CN205576957U - 桩底桩结构 - Google Patents

桩底桩结构 Download PDF

Info

Publication number
CN205576957U
CN205576957U CN201620274371.3U CN201620274371U CN205576957U CN 205576957 U CN205576957 U CN 205576957U CN 201620274371 U CN201620274371 U CN 201620274371U CN 205576957 U CN205576957 U CN 205576957U
Authority
CN
China
Prior art keywords
stake
pile
coupling bar
drilling
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620274371.3U
Other languages
English (en)
Inventor
卢明全
柳玉印
林伟
于喆任
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiuding Sanli Construction Group Co ltd
Original Assignee
Dalian Jiuding Xiangrui Special Engineering Technology Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Jiuding Xiangrui Special Engineering Technology Research Institute Co Ltd filed Critical Dalian Jiuding Xiangrui Special Engineering Technology Research Institute Co Ltd
Priority to CN201620274371.3U priority Critical patent/CN205576957U/zh
Application granted granted Critical
Publication of CN205576957U publication Critical patent/CN205576957U/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本实用新型公开了一种桩底桩技术,在桩孔下方为坚硬岩石时,利用钻孔设备在桩基孔底向下钻至少2个小直径钻孔,钻孔达到设计深度后在钻孔内插入连接栓,并在钻孔内注入水泥浆或混凝土,连接栓上端露出钻孔一段距离,然后向桩孔内注入混凝土。连接栓上端锚固于桩身,下端嵌入地基持力层,把桩基桩身和地基持力层牢牢锚固在一起,主桩与桩底桩共同受力从整体上确保桩基承载力达到设计要求,同时桩底桩还能加固桩底地基土层,有效提高桩基承载力和整体稳定性。

Description

桩底桩结构
技术领域
本实用新型涉及岩土工程技术领域
背景技术
桩基础施工过程中,需要嵌入持力层(坚硬或较硬岩层)一定深度;遇到坚硬岩层下卧软弱夹层时,还需要穿越坚硬岩层和软弱夹层嵌入持力层。在坚硬岩层内桩基成孔施工,无论是机械作业还是人工挖孔都有相当难度,通常的做法是爆破作业。而在城市中心建筑密集区域,往往又不允许爆破施工,这就给桩基施工造成很大难度,严重影响工期和成本。
桩基设计时,还会遇到持力层基底承载力满足荷载要求,但桩身长度不满足锚固要求的情况。加大桩身长度可以满足锚固要求,但会增加成本和工期。
实用新型内容
本实用新型所解决的技术问题是提供一种桩底桩技术在桩基础施工过程中遇到坚硬岩石时、桩基岩层失稳时保证桩身抗拔力的前提下缩短工期、降低成本。
本实用新型采用的技术方案是一种桩底桩结构,桩孔的孔底端到达坚硬岩层,在桩孔孔底向下开挖有至少两个小直径钻孔,钻孔直径不小于10cm,钻孔向下依次穿过坚硬岩层、软弱土层到达持力层,钻孔内插有连接栓,连接栓下端插入小口径钻孔孔底,连接栓上端露出钻孔一段距离,桩孔布置有钢筋,钢筋下端插入桩孔孔底,钢筋和连接栓周围浇筑有混凝土。
所述接栓为钢管或者工字钢。
所述钻孔呈竖直方向向下延伸,或者呈放射状向下延伸。
本实用新型的有益效果是,一方面,可在有效范围内解决桩身抗拔力不足问题,为大吨位动载条件下新型码头设计、施工提供技术方案。另一方面,可同时加固桩底一定范围内地层,使桩基稳定性得到加强,解决一些特殊条件下桩基失稳问题。在地下空间开发利用领域有着广阔的应用前景。
附图说明
图1为本实用新型结构示意图。
图中标记为:1-桩孔,2-连接栓,41-坚硬岩层,42-软弱夹层,43-持力层。
具体实施方式
下面结合附图对本实用新型作进一步说明。
在大直径成桩施工中,桩孔钻到一定深度时,遇到坚硬岩石,暂停桩孔的施工,在大直径桩底部施工侧向或竖向钻孔若干,呈放射状向下延伸,在钻孔内插入连接栓,并灌注高强度水泥浆或混凝土,水泥凝固后形成桩底桩。连接栓上端露出钻孔一段距离,然后向桩孔内注入混凝土,形成稳固的桩身。由于连接栓上端锚固于桩身,下端嵌入地基持力层,形成一种类似插销的锚固结构,把桩基桩身和地基持力层牢牢锚固在一起,主桩与桩底桩共同受力,形成统一的整体承担上部荷载,从整体上确保桩基承载力达到设计要求。
桩底桩可以垂直向下施工,也可以呈放射状向下各方延伸,当坚硬岩层下方存在软弱土层,再向下才是持力层,桩底桩结构可以加固桩底地基土层,有效提高桩基承载力和整体稳定性。
连接栓也可以用工字钢、钢管或钢轨等型材代替。钻孔呈竖直方向向下延伸,或者呈放射状向下延伸,钻孔的数量和设计深度根据抗拔力要求进行计算,一般情况下,如果桩身承载力满足要求,抗拔力不足,则根据需要的抗拔力和欠缺抗拔力之差换算成连接栓的锚固力(见式1,式2);如果需要穿越软弱夹层到达持力层,则按照设计嵌入持力层一定深度即可。
F-F'=Fm 式1
Fm=N·fm 式2
式中:F为桩身整体抗拔力
F'为开挖到坚硬岩石桩身能提供的抗拔力(可由桩基技术规范计算得到)
Fm为桩底桩的锚固力
N桩底桩连接栓数量
fm为单个连接栓能提供的锚固力
桩底桩技术可在有效范围内解决桩身抗拔力不足问题,为大吨位动载条件下新型码头设计、施工提供技术方案。同时加固桩底一定范围内地层,使桩基稳定性得到加强,解决一些特殊条件下桩基失稳问题。
桩底桩技术可在有效范围内解决桩身抗拔力不足问题,为大吨位动载条件下新型码头设计、施工提供技术方案。同时加固桩底一定范围内的地层,使桩基稳定性得到加强,解决一些特殊条件下桩基失稳问题。

