CN1664310A - Control method for coal mine detached island coal pillar rock burst - Google Patents
Control method for coal mine detached island coal pillar rock burst Download PDFInfo
- Publication number
- CN1664310A CN1664310A CN 200510011363 CN200510011363A CN1664310A CN 1664310 A CN1664310 A CN 1664310A CN 200510011363 CN200510011363 CN 200510011363 CN 200510011363 A CN200510011363 A CN 200510011363A CN 1664310 A CN1664310 A CN 1664310A
- Authority
- CN
- China
- Prior art keywords
- coal
- hole
- rib
- rice
- blasting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The invention discloses a coal mine isolated island coal column impacting ground pressure controlling method that includes laneway collocation, demolishing pressure relief, the reinforcing of superficial of the up and down slots laneway, altering the deep physical of the laneway. The advantage is decreasing the impact fatalness, increasing the intensity of the gas, and enhancing the protection function for workers in the laneway.
Description
Technical field
The invention belongs to the coal mining technical field.
Background technology
The control problem of bump is the difficult problem that world-class coal mining will solve, and especially the isolated island coal pillar mining usually follows damaging impact ground to press.The method of preventing and treating of the control of the bump of isolated island coal pillar mining and routine work face is basic identical at present, mainly in recovery process, takes to separate the danger measure in the high pressure stress district, comprises measures such as drilling and blasting release, boring release, top board explosion, base plate processing.These measures are in specific implementation process, owing to follow pushing to adopt of work plane, very dangerous between implementation period, the degree of separating danger is insufficient, causes stress raisers easily, and safety guarantee is not sure.Narrower when coal pillar width, when buried depth is big, when implementing drilling and blasting and boring release, creep into just very difficultly, it is relatively poor to separate the danger effect; Implement the coal-bed flooding method and be difficult to realize creeping into of water injecting drilling equally.Therefore controlling to of the bump of isolated island coal pillar mining also fundamentally do not reach the degree of control fully so far, and the degree of danger of its exploitation is bigger.
Goal of the invention
The objective of the invention is great deficiency, propose a kind of new bump control method at the local solution danger that exists in the present isolated island coal pillar mining bump control.
Technical scheme of the present invention is:
1, roadway arrangement
At first arrange coal cutting roadway in the low stress area of isolated island coal column, coal cutting roadway comprises other tunnels that crossheading, following crossheading and work plane are cut eye and satisfied production ventilation needs, leaves the wide coal column of 3.0-4.0 rice between coal cutting roadway and the goaf.
2, in-place blasting out release
Bore the unloading pressure by blasting hole every 3.0-4.0 rice on upper and lower crossheading rib, the aperture is generally 42 millimeters, and hole depth is coal seam thickness or span length 3 times, and the aperture is arranged in apart from base plate 1.0-1.3 rice is convenient to operation, and the boring direction elevation angle is generally 0-3 °; Bore pilot hole between per two holes, unloading pressure by blasting hole, pilot hole can be the large diameter hole greater than 100 millimeters, also can be arranged to 2-3 the small diameter bore identical with the unloading pressure by blasting bore dia; Load explosive and detonator then in the unloading pressure by blasting hole, shot depth is about 40% of a drilling depth, stops up with stemming, and line detonates, and the quick-fried pine of coal body, produces the crack between the Kong Yukong, realizes inner release.
3, upper and lower gate road helps the body superficial part to reinforce
A kind of scheme is: under the harder complete situation of upper and lower crossheading rib, rib spraying cement mortar is sealed, form the mortar spray-up, jetting thickness 5-10 centimetre.
