CN104453899B CN201410618537.4A CN201410618537A CN104453899B CN 104453899 B CN104453899 B CN 104453899B CN 201410618537 A CN201410618537 A CN 201410618537A CN 104453899 B CN104453899 B CN 104453899B
Authority
CN
China
Prior art keywords
work surface
coal
meters
face
advance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410618537.4A
Other languages
Chinese (zh)
Other versions
CN104453899A (en
Inventor
陈旭忠
田利军
张效春
李有春
刘锦荣
陈涛
刘宏旺
刘宏珠
武卫东
马来斌
樊靖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datong Coal Mine Group Co Ltd
Original Assignee
Datong Coal Mine Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datong Coal Mine Group Co Ltd filed Critical Datong Coal Mine Group Co Ltd
Priority to CN201410618537.4A priority Critical patent/CN104453899B/en
Publication of CN104453899A publication Critical patent/CN104453899A/en
Application granted granted Critical
Publication of CN104453899B publication Critical patent/CN104453899B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Road Repair (AREA)

Abstract

The present invention relates to a kind of complex condition island working face safety coal extraction method, have employed the innovation mode of " adopting front walkthrough, Bian Caibian row ", it is ensured that water in gob area does not affect the normal back production of work surface.Preventing and treating bump uses other relevant Controlling of Coal Outburst ways such as boring release, base plate relieving shot, coal-bed flooding, not only increases the order of accuarcy of prediction, and reduces the possibility that bump occurs, and the normal back production for work surface provides guarantee.Work surface end is used to adopt oblique adjusting, avoid the mode that periodic weighting position combines and comprehensively determine that work surface stops adopting position, guarantee that in the range of coal-winning machine cut and work surface two ends avoids periodic weighting position to face length, keeps away not open periodic weighting position in the middle part of work surface.

