CN106285674A - The method of impact soft seam tunnel with meeting head on release pressure energy - Google Patents

The method of impact soft seam tunnel with meeting head on release pressure energy Download PDF

Info

Publication number
CN106285674A
CN106285674A CN201610915601.4A CN201610915601A CN106285674A CN 106285674 A CN106285674 A CN 106285674A CN 201610915601 A CN201610915601 A CN 201610915601A CN 106285674 A CN106285674 A CN 106285674A
Authority
CN
China
Prior art keywords
tunnel
hole
major diameter
depth
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610915601.4A
Other languages
Chinese (zh)
Inventor
潘立友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201610915601.4A priority Critical patent/CN106285674A/en
Publication of CN106285674A publication Critical patent/CN106285674A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C37/00Other methods or devices for dislodging with or without loading
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor

Abstract

The method that the invention discloses a kind of impact soft seam tunnel with meeting head on release pressure energy, first it determine the region that impact soft seam tunnel meets head on to have danger of burst;Determining to meet head in the tunnel with the rock burst fatalness area, move towards along tunnel, cross section perpendicular centrage both sides same level line is arranged two major diameter pilot holes, manifest situation according to rate of penetration with creeping into power simultaneously, determine that stress of coal seam situation of change, when determining that stress of coal seam is unchanged, continues to tunnel forward;When determining that stress of coal seam changes, when driving has the depth location 4m of shock hazard to distance, stop driving, move towards construction vibrations hole along tunnel in both sides, tunnel, after once detonation blast hole explosion, the crack between major diameter pilot hole is turned on, formed and destroy band, removal surge.Unloading pressure by blasting is played excessive lead effect by the present invention, forms " convex " type damage-form, in advance, releases energy in order, fundamentally reduces damaging impact dangerous.

