CN1978838A - 组合式"v"形钢管混凝土柱施工方法 - Google Patents

组合式"v"形钢管混凝土柱施工方法 Download PDF

Info

Publication number
CN1978838A
CN1978838A CN 200510122876 CN200510122876A CN1978838A CN 1978838 A CN1978838 A CN 1978838A CN 200510122876 CN200510122876 CN 200510122876 CN 200510122876 A CN200510122876 A CN 200510122876A CN 1978838 A CN1978838 A CN 1978838A
Authority
CN
China
Prior art keywords
inclined tube
steel pipe
concrete
steel
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510122876
Other languages
English (en)
Other versions
CN100476142C (zh
Inventor
杨中源
全有维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
杨中源
全有维
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 杨中源, 全有维 filed Critical 杨中源
Priority to CNB2005101228764A priority Critical patent/CN100476142C/zh
Publication of CN1978838A publication Critical patent/CN1978838A/zh
Application granted granted Critical
Publication of CN100476142C publication Critical patent/CN100476142C/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本发明公开了组合式"V"形钢管混凝土柱施工方法。本发明属于建筑施工领域。其特点:A.组合式"V"形钢管混凝土柱根部向两个不同方向制作钢管混凝土柱,钢管与楼面通过""形预埋件的精确加工和安装,确保了"V"钢管的焊接连接。B.为了保证"V"形柱斜钢管各相贯口的切割准确,施工时采用电脑放样各相贯线,从而保证了"V"形钢管的准确安装。C."V"形钢管柱的斜管安装要插入锚接钢筋笼。施工时采用一个吊钩固定两个吊耳,在下端的吊耳上安装一只可调长度装置--手拉葫芦,使斜管顺利插入已安装好的锚筋内。D.砼的浇筑采用高位抛落确保钢管混凝土三向受力性能达到设计要求。本发明的方法适用于各种组合式"V"形钢管混凝土柱的施工和应用。