Claims (3)

1.桩底桩结构,其特征在于:桩孔的孔底端到达坚硬岩层,在桩孔孔底向下开挖有至少两个小直径钻孔,钻孔直径不小于10cm,钻孔向下依次穿过坚硬岩层、软弱土层到达持力层,钻孔内插有连接栓,连接栓下端插入小口径钻孔孔底,连接栓上端露出钻孔一段距离,桩孔布置有钢筋,钢筋下端插入桩孔孔底,钢筋和连接栓周围浇筑有混凝土。
2.如权利要求1所述的桩底桩结构,其特征在于:所述连接栓为钢管或者工字钢。
3.如权利要求1所述的桩底桩结构,其特征在于:所述钻孔呈竖直方向向下延伸,或者呈放射状向下延伸。
CN201620274371.3U 2016-03-31 2016-03-31 桩底桩结构 Active CN205576957U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620274371.3U CN205576957U (zh) 2016-03-31 2016-03-31 桩底桩结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620274371.3U CN205576957U (zh) 2016-03-31 2016-03-31 桩底桩结构

Publications (1)

Publication Number Publication Date
CN205576957U true CN205576957U (zh) 2016-09-14

Family

ID=56864144

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620274371.3U Active CN205576957U (zh) 2016-03-31 2016-03-31 桩底桩结构

Country Status (1)

Country Link
CN (1) CN205576957U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086307A (zh) * 2017-12-26 2018-05-29 中铁第四勘察设计院集团有限公司 钢管混凝土挖孔灌注复合微型桩
CN111364449A (zh) * 2020-04-07 2020-07-03 中建四局第一建筑工程有限公司 一种针对预制管桩贯穿溶洞的施工方法及结构
CN115288124A (zh) * 2022-07-22 2022-11-04 广州环投南沙环保能源有限公司 一种用于上软下硬地层中的管桩结构及加固方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086307A (zh) * 2017-12-26 2018-05-29 中铁第四勘察设计院集团有限公司 钢管混凝土挖孔灌注复合微型桩
CN111364449A (zh) * 2020-04-07 2020-07-03 中建四局第一建筑工程有限公司 一种针对预制管桩贯穿溶洞的施工方法及结构
CN115288124A (zh) * 2022-07-22 2022-11-04 广州环投南沙环保能源有限公司 一种用于上软下硬地层中的管桩结构及加固方法

Similar Documents

Publication Publication Date Title
CN104612143B (zh) 一种溶洞/土洞地质条件下的钻孔复合桩结构
CN100501011C (zh) 钻孔压浆桩施工方法
CN109024651B (zh) 一种钢管混凝土混合桩基及施工方法
CN102518135A (zh) 水平旋喷土锚和灌注桩复合基坑支护施工工法
CN101173517A (zh) 一种拔桩施工方法
CN1657711A (zh) 旋喷锚杆桩施工工艺
CN106759376A (zh) 用于临近既有地下结构的基坑桩锚支护体系及其施工方法
CN205576957U (zh) 桩底桩结构
CN103603379A (zh) 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系及其施工工艺
CN102561377A (zh) 带扩底的抗震柱岩石锚杆基础及其施工方法
CN101629422B (zh) 加筋水泥土墙基坑支护施工方法
CN107938685A (zh) 一种新型斜撑复合支护装置
CN203613568U (zh) 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系
CN207484290U (zh) 超大直径空心群桩锚碇
CN201459749U (zh) 一种深水钢管桩施工平台稳定结构
CN101280561B (zh) 一种适用于特殊地层的复合型桩体的制作方法
CN107700508A (zh) 一种型钢搅喷水泥土帷幕支护桩的施工方法
CN103821140B (zh) 一种加固松软土地基的施工方法
CN208472713U (zh) 一种治理小型滑坡的组合结构微型桩
CN203583501U (zh) 一种抵抗岩体滑动的深层抗剪装置
CN106638611A (zh) 一种微型钢管桩锚联合支护的施工方法
CN204780975U (zh) 用于中压配电线路的四回路终端钢管杆掏挖锚桩复合基础
CN107447775A (zh) 滑坡灾害体造地排水加筋土挡墙结构
CN204311463U (zh) 一种用于边坡加固的复合锚杆桩
CN105951743A (zh) 梅花形型钢水泥搅拌墙

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180403

Address after: 116023 room 2818, International Building, Zhongshan Road 692, Zhongshan Road, Shahekou District, Dalian, Liaoning

Patentee after: DALIAN JIUDING SPECIAL CONSTRUCTION ENGINEERING CO.,LTD.

Address before: 116023 Zhongshan Road 692, Shahekou District, Dalian, Liaoning Province, room 2817

Patentee before: DALIAN JIUDING XIANGRUI SPECIAL ENGINEERING TECHNOLOGY RESEARCH INSTITUTE Co.,Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Room 815, Free Trade Building, Dalian Free Trade Zone, Liaoning Province, 116023

Patentee after: Jiuding Sanli Construction Group Co.,Ltd.

Address before: Room 2818, Chenxi Xinghai International Building, No. 692 Zhongshan Road, Shahekou District, Dalian City, Liaoning Province, 116023

Patentee before: DALIAN JIUDING SPECIAL CONSTRUCTION ENGINEERING CO.,LTD.