CN1978801B - 超大跨度钢斜拱施工方法 - Google Patents

超大跨度钢斜拱施工方法 Download PDF

Info

Publication number
CN1978801B
CN1978801B CN200510122875XA CN200510122875A CN1978801B CN 1978801 B CN1978801 B CN 1978801B CN 200510122875X A CN200510122875X A CN 200510122875XA CN 200510122875 A CN200510122875 A CN 200510122875A CN 1978801 B CN1978801 B CN 1978801B
Authority
CN
China
Prior art keywords
arch
moulding bed
steel
assembly unit
weld
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200510122875XA
Other languages
English (en)
Other versions
CN1978801A (zh
Inventor
蒋振彦
杨中源
全有维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN200510122875XA priority Critical patent/CN1978801B/zh
Publication of CN1978801A publication Critical patent/CN1978801A/zh
Application granted granted Critical
Publication of CN1978801B publication Critical patent/CN1978801B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种超大跨度钢斜拱施工方法。本发明属于建筑施工钢结构领域。本发明特点在于:超大跨度钢斜拱的安装施工采用胎架支撑分段安装法,其步骤如下:A、将超大跨度钢斜拱分为21个结构单元;B、每个结构单元拼装采用卧式拼装法(焊接);C、采用全站仪进行支撑胎架的测设定位;D、安装支撑胎架;E、钢斜拱结构单元安装顺序为从两边向中间对称安装,最后安装中间钢斜拱结构单元;H、支撑胎架拆除。本方法施工有序,保证了施工安全。从两端往中间安装,及时消除安装的累计误差,提高了整个工程的安全保障系数,确保钢斜拱合拢一次成功。本发明的方法适用于类似的大型场馆的超大跨度钢斜拱的施工。