Another kind of scheme is: help at upper and lower gate road under the situation of body soft broken, on rib, bore the chemical grouting hole, pitch-row 2.0-4.0 rice, hole depth 1.5-3.0 rice, Grouting Pipe slip casting in the hole is inserted in the boring back, injecting paste material is an organic polymer, and group's body is carried out chemosetting, makes rib form the chemical consolidation confining zone of 1.0-1.5 rice
4, to tunnel group body deep physical modification
After treating that tunnel group body superficial part is reinforced, on the rib of reinforcing, bore the physics injected hole, aperture, pitch-row are identical with the chemical grouting hole, also can in former chemical grouting hole, continue to creep into, brill is 3 times of lanewidth deeply, boring back slip casting in the coal body of in-place blasting out, injecting paste material is water glass-cement mixing slurries commonly used, has changed the mechanical property in group body deep after the slip casting.
Good effect of the present invention is: 1. reinforce and the deep physical modification by tunnel coal body superficial part, and unloading pressure by blasting, changed the mechanical property in coal body deep, made that having the coal body that impacts tendency is converted into weak impact tendency or impacts tendency, fundamentally reduces shock hazard.From rib to the deep modified zone, the intensity of coal body improves, and plays restriction to crushing of deep coal is bad, thereby coal mine detached island coal pillar rock burst is effectively controlled.
Description of drawings
Fig. 1 is the top plan view that roadway arrangement, unloading pressure by blasting hole are arranged, Fig. 2 is that coal body is reinforced schematic diagram, and Fig. 3 is that the rib of another embodiment is reinforced schematic diagram.
Among the figure: the last crossheading of 1-, 2-exploiting field coal column, the 3-pilot hole, the 4-work plane is cut eye, 5-goaf, 6-unloading pressure by blasting hole, crossheading under the 7-, 8-chemical grouting hole, 9-chemical consolidation confining zone, 10-physical modification district, 11-physics injected hole, 12-spray-up.
The specific embodiment
With certain coal seam thickness is that 2 meters colliery isolated island coal column is an example, compresses into row control with taking following method impact.
As shown in Figure 1:
One, go up crossheading 1, crossheading 7 down along the coal seam direction developing of coal column, cut eye 4 along the coal seam tendency development works face of coal column, what 3-4 rice was left in above-mentioned tunnel and goaf 5 adopts sky coal column 2, and by the requirement of safety of coal mines supporting is carried out in above-mentioned tunnel.
Two, in upper and lower crossheading apart from the unloading pressure by blasting hole 6 of 42 millimeters of the height drill diameters of 1.0 meters of base plates, 6 meters of the spacings of wells, 6 meters of drilling depths, between unloading pressure by blasting hole 6, bore pilot hole 3 again, pilot hole 3 adopts the large diameter hole of 110 millimeters of diameters, and hole depth is 7 meters, filling explosive cartridge in the unloading pressure by blasting hole 6,2.5 meters of shot depths, the double detonator parallel connection of big gun head, after the stemming obstruction, connect outside the hole once detonation or segmentation are detonated, with the quick-fried pine of coal body, removal pressure.
As shown in Figure 2:
Three, in upper and lower crossheading, be drilled in 42 millimeters of drill diameters on the rib, dark 1 meter chemical grouting hole 8 with electric detonation, 2 meters of jewel hole spacings, plug pvc pipe after the boring and annotate chemical grout to lane group superficial part, chemical grout is selected " the beautiful diffusing N of horse " for use, and lane group is formed greater than 1 meter dark chemical consolidation confining zone 9;
Four,,, inject water glass-cement grout to coal body by this hole as physics injected hole 11 in the position, hole in above-mentioned chemical grouting hole 8 or keep and continue in the intact hole to bore deeply to 6 meters.
After injecting slurries, slurries are enclosed in the coal body, make the slip casting zone form physical modification district 10 by chemical consolidation confining zone 9.
After above-mentioned steps is finished, can carry out actual mining, bump is controlled in the back production.
Fig. 3 is that the rib of another embodiment is reinforced schematic diagram, different is under the harder complete situation of upper and lower crossheading rib with Fig. 2, no longer bore injected hole and carry out chemical grouting, but rib spraying cement mortar is sealed, form spray-up 12, jetting thickness 5-10 centimetre, other step is identical with Fig. 1, Fig. 2.