Description

Complex condition island working face safety coal extraction method
Technical field
The present invention relates to a kind of coal mine work area stoping method, particularly a kind of complex condition island working face returns safely Mining method.
Background technology
In general two crossheadings of island working face and work surface, to manifest ratio more serious and many in goaf, work surface both sides for ore deposit pressure There are hydrops, work surface complicated condition.Such as kiln ore deposit, Datong Coal Group Company Xinzhou 11#Eastern panel 8101 work surface of layer is an isolated island job Face, is 8103 work surface goafs at 20 meters of 5101 lane, is former 11 at work surface open-off cut 23 meters#Eastern two panel 8312 of layer Work surface goaf, is former 11 at 30 meters of 2101 lane#Layer 302 goaf, panel, there is hydrops in goaf, work surface both sides, and two is suitable In groove and work surface, to manifest ratio more serious for ore deposit pressure, and work surface condition is more complicated, brings the biggest difficulty to working face extraction.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of complex condition island working face safety coal extraction method, the party Method can ensure the normal back production of work surface.
One complex condition island working face safety coal extraction method of the present invention, comprises the following steps:
A, discharge water in gob area
Before stope, in work surface two crossheading construction dewatering orifice, release work surface both sides water in gob area, and It is continued for this process to working face extraction to terminate, drains into shaft bottom water by crossheading drain pipe, collection middle orbit lane drain pipe Storehouse, when the advance of the face is to time at osculum 10 meters, closes this osculum immediately, opens next row water hole, carry out successively;
Using panel compartment drainage, i.e. when a panel carries out draining, other panels stop draining;
B, prevent top board large area from pressing
Work surface uses spontaneous caving to hold concurrently two ends artificial overhead caving controlroof, simultaneously according to Face Ground Pressure Behavior Situation, moves back anchor to the roof timbering of two ends, and the purpose in construction overhead caving hole is turned off the integrity that coal seam is directly pushed up, Aggravation directly top is caving, it is to avoid the outstanding top of top board large area, causes stress raisers, thus it is aobvious to weaken ore deposit pressure to a certain extent The probability that existing and reduction bump occurs.
C, Controlling of Coal Outburst
Use the method that boring platen press, base plate pressure explosion and coal-bed flooding method combine,
Boring destressing method, uses large aperture pressure relief vent, from the beginning of two gate road first advance 30 meters, at gate road Two help, adopt line, in work with the pressure relief vent of 500mm spacing construction φ=108mm, L=8000mm to stopping successively away from roadway floor 0.6 meter When making face exploitation, it is ensured that the construction first advance of pressure relief vent more than 200 meters, relatively collect because two gate roads face empty side one lateral stress In, for avoiding the occurrence of accident, therefore with loess sealing of hole 1 meter after facing the side pressure relief vent construction of empty side;
Base plate relieving shot, from the beginning of two gate road first advance 60 meters, at two gate roads successively with 1000mm Spacing construction φ=42mm, the blast hole of L=2000mm adopt line to stopping, and wherein, fortune faces empty side 300mm along crossheading borehole blasting pitch-row, Air return way borehole blasting pitch-row faces empty side 500mm, when working face mining, it is ensured that the construction first advance of pressure relief vent 200 meters Above, relatively concentrate because two gate roads face empty side one lateral stress, for avoiding the occurrence of accident, therefore after facing the side pressure relief vent construction of empty side With loess sealing of hole 1 meter;
Coal-bed flooding method, with elongated hole, two-way water flood, two gate road work surfaces sides at roadway floor 1.5 meters with 20 meters of spacing multiple operation faces carry out water filling along the punching of seam inclination direction.
D, determine the position of terminal mining line
For avoiding periodic weighting, i.e. determine according to the principle stopping adopting line-spacing last time periodic weighting (2/5) L~(3/5) L The position of terminal mining line, L is periodic weighting step pitch;
E, work surface ending oblique adjusting
Oblique adjusting is carried out at work surface the position of terminal mining line, unimpeded for transporting during ensureing oblique adjusting, with work surface head end be Central rotation machine tail end, it is contemplated that the cut scope of coal-winning machine, after determining oblique adjusting, face length increases by 1.5 meters, in oblique adjusting mistake Cheng Zhong, uses " length ", " short " cutter to intert coal cutting, owing to head is without advance rate, for prevent conveyer and support downslide, on Altering, squeeze frame, the problem such as fall apart, when cutting short sword, moving conveyor is carried out when unit sky cutter is advanced;When cutting rimmer knife, it is normally carried out Moving conveyor, and conveyer along full face straightening and is cut neat rib, full face support alinement.
The method have the advantages that
1, break the tradition that improvement flood " is first controlled and adopted afterwards ", have employed the innovation mode of " adopting front walkthrough, Bian Caibian row ", protect Card water in gob area does not affect the normal back production of work surface.
2, preventing and treating bump uses other relevant bumps such as boring release, base plate relieving shot, coal-bed flooding Prevention and treatment method, not only increases the order of accuarcy of prediction, and reduces the possibility that bump occurs, normal for work surface Back production provides guarantee.
3, the single mode of employing broken traditions determines that work surface stops adopting position, the most only consider to stop adopting top, position, base plate and Two help adjoining rock stability situation, use work surface end to adopt oblique adjusting, avoid the mode that periodic weighting position combines and comprehensively determine work Face stops adopting position, it is ensured that face length is in the range of coal-winning machine cut and work surface two ends avoids periodic weighting position, work Periodic weighting position is kept away not open as Middle face.
Accompanying drawing explanation
Fig. 1 is to bear directly top, the dual rotation pressure schematic diagram on old top at working face wall for a long time.
Fig. 2 is that oblique adjusting schematic diagram is adopted at work surface end.
Detailed description of the invention
Claimed technical scheme is done the most clear with kiln ore deposit 8101, Datong Coal Group Company Xinzhou work surface below Chu, complete explanation.
Work surface basic condition
8101 work surfaces are positioned at kiln mine field, Xinzhou to oblique east, and substantially in a fold tectonic, work face length 126 meters, coal Layer thickness 2.8 meters~4.6 meters, average 3.56 meters, the double lane of work surface is arranged, uses single longwell retrusive, spontaneous caving to hold concurrently two The comprehensive mechanized coal mining method of termination artificial overhead caving controlroof.8101 work surface impact danger are analyzed through composite index law Danger index W t=0.69, has medium impact dangerous.Adjacent 402 panel 8215 work surfaces (adopting for 1986) goaf, work surface east, south Adjacent 8405 work surfaces (adopting for 1970) goaf, adjacent eastern two panel 8314 work surfaces (adopting for 1987) goaf, north, west is adjacent 8103 work surface goafs, for island working face, top, base plate are medium-fine sand rock and the shale alternating layers of about 8 meters, for typically Datong Mine Area " three is hard " coal seam, work surface and two gate road local stress collection all can be caused in fold, isolated island, " three is hard " coal seam In, thus inducing bump, there is hydrops in goaf, work surface thing both sides.