Description

组合式"V"形钢管混凝土柱施工方法
技术领域
本发明属于建筑施工技术领域,尤其是属于组合式“V”形钢管混凝土柱施工方法领域。
背景技术
组合式“V”形钢管混凝土柱由两根钢管在底部成一定夹角焊接连接,组合式“V”形钢管安装焊接完毕后,钢管内部浇筑混凝土,钢管混凝土柱顶部与斜梁相交。由于钢管连接的曲面线条比较多且很复杂,给预埋件和钢管的制作和安装带来了许多难题。钢管安装位置的标高比较高,距离平台边缘比较远,吊装方案的选用也是一个难题。混凝土配合比的设计和浇筑也是难点之一。所以,组合式“V”形钢管混凝土柱的施工还有一系列的技术问题需要解决。
发明内容
针对现有技术中的难题,本发明的目的是提供一种组合式“V”形钢管混凝土柱施工方法,它能保证组合式“V”形钢管混凝土柱的施工质量,确保施工质量达到设计要求。
本发明的目的是这样实现的:组合式“V”钢管混凝土柱施工方法包括预埋件制作、
Figure A20051012287600061
形埋件及根部钢筋笼预埋、“V”形柱根部相关口制作、组合式钢管混凝土柱钢管安装、上端环行预埋件安装焊接、管内混凝土浇筑,其特别之处在于:埋件和钢管的制作安装均采用电脑放样、模拟,采用汽车吊和常规的拔杆吊装技术,代替大型吊车进行吊装,既保证了工程质量,又大大地节约了费用。具体施工方法依以下次序的步骤进行:
A、预埋件的相关尺寸,采用电脑放样确定。预埋件加工时,在边缘板上焊接锚筋、中间呈圆孔,边缘板的加工要根据钢管圆柱周边不同位置和不同标高才能确定,下料加工时同样采用电脑放样,确定相关线后再制作加工。预埋件加工精度要求高,几何尺寸偏差不能超过2mm,平整误差不得超过2mm,水平度误差不得超1/1000。
B、
Figure A20051012287600071
形埋件安装后,做好斜柱锚接钢筋安装
C、各相关口采用电脑放样,将电脑放样绘制出的相关线在钢管上反映出来,然后沿相关线进行切割制作钢管的连接段相关口。相关口制作要求几何尺寸偏差不超过2mm,相关口组合后焊口宽度偏差不超过2mm。具体操作方法是,先沿管周将管外圈弹出纵向四等分线,此等分线作为绘制相关线和钢管就位的基准线。以基准线为参照线描绘各相关线。制作时立管三通相关口时,应按负误差控制,才能确保对口焊接质量。
D、钢管吊装采用汽车吊将管件及拔杆垂直运输到楼面上。通过滚杠将钢管滑移到要求安装位置,采用单拔杆进行钢管起吊安装。①立管和斜管分别一次安装就位。根据钢管的高度,采用一定高度的拔杆先吊装垂直钢管。待垂直立管焊接完成后再吊装斜管。斜管就位的难点是吊起后斜穿在3.0m长锚接钢筋笼外侧。施工时采用一个吊钩固定两个吊耳,在下端的吊耳上安装一只可调长度装置(手拉葫芦)。立管根部也安装一只手拉葫芦,通过手拉葫芦调整斜管的角度,使斜管顺利套在已安装好的斜向锚筋外。斜管安装如图3②钢管安装焊接:焊接前在预埋钢板上预先坡口,对口时将钢管放在
Figure A20051012287600081
形预埋钢板的圆孔相应位置,使钢管对接准确方便,保证坡口焊的顺利进行。为了防止焊接方法不当造成焊接变形使钢管产生倾斜和偏移。根据环形焊口的特点,采用等宽焊口、相同焊接遍数,相同焊接速度、分段、对称施焊的方法进行焊接。③斜管测量定位:利用电脑模拟试验,将斜管上端中心坐标点引到钢管外边缘,作为理论定位观侧点,施工时将斜管投影中心在斜管及楼面弹出线,在楼面斜管投影中心线上标出理论观测点在此线上的投影点,并计算出理论观测点到其投影点的距离。在楼面上投影点处画出投影线的垂直线,在垂线上安装全站仪并测出其到垂足的距离,确定理论观测点的视角。在斜管中心投影线上安装径纬仪。利用全站仪控制斜管上下位置,利用经纬仪控制斜管左右位置。斜管测量定位见图④斜钢管支撑制作与安装:由于斜管较长,在拆除拔杆之前须对斜管进行临时支撑和拉杆固定。在斜管1/2高度位置焊接水平拉杆,变“V”形成三角形。斜管下支撑用2个DN200钢管组成八字形撑脚,支撑位置距管顶不超过6m,确保了浇筑混凝土时斜管的安全与稳定。用钢管作支撑时,钢管与斜管交接处,按相关线切割后进行施焊。在垂直支撑的底部用1000×800×20mm厚钢板铺设在楼板框架梁位置。在承受支撑点的梁下层相应位置增加加固支撑,确保楼面结构安全。