Claims (3)
1, a kind of control method for coal mine detached island coal pillar rock burst, it at first arranges coal cutting roadway in the low stress area of isolated island coal column, coal cutting roadway comprises other tunnels that crossheading, following crossheading and work plane are cut eye and satisfied production ventilation needs, leaves the wide coal column of 3.0-4.0 rice between coal cutting roadway and the goaf; It is characterized in that may further comprise the steps:
(1) in-place blasting out release
On upper and lower crossheading rib, bore the unloading pressure by blasting hole every 3.0-4.0 rice, the aperture is generally 42 millimeters, hole depth is coal seam thickness or span length 3 times, the aperture be arranged in be convenient to operate apart from base plate 1.0-1.3 rice, the boring direction elevation angle is generally 0-3 °, between per two holes, unloading pressure by blasting hole, bore pilot hole, in the unloading pressure by blasting hole, load explosive and detonator then, shot depth is about 40% of a drilling depth, stop up with stemming, line detonates, the quick-fried pine of coal body, produce the crack between the Kong Yukong, realize inner release;
(2) upper and lower gate road helps the body superficial part to reinforce
Under the harder complete situation of upper and lower crossheading rib, rib spraying cement mortar is sealed, form the mortar spray-up, jetting thickness 5-10 centimetre;
Help at upper and lower gate road under the situation of body soft broken, on rib, bore the chemical grouting hole, pitch-row 2.0-4.0 rice, hole depth 1.5-3.0 rice, Grouting Pipe slip casting in the hole is inserted in the boring back, injecting paste material is an organic polymer, and group's body is carried out chemosetting, makes rib form the chemical consolidation confining zone of 1.0-1.5 rice;
(3) to tunnel group body deep physical modification
After treating that tunnel group body superficial part is reinforced, on the rib of reinforcing, bore the physics injected hole, aperture, pitch-row are identical with the chemical grouting hole, also can in former chemical grouting hole, continue to creep into, brill is 3 times of lanewidth deeply, boring back slip casting in the coal body of in-place blasting out, injecting paste material is water glass-cement mixing slurries commonly used.
2, control method for coal mine detached island coal pillar rock burst as claimed in claim 1 is characterized in that, the pilot hole in step 1 is the large diameter hole greater than 100 millimeters.
3, control method for coal mine detached island coal pillar rock burst as claimed in claim 1 is characterized in that, the pilot hole in step 1 is the small diameter bore identical with the unloading pressure by blasting bore dia of 10 centimetres of 2-3 spacings.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200510011363 CN1664310A (en) | 2005-02-28 | 2005-02-28 | Control method for coal mine detached island coal pillar rock burst |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200510011363 CN1664310A (en) | 2005-02-28 | 2005-02-28 | Control method for coal mine detached island coal pillar rock burst |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1664310A true CN1664310A (en) | 2005-09-07 |
Family
ID=35035586
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200510011363 Pending CN1664310A (en) | 2005-02-28 | 2005-02-28 | Control method for coal mine detached island coal pillar rock burst |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1664310A (en) |