Description

超大跨度钢斜拱施工方法
技术领域
本发明属于建筑施工钢结构技术领域,尤其是属于超大跨度钢斜拱施工方法领域。
背景技术
超大跨度钢斜拱多出现在大型公共体育场馆的建筑设计中,这种超大跨度钢斜拱给我们施工带来许多难题,主要有以下难题:A、主拱分段重量及作业半径大,吊装高度高,安装精度受现场环境、温度变化等多方面的影响,施工难度很大;B、主拱安装时由临时支撑系统支承,在卸载过程中结构体系逐步转换,杆件内力和临时支撑的受力发生变化,工况复杂;C、主拱节点体型大、重量重、支管数量多、空间角度变化多样、空间定位困难、组装难度大。不可见焊缝的焊接必须采取合理的组装焊接顺序和组装方法,才能保证焊口的组装与焊接质量。所以,超大跨度钢斜拱的就位、焊接、吊装施工还有一系列的技术问题需要解决。
发明内容
针对现有技术中的难题,本发明的目的是提供一种超大跨度钢斜拱施工方法,它能保证超大跨度钢斜拱的施工质量,确保施工质量达到设计要求。
本发明的目的是这样实现的:超大跨度钢斜拱施工方法包括分为以下几个方面:
A、将超大跨度钢斜拱分为21个结构单元;
B、每个结构单元拼装采用卧式拼装法,钢斜拱拼装时采用箱型梁拼装的统一拼装平台,拼装完成后吊装前再进行翻身,以方便拼装施工,拼装时,钢斜拱先在内场支架上拼装成三角形后,再在胎架顶上按分段组装钢斜拱;
C、采用全站仪进行支撑胎架的测设定位,首先计算拼装胎架定位点的相对坐标,然后在拼装场地选一基准点,并计算基准点到胎架定位点的距离和角度,将全站仪架在基准点处,逐一测设各胎架定位点的平面坐标,胎架定位点的垂直坐标通过胎架高度确定;
D、安装支撑胎架,拼装胎架的安装精度是确保主拱安装准确的关键,胎架下部必须是硬质地面,胎架底部用焊接或膨胀螺栓与地面牢固连接,有胎架上构件的基准线和中心线,装配必要的定位支撑,以满足设计要求,胎架安装时可用缆风绳临时固定;
E、钢斜拱结构单元安装顺序为从两边向中间对称安装,最后安装中间钢斜拱结构单元;
F、支撑胎架拆除。
通过上述措施,确保了主拱安装的精度要求。
附图说明
附图1是拼装胎架的测设定位示意图
附图2是主拱吊装立面示意图一(主拱第1~4,18~21段吊装工况)
附图3是主拱吊装立面示意图二(主拱第5~17段吊装工况)
附图中标记分述如下:1——主拱弦杆;2——基准点;3——全站仪;4——定位点;5——平面测设坐标;6——CC2000型300t履带吊;7——2500×2500四方架支撑;8——临时支撑;9——主拱;10——钢箱型梁;11——CC2800型600t履带吊;12——卡车通道;13——履带吊开行中心;14——路基箱;
具体实施方式
下面结合附图与实施例对发明的具体实施方式作进一步详细的描述。南京奥体中心主体育场南北方向的两榀372m跨的主拱,跨度大、重量重、单榀重达1606t,拱顶最高点的标高达65m,主拱为空间结构管桁架,弧线长度达429.26m,其断面为三角形,由3根主弦管布置于斜三角形的三个顶点和底边的中点上,三角形断面的底边与地面的夹角为45°。针对跨度大、重量重等施工难题,钢拱施工时将超大跨度钢斜拱分为21个结构单元,每个结构单元拼装采用卧式拼装法(焊接),主拱拼装采用卧式拼装法,钢斜拱拼装时采用箱型梁拼装的统一拼装平台,拼装完成后吊装前再进行翻身,以方便拼装施工。拼装时,钢斜拱先在内场支架上拼装成三角形后,再在胎架顶上按分段组装钢斜拱。钢斜拱的拼装采用焊接,主拱拼装采用焊接,焊接顺序与本专利相同a、主拱各分段地面组装时的焊接顺序是:①先焊主弦杆与管、管与铸钢件对接焊缝、主弦杆与压制球的相贯焊缝;②再焊斜腹杆与铸钢件的对接焊缝、斜腹杆与主弦杆、压制球的相贯焊缝、斜腹杆和斜腹杆的相贯焊缝。③同一管子的两条焊缝不得同时焊接,焊接时应由中间往两边对称跳焊,防止扭曲变形。b、主拱各分段在高空拼装时,焊接顺序如下:①先焊主弦杆焊缝,四根弦杆应同时对称焊接。②再焊斜腹杆与铸钢件的对接焊缝、斜腹杆与主弦杆、压制球的相贯焊缝、斜腹杆和斜腹杆的对接焊缝。③最后焊“M”杆与铸钢件的对接焊缝。拼装完成后吊装前再进行翻身,以方便拼装施工,确保拼装精度的控制。再进行支撑胎架的测设定位和安装,采用全站仪进行支撑胎架的测设定位和安装,支撑胎架测设和安装控制要点为:(1)首先计算拼装胎架定位点的相对坐标(A、B……),然后在拼装场地选一基准点,并计算基准点到胎架定位点的距离和角度,将全站仪架在基准点处,逐一测设各胎架定位点的平面坐标,胎架定位点的垂直坐标通过胎架高度确定(见图);(2)拼装胎架的安装精度是确保主拱安装准确的关键。胎架下部必须是硬质地面(钢板或路基箱),胎架底部用焊接或膨胀螺栓与地面牢固连接。有胎架上构件的基准线和中心线,装配必要的定位支撑,以满足设计要求,胎架安装时可用缆风绳临时固定;
最后进行主拱的吊装,钢斜拱采用分段安装,钢斜拱结构单元安装顺序为从两边向中间对称安装,最后安装中间钢斜拱结构单元;为了精确控制屋面外和屋面内交界处的主拱分段点的尺寸精度,施工时,采用坐标定位法施测,即根据交界处屋面主拱分段点最终的坐标来确定交界处屋面内主拱分段点的坐标。同时根据已拼装完的交界处屋面外主拱分段点的外形尺寸来控制交界处屋面内主拱分段拼装胎架的放线与定位。钢斜拱安装过程采用了以下措施:(1)设置质量控制点。主拱的安装精度以“M”杆为基准,“M”杆的安装精度和标志点必须严格控制。每个主拱分段通过两个控制点来控制它的安装偏差;(2)严格控制主拱支撑胎架的安装精度。屋面外的主拱分段的安装直接以支撑胎架为基准,安装前,必须在胎架上标设标志点,并严格控制其准确度;(3)场内的分段主拱依靠“M”杆支撑。安装时,在主拱的主弦杆上焊接临时装配式耳板,进行临时固定后,进行“M”杆与铸钢之间的焊接,以避免铸钢件在受力状态下的焊接;(4)有效控制焊接应力和焊接变形的累积影响,主拱在地面分段拼装时,应至少二段一起拼装,拼装完成后留下一段作为下一段主拱的参照依据,依次类推,直到全部主拱分段拼装完毕;(5)管口对接采用工装件,以便于高空就位和调整;(6)吊装从两端向中间进行,由于主拱采用卧式连续拼装法,所以吊装前要进行翻身,翻身时采用双门滑轮,以减少翻身过程中的冲击。吊装前通过葫芦调节主拱的空间角度,确保高空对口就位准确无误。(7)合拢段的长度根据合拢时的实际测量尺寸下料。在从两端往中间安装主拱过程中,逐段消除安装误差,合拢前要进行连续观测,确定温差对拱身的影响,选择合适的时间及合拢温度,20℃安装就位,28℃定位焊接,焊接时工人对称连续施焊。即吊装顺序为:先按顺序安装第1~4段、18~21段屋面外钢斜拱,接着按顺序安装第5~10段、12~17段屋面内钢斜拱,最后安装第11段屋面内合拢段钢斜拱,合拢段的长度根据合拢时的实际测量尺寸下料。通过上述措施,确保了主拱安装的精度要求。保证了372m跨钢拱合拢一次成功。