Description

The method of impact soft seam tunnel with meeting head on release pressure energy
Technical field
The invention belongs to Coal Mining Technology field.
Background technology
In coal mining, the hardness Protodyakonov coefficient f coal seam less than or equal to 1.0 belongs to soft seam.China Mine Geological bar Part is complicated and changeable, and along with the increase of the pit mining degree of depth, soft seam bump is increasingly severe, and this soft seam belongs to impact Property soft seam.The front of meeting head on of tunnelling process is often accompanied by the situation such as structure, coal rock layer textural anomaly, gas exception, Therefore, impact soft seam tunnelling Controlling of Coal Outburst of meeting head in deep is the technical barrier that solution is presently required.Occur in lane Pressing the danger caused to be continuously increased, impact soft seam is particularly acute the damaging impact met head in road, current this kind of impact ground The prevention and controls of pressure mainly takes unloading pressure means of holing, and this method easily induces impact failure under the conditions of impact soft seam, Cause shake top, stuck rig phenomenon.Along with mining depth increases, it is extremely difficult to reduce the purpose of impact soft seam degree of danger. Simultaneously because there is disguised disturbance induction danger, it is abnormal difficult that it controls difficulty, owing to current boring pressure relief method is formed Relief range little, between boring, release is insufficient, causes heavily stressed transfer not in place, and energy release is insufficient, and bump is difficult To control, and it is susceptible to the energy release that rank is bigger, causes great loss.When tunnel meets head on to there is the abnormal region of high stress Time, when carrying out the boring release of routine, also occur creeping into difficulty phenomenon, solve danger effect poor.The most up to the present, Gao Ying Meet head on the degree that bump the most fundamentally reaches to control completely in impact soft seam tunnel under the conditions of power, great burying. Invent and a kind of use boring to guide to meet head on the technical side of bump with vibrations propagation property method preventing and treating impact soft seam tunnel Method has Great significance.
Summary of the invention
In order to overcome the deficiencies in the prior art, fundamentally reaching the degree controlled completely, the present invention proposes a kind of impact Property soft seam tunnel meet head on release ground pressure energy method.The method is guided by boring and releases energy with vibrations propagation property.
For reaching above-mentioned purpose, the present invention adopts the technical scheme that:
The method of a kind of impact soft seam tunnel with meeting head on release pressure energy, it is characterised in that step is as follows:
The first step, determine the region that impact soft seam tunnel meets head on to have danger of burst
At impact soft seam boring head, by analogy, the analysis of adjacent stope pressure bump behavior feature, on-the-spot reality Observation judges, determines the region with danger of burst;
Second step, construction guidance hole
Determining to meet head in the tunnel with the rock burst fatalness area, moving towards along tunnel, in cross section perpendicular centrage both sides The major diameter pilot hole of two more than diameter 115mm is arranged, it is desirable to hole depth 20m, orifice position distance base plate on same level line 1.2-1.6m, two spacings of wells 0.6-0.8m;12m is often tunneled in tunnel, continues to creep into forward 20m by two borings, maintains The buffer protection band of the 8m degree of depth;During drilling construction, manifest situation according to rate of penetration with creeping into power, determine coal seam Situation of change is strong and weak with stress, it is thus achieved that the depth of shock hazard;On the other hand two borings are played the increase scope of freedom and are led To the effect of release;
When determining that stress of coal seam is unchanged, continue to tunnel forward, often tunnel 12m, stop driving, two borings are continued Creep into forward the 20m degree of depth, keep the buffer protection band of the front at least 8m degree of depth;
3rd step, concussion of blasting release
When determining that stress of coal seam changes, when driving has the depth location 4m of shock hazard to distance, stop Driving, move towards along tunnel in both sides, tunnel construction vibrations hole, every side construct three shake holes, including two diameter 115mm with On major diameter emptying aperture and a diameter 42mm blast hole, major diameter void depth 10m, blast hole degree of depth 8m, three vibrations holes Arrange in the same horizontal line, the elevation angle 0~3 °, distance bottom plate heights 1.2-1.5m;Two major diameter emptying aperture spacing 0.8-1m, its In near inboard major diameter emptying aperture distance pilot hole 0.5m, blast hole is arranged in the middle of two major diameter emptying apertures;Major diameter is empty Hole not powder charge, as the broken swollen space of explosion, blast hole loaded length 1.0-1.5m, is evenly arranged two thunders in parallel in blast hole Pipe, wired in series outside hole, once detonation;Being turned in crack between major diameter pilot hole after explosion, formed and destroy band, removal rushes Hit pressure.
Operation principle and the good effect of the present invention be: 1, by construction large-diameter deep pilot hole, on the one hand obtains impact Dangerous trickle distribution, on the other hand plays the effect guiding release with the scope of freedom;2, after vibrations hole explosion, major diameter is empty Crack conducting between hole, is formed and destroys band, has ensured the safety during region driving of meeting head on;3, advanced pilot hole is constructed in advance, Unloading pressure by blasting is played excessive lead effect, forms " convex " type damage-form, in advance, release energy in order, fundamentally reduce Damaging impact is dangerous.
Accompanying drawing explanation
The enforcement of the present invention is described below in conjunction with the accompanying drawings.
Fig. 1 is pilot hole of the present invention and the schematic diagram of vibrations pore cross section layout drawing;
Fig. 2 is the A-A direction view of Fig. 1, i.e. pilot hole and the schematic diagram of vibrations hole site plan.
In figure: 1-major diameter pilot hole, 2-major diameter emptying aperture, 3-powder stick, 4-blast hole, 5-meets head in tunnel.
Detailed description of the invention
As depicted in figs. 1 and 2, the method for the impact soft seam tunnel of the present invention with meeting head on release pressure energy is as follows:
One, the region that impact soft seam tunnel meets head on to have danger of burst is determined
At impact soft seam boring head, by analogy, the analysis of adjacent stope pressure bump behavior feature, on-the-spot reality Observation judges, determines the region with danger of burst;
Two, construction guidance hole
As depicted in figs. 1 and 2, determining that the tunnel with the rock burst fatalness area meets head on 5, moving towards along tunnel, disconnected The major diameter pilot hole 1 of two more than diameter 115mm is arranged, it is desirable to hole depth h1=on the same level line of vertical center line both sides, face 20m, orifice position distance bottom plate heights H=1.2-1.6m, pitch of holes a=0.6-0.8m;During drilling construction, according to Rate of penetration manifests situation with creeping into power, determines that coal seam situation of change is strong and weak with stress, it is thus achieved that the position of shock hazard is deep Degree;On the other hand the effect increasing scope of freedom guiding release is played in two borings;
When determining that stress of coal seam is unchanged, can continue to tunnel forward, often tunnel 12m, stop driving, by two major diameters Pilot hole 1 continues to creep into forward the 20m degree of depth, keeps the buffer protection band of the front at least 8m degree of depth;
Three, concussion of blasting release
When further determining that stress of coal seam changes, there is to distance at driving the depth location 4m of shock hazard Time, stopping driving, move towards construction vibrations hole in both sides, tunnel along tunnel, three vibrations holes of every side construction, including two diameters The major diameter emptying aperture 2 of more than 115mm and a diameter 42mm blast hole 4, major diameter emptying aperture 2 degree of depth h2=10m, blast hole 4 is deep Degree h3=8m, in the same horizontal line, the elevation angle 0~3 °, apart from bottom plate heights h4=1.2-1.5m for three vibrations holes layouts;Two Major diameter emptying aperture spacing c=0.8-1m, wherein near distance b=0.5m of inboard major diameter emptying aperture 2 with pilot hole 1, explosion Hole 4 is arranged in the middle of two large diameter holes 2;Major diameter emptying aperture 2 not powder charge is as the broken swollen space of explosion, and blast hole 4 is equipped with powder stick 3, powder stick 3 loaded length 1.0-1.5m, be evenly arranged two detonators in parallel, wired in series outside hole, once rise in blast hole 4 Quick-fried;After explosion, the crack between major diameter emptying aperture 2 is turned on, formed and destroy band, removal surge.