Cited By (43)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1804374B (en) * | 2006-01-06 | 2010-12-01 | 山东科技大学 | Method for preventing and controlling impact geopressure in longwall face gate of coal mine |
CN101936162A (en) * | 2010-04-16 | 2011-01-05 | 兖州煤业股份有限公司 | Method for preventing rock burst of bottom plate of layered tunnel in tectonic stress region of coal mine |
CN102296958A (en) * | 2011-07-22 | 2011-12-28 | 山东科技大学 | Method for preventing rock burst by artificial space defect body |
CN102296957A (en) * | 2011-07-22 | 2011-12-28 | 山东科技大学 | Method of transfixing and distressing with one explosion during tunneling of seam roadway with rock burst |
CN102322262A (en) * | 2011-09-12 | 2012-01-18 | 山东科技大学 | Colliery isolated island coal column crossheading bump control method |
CN102383728A (en) * | 2011-09-12 | 2012-03-21 | 山东科技大学 | Coal mine rockburst defect segmentation and control method |
CN101713290B (en) * | 2009-12-10 | 2012-04-18 | 天地科技股份有限公司 | Method for clearing rock burst of full-mine laneway deep in mine |
CN102425416A (en) * | 2011-09-12 | 2012-04-25 | 山东科技大学 | Coal mine high stress area roadway driving face impact ground pressure control method |
CN102434159A (en) * | 2011-11-28 | 2012-05-02 | 浙江永昌仪表有限公司 | Mining method for ore bed |
RU2451180C1 (en) * | 2010-11-22 | 2012-05-20 | Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" | Method of roof advanced attachment at pillar extraction between workings filled with concrete |
CN102518471A (en) * | 2011-11-14 | 2012-06-27 | 山东科技大学 | Rock burst energy releasing method of roadway of high stress area in coal mine |
CN102603240A (en) * | 2012-03-23 | 2012-07-25 | 中南大学 | Dynamic load-resistant rock pillar strengthening method |
CN102635327A (en) * | 2012-04-01 | 2012-08-15 | 天地科技股份有限公司 | Grouting method and system of cracked coal rock mass |
CN102787843A (en) * | 2012-08-07 | 2012-11-21 | 新汶矿业集团有限责任公司协庄煤矿 | Dirt band-containing coal seam working surface mining process |
CN101762830B (en) * | 2009-09-29 | 2013-01-02 | 中国矿业大学 | Distributed coal mine rock burst monitoring method |
CN103061766A (en) * | 2013-01-11 | 2013-04-24 | 河南理工大学 | Method for preventing and controlling coalbed rockburst through chemical reaction |
CN103233738A (en) * | 2013-04-27 | 2013-08-07 | 西安科技大学 | Comprehensive weakening method of top coal of heavy-pitch super high seam |
CN104005765A (en) * | 2014-04-29 | 2014-08-27 | 中国矿业大学 | Stereo type prevention and control method for hard roof rock burst |
CN104453944A (en) * | 2014-12-29 | 2015-03-25 | 山东科技大学 | Coal-pillar-impacting-preventing roadway protecting method |
CN104453899A (en) * | 2014-11-06 | 2015-03-25 | 大同煤矿集团有限责任公司 | Safety recovery method of island working surface under complicated condition |
CN104533452A (en) * | 2014-12-05 | 2015-04-22 | 中国矿业大学 | Sectional type grouting reinforcement method for underground coal mine fragmentized coal bodies |
CN104632218A (en) * | 2014-12-11 | 2015-05-20 | 安徽理工大学 | Water injection reinforcing method for extremely-soft and low-moisture-content coal body working surface |
CN104832198A (en) * | 2015-03-13 | 2015-08-12 | 中煤科工集团重庆研究院有限公司 | Roadway surrounding rock deformation, rock burst and coal and gas outburst comprehensive treatment method |
CN105156110A (en) * | 2015-07-03 | 2015-12-16 | 陕西煤业化工技术研究院有限责任公司 | Dynamic disaster mine district roadway structure and method for developing same |
CN105350965A (en) * | 2015-11-27 | 2016-02-24 | 西安科技大学 | Rock burst control method for coal mining tunnel |
