CN201099831Y - Double layer mirror-image entire interchange type overpass - Google Patents

Double layer mirror-image entire interchange type overpass Download PDF

Info

Publication number
CN201099831Y
CN201099831Y CNU2007200867623U CN200720086762U CN201099831Y CN 201099831 Y CN201099831 Y CN 201099831Y CN U2007200867623 U CNU2007200867623 U CN U2007200867623U CN 200720086762 U CN200720086762 U CN 200720086762U CN 201099831 Y CN201099831 Y CN 201099831Y
Authority
CN
China
Prior art keywords
layer
transformation
meters
mirror
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200867623U
Other languages
Chinese (zh)
Inventor
邓有则
赵明理
凌二虎
柯璇
陈宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Yaheng Science & Technology Development Co Ltd
Original Assignee
Wuhan Yaheng Science & Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Yaheng Science & Technology Development Co Ltd filed Critical Wuhan Yaheng Science & Technology Development Co Ltd
Priority to CNU2007200867623U priority Critical patent/CN201099831Y/en
Application granted granted Critical
Publication of CN201099831Y publication Critical patent/CN201099831Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

A double-layer mirror-image complete interchange type overpass comprises that an upper layer and a lower layer employ a symmetrical operation I transformation, an upper bridge and a lower bridge employ a step transformation (G+-), and transformation of the two layers employs a mirror transformation M. After three transformations, the upper layer comprises two straight driving lanes and four left turning lanes, and the lower layer comprises two straight lanes and four right turning lanes. The double-layer mirror-image complete interchange type overpass has the advantages that accommodation area is small, noise pollution to residents around is largely reduced, land resource and funds for construction are largely saved, and because vehicles pass by rapidly, energy and time are saved.