Claims (1)

1. the method for impact soft seam tunnel with meeting head on a release pressure energy, it is characterised in that step is as follows:
The first step, determine the region that impact soft seam tunnel meets head on to have danger of burst
At impact soft seam boring head, see by analogy, the analysis of adjacent stope pressure bump behavior feature and scene are actual Survey and judge, determine the region with danger of burst;
Second step, construction guidance hole
Determining to meet head in the tunnel with the rock burst fatalness area, moving towards along tunnel, same in cross section perpendicular centrage both sides The major diameter pilot hole of two more than diameter 115mm is arranged, it is desirable to hole depth 20m, orifice position distance base plate 1.2-on horizontal line 1.6m, two spacings of wells 0.6-0.8m;12m is often tunneled in tunnel, continues to creep into forward 20m by two borings, maintains 8m deep The buffer protection band of degree;During drilling construction, manifest situation according to rate of penetration with creeping into power, determine stress of coal seam Situation of change, it is thus achieved that the depth of shock hazard;On the other hand the work increasing scope of freedom guiding release is played in two borings With;
When determining that stress of coal seam is unchanged, continue to tunnel forward, often tunnel 12m, stop driving, two borings are continued forward Creep into the 20m degree of depth, keep the buffer protection band of the front at least 8m degree of depth;
3rd step, concussion of blasting release
When determining that stress of coal seam changes, when driving has the depth location 4m of shock hazard to distance, stop driving, Move towards construction vibrations hole along tunnel in both sides, tunnel, construct three vibrations holes in every side, big including two more than diameter 115mm Diameter emptying aperture and a diameter 42mm blast hole, major diameter void depth 10m, blast hole degree of depth 8m, three vibrations holes are arranged in On same level line, the elevation angle 0~3 °, distance bottom plate heights 1.2-1.5m;Two major diameter emptying aperture spacing 0.8-1m, the most close Inboard major diameter emptying aperture distance pilot hole 0.5m, blast hole is arranged in the middle of two major diameter emptying apertures;Major diameter emptying aperture does not fills Medicine, as the broken swollen space of explosion, blast hole loaded length 1.0-1.5m, is evenly arranged two detonators in parallel, outside hole in blast hole Wired in series, once detonation;After explosion, the crack between major diameter pilot hole is turned on, formed and destroy band, removal surge.
CN201610915601.4A 2016-10-20 2016-10-20 The method of impact soft seam tunnel with meeting head on release pressure energy Pending CN106285674A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610915601.4A CN106285674A (en) 2016-10-20 2016-10-20 The method of impact soft seam tunnel with meeting head on release pressure energy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610915601.4A CN106285674A (en) 2016-10-20 2016-10-20 The method of impact soft seam tunnel with meeting head on release pressure energy