CN105569699A (en) * | 2015-12-22 | 2016-05-11 | 大同煤矿集团有限责任公司 | Inclined shaft development support technology for isolated coal pillar |
CN105909246A (en) * | 2016-06-30 | 2016-08-31 | 太原理工大学 | Horizontal segment blast cracking and chemical weakening method for igneous rock in thick coal seam |
CN106285674A (en) * | 2016-10-20 | 2017-01-04 | 山东科技大学 | The method of impact soft seam tunnel with meeting head on release pressure energy |
CN106401587A (en) * | 2016-10-20 | 2017-02-15 | 山东科技大学 | Method for preventing and treating bottom sliding type rock burst |
CN106437711A (en) * | 2016-10-20 | 2017-02-22 | 山东科技大学 | Coal seam impact type mine earthquake prevention and control method |
CN107013214A (en) * | 2017-05-12 | 2017-08-04 | 中国矿业大学(北京) | A kind of solution danger method of bump |
CN108661642A (en) * | 2018-04-23 | 2018-10-16 | 北京科技大学 | A kind of method of the nearly upright Bumping Pressure in Coal Layers of depth hole relieving shot prevention |
CN109209472A (en) * | 2018-07-27 | 2019-01-15 | 中国矿业大学 | The coal seam pressure relief anti-burst method that a kind of punching, explosion, water filling intercouple |
CN109854245A (en) * | 2018-12-26 | 2019-06-07 | 龙口矿业集团有限公司 | A kind of erosion control safety method of Coal Face Passing Through connection roadway |
CN109915140A (en) * | 2019-04-13 | 2019-06-21 | 山东科技大学 | Press control method to a kind of irregular gob-surrounded pillar roadway bump |
CN110005431A (en) * | 2019-04-13 | 2019-07-12 | 山东科技大学 | A kind of irregular gob-surrounded pillar working face Controlling of Coal Outburst method |
CN110219649A (en) * | 2019-06-13 | 2019-09-10 | 山东科技大学 | Buffering release drainage and wide lane flexible wall prevention and treatment tight roof stay lane bump method |
CN110259448A (en) * | 2019-06-13 | 2019-09-20 | 山东科技大学 | Unload crush the lane Ding Yukuan flexible wall prevention and treatment tight roof stay lane bump method |
CN110966002A (en) * | 2019-11-29 | 2020-04-07 | 中国矿业大学 | Roof cutting pressure relief method based on intensive drilling |
CN111636869A (en) * | 2020-04-26 | 2020-09-08 | 华北科技学院 | Roadway protection structure and method for gob-side roadway |
CN111852513A (en) * | 2020-07-29 | 2020-10-30 | 中国矿业大学 | Construction method for forming water-resisting grouting curtain on water-rich pore rock stratum by utilizing blasting |
CN112709573A (en) * | 2019-10-24 | 2021-04-27 | 西安闪光能源科技有限公司 | Hard coal face rock burst prevention and control method based on controllable shock wave pre-splitting |
CN116971817A (en) * | 2023-09-25 | 2023-10-31 | 太原理工大学 | High-gas working face ventilation method for alternately entering and returning air in gallery |
-
2005
- 2005-02-28 CN CN 200510011363 patent/CN1664310A/en active Pending
Cited By (60)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1804374B (en) * | 2006-01-06 | 2010-12-01 | 山东科技大学 | Method for preventing and controlling impact geopressure in longwall face gate of coal mine |
CN101762830B (en) * | 2009-09-29 | 2013-01-02 | 中国矿业大学 | Distributed coal mine rock burst monitoring method |
CN101713290B (en) * | 2009-12-10 | 2012-04-18 | 天地科技股份有限公司 | Method for clearing rock burst of full-mine laneway deep in mine |
CN101936162A (en) * | 2010-04-16 | 2011-01-05 | 兖州煤业股份有限公司 | Method for preventing rock burst of bottom plate of layered tunnel in tectonic stress region of coal mine |
CN101936162B (en) * | 2010-04-16 | 2012-04-18 | 兖州煤业股份有限公司 | Method for preventing rock burst of bottom plate of layered tunnel in tectonic stress region of coal mine |