Description

Double-layer mirror image complete interchange viaduct
Technical field
The utility model is the bridge construction technical field, relates to intersection and bridge, is a kind of double-layer mirror image complete interchange viaduct.
Background technology
In the world wide, the city emerges, and high building towers, and motor vehicles increase exponentially, and traffic congestion, traffic congestion phenomenon frequently occur.
Each urban traffic thoroughfare in recent years, many overpass bridges have been built in the intersection.Also built many large-scale overpass bridges in suburbs, floor space is in 3 hectares to 50 hectares scopes, and great majority are three to four layers.Not only floor space is big, and cost is also very high.Minimum profile curvature radius does not wait to 50 meters by 15 meters, and maximum longitudinal grade is generally 3.5% to 6%, and design speed is in 20km/h to the 50km/h scope.
Build road in the urban center initial planning and mostly be about 60M, build complete interchange viaduct, need tear crossing retail shop open, dwelling house etc.Owing to be subjected to the restriction of road surrounding enviroment, city overpass bridge great majority are incomplete intercommunication formula at present, still can not cancel traffic lights.So in the vehicle peak period, in time, goes slowly and blocks up phenomenon.
The utility model content
The purpose of this utility model is that development is a kind of on original four-legs intersection road junction, as long as have a lot of social connections more than 20 meters, be preferably 60 meters to 80 meters wide, save a large amount of soil and fund not tearing open under the situation of retail shop and dwelling house on every side, can build two layers of mirror image complete interchange viaduct.
The utility model double-layer mirror image complete interchange viaduct comprises the two-layer up and down symmetry behaviour that used
Figure S2007200867623D00011
Conversion, up and down bridge used step conversion (
Figure S2007200867623D00012
), two-layer transformation applications mirror transformation
Figure S2007200867623D00013
After the cubic transformation, the upper strata is two craspedodrome roads, turns left for four, and lower floor is two craspedodrome roads, turns right for four; Perhaps descend two craspedodrome roads of arrangement layer, turn left for four, then go up two craspedodrome roads of arrangement layer, turn right for four.
Bilevel symmetry, step conversion, mirror transformation should meet following mathematical formulae:
One, symmetry operation
I ^ R Z L = - 1 0 0 0 - 1 0 0 0 - 1 R Z L
Two, step conversion
Figure S2007200867623D00021
Figure S2007200867623D00022
Three, mirror transformation
M ^ R Z L = 1 0 0 0 - 1 0 0 0 1 R Z L
Four-legs intersection crossing traffic route, with east (E), west (W), south (S), northern (N) expression, the route of turning right is kept straight on and is used (Z) representative with (R) representative, the usefulness of turning left (L) expression, tune is represented with (T).
Being 20 meters to 30 meters in the minimum of having a lot of social connections changes in the four-legs intersection road of 60 meters to 80 meters of maximums, and finish mirror transformation under the bridge on the bridge within two-layer, floor space is in 12 mu, minimum profile curvature radius is between 25 meters to 50 meters, longitudinal grade is 3.5% to 6%, and the speed of a motor vehicle is 20km/h to 50km/h.
Implement " public traffic in priority " scheme, with bus routes be arranged in turn right and keep straight between, perhaps between turning left and keeping straight on.The present invention's " people-oriented " fuses walkway and hanging garden, and hollow is built into funnel-shaped, and the control noise prevents to pollute.If do not build hanging garden, the walkway can be built equally spaced position, two crossroads in, can build underground passage, also can build pedestrian overcrossing.
The advantage of the utility model double-layer mirror image complete interchange viaduct is as follows: (1) floor space is little, in original intersection, only accounts in 12 mu of ground.(2) to have a lot of social connections with 60 meters be example to minimum profile curvature radius, is 50 meters.(3) maximum longitudinal grade is designed to 6%, and this is that (4) design speed that allows in the scope of new material new technology is 50km/h.
This is the applied mathematics design, and once great breakthrough invention greatly reduces the large-scale grade separation floor space in suburbs, be compressed in 1 hectare (15 mu) from 3 hectares to 50 hectares, for the descendants benefits,, significantly reduced noise pollution to surrounding resident owing to pass through fast.
In the design of and beautiful design art up, can set up hanging garden, beautify the environment limit noise on the upper strata in large-scale grade separation hommization.Allow fleet pass through fast, allow the highway of motherland's the earth also as the double track of railway at the moving environment of grace, unblocked.
Only the soil this, will economize on the use of funds widely, the every mu of market price in general city is 6,000,000 RMB, suburbs are 1,000,000-3,000,000 RMB.The fund of over ten billion Yuan will have been saved in a metropolis, and stay development space for the descendants.Pass through fast, energy conservation and time also are limitless.
Use at the access bridge of striding the rivers bridge and striding railway bridge, the cloverleaf formula of the sort of formula of enclosing the land or rhombus design, just needn't, be reduced to the straight way formula.Two sides are enclosed the land big more, and it is just big more to disturb residents.
On the scheme of considering " people-oriented " and " public traffic in priority ", the sidewalk is built on the hanging garden, also can design between two crossroads, also can do underground passage, guarantees the current of pedestrian and non motorized vehicle." public traffic in priority " can be with the bus routes design between turning right and keeping straight on, behind mirror transformation, can design and turn left between route and the craspedodrome route, can guarantee the unimpeded of public transport,, can dredge stifled fast by dedicated bus lanes just in case have vehicle to have an accident on the road or rear crash event etc.
Description of drawings
Fig. 1 is the first floor plan view of two layers of mirror image complete interchange viaduct.
Fig. 2 is the second layer plan view of two layers of mirror image complete interchange viaduct.
The specific embodiment
Embodiment one:
The full interchange viaduct of double-layer mirror image is built at 60 meters wide four-legs intersection road junctions, and first floor is arranged the East, West, South, North four direction circuit E that turns right R, W R, S R, N R, arranging two direct lanes is the north-south, i.e. S, N.(under the craspedodrome Z footnote slightly) second layer is arranged four corners of the world four direction circuit E that turns left L, W L, S L, NL, two direct lanes are East and West direction, E, W.
Floor space (exchange area, center) 60M * 60M=3600m 2(5.4 mu).Minimum profile curvature radius is 50 meters, maximum longitudinal grade 6%, and design speed is 50km/h.
Can arrange special-purpose bus zone, between turning right and keeping straight on, also can place turn left and keep straight between, R, Z, the L track is two-way traffic, per pass 4M-3.7M is wide.Be convenient to dredge stifled.
Embodiment two:
The four-legs intersection road junction grade separation that is connected with ring road.Ring road is that one deck, two craspedodromes of two arrangement layers and four tunnel are turned left.Charge station or other monitor control mechanisms should be arranged in the crossing of going down town.
Floor space is generally 80M * 80M=6400m 2(10 mu) minimum profile curvature radius is 60 meters, and longitudinal grade 3.5-6%, design speed are 60km/h.
Embodiment three:
Cross the access bridge of river bridge, the two sides of bridge directly link to each other with the four-legs intersection road junction, will cloverleaf and the enclose the land following bridge mode of formula of rhombus, and bridge under the straight passes through fast, reduces noise and holds together the people.

