挖孔桩,而采用大型机械设备打桩会增加进出场费用,加大了工程成本。而把锚杆静压桩基础,仅采用小型机具即可施工,施工方便,安全稳定可靠,节约造价即成本低廉。
附图说明
图1为一种塔式起重机锚杆静压桩基础平面示意图;
图2为一种塔式起重机锚杆静压桩基础剖面示意图。
其中:1-钢筋混凝土承台,2-压桩孔,3-锚杆静压桩,4-塔吊基础承台面钢筋,5-塔吊基础承台底钢筋,6-塔吊基础承台拉结钢筋,7-混凝土封桩头,8-锚杆钢筋,9-锚杆静压桩与钢筋混凝土承台连接钢筋,10-连接钢筋,11-塔吊基座预埋螺栓。
具体实施方式
下面结合附图对本实用新型作进一步详细描述:根据图1、图2可知,一种塔式起重机锚杆静压桩基础,它包括钢筋混凝土承台1、锚杆静压桩3。锚杆静压桩3与钢筋混凝土承台1连接,是在钢筋混凝土承台1压桩孔2内压入锚杆静压桩3,是通过连接锚杆钢筋10与锚杆钢筋8交叉焊接后二次浇筑混凝土连接成整体。塔式起重机直接安装在钢筋混凝土承台1上预埋的高强螺栓11即可进行工作。锚杆静压桩基础施工顺序是先将塔吊基础承台面钢筋4、塔吊基础承台底钢筋5、塔吊基础承台拉结钢筋6分别绑扎完毕。在浇筑混凝土前在钢筋混凝土承台1上预留8个或12个压桩孔2以及锚杆钢筋8和塔式基座预埋螺栓11,现场浇筑混凝土形成钢筋混凝土承台1。待混凝土达到设计强度后,将压桩架与预埋的锚杆钢筋8用螺栓连接固定,利用钢筋混凝土承台1自重作反力,在压桩架上用千斤顶将预制好的混凝土锚杆静压桩(长2.0m左右)逐根从压桩孔2内压入地下,压桩施工按对称方式进行(锚杆静压桩之间可采用硫磺胶泥连接或焊接连接)。压至设计长度或达到设计油压值时,卸载千斤顶,拆除压桩架,用连接钢筋10与锚杆钢筋8交叉焊接,清除压桩孔2内杂物后,二次浇筑混凝土封桩头7,通过采用上述方法,将钢筋混凝土承台1与锚杆静压桩3连接成整体。封桩混凝土达到设计强度后,将塔式起重机基础节与钢筋混凝土承台1上预埋的塔吊基座预埋螺栓11连接后,即可完成全部塔式起重机的安装。

Claims (2)

1、一种塔式起重机锚杆静压桩基础,它包括钢筋混凝土承台(1)、锚杆静压桩(3),其特征在于:将塔吊基础承台面钢筋(4)、承台底钢筋(5)、塔吊基础承台拉结钢筋(6)分别绑扎,预留压桩孔(2)和预埋锚杆钢筋(8)及塔吊基座预埋螺栓(11)后,现场浇筑钢筋混凝土承台(1),在锚杆钢筋(8)上安装压桩机架,在压桩机架上用千斤顶将锚杆静压桩(3)压入地下,用连接钢筋(10)与锚杆钢筋(8)交叉焊接并二次浇筑混凝土封桩头(7),钢筋混凝土承台(1)与锚杆静压机(3)上的锚杆静压桩与钢筋混凝土承台连接钢筋(9)形成塔式起重机锚杆静压桩基础。
2、根据权利要求1所述的一种塔式起重机锚杆静压桩基础,其特征在于:锚杆静压桩(3)与钢筋混凝土承台(1)连接,在钢筋混凝土承台(1)压桩孔(2)内压入锚杆静压桩(3),通过连接钢筋(10)与钢筋混凝土承台(1)预留锚杆钢筋(8)焊接后二次浇筑混凝土连接成整体。
CNU2008200659057U 2008-03-11 2008-03-11 塔式起重机锚杆静压桩基础 Expired - Fee Related CN201172830Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200659057U CN201172830Y (zh) 2008-03-11 2008-03-11 塔式起重机锚杆静压桩基础

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200659057U CN201172830Y (zh) 2008-03-11 2008-03-11 塔式起重机锚杆静压桩基础

Publications (1)

Publication Number Publication Date
CN201172830Y true CN201172830Y (zh) 2008-12-31

Family

ID=40199943

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200659057U Expired - Fee Related CN201172830Y (zh) 2008-03-11 2008-03-11 塔式起重机锚杆静压桩基础

Country Status (1)