Discharge water in gob area
Owing to 8105,8103 work surfaces find that during administering flood water in gob area is running water, and increment compares Greatly, it is impossible to realize first controlling adopting afterwards, it has been decided through consideration, the method using " adopting front walkthrough, Bian Caibian row ", it is ensured that water in gob area is not Affect the normal back production of work surface, take to discharge in work surface inside and outside construction dewatering orifice Adjacent Working Face water in gob area, i.e. exist Before back production 8101 work surface, in belt lane, the big lane of mine prevailing traffic that is 865 to 8105 construction dewatering orifices, work surface goaf, Accumulative draining 1960m3;Before back production 8101 work surface, in work surface two crossheading construction dewatering orifice, release work surface both sides are adopted Dead zone hydrops, and be continued for this process to working face extraction to terminate, accumulative draining 12440m3.Two crossheadings are every 100 meters Construct a dewatering orifice, drain into wellhole by crossheading drain pipe, collection middle orbit lane drain pipe.When the advance of the face is to away from draining Time at 10 meters of hole, close this osculum immediately, open next row water hole, carry out successively.Due to by great Xiang ditch drain discharge Limiting, each panel drainage works can not be carried out simultaneously, to this end, my ore mining panel compartment drainage, i.e. carries out when a panel During draining, other panels stop draining, and each panel is according to practical situation close fit, in turn draining, it is ensured that mine drainage work That makees is normally carried out.During working face extraction, water in gob area does not pour in work surface, in practice it has proved that, dewatering orifice Construction solve the flood problem of work surface well, the smooth back production for work surface creates condition.
Prevent top board large area from pressing
1. goaf top plate management
Work surface uses spontaneous caving to hold concurrently two ends artificial overhead caving controlroof, simultaneously according to Face Ground Pressure Behavior Situation, moves back anchor to the roof timbering (anchor pole, anchor cable) of two ends.It is direct that the purpose in construction overhead caving hole is turned off coal seam The integrity on top, aggravation directly top is caving, it is to avoid the outstanding top of top board large area, causes stress raisers, thus to a certain degree On weaken ore deposit pressure manifest and reduces bump generation probability.
8101 work surfaces, in progradation, use in " pace type ", caving mode that deep hole combines, except cutting opening Outside ophthalmic construction caving hole, also starting at away from open-off cut 4 meters at two gate roads every 6 meters of 3 groups of caving holes of constructing, construction is extremely Terminate away from stopping adopting at 11 meters of line, caving hole first advance 80 meters construction, hang toplap when two ends and cross 5 × 10m2Time, fill Medicine, explosion, during explosion, big gun hole allowed support break line 1.5 meters, when goaf top plate slump is preferable, not powder charge, explosion.11# East one coal seam, panel puppet top thickness 0.6m~0.7m, direct top thickness 1.9m~2.8m, old top thickness 4.5m~10.24m, between work surface Two ends is caving near coal column side side top board is more difficult, is then easier to be caving near work surface side side, considers again meanwhile The direct purpose of " caving " is that work surface two ends is directly pushed up generation crack, destroys the integrity that coal seam is directly pushed up, the most again Will to old jacking row presplitting, so, construct 2 groups of deep holes in coal column side side, 1 group of mesopore of constructing in work surface side side, and must Must ensure that the vertical depth of hole depth at least enters 1 meter of old top, so far, caving hole design parameter is as shown in table 1.
Table 1
Through long-term practice, finding when 1/3 that sealed borehole length is hole depth, demolition effect is best, uses loess simultaneously Sealing of hole, powder charge uses forward charge constitution.
Overhead caving hole is moved back anchor and is combined and avoid the outstanding top of top board large area with two ends, reduces the collection intermediate range of stress Degree, prevents top board large area to press from source.
2. face roof management
8101 work surfaces use ZZS6000/17/36 type four post support shield type hydraulic support, 87 frame altogether, support safety Valve opening pressure 31MPa.Use simultaneously advanced person KJ216 type top board On-Line Dynamic Monitoring system, respectively 1#, 10#, 20#, 30#, 40#, 50#, 60#, 70#, 80#, 87# support is respectively installed a set of, zoning monitoring work surface inner support working resistance change rule Rule and relief valve open frequency.Gathered by ore deposit pressure chamber, arrange ore deposit pressure data, analyze, add up ore deposit pressure data, according to Mine pressure analysis, In conjunction with work surface macroscopic view observed case, it is contemplated that first and periodic weighting step pitch, issue work surface weighting length in time, it is ensured that work Face safely, quickly propel.
Compare proximal surface 8103 work surface, and 8101 work surfaces have employed the top board On-Line Dynamic Monitoring system of advanced person, it is possible to Monitoring face roof pressure distribution situation and ore deposit pressure manifest situation at any time, meanwhile, in conjunction with work surface macroscopic view observed case, find Rule of roof movement of coal and periodic weighting step pitch, for evaluating bracket support effect, support to the well-posedness of such top board and top board Rule is pressed to provide foundation.
According to the back production experience of 8105,8103 work surfaces, this force piece working resistance situation of change and work surface ore deposit Pressure manifests situation, and all water component of this work surface are 21 meters, and when work surface pushes up periodic weighting always, working resistance of support is universal At 28-30MPa, the relief valve unlatching frequency is higher, and working face wall has wall caving phenomenon, and the two vexed piers of gate road are frequent, show this Time pressure intensity higher.When work surface goaf is square, ore deposit pressure manifests the strongest.
In view of above-mentioned phenomenon, when advance of the face length is close to during away from periodic weighting last time 20 meters, strict guarantee pumping plant work Make pressure, support setting load, two crossheading advance support setting loads and improve work surface two ends demolition effect.
Find according to long tracking and monitoring, when work surface two ends demolition effect is poor, when moving back anchor not in time, a side Face, not only results in working resistance of support at the increase of two ends direct top-hung top area, two ends and increases, meanwhile, work as goaf Directly top-hung apex distance from reach capacity span time, once slump, a large amount of toxic and harmfuls can be discharged to work surface, affect work The normal production in face;On the other hand,