E、在垂直立管和斜管安装后,进行钢管混凝土柱上部斜梁施工,斜梁下部安装环行预埋件,使钢管的端部通过环形埋件焊接与混凝土斜梁固定。
F、管内混凝土施工包括(1)混凝土等级和配合比设计:对于C40混凝土,每m3材料用量为:PO42.5水泥410kg、2.5江砂688kg、5-31.5石子1077kg、JM-8外加剂6.44kg(具有缓凝、泵送和高效增强作用)、水175kg,II级粉煤灰50kg、聚丙烯纤维(丹强丝)0.8kg。(2)管内混凝土浇筑①采用泵送混凝土输送到位,先浇筑垂直立管混凝土,后浇筑斜管混凝土,直管内混凝土分两次浇筑完成,第一次先浇筑到管顶锚接钢筋笼以下,然后安装顶端锚接钢筋笼,第二次浇筑到斜梁底部。斜管内混凝土分三次浇筑,第一次浇筑到斜管支撑部位,三天后再浇筑斜管支撑部位到锚接钢筋下的混凝土,然后安装斜管顶端锚接钢筋,再进行第三次混凝土浇筑到斜梁底部。②采用高位抛落振捣法。混凝土用输送泵自钢管上口灌入,根据钢管的高度,用特制插入式振捣器进行振实。在钢管横截面内分布三个振捣位置,使振捣棒的影响范围全部覆盖管内混凝土范围,每次振捣时间不少于60s。钢管内的混凝土浇筑工作要连续进行,为保证浇筑质量,操作人员及时在钢管外用木槌敲击。③在浇筑垂直立管混凝土时,混凝土会从斜管叉口进入斜管内,随着立管混凝土的浇筑高度升高,斜管内的混凝土也随着上升,根据施工时用木槌敲击斜管,斜管内混凝土上升到2m左右就基本稳定。待垂直立管混凝土浇筑到梁底后,再进行斜管内混凝土浇筑。
附图说明
附图1组合式“V”钢管混凝土柱节点示意图
附图2是相关口制作示意图
附图3是拔杆安装斜管示意图
附图4是斜钢管测量定位示意图
附图中标记分述如下:1----环形埋件;2---
埋件;3----V型钢管混凝土柱(端部);4---V型钢管混凝土柱(底部);5---钢管;6---葫芦;7----拔杆;8---钢筋;9---轴线坐标点;10---观测点;11—全站仪;12---经纬仪;13---投影点;
具体实施方式
下面结合附图与实施例对发明的具体实施方式作进一步详细的描述。组合式“V”形钢管混凝土柱,位于南京奥体中心主体育场东区和西区H轴外侧26.2m标高的钢筋混凝土楼面结构以上。斜柱长度从14m~20m,垂直立柱最高约15m,钢管混凝土柱外径1000mm,钢管壁厚18mm。钢管混凝土柱顶部与44.28m标高钢筋混凝土环梁相交。斜叉钢管与垂直钢管夹角从20°~32°不等。本发明的技术方案即是在该工程的实际施工中创造出来的。针对预埋件、锚接钢筋、钢管及根部相关口制作安装的难题,均采用电脑放样、模拟,再进行加工安装,确保了接口的准确。针对最大“V”形钢管柱的斜管重达8.7t,“V”形钢管混凝土柱位于26.2m标高,吊装高度达40m,而且距平台边缘约13m,采用何种方法吊装这一难题,通过方案对比,采用拔杆和50tm汽车吊代替350tm大型吊车进行吊装,既保证了吊装质量,又大大节约了费用。混凝土施工从混凝土等级和配合比设计、浇筑两方面进行控制,保证混凝土质量。预埋件、锚接钢筋、钢管及根部相关口制作安装技术、拔杆和50tm汽车技术、特种混凝土设计和浇筑技术的综合应用,保证了组合式“V”形钢管混凝土柱的施工质量。