Country Link
CN (1) CN201172830Y (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892671A (zh) * 2010-08-11 2010-11-24 霍宏斌 桩锚杆基础结构
CN102477747A (zh) * 2010-11-26 2012-05-30 河南省电力勘测设计院 一种压浆螺旋锚基础
CN102605785A (zh) * 2012-04-01 2012-07-25 江苏东南特种技术工程有限公司 锚杆静压桩预加压力封桩装置
CN102887446A (zh) * 2011-07-19 2013-01-23 上海庞源机械租赁股份有限公司 一种塔式起重机可拆卸固定支脚结构
CN104278690A (zh) * 2014-10-11 2015-01-14 国家电网公司 一种新型高压输电线路铁塔桩基础
CN108643219A (zh) * 2018-06-29 2018-10-12 华中科技大学 一种装配式输电线路锚杆静压微型桩基础及其施工方法
CN108914961A (zh) * 2018-08-03 2018-11-30 福州铭林钢塔钢构制造有限公司 采用螺旋锚的通讯铁塔基础及施工方法
CN108914961B (zh) * 2018-08-03 2024-04-26 福州铭林钢塔钢构制造有限公司 采用螺旋锚的通讯铁塔基础及施工方法

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892671B (zh) * 2010-08-11 2012-01-11 霍宏斌 桩锚杆基础结构
WO2012019505A1 (zh) * 2010-08-11 2012-02-16 Huo Hongbin 桩锚杆基础结构
CN101892671A (zh) * 2010-08-11 2010-11-24 霍宏斌 桩锚杆基础结构
CN102477747A (zh) * 2010-11-26 2012-05-30 河南省电力勘测设计院 一种压浆螺旋锚基础
CN102887446B (zh) * 2011-07-19 2016-01-06 上海庞源机械租赁股份有限公司 一种塔式起重机可拆卸固定支脚结构
CN102887446A (zh) * 2011-07-19 2013-01-23 上海庞源机械租赁股份有限公司 一种塔式起重机可拆卸固定支脚结构
CN102605785A (zh) * 2012-04-01 2012-07-25 江苏东南特种技术工程有限公司 锚杆静压桩预加压力封桩装置
CN104278690A (zh) * 2014-10-11 2015-01-14 国家电网公司 一种新型高压输电线路铁塔桩基础
CN104278690B (zh) * 2014-10-11 2016-03-30 国家电网公司 一种新型高压输电线路铁塔桩基础
CN108643219A (zh) * 2018-06-29 2018-10-12 华中科技大学 一种装配式输电线路锚杆静压微型桩基础及其施工方法
CN108643219B (zh) * 2018-06-29 2023-06-02 华中科技大学 一种装配式输电线路锚杆静压微型桩基础及其施工方法
CN108914961A (zh) * 2018-08-03 2018-11-30 福州铭林钢塔钢构制造有限公司 采用螺旋锚的通讯铁塔基础及施工方法
CN108914961B (zh) * 2018-08-03 2024-04-26 福州铭林钢塔钢构制造有限公司 采用螺旋锚的通讯铁塔基础及施工方法

Similar Documents

Publication Publication Date Title
CN104947654B (zh) 一种复杂水域倾斜岩面大直径钻孔灌注桩的施工方法
CN201172830Y (zh) 塔式起重机锚杆静压桩基础
CN103726503B (zh) 用于加固变形桥桩的锚杆桩加固承台结构及施工方法
CN106013052A (zh) 钢板桩与沉井组合式地下停车库及其施工方法
CN106759442A (zh) 一种单桩高位承台与锚索塔吊基础结构及其施工方法
CN105350526B (zh) 钢平台的搭设方法
CN102817621B (zh) 一种适用于不良地质隧道控制拱墙脚沉降的综合施工方法
CN102434717A (zh) 工字钢顶管工作坑的施工方法
CN203654308U (zh) 用于加固变形桥桩的锚杆桩加固承台结构
CN103572770B (zh) 一种桩箱水工结构物及其建造方法
CN106480891B (zh) 一种竖井施工方法
CN103790176B (zh) 一种预埋短肢柱结构的施工方法
CN203654309U (zh) 一种桩箱水工结构物
CN107558489A (zh) 一种盾构下穿既有建筑物的施工方法
CN105862862A (zh) 一种大直径桩埋锤打捞方法
CN205576957U (zh) 桩底桩结构
CN104594371A (zh) 一种已有基础底板的加固结构及其施工方法
CN204780870U (zh) 一种复杂水域倾斜岩面大直径钻孔灌注桩
CN204199296U (zh) 基于老旧地下室外墙结构的基坑支护结构
CN102493436A (zh) 矩形抗滑桩人工掘进新工法
CN206376274U (zh) 一种单桩高位承台与锚索塔吊基础结构
CN206368375U (zh) 一种输电铁塔用基础
CN201598650U (zh) 古建筑松散毛石基础托换加固装置
CN212642730U (zh) 一种湿陷性黄土地区隧道穿越人防结构
CN204626439U (zh) 一种已有基础底板的加固结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081231

Termination date: 20140311