Two ends is directly pushed up not to be caving for a long time to cause and is born directly top, old dual time pushed up at working face wall for a long time Turn pressure as it is shown in figure 1, cause coal wall caving phenomenon to increase the weight of, working resistance of support increase.
Top board On-Line Dynamic Monitoring systematic difference can not only grasp in time work surface inner support working resistance change, Solve Face Ground Pressure Behavior degree, in order to instruct team's group safety in production, and, itself and the artificial overhead caving of two ends, two ends Move back after anchor combines, artificial overhead caving can be grasped, move back the anchor alleviation situation to work surface stress concentration degree, in order to further Optimize the design parameter in overhead caving hole so that it is more scientific, reasonable.
4, bump monitoring technology
1. drilling cuttings method
Drilling cuttings method is the boring by beating diameter 42~50mm in coal seam, according to the coal dust amount discharged and Changing Pattern thereof With relevant dynamic effect, differentiate a kind of method of danger of burst.
For confirming the existence of borehole effect and finding the stress distribution law of 5101 lane advance support sections, and foundation 8105, The back production experience of 8103 work surfaces, plays the boring of an a diameter of 50mm in 5101 lane adjacent air space side sides every 10 meters, and in impact Play a boring again after ground Hair Fixer is raw, compare, through testing discovery for a long time, at 5101 lane first advances before occurring In the range of 10 meters~15 meters, at rib 8 meters~12 meters, coal dust amount substantially rises, and sometimes beat with drilling rod, bit freezing etc. dynamic Stress effect, simultaneously, in practice it has proved that most bumps occur within the range.Before bump occurs, super in 5101 lanes Leading face about 10 meters place, stress is relatively concentrated, and after bump occurs, peak stress shifts to coal body depths.Meanwhile, down-hole Practical situation has also complied with this point, and in the range of being somebody's turn to do, roadway floor substantially occurs that pucking, advance support girder steel have buckling phenomenon.
2. micro-seismic method
Along with the continuous propelling of work surface, mine pressure will certainly be caused to redistribute, inevitably bring certain The vibrations of degree, micro-seismic method is exactly the energy of record mining vibrations, and then determines, analyzes the direction of vibrations, carrys out epicenter location Evaluate and prediction mine power phenomenon.Along with constantly the promoting of engineers and technicians' quality, On Microseismic Monitoring Technique the most more Newly, the accuracy rate that my ore deposit utilizes this technological prediction bump to occur has brought up to more than 60%.
3. electromagnetic radiation method
After excavation is formed, work surface coal body loses stress equilibrium, plays pendulum, and coal body must become Shape or rupture, with to new stress equilibrium status transition, this process can cause electromagnetic radiation, uses cordless to accept electricity Magnetic radiation signal such that it is able to analyze stress concentration degree, the probability of happening of further predicting rock burst.
My ore deposit now uses the critical method in electromagnetic radiation method to be predicted, and i.e. connects in the region not having bump danger Continuous observation electromagnetic radiation amplitude maximum, amplitude meansigma methods and umber of pulse data, k times (general k=1.5) taking its meansigma methods are made For marginal value, its predictor formula is
ECritical=kEAveragely
At present electromagnetic radiation method in my ore deposit also in the starting stage, the most immature, work afterwards also needs to into one Step strengthens the monitoring in this field.
4. pressure observation method
Traditional pressure observation method mainly observes the amount of crushing, working resistance of support, support post decrement alive and every day Face condition is carried out macroscopic view observation, including coal wall caving, vexed pier, roof cracking, goaf hanging deck and inbreak, pumping plant pressure Power, two gate road roof delamination amounts etc..On this basis, the KJ216 type top board dynamic monitoring system that my ore mining is advanced, often Install a set of every ten framves, the working resistance Changing Pattern of zoning monitoring work surface inner support and relief valve open frequency, find top Plate mechanics and periodic weighting step pitch, gathered by ore deposit pressure chamber, arrange ore deposit pressure data, analyzes, adds up ore deposit pressure data, presses according to ore deposit Analyze, in conjunction with work surface macroscopic view observed case, it is contemplated that first and periodic weighting step pitch, issue work surface weighting length in time, for Prevent bump generation with having emphasis provides foundation.
Through proximal surface (8103 work surface) back production experience and the long-term observation to this work surface, find the cycle of this work surface Water component average out to 22 meters, when pressing, working resistance of support maximum can reach 5950KN, and top, the base plate maximum amount of shifting near are 90mm, and with vexed pier, there is the bending of pucking, advance support girder steel, working face wall wall caving in two gate road advance support sections Deng, based on this, work surface is in progradation, when adopting to about 15 meters at last time periodic weighting, closely observe work surface, Two gate road strata behaviors situations also combine the data analysis of monitoring system, further determine that whether top board presses, with Just correlative protection measure is taked.
After taking KJ216 type top board dynamic monitoring system, the research to the working resistance Changing Pattern of work surface inner support More scientific, no longer as dependence experience the most blindly, meanwhile, for the first time relief valve open frequency is made research, and tie Closing work surface macroscopic view observed case, the prediction to Rule of roof movement of coal and periodic weighting step pitch is more accurate, has had sector more Add the directive significance of reality.
5, Controlling of Coal Outburst technology
1. hole destressing method
Boring destressing method is that utilization boring reduces the elasticity energy accumulating in coal seam, is that the one of the elastic energy of release has efficacious prescriptions Method.
My ore mining large aperture pressure relief vent, from the beginning of two gate road first advance 30 meters, help at gate road two, away from Roadway floor 0.6 meter adopts line with 500mm spacing construction φ=108mm, the pressure relief vent of L=8000mm to stopping successively, opens at work surface When adopting, it is ensured that the construction first advance of pressure relief vent more than 200 meters, relatively concentrate because two gate roads face empty side one lateral stress, for Avoid the occurrence of accident, therefore with loess sealing of hole 1 meter after facing the side pressure relief vent construction of empty side.
After pressure relief vent construction, along with the continuous propelling of work surface, a bearing capacity moves forward with certain speed equally, when When arriving pressure relief vent position, if a bearing capacity is less than the stability of hole wall, hole wall does not destroys;When a bearing capacity surpasses When crossing the stability of hole wall, hole wall deformation, a bearing capacity is the highest, and hole wall damage envelope is bigger, further illustrates, Tunnel Pressure Shifted, discharged.
2. base plate relieving shot