Claims (5)

1、组合式“V”钢管混凝土柱施工方法包括埋件制作、“
Figure A2005101228760002C1
”形埋件及根部钢筋笼预埋、“V”形柱根部相关口制作、组合式钢管混凝土柱钢管安装、上端环行预埋件安装、管内混凝土浇筑,其特征在于:施工依以下步骤的方法进行:
A、预埋件的相关尺寸,采用电脑放样确定。预埋件加工时,在边缘板上焊接锚筋、中问呈圆孔,边缘板的加工要根据钢管圆柱周边不同位置和不同标高才能确定,下料加工时同样采用电脑放样,确定相关线后再制作加工
B、“
Figure A2005101228760002C2
”形埋件安装后,做好斜柱锚接钢筋笼安装
C、各相关口采用电脑放样,将电脑放样绘制出的相关线在钢管上反映出来,然后沿相关线进行切割制作钢管的连接段相关口。
D、钢管吊装采用汽车吊将管件及拔杆垂直运输到楼面上。通过滚杠将钢管滑移到要求安装位置,采用单拔杆进行钢管起吊安装。
E、在垂直立管和斜管安装后,进行钢管混凝土柱上部斜梁施工,钢管上端安装环行预埋件,使钢管的上端通过环形埋件焊接与混凝土斜梁固定。
F、管内混凝土施工
2、根据权利要求l所述的方法,其特征在于:预埋件加工精度要求高,几何尺寸偏差不能超过2mm,平整误差不得超过2mm,水平度误差不得超1/1000。
3、根据权利要求1或2所述的方法,其特征在于:相关口制作要求几何尺寸偏差不超过2mm,相关口组合后焊口宽度偏差不超过2mm。具体操作方法是,先沿管周将管外圈弹出纵向四等分线,此等分线作为绘制相关线和钢管就位的基准线。以基准线为参照线描绘各相关线。制作时立管三通相关口时,应按负误差控制,才能确保对口焊接质量。
4、根据权利要求1至3所述的方法,其特征在于:钢管吊装:①立管和斜管分别一次安装就位。根据钢管的高度,采用一定高度的拔杆先吊装垂直立管。待垂直立管焊接完成后再吊装斜管。斜管就位的难点是吊起后斜穿在3.0m长锚接钢筋笼外侧。施工时采用一个吊钩固定两个吊耳,在下端的吊耳上安装一只可调长度装置(手拉葫芦)。立管根部也安装一只手拉葫芦,通过手拉葫芦调整斜管的角度,使斜管顺利套在已安装好的斜向锚筋外。斜管安装如图3②钢管安装焊接:焊接前在预埋钢板上预先坡口,对口时将钢管放在“8”字形预埋钢板的圆孔相应位置,使钢管对接准确方便,保证坡口焊的顺利进行。为了防止焊接方法不当造成焊接变形使钢管产生倾斜和偏移。根据环形焊口的特点,采用等宽焊口、相同焊接遍数,相同焊接速度、分段、对称施焊的方法进行焊接。③斜管测量定位:利用电脑模拟试验,将斜管上端中心坐标点引到钢管外边缘,作为理论定位观侧点,施工时将斜管投影中心在斜管及楼面弹出线,在楼面斜管投影中心线上标出理论观测点在此线上的投影点,并计算出理论观测点到其投影点的距离。在楼面上投影点处画出投影线的垂直线,在垂线上安装全站仪并测出其到垂直的距离,确定理论观测点的视角。在斜管中心投影线上安装径纬仪。利用全站仪控制斜管上下位置,利用经纬仪控制斜管左右位置。斜管测量定位见图④斜钢管支撑制作与安装:由于斜管较长,在拆除拔杆之前须对斜管进行临时支撑和拉杆固定。在斜管1/2高度位置焊接水平拉杆,变“V”形成三角形。斜管下支撑用2个DN200钢管组成八字形撑脚,支撑位置距管顶不超过6m,确保了浇筑混凝土时斜管的安全与稳定。用钢管作支撑时,钢管与斜管交接处,按相关线切割后进行施焊。在垂直支撑的底部用1000×800×20mm厚钢板铺设在楼板框架梁位置。在承受支撑点的梁下层相应位置增加加固支撑,确保楼面结构安全。
5、根据权利要求1至4所述的方法,其特征在于:管内混凝土施工包括(1)混凝土等级和配合比设计:对于C40混凝土,每m3材料用量为:PO42.5水泥410kg、2.5江砂688kg、5-31.5石子1077kg、JM-8外加剂6.44kg(具有缓凝、泵送和高效增强作用)、水175kg,II级粉煤灰50kg、聚丙烯纤维(丹强丝)0.8kg。(2)管内混凝土浇筑①采用泵送混凝土输送到位,先浇筑垂直立管混凝土,后浇筑斜管混凝土,直管内混凝土分两次浇筑完成,第一次先浇筑到管顶锚接钢筋笼以下,然后安装顶端锚接钢筋笼,第二次浇筑到斜梁底部。斜管内混凝土分三次浇筑,第一次浇筑到斜管支撑部位,三天后再浇筑斜管支撑部位到锚接钢筋下的混凝土,然后安装斜管顶端锚接钢筋,再进行第三次混凝土浇筑到斜梁底部。②采用高位抛落振捣法。混凝土用输送泵自钢管上口灌入,根据钢管的高度,用特制插入式振捣器进行振实。在钢管横截面内分布三个振捣位置,使振捣棒的影响范围全部覆盖管内混凝土范围,每次振捣时间不少于60s。钢管内的混凝土浇筑工作要连续进行,为保证浇筑质量,操作人员及时在钢管外用木槌敲击。③在浇筑垂直立管混凝土时,混凝土会从斜管叉口进入斜管内,随着立管混凝土的浇筑高度升高,斜管内的混凝土也随着上升,根据施工时用木槌敲击斜管,斜管内混凝土上升到2m左右就基本稳定。待垂直立管混凝土浇筑到梁底后,再进行斜管内混凝土浇筑。
CNB2005101228764A 2005-12-06 2005-12-06 组合式“v”形钢管混凝土柱施工方法 Active CN100476142C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005101228764A CN100476142C (zh) 2005-12-06 2005-12-06 组合式“v”形钢管混凝土柱施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005101228764A CN100476142C (zh) 2005-12-06 2005-12-06 组合式“v”形钢管混凝土柱施工方法