Claims (3)

1.一种超大跨度钢斜拱施工方法,其特征在于:所述的施工方法分为以下几个方面:
A、将超大跨度钢斜拱分为21个结构单元;
B、每个结构单元拼装采用卧式拼装法,钢斜拱拼装时采用箱型梁拼装的统一拼装平台,拼装完成后吊装前再进行翻身,以方便拼装施工,拼装时,钢斜拱先在内场支架上拼装成三角形后,再在胎架项上按分段组装钢斜拱;
C、采用全站仪进行支撑胎架的测设定位,首先计算拼装胎架定位点的相对坐标,然后在拼装场地选一基准点,并计算基准点到胎架定位点的距离和角度,将全站仪架在基准点处,逐一测设各胎架定位点的平面坐标,胎架定位点的垂直坐标通过胎架高度确定;
D、安装支撑胎架,拼装胎架的安装精度是确保主拱安装准确的关键,胎架下部必须是硬质地面,胎架底部用焊接或膨胀螺栓与地面牢固连接,有胎架上构件的基准线和中心线,装配必要的定位支撑,以满足设计要求,胎架安装时可用缆风绳临时固定;
E、钢斜拱结构单元安装顺序为从两边向中间对称安装,最后安装中间钢斜拱结构单元;
F、支撑胎架拆除。
2.根据权利要求1所述的施工方法,其特征在于:
(1)主拱各分段地面组装时的焊接顺序是:①先焊主弦杆与管、管与铸钢件对接焊缝、主弦杆与压制球的相贯焊缝;②再焊斜腹杆与铸钢件的对接焊缝、斜腹杆与主弦杆、压制球的相贯焊缝、斜腹杆和斜腹杆的相贯焊缝;③同一管子的两条焊缝不得同时焊接,焊接时应由中间往两边对称跳焊,防止扭曲变形;
(2)主拱各分段在高空拼装时,焊接顺序如下:①先焊主弦杆焊缝,三根弦杆应同时对称焊接;②再焊斜腹杆与铸钢件的对接焊缝、斜腹杆与主弦杆、压制球的相贯焊缝、斜腹杆和斜腹杆的对接焊缝;③最后焊“M”杆与铸钢件的对接焊缝。
3.根据权利要求1所述的施工方法,其特征在于:
中间结构单元的长度根据合拢时的实际测量尺寸下料,在从两端往中间安装主拱过程中,逐段消除安装误差,合拢前要进行连续观测,确定温差对拱身的影响,选择合适的时间及合拢温度,20℃安装就位,28℃定位焊接,焊接时工人对称连续施焊。
CN200510122875XA 2005-12-06 2005-12-06 超大跨度钢斜拱施工方法 Active CN1978801B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200510122875XA CN1978801B (zh) 2005-12-06 2005-12-06 超大跨度钢斜拱施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200510122875XA CN1978801B (zh) 2005-12-06 2005-12-06 超大跨度钢斜拱施工方法