From the beginning of two gate road first advance 60 meters, two gate roads successively with 1000mm spacing construction φ= The blast hole of 42mm, L=2000mm adopts line to stopping, and wherein, fortune faces empty side 300mm along crossheading borehole blasting pitch-row, quick-fried in air return way Holes is away from facing empty side 500mm, and blast hole fills 3 grades of coal mine allowable powdered emulsified explosives of volume three φ=35mm, L=200mm, in work During the exploitation of face, it is ensured that the construction first advance of pressure relief vent more than 200 meters, relatively collect because two gate roads face empty side one lateral stress In, for avoiding the occurrence of accident, therefore use loess sealing of hole 1 meter after facing the side pressure relief vent construction of empty side, the construction of blast hole is at work surface Before back production the most complete.
Behind construction relieving shot hole, being affected by lead abutment pressure, the base plate before loosened gradually is compacted, and illustrates, pressure Power has obtained effective release, and Floor Heave in Roadway degree substantially weakens.
3. coal-bed flooding method
The purpose of coal-bed flooding mainly reduces elasticity and the intensity of coal body, in making the coal rock layer marginal zone of work surface reduce Portion's cohesive force, reduces its elasticity, reduces its potential.
8101 work surfaces use elongated hole, two-way water floods, two gate road work surfaces side at roadway floor 1.5 meters with Punching along seam inclination direction in 20 meters of spacing multiple operation faces, hole depth is that (1/3) ÷ the Cos γ, γ of face length are for holing Angle, i.e. hole depth=42 meter, bore angle γ=α-θ,
α-seam inclination, takes 3 °;
Along angle under θ-boring maximum, typically take 0.2~0.5 °, at this, take 0.5 °;
Finally, bore angle γ=2.5 °.
The spacing of wells is the width that water moistens coal body, and empirically value takes 20 meters
The distance X=Te S+M of water filling first advance
Te-water filling natural law, S-work surface day advance rate, take 4 meters, M-stops the boring distance away from work surface during water filling, takes 70 meters~80 meters
It is computed X=90 rice.
The distance of water filling first advance must assure that the advance of the face is fully infiltrated to coal body during water injection hole.
Water injection rate Q=LBM γ q
Q-ton coal water injection rate, the experience in should putting into practice according to water loss rate during water filling, the porosity of coal body and water filling Determine, typically take 0.03m3/t;
L-face length/2;M-coal seam thickness, takes 3.56 meters;γ-coal seam unit weight, takes 1.34t/m3;Between B-water injection hole Away from.
Water injection time t=Q/60 S,
Q-single hole water injection rate;S-injection flow, takes 0.1m3/min。
Water injection pressure 5MPa, uses water injection hole packer sealing of hole.
Table 2 is water injection hole parameter.
Table 2
After the contrast of coal seam forward and backward to the water filling index of correlation, analyzing, before discovery water filling, seam hardness coefficient is 4, after water filling It is 2.85, it can be seen that, water filling can reduce coal rock layer hardness, makes coal petrography soft moistening, reduces elasticity, thus reduces coal seam and amass The probability of cumulative.
In 8101 work surface erosion controls work, in strict accordance with erosion control six word policy, i.e. " survey, unload, prop up, break, protect, keep away ", work Making face production period, pedestrian is forbidden in 5101 lanes, and hangs " dangerous, to forbid to individually enter " board plate at 5101 lane damper positions, When work surface stops production for some reason, when stopping adopting, it is necessary to avoid periodic weighting position, meanwhile, improving advance support quality, and propping up in advance Protective material all uses flexible support material, and two gate roads all use anchor, net, band support pattern when driving, stops to use just Property supporting.
During 8101 working face minings, only in 170 meters of 5101 lane, press with there occurs 2 Secondary Shocks at 180 meters, and all Accurately, there is not personnel casualty accidents in prediction, these benefit from taking of above-mentioned measure.
Meanwhile, work surface carrying out oblique adjusting and also can avoid the outstanding top of top board large area, its principle is, by work surface and two crossheadings Tunnel oblique, the oldest top-hung top is trapezoidal, the principle of the section of breaking when reaching Limit Span according to top board, and old the disrumpent feelings of top will be unlikely Cause work surface to press comprehensively, the possibility that induction bump occurs can be reduced to a certain extent.Secondly by advanced crossheading In in, sensor is buried in gun drilling underground, monitors the continuous propelling along with exploitation, the Soft soil treatmen of lead abutment pressure, a pressure-bearing Power peak value, supporting pressure spikes position and speed of advancement etc., for advance support scope and prevent bump with having emphasis Generation provide foundation.To the monitoring of bump, preventing and treating, new technique is necessary tests in my ore deposit, promote for these.
6, the position of terminal mining line is determined
For avoiding periodic weighting, i.e. foundation stops adopting line-spacing last time periodic weighting (2/5) L~(3/5) L(L is periodic weighting Step pitch) principle determine the position of terminal mining line, i.e. stop to adopt line-spacing last time periodic weighting 7 meters~10.5 meters.
Thus, determine 2101 Ting Cai positions, lane away from once at periodic weighting 9 meters, after work surface oblique adjusting, 5101 lanes stop adopting Position away from once periodic weighting 7.5(9+19.5-21) at rice, two crossheading the position of terminal mining lines meet the requirements.Wherein, 6# support ~84# support is undesirable, 52# support is positioned at periodic weighting.
7, work surface ending oblique adjusting
In order to improve resource recovery, determine at work surface the position of terminal mining line, carry out oblique adjusting, for transporting during ensureing oblique adjusting Defeated unimpeded, whirler tail end centered by work surface head end, it is contemplated that the cut scope of coal-winning machine, determine work surface after oblique adjusting Length increases by 1.5 meters, and i.e. after oblique adjusting, face length is 127.5 meters, stops adopting 19.5 meters, advanced head termination, tail termination, place, During oblique adjusting, for having managed top board, quick oblique adjusting, " length ", " short " cutter is used to intert coal cutting, owing to head is without advance rate, for Prevent conveyer and support glide, on alter, squeeze frame, the problem such as fall apart, when cutting short sword, moving conveyor is at unit sky cutter row Carry out when entering;When cutting rimmer knife, it is normally carried out moving conveyor, and conveyer along full face straightening and is cut neat rib, Quan Gong Make face support alinement, lay a solid foundation for next corner.Fig. 2 is that oblique adjusting schematic diagram is adopted at work surface end.After work surface oblique adjusting, 6# support~84# support do not meet and stop adopting line and stop setting requirement, and 52# support is positioned at periodic weighting.To this end, during oblique adjusting when When unit is advanced into this region, using and wipe heading tape pressure and time shift frame, support drops less and draws soon, and guarantees that support setting load is qualified.Work Make face oblique adjusting and make the many coal mining outputs in my ore deposit 0.58 ten thousand tons, not only increase resource recovery, alleviate the most to a certain extent simultaneously The tensity of Linking up digging.