RU2451180C1 (en) * | 2010-11-22 | 2012-05-20 | Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" | Method of roof advanced attachment at pillar extraction between workings filled with concrete |
CN102296958A (en) * | 2011-07-22 | 2011-12-28 | 山东科技大学 | Method for preventing rock burst by artificial space defect body |
CN102296957A (en) * | 2011-07-22 | 2011-12-28 | 山东科技大学 | Method of transfixing and distressing with one explosion during tunneling of seam roadway with rock burst |
CN102296957B (en) * | 2011-07-22 | 2013-07-17 | 山东科技大学 | Method of transfixing and distressing with one explosion during tunneling of seam roadway with rock burst |
CN102425416A (en) * | 2011-09-12 | 2012-04-25 | 山东科技大学 | Coal mine high stress area roadway driving face impact ground pressure control method |
CN102425416B (en) * | 2011-09-12 | 2013-09-25 | 山东科技大学 | Coal mine high stress area roadway driving face impact ground pressure control method |
CN102383728A (en) * | 2011-09-12 | 2012-03-21 | 山东科技大学 | Coal mine rockburst defect segmentation and control method |
CN102322262A (en) * | 2011-09-12 | 2012-01-18 | 山东科技大学 | Colliery isolated island coal column crossheading bump control method |
CN102518471A (en) * | 2011-11-14 | 2012-06-27 | 山东科技大学 | Rock burst energy releasing method of roadway of high stress area in coal mine |
CN102434159A (en) * | 2011-11-28 | 2012-05-02 | 浙江永昌仪表有限公司 | Mining method for ore bed |
CN102434159B (en) * | 2011-11-28 | 2014-03-05 | 浙江永昌仪表有限公司 | Mining method for ore bed |
CN102603240A (en) * | 2012-03-23 | 2012-07-25 | 中南大学 | Dynamic load-resistant rock pillar strengthening method |
CN102635327A (en) * | 2012-04-01 | 2012-08-15 | 天地科技股份有限公司 | Grouting method and system of cracked coal rock mass |
CN102635327B (en) * | 2012-04-01 | 2015-04-22 | 天地科技股份有限公司 | Grouting method and system of cracked coal rock mass |
CN102787843A (en) * | 2012-08-07 | 2012-11-21 | 新汶矿业集团有限责任公司协庄煤矿 | Dirt band-containing coal seam working surface mining process |
CN103061766A (en) * | 2013-01-11 | 2013-04-24 | 河南理工大学 | Method for preventing and controlling coalbed rockburst through chemical reaction |
CN103061766B (en) * | 2013-01-11 | 2015-07-15 | 河南理工大学 | Method for preventing and controlling coalbed rockburst through chemical reaction |
CN103233738A (en) * | 2013-04-27 | 2013-08-07 | 西安科技大学 | Comprehensive weakening method of top coal of heavy-pitch super high seam |
CN103233738B (en) * | 2013-04-27 | 2015-06-10 | 西安科技大学 | Comprehensive weakening method of top coal of heavy-pitch super high seam |
CN104005765A (en) * | 2014-04-29 | 2014-08-27 | 中国矿业大学 | Stereo type prevention and control method for hard roof rock burst |
CN104453899A (en) * | 2014-11-06 | 2015-03-25 | 大同煤矿集团有限责任公司 | Safety recovery method of island working surface under complicated condition |
CN104453899B (en) * | 2014-11-06 | 2016-08-24 | 大同煤矿集团有限责任公司 | Complex condition island working face safety coal extraction method |
CN104533452A (en) * | 2014-12-05 | 2015-04-22 | 中国矿业大学 | Sectional type grouting reinforcement method for underground coal mine fragmentized coal bodies |
CN104632218A (en) * | 2014-12-11 | 2015-05-20 | 安徽理工大学 | Water injection reinforcing method for extremely-soft and low-moisture-content coal body working surface |
CN104453944A (en) * | 2014-12-29 | 2015-03-25 | 山东科技大学 | Coal-pillar-impacting-preventing roadway protecting method |
CN104832198A (en) * | 2015-03-13 | 2015-08-12 | 中煤科工集团重庆研究院有限公司 | Roadway surrounding rock deformation, rock burst and coal and gas outburst comprehensive treatment method |