Publications (2)

Publication Number Publication Date
CN1978801A CN1978801A (zh) 2007-06-13
CN1978801B true CN1978801B (zh) 2010-04-14

Family

ID=38130089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200510122875XA Active CN1978801B (zh) 2005-12-06 2005-12-06 超大跨度钢斜拱施工方法

Country Status (1)

Country Link
CN (1) CN1978801B (zh)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101328746B (zh) * 2007-06-18 2010-09-29 浙江展诚建设集团股份有限公司 钢结构高空安装方法
CN101314960B (zh) * 2008-06-23 2010-05-12 华丰建设股份有限公司 混凝土落地拱的浇注施工方法
CN101988308B (zh) * 2010-09-30 2011-08-10 中国华西企业有限公司 大跨度空间螺栓球钢网壳穹顶无支撑安装工法
CN102465600B (zh) * 2010-11-17 2015-09-02 五冶集团上海有限公司 苯加氢工程苯加氢主装置钢结构框架制作方法
CN102337785B (zh) * 2011-08-19 2012-07-18 徐州中煤百甲重钢结构有限公司 超大跨度网架拱棚储料仓施工工艺
CN102691420B (zh) * 2012-06-21 2015-04-29 中国建筑第八工程局有限公司 多层大跨度钢桁架安装施工方法
CN102777043B (zh) * 2012-08-03 2015-03-04 浙江精工钢结构集团有限公司 一种拱形结构“零变形”状态提升施工方法
CN102995909A (zh) * 2012-11-14 2013-03-27 中冶天工集团有限公司 一种空间网壳坐标旋转拼装方法
CN102953553B (zh) * 2012-11-14 2015-04-15 中冶天工集团有限公司 一种利用臂架变幅机构进行大跨度管桁架安装的方法
CN108581254B (zh) * 2018-01-09 2020-02-11 南通中远重工有限公司 一种大型构件预合拢工艺方法
CN108316479B (zh) * 2018-04-16 2023-10-27 中建二局第三建筑工程有限公司 一种桁架拱门系统及其施工方法
CN113982284A (zh) * 2021-10-28 2022-01-28 中铁三局集团建筑安装工程有限公司 大跨度异型钢结构收费棚安装方法
CN114197640A (zh) * 2022-01-19 2022-03-18 中建科工集团有限公司 拱形钢结构支撑结构
CN114892813B (zh) * 2022-05-17 2023-11-10 中建二局第三建筑工程有限公司 一种大跨度建筑主体支撑钢结构及施工方法
CN114775800B (zh) * 2022-05-24 2023-06-27 浙江精工钢结构集团有限公司 一种大跨拱形钢结构无支撑安装方法
CN114855991B (zh) * 2022-06-16 2023-11-10 中国建筑一局(集团)有限公司 一种适用于大跨度拱形钢结构建筑的合拢方法
CN115748984B (zh) * 2022-11-28 2024-04-26 中铁建设集团有限公司 一种大截面梭形双倾斜柱逆作业施工方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL7501620A (en) * 1975-02-11 1976-08-13 Willem Lambooy Hall with roof with circular cross section - has segments of carrying heights with steel arches linked by flange ties and cross braces
US5333421A (en) * 1993-07-09 1994-08-02 Mckenna John T Housing unit