Claims (1)

1. a complex condition island working face safety coal extraction method, comprises the following steps:
A, discharge water in gob area
Before stope, in work surface two crossheading construction dewatering orifice, release work surface both sides water in gob area, and by this One process is continued for working face extraction terminating, and drains into wellhole by crossheading drain pipe, collection middle orbit lane drain pipe, when The advance of the face, to time at osculum 10 meters, is closed this osculum immediately, is opened next row water hole, carry out successively;
Using panel compartment drainage, i.e. when a panel carries out draining, other panels stop draining;
B, prevent top board large area from pressing
Work surface uses spontaneous caving to hold concurrently two ends artificial overhead caving controlroof, simultaneously according to Face Ground Pressure Behavior feelings Condition, moves back anchor to the roof timbering of two ends,
C, Controlling of Coal Outburst
Use the method that boring platen press, base plate pressure explosion and coal-bed flooding method combine,
Boring destressing method, uses large aperture pressure relief vent, from the beginning of two gate road first advance 30 meters, at gate road two Side, adopt line to stopping, in work with 500mm spacing construction φ=108mm, the pressure relief vent of L=8000mm successively away from roadway floor 0.6 meter During the exploitation of face, it is ensured that the construction first advance of pressure relief vent more than 200 meters, after facing the side pressure relief vent construction of empty side, use loess sealing of hole 1 meter;
Base plate relieving shot, from the beginning of two gate road first advance 60 meters, at two gate roads successively with 1000mm spacing Construction φ=42mm, the blast hole of L=2000mm adopt line to stopping, and wherein, fortune faces empty side 300mm, return air along crossheading borehole blasting pitch-row Crossheading borehole blasting pitch-row faces empty side 500mm;
Coal-bed flooding method, with elongated hole, two-way water flood, helps at roadway floor 1.5 meters at two gate road work surfaces with 20 meters Spacing multiple operation face carries out water filling along the punching of seam inclination direction;
D, determine the position of terminal mining line
For avoiding periodic weighting, i.e. determine according to the principle stopping adopting line-spacing last time periodic weighting (2/5) L~(3/5) L and stop adopting Line position, L is periodic weighting step pitch;
E, work surface ending oblique adjusting
Oblique adjusting is carried out at work surface the position of terminal mining line, whirler tail end centered by work surface head end, work surface after oblique adjusting Length increases by 1.5 meters, during oblique adjusting, uses " length ", " short " cutter to intert coal cutting, owing to head is without advance rate, for preventing out Existing conveyer and support glide, on alter, squeeze frame, the problem such as fall apart, when cutting short sword, moving conveyor enters when unit sky cutter is advanced OK;When cutting rimmer knife, being normally carried out moving conveyor, and along full face straightening and conveyer is cut neat rib, full face is propped up Frame alinement.
CN201410618537.4A 2014-11-06 2014-11-06 Complex condition island working face safety coal extraction method Active CN104453899B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410618537.4A CN104453899B (en) 2014-11-06 2014-11-06 Complex condition island working face safety coal extraction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410618537.4A CN104453899B (en) 2014-11-06 2014-11-06 Complex condition island working face safety coal extraction method