Publications (2)

Publication Number Publication Date
CN1978838A true CN1978838A (zh) 2007-06-13
CN100476142C CN100476142C (zh) 2009-04-08

Family

ID=38130125

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005101228764A Active CN100476142C (zh) 2005-12-06 2005-12-06 组合式“v”形钢管混凝土柱施工方法

Country Status (1)

Country Link
CN (1) CN100476142C (zh)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101913064A (zh) * 2010-08-23 2010-12-15 中冶建工有限公司 斜拉桥y型钢锚箱索道管开孔方法
CN101961810A (zh) * 2009-07-24 2011-02-02 王正怡 一种多管相贯钢管构件制作施工方法
CN102061748A (zh) * 2010-11-30 2011-05-18 哈尔滨工业大学 内含钢筋骨架钢模约束高强混凝土立面交叉节点
CN102493663A (zh) * 2011-11-28 2012-06-13 中建八局大连建设工程有限公司 一种钢结构管桁架安装方法
CN102587656A (zh) * 2012-03-05 2012-07-18 中建三局建设工程股份有限公司 超高层建筑矩形钢管弯折柱或倾斜柱施工工法
CN103243928A (zh) * 2013-05-22 2013-08-14 中国建筑第八工程局有限公司 双向倾斜v型柱施工方法
CN104631837A (zh) * 2014-12-08 2015-05-20 永升建设集团有限公司 异形大吨位铸钢件安装施工方法
CN104674945A (zh) * 2015-03-09 2015-06-03 中国建筑第八工程局有限公司 树形钢管柱结构及其施工方法
CN105781119A (zh) * 2016-03-07 2016-07-20 彭宝安 后张法预应力混凝土施工中拔出预埋钢管的装置及方法
CN106088478A (zh) * 2016-08-23 2016-11-09 中建八局第二建设有限公司 倾斜劲钢砼圆柱施工方法
CN109025287A (zh) * 2018-07-20 2018-12-18 山东天齐置业集团股份有限公司 一种斜圆柱大型钢套筒预埋件后锚施工方法
CN112854779A (zh) * 2021-01-05 2021-05-28 中国建筑第八工程局有限公司 倾斜状钢结构柱柱脚施工方法
CN113073789A (zh) * 2021-04-22 2021-07-06 中国十七冶集团有限公司 一种游泳馆树杈柱斜柱施工方法
CN113107082A (zh) * 2021-04-26 2021-07-13 机械工业第六设计研究院有限公司 一种钢三角撑的施工方法
CN113107083A (zh) * 2021-04-26 2021-07-13 机械工业第六设计研究院有限公司 用于非对称建筑和连接体的减震连接结构
CN113668873A (zh) * 2021-08-12 2021-11-19 中建四局第五建筑工程有限公司 一种倾斜支撑钢柱的安装方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE466112B (sv) * 1989-04-05 1991-12-16 Joergen Thor Anordning vid en samverkanpelare samt saett foer tillverkning av en dylik anordning
CA2070079C (en) * 1992-05-29 1997-06-10 Vittorio De Zen Thermoplastic structural system and components therefor and method of making same
JP4089937B2 (ja) * 2000-02-10 2008-05-28 株式会社リコー 用紙のカール除去装置及びこの装置を備えた画像形成装置
CN2670469Y (zh) * 2003-12-17 2005-01-12 浙江杭萧钢构股份有限公司 梁柱与支撑节点结构