CN105156110A (en) * | 2015-07-03 | 2015-12-16 | 陕西煤业化工技术研究院有限责任公司 | Dynamic disaster mine district roadway structure and method for developing same |
CN105350965A (en) * | 2015-11-27 | 2016-02-24 | 西安科技大学 | Rock burst control method for coal mining tunnel |
CN105350965B (en) * | 2015-11-27 | 2017-12-29 | 西安科技大学 | Press prevention and controls exploiting colliery roadway bump |
CN105569699A (en) * | 2015-12-22 | 2016-05-11 | 大同煤矿集团有限责任公司 | Inclined shaft development support technology for isolated coal pillar |
CN105909246B (en) * | 2016-06-30 | 2018-02-16 | 太原理工大学 | A kind of chemical weakening method of high seam moderate heat diagenesis horizontal fragmentation blast cracking |
CN105909246A (en) * | 2016-06-30 | 2016-08-31 | 太原理工大学 | Horizontal segment blast cracking and chemical weakening method for igneous rock in thick coal seam |
CN106285674A (en) * | 2016-10-20 | 2017-01-04 | 山东科技大学 | The method of impact soft seam tunnel with meeting head on release pressure energy |
CN106401587A (en) * | 2016-10-20 | 2017-02-15 | 山东科技大学 | Method for preventing and treating bottom sliding type rock burst |
CN106437711A (en) * | 2016-10-20 | 2017-02-22 | 山东科技大学 | Coal seam impact type mine earthquake prevention and control method |
CN107013214A (en) * | 2017-05-12 | 2017-08-04 | 中国矿业大学(北京) | A kind of solution danger method of bump |
CN107013214B (en) * | 2017-05-12 | 2018-12-28 | 中国矿业大学(北京) | A kind of solution danger method of bump |
CN108661642A (en) * | 2018-04-23 | 2018-10-16 | 北京科技大学 | A kind of method of the nearly upright Bumping Pressure in Coal Layers of depth hole relieving shot prevention |
CN108661642B (en) * | 2018-04-23 | 2019-08-06 | 北京科技大学 | A kind of method of the nearly upright Bumping Pressure in Coal Layers of depth hole relieving shot prevention and treatment |
CN109209472A (en) * | 2018-07-27 | 2019-01-15 | 中国矿业大学 | The coal seam pressure relief anti-burst method that a kind of punching, explosion, water filling intercouple |
CN109209472B (en) * | 2018-07-27 | 2020-04-21 | 中国矿业大学 | Punching, blasting and water injection mutual coupling coal seam pressure relief and outburst prevention method |
CN109854245A (en) * | 2018-12-26 | 2019-06-07 | 龙口矿业集团有限公司 | A kind of erosion control safety method of Coal Face Passing Through connection roadway |
CN110005431A (en) * | 2019-04-13 | 2019-07-12 | 山东科技大学 | A kind of irregular gob-surrounded pillar working face Controlling of Coal Outburst method |
CN109915140A (en) * | 2019-04-13 | 2019-06-21 | 山东科技大学 | Press control method to a kind of irregular gob-surrounded pillar roadway bump |
CN110219649A (en) * | 2019-06-13 | 2019-09-10 | 山东科技大学 | Buffering release drainage and wide lane flexible wall prevention and treatment tight roof stay lane bump method |
CN110259448A (en) * | 2019-06-13 | 2019-09-20 | 山东科技大学 | Unload crush the lane Ding Yukuan flexible wall prevention and treatment tight roof stay lane bump method |
CN110219649B (en) * | 2019-06-13 | 2020-11-10 | 山东科技大学 | Method for preventing and treating hard roof roadway retention rock burst by buffering pressure relief belt and wide roadway flexible wall |
CN112709573A (en) * | 2019-10-24 | 2021-04-27 | 西安闪光能源科技有限公司 | Hard coal face rock burst prevention and control method based on controllable shock wave pre-splitting |
CN112709573B (en) * | 2019-10-24 | 2023-08-11 | 西安闪光能源科技有限公司 | Method for preventing and controlling rock burst of hard coal face based on controllable shock wave presplitting |
CN110966002A (en) * | 2019-11-29 | 2020-04-07 | 中国矿业大学 | Roof cutting pressure relief method based on intensive drilling |