Publications (1)

Publication Number Publication Date
CN106285674A true CN106285674A (en) 2017-01-04

Family

ID=57719502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610915601.4A Pending CN106285674A (en) 2016-10-20 2016-10-20 The method of impact soft seam tunnel with meeting head on release pressure energy

Country Status (1)

Country Link
CN (1) CN106285674A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108952809A (en) * 2018-07-11 2018-12-07 黑龙江科技大学 A method of prevention and treatment bump is guided using energy
CN109915140A (en) * 2019-04-13 2019-06-21 山东科技大学 Press control method to a kind of irregular gob-surrounded pillar roadway bump
CN110005431A (en) * 2019-04-13 2019-07-12 山东科技大学 A kind of irregular gob-surrounded pillar working face Controlling of Coal Outburst method
CN110185448A (en) * 2019-05-19 2019-08-30 中铁十九局集团矿业投资有限公司 A kind of ground fracturing and underground blasting control deep orebody rock burst method
CN113914859A (en) * 2021-09-07 2022-01-11 中煤科工开采研究院有限公司 Method for preventing rock burst during coal mine tunneling roadway fault crossing
CN115263318A (en) * 2022-06-29 2022-11-01 中国矿业大学 Combined pressure relief method for head-on blasting and cracking of rock burst mine excavation roadway

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2148171C1 (en) * 1998-07-06 2000-04-27 Дальневосточный государственный технический университет Method of mineral deposit mining
CN1664310A (en) * 2005-02-28 2005-09-07 清华大学 Control method for coal mine detached island coal pillar rock burst
CN101713290A (en) * 2009-12-10 2010-05-26 天地科技股份有限公司 Method for clearing rock burst of full-mine laneway deep in mine
CN102296958A (en) * 2011-07-22 2011-12-28 山东科技大学 Method for preventing rock burst by artificial space defect body
CN102425416A (en) * 2011-09-12 2012-04-25 山东科技大学 Coal mine high stress area roadway driving face impact ground pressure control method
CN102518471A (en) * 2011-11-14 2012-06-27 山东科技大学 Rock burst energy releasing method of roadway of high stress area in coal mine
CN102678120A (en) * 2012-05-18 2012-09-19 河南大有能源股份有限公司 Method for releasing pressure and removing danger of rock burst

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2148171C1 (en) * 1998-07-06 2000-04-27 Дальневосточный государственный технический университет Method of mineral deposit mining
CN1664310A (en) * 2005-02-28 2005-09-07 清华大学 Control method for coal mine detached island coal pillar rock burst
CN101713290A (en) * 2009-12-10 2010-05-26 天地科技股份有限公司 Method for clearing rock burst of full-mine laneway deep in mine
CN102296958A (en) * 2011-07-22 2011-12-28 山东科技大学 Method for preventing rock burst by artificial space defect body
CN102425416A (en) * 2011-09-12 2012-04-25 山东科技大学 Coal mine high stress area roadway driving face impact ground pressure control method
CN102518471A (en) * 2011-11-14 2012-06-27 山东科技大学 Rock burst energy releasing method of roadway of high stress area in coal mine
CN102678120A (en) * 2012-05-18 2012-09-19 河南大有能源股份有限公司 Method for releasing pressure and removing danger of rock burst