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101961810A (zh) * 2009-07-24 2011-02-02 王正怡 一种多管相贯钢管构件制作施工方法
CN101913064A (zh) * 2010-08-23 2010-12-15 中冶建工有限公司 斜拉桥y型钢锚箱索道管开孔方法
CN102061748A (zh) * 2010-11-30 2011-05-18 哈尔滨工业大学 内含钢筋骨架钢模约束高强混凝土立面交叉节点
CN102061748B (zh) * 2010-11-30 2012-05-02 哈尔滨工业大学 内含钢筋骨架钢模约束高强混凝土立面交叉节点
CN102493663A (zh) * 2011-11-28 2012-06-13 中建八局大连建设工程有限公司 一种钢结构管桁架安装方法
CN102587656A (zh) * 2012-03-05 2012-07-18 中建三局建设工程股份有限公司 超高层建筑矩形钢管弯折柱或倾斜柱施工工法
CN102587656B (zh) * 2012-03-05 2015-10-07 中建三局建设工程股份有限公司 超高层建筑矩形钢管弯折柱或倾斜柱施工工法
CN103243928B (zh) * 2013-05-22 2015-12-02 中国建筑第八工程局有限公司 双向倾斜v型柱施工方法
CN103243928A (zh) * 2013-05-22 2013-08-14 中国建筑第八工程局有限公司 双向倾斜v型柱施工方法
CN104631837A (zh) * 2014-12-08 2015-05-20 永升建设集团有限公司 异形大吨位铸钢件安装施工方法
CN104674945B (zh) * 2015-03-09 2016-08-17 中国建筑第八工程局有限公司 树形钢管柱结构及其施工方法
CN104674945A (zh) * 2015-03-09 2015-06-03 中国建筑第八工程局有限公司 树形钢管柱结构及其施工方法
CN105781119A (zh) * 2016-03-07 2016-07-20 彭宝安 后张法预应力混凝土施工中拔出预埋钢管的装置及方法
CN106088478A (zh) * 2016-08-23 2016-11-09 中建八局第二建设有限公司 倾斜劲钢砼圆柱施工方法
CN109025287A (zh) * 2018-07-20 2018-12-18 山东天齐置业集团股份有限公司 一种斜圆柱大型钢套筒预埋件后锚施工方法
CN109025287B (zh) * 2018-07-20 2020-07-24 山东天齐置业集团股份有限公司 一种斜圆柱大型钢套筒预埋件后锚施工方法
CN112854779B (zh) * 2021-01-05 2022-07-12 中国建筑第八工程局有限公司 倾斜状钢结构柱柱脚施工方法
CN112854779A (zh) * 2021-01-05 2021-05-28 中国建筑第八工程局有限公司 倾斜状钢结构柱柱脚施工方法
CN113073789A (zh) * 2021-04-22 2021-07-06 中国十七冶集团有限公司 一种游泳馆树杈柱斜柱施工方法
CN113073789B (zh) * 2021-04-22 2022-04-19 中国十七冶集团有限公司 一种游泳馆树杈柱斜柱施工方法
CN113107083A (zh) * 2021-04-26 2021-07-13 机械工业第六设计研究院有限公司 用于非对称建筑和连接体的减震连接结构
CN113107082B (zh) * 2021-04-26 2022-03-29 机械工业第六设计研究院有限公司 一种钢三角撑的施工方法
CN113107082A (zh) * 2021-04-26 2021-07-13 机械工业第六设计研究院有限公司 一种钢三角撑的施工方法
CN113668873A (zh) * 2021-08-12 2021-11-19 中建四局第五建筑工程有限公司 一种倾斜支撑钢柱的安装方法