Publications (2)

Publication Number Publication Date
CN104453899A CN104453899A (en) 2015-03-25
CN104453899B true CN104453899B (en) 2016-08-24

Family

ID=52900569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410618537.4A Active CN104453899B (en) 2014-11-06 2014-11-06 Complex condition island working face safety coal extraction method

Country Status (1)

Country Link
CN (1) CN104453899B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106767213A (en) * 2017-01-18 2017-05-31 长沙有色冶金设计研究院有限公司 A kind of Roof Control blasting method of soft broken top board ore body back production
CN107575229A (en) * 2017-09-26 2018-01-12 山东科技大学 A kind of class house pillar type coal mining method cut top filling and close on goaf
CN110005431A (en) * 2019-04-13 2019-07-12 山东科技大学 A kind of irregular gob-surrounded pillar working face Controlling of Coal Outburst method

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104989405B (en) * 2015-06-12 2017-09-29 北京科技大学 Mining steeply dipping coal seam bump orients prevention and controls
CN105569699A (en) * 2015-12-22 2016-05-11 大同煤矿集团有限责任公司 Inclined shaft development support technology for isolated coal pillar
CN105626150B (en) * 2016-02-04 2017-12-08 山东大学 A kind of driuing along goaf tunnel dynamic monitoring based on micro seismic monitoring and Stability Assessment method
CN106337685B (en) * 2016-10-21 2019-04-05 中国矿业大学(北京) A kind of coal and its association oil shale unitized production method
CN106894816A (en) * 2017-02-23 2017-06-27 中国矿业大学 Far field key stratum based on set square structural model cuts top release shield lane method
CN108594295B (en) * 2018-05-31 2019-12-17 天地科技股份有限公司 Method for evaluating coal bed blasting pressure relief effect
CN109915140A (en) * 2019-04-13 2019-06-21 山东科技大学 Press control method to a kind of irregular gob-surrounded pillar roadway bump
CN111075507A (en) * 2019-12-06 2020-04-28 华亭煤业集团有限责任公司 Method and device for determining stoping line of coal mine stoping working face
CN111553614B (en) * 2020-05-12 2022-04-05 华北科技学院 Anti-impact safe mining demonstration method for island working face
CN111946344B (en) * 2020-08-20 2022-09-23 山西汇和盛科技有限公司 Method for moving pressure protection of gob-side roadway and coal pillar by longwall mining spanning structure
CN112305608B (en) * 2020-10-28 2022-12-27 河北煤炭科学研究院有限公司 Method and device for calculating pressure step of stope face and terminal equipment
CN112727459B (en) * 2020-12-25 2022-05-17 中国矿业大学 Mining method for reducing mining influence of shallow coal seam
CN113738363B (en) * 2021-09-15 2024-02-23 陕西正通煤业有限责任公司 High-low-level broken roof pressure relief method for continuous multilayer hard roof coal seam
CN114086957B (en) * 2021-11-23 2023-05-05 陕西正通煤业有限责任公司 Colliery strong impact dangerous island working face roadway outside staggered arrangement anti-impact method
CN115199269A (en) * 2022-07-08 2022-10-18 中国矿业大学 Multi-disaster integrated prevention and control method for island outburst coal seam strong and weak coupling structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1664310A (en) * 2005-02-28 2005-09-07 清华大学 Control method for coal mine detached island coal pillar rock burst
CN101050709A (en) * 2006-04-03 2007-10-10 郭国政 High water pressure releasing and blocking mining method for mining area
CN101498225A (en) * 2009-02-24 2009-08-05 太原理工大学 U+I type ventilating system for top-coal caving face
CN102678120A (en) * 2012-05-18 2012-09-19 河南大有能源股份有限公司 Method for releasing pressure and removing danger of rock burst
CN103397883A (en) * 2013-08-21 2013-11-20 大同煤矿集团有限责任公司 Comprehensive control method for rockburst in multiple-coalbed mining mine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1664310A (en) * 2005-02-28 2005-09-07 清华大学 Control method for coal mine detached island coal pillar rock burst
CN101050709A (en) * 2006-04-03 2007-10-10 郭国政 High water pressure releasing and blocking mining method for mining area
CN101498225A (en) * 2009-02-24 2009-08-05 太原理工大学 U+I type ventilating system for top-coal caving face
CN102678120A (en) * 2012-05-18 2012-09-19 河南大有能源股份有限公司 Method for releasing pressure and removing danger of rock burst
CN103397883A (en) * 2013-08-21 2013-11-20 大同煤矿集团有限责任公司 Comprehensive control method for rockburst in multiple-coalbed mining mine