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL7501620A (en) * 1975-02-11 1976-08-13 Willem Lambooy Hall with roof with circular cross section - has segments of carrying heights with steel arches linked by flange ties and cross braces
US5333421A (en) * 1993-07-09 1994-08-02 Mckenna John T Housing unit

Also Published As

Publication number Publication date
CN1978801A (zh) 2007-06-13

Similar Documents

Publication Publication Date Title
CN1978801B (zh) 超大跨度钢斜拱施工方法
CN114086669B (zh) 一种大型空间异形曲面钢网架模块化快速建造方法
CN101440667A (zh) 大跨度单层雨棚网壳结构安装方法
CN112554345A (zh) 一种大跨度焊接球网架地面拼装整体提升工法
CN110409624B (zh) 一种大型设备安装与主体结构逆作计算与施工方法
CN111561175B (zh) 一种预应力托换静力切割拔柱施工工艺
CN113463768A (zh) 120m跨预应力三角钢管桁架梁施工方法
CN115419277B (zh) 一种重型钢箱型斜柱的施工方法
CN111851746A (zh) 一种多线型大跨度倒梯形空间桁架屋盖体系施工方法
CN115467421A (zh) 一种复杂大跨钢屋盖吊装施工方法
CN106223623A (zh) 钢结构箱型拱形屋架安装方法
CN114775881B (zh) 一种穹顶结构吊装施工方法及安装连接结构
CN114575462B (zh) 一种编织环状建筑结构
CN116770980A (zh) 超长变高度v型大跨度钢结构连廊及其施工方法
CN106437048A (zh) 一种折叠桁架式全自动伸缩雨棚及其操作方法
CN114214920A (zh) 大跨度双层合建钢桁架拱桥及其施工方法
CN114086770A (zh) 一种架钢构的吊装安装方法
CN112854004A (zh) 一种鱼腹式箱梁梁柱式支架施工方法
CN110241735B (zh) 斜拉桥主塔索导管的定位调整装置和调整方法
CN116816103A (zh) 一种大跨度铝合金单层网壳穹顶结构“外扩式”施工方法
CN111188281A (zh) 一种预制梁架设施工机械横向移动支撑系统及施工方法
CN100366855C (zh) 倾斜三棱锥形桁架式框架结构及其制作、安装、测量方法
CN115821753A (zh) 一种斜拉桥主塔索导管精密定位方法
CN115354750A (zh) 大跨超重异形拱桁架施工安装方法
CN100362195C (zh) 一种斜塔柱脚预埋锚栓的加工、安装方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20071109

Address after: No. 100 Yao Jian village, Yao Hua gate, Nanjing, Jiangsu

Applicant after: China Construction Eighth Engineering Bureau Third Construction Company

Address before: No. 100 Yao Jian village, Yao Hua gate, Nanjing, Jiangsu

Applicant before: Jiang Zhenyan

Co-applicant before: Yang Zhongyuan

Co-applicant before: Quan Youwei

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION CO.

Free format text: FORMER OWNER: THE THIRD CONSTRUCTION CO., LTD. OF CHINA CONSTRUCTION EIGHTH BUREAU

Effective date: 20130208

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 210046 NANJING, JIANGSU PROVINCE TO: 200122 PUDONG NEW AREA, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20130208

Address after: 200122 Pudong New Area Century Avenue, Shanghai, No. 27, layer 1568

Patentee after: China Construction Eighth Engineering Division Co., Ltd.

Address before: Nanjing City, Jiangsu province 210046 Yao new Yao Road No. 18

Patentee before: The Third Construction Co., Ltd. of China Construction Eighth Bureau