Also Published As

Publication number Publication date
CN100476142C (zh) 2009-04-08

Similar Documents

Publication Publication Date Title
CN100476142C (zh) 组合式“v”形钢管混凝土柱施工方法
CN103938796B (zh) 现浇钢筋混凝土柱施工工法
CN104895092B (zh) 一种内支撑临时格构柱用作永久结构柱的方法
CN104695557B (zh) 钢结构建筑预埋地脚螺栓一次到位施工方法
CN105239725A (zh) 超高倾斜混凝土圆柱的施工方法及施工模板
CN103758348B (zh) 型钢框架结构混凝土楼板悬模浇筑施工方法
CN102518300B (zh) 预埋锥形承载接头式钢结构支座及其施工方法
CN113833020B (zh) 地下空间大型鱼腹式斜柱结构施工方法
CN104131704A (zh) 一种钢管柱混凝土的侧浇方法及所用的钢管柱结构
CN206625428U (zh) 一种管井后浇楼板封闭体系
CN108755421A (zh) 盖梁施工装置及施工方法
CN103374923A (zh) 一种水中墩承台的预制与安装方法
CN109024608A (zh) 用于逆作法的钢管柱快速定位的施工方法
CN111472353A (zh) 一种逆作法钢管立柱桩施工套管装置及其施工方法
CN101614039B (zh) 现浇剪力墙结构体系模板工程逆序施工方法
CN104831832B (zh) 装配式剪力墙结构及其安装方法
CN108149866A (zh) Pc楼梯现浇节点预埋螺栓定位装置及方法
CN105040992B (zh) 逆作法结构型钢柱倒插式施工方法
CN207717504U (zh) 一种用于超大型岔管群水压试验的支撑结构
CN205343431U (zh) 预制墙体灌浆套筒条状密排外露钢筋精确定位模具
CN114856195A (zh) 建筑管井处楼板后浇注施工方法
CN113293804A (zh) 地下室外墙防渗结构及其施工方法
CN207392744U (zh) 装配式混凝土结构主次梁连接一体化支撑系统
CN103161311A (zh) 大口径钢筋混凝土管道横穿桥台的施工方法
CN105643791A (zh) 预制墙体灌浆套筒条状密排外露钢筋精确定位模具

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: NO.3 BUILDING CO., LTD., CHINA NO.8 BUILDING ENGI

Free format text: FORMER OWNER: YANG ZHONGYUAN; APPLICANT

Effective date: 20070706

C10 Entry into substantive examination
C41 Transfer of patent application or patent right or utility model
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20070706

Address after: 210046 No. 100 Yao Jian village, Yao Cheng Gate, Nanjing, Jiangsu

Applicant after: China Construction Eighth Engineering Bureau Third Construction Company

Address before: 210046 No. 100 Yao Jian village, Yao Cheng Gate, Nanjing, Jiangsu

Applicant before: Yang Zhongyuan

Co-applicant before: Quan Youwei

C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION CO.

Free format text: FORMER OWNER: THE THIRD CONSTRUCTION CO., LTD. OF CHINA CONSTRUCTION EIGHTH BUREAU

Effective date: 20130219

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 210046 NANJING, JIANGSU PROVINCE TO: 200122 PUDONG NEW AREA, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20130219

Address after: 200122 Pudong New Area Century Avenue, Shanghai, No. 27, layer 1568

Patentee after: China Construction Eighth Engineering Division Co., Ltd.

Address before: Nanjing City, Jiangsu province 210046 Yao new Yao Road No. 18

Patentee before: The Third Construction Co., Ltd. of China Construction Eighth Bureau