Claims (4)

1, a kind of double-layer mirror image complete interchange viaduct is characterized in that: two-layerly up and down used the symmetry operation
Figure S2007200867623C00011
Conversion, up and down bridge used step conversion (
Figure S2007200867623C00012
), two-layer transformation applications mirror transformation
Figure S2007200867623C00013
After the cubic transformation, the upper strata is two craspedodrome roads, turns left for four, and lower floor is two craspedodrome roads, turns right for four.
2, double-layer mirror image complete interchange viaduct according to claim 1 is characterized in that: two craspedodrome roads of following arrangement layer, turn left for four, and then go up two craspedodrome roads of arrangement layer, turn right for four.
3, double-layer mirror image complete interchange viaduct according to claim 1 is characterized in that: bilevel symmetry, step conversion, mirror transformation should meet following mathematical formulae:
1. symmetry operation
I ^ R Z L = - 1 0 0 0 - 1 0 0 0 - 1 R Z L
2. step conversion
Figure S2007200867623C00016
3. mirror transformation
M ^ R Z L = 1 0 0 0 - 1 0 0 0 1 R Z L
4, double-layer mirror image complete interchange viaduct according to claim 1, it is characterized in that: be 20 meters to 30 meters in the minimum of having a lot of social connections and in the four-legs intersection road of 60 meters to 80 meters of maximums, change, and finish mirror transformation under the bridge on the bridge within two-layer, floor space is in 12 mu, minimum profile curvature radius is between 25 meters to 50 meters, longitudinal grade is 3.5% to 6%, and the speed of a motor vehicle is 20km/h to 50km/h.
CNU2007200867623U 2007-08-30 2007-08-30 Double layer mirror-image entire interchange type overpass Expired - Fee Related CN201099831Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200867623U CN201099831Y (en) 2007-08-30 2007-08-30 Double layer mirror-image entire interchange type overpass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200867623U CN201099831Y (en) 2007-08-30 2007-08-30 Double layer mirror-image entire interchange type overpass

Publications (1)

Publication Number Publication Date
CN201099831Y true CN201099831Y (en) 2008-08-13

Family

ID=39936362

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200867623U Expired - Fee Related CN201099831Y (en) 2007-08-30 2007-08-30 Double layer mirror-image entire interchange type overpass

Country Status (1)

Country Link
CN (1) CN201099831Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102013118A (en) * 2010-11-22 2011-04-13 上海市城市建设设计研究院 Solid road toll system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102013118A (en) * 2010-11-22 2011-04-13 上海市城市建设设计研究院 Solid road toll system

Similar Documents

Publication Publication Date Title
CN1249302C (en) Full spatial urban road system and traffic method using same
CN101405458A (en) Hexagonal roadway system and traffic control system thereof
CN203487426U (en) Crisscross urban overpass
CN201553961U (en) Double-arch underpass
CN102587235A (en) Urban rapid transit network system
CN100351468C (en) Full stereoscopic city road system and traffic method using said system
CN201144378Y (en) Non-interchanging intercommunicated lane road
CN100443664C (en) Tower type rotary whole-interchange fly-over bridge
CN103643607A (en) Totally-closed full-interchange rapid public transport road system
CN105350416A (en) Method for solving urban road traffic jam
CN201099831Y (en) Double layer mirror-image entire interchange type overpass
CN101654900A (en) Smooth-moving bridge for intersection
CN104831595A (en) Intercommunication type grade-separated junction layout structure
CN101377071A (en) Double-layer mirror image complete interchange viaduct
CN101298749B (en) Winding across method of communicated crossroads
CN101845782B (en) Highway crossroad flyover for vehicles and pedestrian to arbitrarily pass through
CN101487214A (en) Humanized multifunctional intersection for urban crossroad
CN203639771U (en) Totally-enclosed all-interchange rapid bus road system
CN201010845Y (en) Simple vertical crossing T-shaped intersection
CN202509392U (en) Fast installing-dismounting city small car over-bridge
CN203383113U (en) Cross road and T road all-directional no-parking flyover
CN202416105U (en) Unblocked bridge for crossroad
CN201132919Y (en) Single-layer all-communicated crossroads
CN202023130U (en) Elevated overpass shaped like a Chinese character `Ri`
CN202194042U (en) Traffic junction utilizing lane changing way

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080813

Termination date: 20110830