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
徐春光等: "湖下深井掘进工作面冲击地压防治技术", 《山东煤炭科技》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108952809A (en) * 2018-07-11 2018-12-07 黑龙江科技大学 A method of prevention and treatment bump is guided using energy
CN108952809B (en) * 2018-07-11 2020-01-14 黑龙江科技大学 Method for preventing rock burst by energy guide
CN109915140A (en) * 2019-04-13 2019-06-21 山东科技大学 Press control method to a kind of irregular gob-surrounded pillar roadway bump
CN110005431A (en) * 2019-04-13 2019-07-12 山东科技大学 A kind of irregular gob-surrounded pillar working face Controlling of Coal Outburst method
CN110185448A (en) * 2019-05-19 2019-08-30 中铁十九局集团矿业投资有限公司 A kind of ground fracturing and underground blasting control deep orebody rock burst method
CN113914859A (en) * 2021-09-07 2022-01-11 中煤科工开采研究院有限公司 Method for preventing rock burst during coal mine tunneling roadway fault crossing
CN113914859B (en) * 2021-09-07 2023-12-19 中煤科工开采研究院有限公司 Method for preventing rock burst through fault of coal mine tunneling roadway
CN115263318A (en) * 2022-06-29 2022-11-01 中国矿业大学 Combined pressure relief method for head-on blasting and cracking of rock burst mine excavation roadway
CN115263318B (en) * 2022-06-29 2023-09-19 中国矿业大学 Combined pressure relief method for head-on explosion rupture hole of rock burst mine tunneling roadway

Similar Documents

Publication Publication Date Title
CN106285674A (en) The method of impact soft seam tunnel with meeting head on release pressure energy
AU2017413518B2 (en) Stress-transfer method in tunnel with high ground pressure based on fracturing ring
CN104100266B (en) The method of preventing and treating gob side entry bump
CN102678120B (en) Method for releasing pressure and removing danger of rock burst
CN102425416B (en) Coal mine high stress area roadway driving face impact ground pressure control method
CN103939099B (en) The prevention and controls of the dangerous coal seam group bump of a kind of thump
CN108386192A (en) A kind of method of active Enhanced support and active release prevention bump
CN102518436B (en) Method for controlling tectonic rock burst in coal mine tunneling
CN107304676A (en) A kind of prevention and controls for leaving bump under coal column
CN106285680B (en) Impact soft seam tunnel way of escape Controlling of Coal Outburst method
CN1664310A (en) Control method for coal mine detached island coal pillar rock burst
CN109339786A (en) A kind of prefabricated Fracture orientation hydraulic fracturing cracking method
CN110005431A (en) A kind of irregular gob-surrounded pillar working face Controlling of Coal Outburst method
CN107120137B (en) A kind of coal roadway tunneling is along seat earth Deephole pre-splitting blasting pumping method
CN102425418A (en) Method for controlling rock burst in artificial defect body of coal mine structural area
CN109209495A (en) The stopping of a kind of fully-mechanized mining working cutting top unloading pressure protection method on the face of adopting
CN110145305B (en) Method for preventing and treating rock burst of roadway by hydraulic roof cutting and roadway retaining
CN109915141A (en) The control method of not wide protection pillar mining roadway bump
CN110306984B (en) Coal mine roadway floor type rock burst prevention and control method
CN108661642A (en) A kind of method of the nearly upright Bumping Pressure in Coal Layers of depth hole relieving shot prevention
CN105804750A (en) Prevention method for pressure bump of approximately-vertical super-thick coal seams
CN109915143A (en) The control method of not wide protection pillar working face bump
CN102296957B (en) Method of transfixing and distressing with one explosion during tunneling of seam roadway with rock burst
AU2018413679B2 (en) Method for auxiliary tunneling by means of freezing shaft-sinking carbon dioxide phase change cracking and device therefor
CN106948817A (en) Disconnected ground coal drilling combines the Controlling of Coal Outburst method of unloading pressure by blasting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170104

RJ01 Rejection of invention patent application after publication