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106767213A (en) * 2017-01-18 2017-05-31 长沙有色冶金设计研究院有限公司 A kind of Roof Control blasting method of soft broken top board ore body back production
CN106767213B (en) * 2017-01-18 2018-06-19 长沙有色冶金设计研究院有限公司 A kind of Roof Control blasting method of soft broken top plate ore body back production
CN107575229A (en) * 2017-09-26 2018-01-12 山东科技大学 A kind of class house pillar type coal mining method cut top filling and close on goaf
CN110005431A (en) * 2019-04-13 2019-07-12 山东科技大学 A kind of irregular gob-surrounded pillar working face Controlling of Coal Outburst method

Also Published As

Publication number Publication date
CN104453899A (en) 2015-03-25

Similar Documents

Publication Publication Date Title
CN104453899B (en) Complex condition island working face safety coal extraction method
CN108194088B (en) A kind of soft top coal layer cuts top release gob-side entry retaining method without explosion
CN105422170B (en) Middle deep goaf grouting reinforcing and processing method under a kind of building foundation
CN103321644B (en) The method of tunneling is combined in machinery and controlled blasting
AU2017413518A1 (en) Stress-transfer method in tunnel with high ground pressure based on fracturing ring
CN106761912B (en) It is a kind of be suitable for unstable formation efficiently on to route slicing and filling mining methods
CN101514637B (en) Execution system of gas tunnel outburst prevention comprehensive measures
WO2011103620A1 (en) A method of reducing subsidence or windblast impacts from longwall mining
CN103821558A (en) Coal mine gob filling mining system and gob-side entry retaining filling process
AU2021106168A4 (en) High-gas Coal Seam Group Pressure Relief Mining Method Based on Gob-side Entry Retaining in the First Mining Whole Rock Pressure Relief Working Face
CN109653748A (en) A kind of thin mining methods with very thin ore body
CN108590649A (en) A kind of broken narrow vein medium-length hole recovery method of low-angle dip
CN108049870B (en) The induction caving mining methods of high-dipping middle thickness orebody of the upper disk containing unstable rock stratum
CN103726848A (en) Mining method applicable to recovery of gentle-inclined/inclined thin ore body
Marlow et al. Shotcrete ribs and cemented rock fill ground control methods for stoping in weak squeezing rock at Wattle Dam Gold Mine
CN110080774A (en) Mine Dry-placed fill mining is fallen based on the vertical medium-length hole retrusive of high-dipping ore block
CN109296368A (en) Stepped upward horizontal layered cemented filling mining method
CN110359910B (en) Fully mechanized caving high-level filling mining method for thick coal seam strips under coal mine railway
CN106285777B (en) The method that flood mine mineral building discharges water in advance
CN110397439A (en) Mine Dry-placed fill mining is fallen based on the vertical medium-length hole retrusive of high-dipping ore block
CN108086981A (en) With the construction method of more than the 100m high slopes of national highway zero distance
Townend et al. Mitigation strategies for mining in high stress sill pillars at Coleman Mine–a case study
CN114000882A (en) Caving method and filling method collaborative mining method for same mining area
CN105587321A (en) Collapse column bypassing extraction process
Tang et al. Rapid co-extraction of coal and coalbed methane techniques: a case study in Zhangji coal mine, China

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant