CN104947654B - 一种复杂水域倾斜岩面大直径钻孔灌注桩的施工方法 - Google Patents
一种复杂水域倾斜岩面大直径钻孔灌注桩的施工方法 Download PDFInfo
- Publication number
- CN104947654B CN104947654B CN201510391531.2A CN201510391531A CN104947654B CN 104947654 B CN104947654 B CN 104947654B CN 201510391531 A CN201510391531 A CN 201510391531A CN 104947654 B CN104947654 B CN 104947654B
- Authority
- CN
- China
- Prior art keywords
- steel
- pile
- casing
- pipe pile
- drilling platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510391531.2A CN104947654B (zh) | 2015-07-01 | 2015-07-01 | 一种复杂水域倾斜岩面大直径钻孔灌注桩的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510391531.2A CN104947654B (zh) | 2015-07-01 | 2015-07-01 | 一种复杂水域倾斜岩面大直径钻孔灌注桩的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104947654A CN104947654A (zh) | 2015-09-30 |
CN104947654B true CN104947654B (zh) | 2017-01-18 |
Family
ID=54162676
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510391531.2A Expired - Fee Related CN104947654B (zh) | 2015-07-01 | 2015-07-01 | 一种复杂水域倾斜岩面大直径钻孔灌注桩的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104947654B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111058441A (zh) * | 2019-11-22 | 2020-04-24 | 中铁大桥局集团第二工程有限公司 | 一种深水急流条件下大直径钢护筒安放的施工装置及方法 |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105239573B (zh) * | 2015-10-28 | 2017-12-12 | 浙江省交通工程建设集团有限公司第二分公司 | 型钢栈桥的内植管锚岩施工方法 |
CN105544510B (zh) * | 2015-12-25 | 2017-12-12 | 上海建工四建集团有限公司 | 一种钻孔灌注桩的成桩方法 |
CN105735372B (zh) * | 2016-03-09 | 2017-06-30 | 中冶沈勘工程技术有限公司 | 端承型大直径灌注桩单桩承载力超前检测方法 |
CN106638582B (zh) * | 2017-02-15 | 2019-01-29 | 中交第二航务工程勘察设计院有限公司 | 一种嵌岩桩钢护筒的稳桩装置 |
CN107675707B (zh) * | 2017-09-14 | 2019-06-25 | 中交二航局第三工程有限公司 | 倾斜岩面钢护筒固定及底部堵漏方法 |
CN109914399B (zh) * | 2019-03-21 | 2021-06-01 | 杭州公路工程监理咨询有限公司 | 一种环保的桩基施工方法 |
CN110130343A (zh) * | 2019-05-09 | 2019-08-16 | 中铁四局集团第二工程有限公司 | 一种适用于深水裸岩条件下的钢护筒栽植施工方法 |
CN110241818B (zh) * | 2019-06-01 | 2020-12-25 | 天津弘野建设集团有限公司 | 钻孔灌注桩结构及其施工方法 |
CN110644551B (zh) * | 2019-08-21 | 2021-06-29 | 中国铁建重工集团股份有限公司 | 打桩机及其施工方法 |
CN110700293B (zh) * | 2019-10-23 | 2022-01-07 | 中铁十局集团第五工程有限公司 | 深水斜岩环境下旋挖引孔钢板桩围堰施工方法 |
CN112854241B (zh) * | 2021-01-13 | 2022-11-29 | 浙江精工钢结构集团有限公司 | 深基坑支护下的多层地下室钢柱吊装配套工装及吊装方法 |
CN115198738A (zh) * | 2022-07-06 | 2022-10-18 | 深圳市工勘岩土集团有限公司 | 海上平台钢套管钢筋笼与液压千斤顶组合定位施工方法 |
CN115506338A (zh) * | 2022-09-07 | 2022-12-23 | 苏州交通工程集团有限公司 | 一种桥梁水中钻孔灌注桩的施工工艺 |
CN117027673B (zh) * | 2023-08-28 | 2023-12-22 | 中建交通工程建设(长春)有限公司 | 一种方便移动的河道灌注桩桩基施工装置及其施工方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002339352A (ja) * | 2001-05-21 | 2002-11-27 | Michiaki Sugawara | 拡底鋼管杭 |
CN102268871B (zh) * | 2010-06-03 | 2013-06-05 | 中国建筑第七工程局有限公司 | 桥梁水中桩基础周转平台施工工法 |
CN102677660B (zh) * | 2012-04-28 | 2014-06-04 | 邢台路桥建设总公司 | 快速成桩的方法及利用该方法快速搭建城市立交桥的方法 |
CN203855956U (zh) * | 2014-06-03 | 2014-10-01 | 上海隧道工程股份有限公司 | 一种带套筒的灌注桩结构 |
CN104131556B (zh) * | 2014-07-22 | 2016-03-30 | 杭州江润科技有限公司 | 一种软硬夹层交互地基排水预应力管桩的施工方法 |
CN104213554A (zh) * | 2014-08-15 | 2014-12-17 | 上海市建工设计研究院有限公司 | 注浆成型变截面钢管桩施工方法及其扩挤装置 |
CN204780870U (zh) * | 2015-07-01 | 2015-11-18 | 杭州江润科技有限公司 | 一种复杂水域倾斜岩面大直径钻孔灌注桩 |
-
2015
- 2015-07-01 CN CN201510391531.2A patent/CN104947654B/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111058441A (zh) * | 2019-11-22 | 2020-04-24 | 中铁大桥局集团第二工程有限公司 | 一种深水急流条件下大直径钢护筒安放的施工装置及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104947654A (zh) | 2015-09-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104947654B (zh) | 一种复杂水域倾斜岩面大直径钻孔灌注桩的施工方法 | |
CN101666081B (zh) | 深水库区陡坡裸岩钻孔平台及工艺 | |
CN103195076B (zh) | 淤泥质深基坑塔吊基础施工方法 | |
CN208996025U (zh) | 一种深厚淤泥层双护筒桩基施工结构 | |
CN106988334B (zh) | 一种沉井支撑结构及沉井施工方法 | |
CN104264688A (zh) | 人工挖孔变截面桩支护施工工艺 | |
CN102953373B (zh) | 流砂条件下人工挖孔灌注桩施工工法 | |
CN104047542B (zh) | 嵌岩斜桩冲击钻管锤系统及嵌岩斜桩冲击施工方法 | |
CN110439013A (zh) | 一种主墩承台钢吊箱围堰施工方法 | |
CN110629747A (zh) | 复杂地质条件下桩基础全套管全回转施工工艺 | |
CN104196044A (zh) | 冲击钻限位成孔铣槽结合钢板桩的围堰施工方法 | |
CN208088288U (zh) | 大粒径碎块石高填区桩基快速成孔结构 | |
CN113550340A (zh) | 一种深水入岩条件下无封底双壁钢围堰深水基础施工方法 | |
CN108316289A (zh) | 大粒径碎块石高填区桩基快速成孔结构及其施工工艺 | |
CN113174958A (zh) | 一种劣质地况下临近道路基坑施工方法 | |
CN201172830Y (zh) | 塔式起重机锚杆静压桩基础 | |
CN110042843A (zh) | 一种复杂条件下的大型深基坑施工方法 | |
CN211312224U (zh) | 基于现有路面改造为桥梁钻孔桩用钢护筒定位工装 | |
CN103572770B (zh) | 一种桩箱水工结构物及其建造方法 | |
CN204780870U (zh) | 一种复杂水域倾斜岩面大直径钻孔灌注桩 | |
CN110016911A (zh) | 一种深护筒机械成孔成桩施工工艺 | |
CN106759270A (zh) | 一种预制钢筋混凝土带肋抗拔桩施工方法 | |
CN109577322A (zh) | 一种用于土体内部既有桩基接桩的施工装置 | |
CN210370668U (zh) | 一种位于下穿既有公路下方隧道扩建的地表加固结构 | |
CN212642730U (zh) | 一种湿陷性黄土地区隧道穿越人防结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
CB03 | Change of inventor or designer information |
Inventor after: Jia Yi Inventor after: Di Kai Inventor after: Liu Benfu Inventor after: Gao Haiyan Inventor after: Liu Jinxin Inventor before: Wang Xinquan |
|
COR | Change of bibliographic data | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20161208 Address after: 255000 Zibo, Shandong Province Road, Zichuan District No. 1 Applicant after: SHANDONG JINCHENG CONSTRUCTION CO., LTD. Address before: Gongshu District Shi Xiang Road Hangzhou city Zhejiang province 310015 and Hangzhou Road intersection C Wanda Plaza office building room 1901 Applicant before: Hangzhou Jiang Run Science and Technology Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170118 Termination date: 20200701 |