CN110966002B (en) * | 2019-11-29 | 2021-08-20 | 中国矿业大学 | Roof cutting pressure relief method based on intensive drilling |
CN111636869A (en) * | 2020-04-26 | 2020-09-08 | 华北科技学院 | Roadway protection structure and method for gob-side roadway |
CN111852513A (en) * | 2020-07-29 | 2020-10-30 | 中国矿业大学 | Construction method for forming water-resisting grouting curtain on water-rich pore rock stratum by utilizing blasting |
CN116971817A (en) * | 2023-09-25 | 2023-10-31 | 太原理工大学 | High-gas working face ventilation method for alternately entering and returning air in gallery |
CN116971817B (en) * | 2023-09-25 | 2023-12-12 | 太原理工大学 | High-gas working face ventilation method for alternately entering and returning air in gallery |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1664310A (en) | Control method for coal mine detached island coal pillar rock burst | |
CN104100266B (en) | The method of preventing and treating gob side entry bump | |
CN102678120B (en) | Method for releasing pressure and removing danger of rock burst | |
CN101644156B (en) | Method for weakening coal-rock mass by hydraulic blasting and fracturing | |
CN107120137B (en) | A kind of coal roadway tunneling is along seat earth Deephole pre-splitting blasting pumping method | |
CN107060760A (en) | A kind of method that colliery withdraws tunnel presplit blasting caving release | |
CN113404535B (en) | Method for preventing rock burst by hydraulic fracturing of coal mine underground | |
CN112593936B (en) | Advanced comprehensive control method for multi-disaster area of deep mine | |
WO2011103620A1 (en) | A method of reducing subsidence or windblast impacts from longwall mining | |
CN102322262A (en) | Colliery isolated island coal column crossheading bump control method | |
CN107304676A (en) | A kind of prevention and controls for leaving bump under coal column | |
CN101936153A (en) | Method for exploiting coal bed gas by water power spray drilling for releasing pressure | |
CN111520184A (en) | Comprehensive control system and method for coal mine rock burst and harmful gas | |
CN107387082A (en) | A kind of method for weakening coal seam tight roof | |
CN109209495A (en) | The stopping of a kind of fully-mechanized mining working cutting top unloading pressure protection method on the face of adopting | |
CN107816352A (en) | A kind of method of the hard thick top plate pressure relief erosion control of waterpower cutting | |
CN107503747A (en) | A kind of static blasting economic benefits and social benefits fracturing weakens top plate method | |
CN103411493A (en) | Drilling and powder charging method for goaf-penetrating deep hole presplitting blasting | |
CN109915143A (en) | The control method of not wide protection pillar working face bump | |
WO2019214031A1 (en) | Water retention method for promoting self-repairing of mining-induced fracture by chemically softening carbonate rock | |
CN104847401A (en) | Regional coal and gas outburst coal seam coal face outburst preventing and controlling method | |
CN115749713A (en) | Rock stratum frequency conversion pulse fracture network fracturing method and equipment | |
CN110344831A (en) | Top release is cut without coal column along the sky lane self-contained Xiang Liu method | |
CN106247876A (en) | High working face cuts greatly a blasting method for fully-mechanized mining working tight roof overhead caving | |
CN112160792A (en) | Staged hydraulic fracturing working method for underground hard top plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |