CN109915140A CN201910296245.6A CN201910296245A CN109915140A CN 109915140 A CN109915140 A CN 109915140A CN 201910296245 A CN201910296245 A CN 201910296245A CN 109915140 A CN109915140 A CN 109915140A
Authority
CN
China
Prior art keywords
release
irregular
danger zone
drilling
gob
Prior art date
Application number
CN201910296245.6A
Other languages
Chinese (zh)
Inventor
潘立友
刘宏军
毕强
陈理强
Original Assignee
山东科技大学
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 山东科技大学 filed Critical 山东科技大学
Priority to CN201910296245.6A priority Critical patent/CN109915140A/en
Publication of CN109915140A publication Critical patent/CN109915140A/en

Links

Abstract

Press control method to irregular gob-surrounded pillar roadway bump of the invention, it is as follows: in the return airway for irregular gob-surrounded pillar of constructing, it is arranged along low stress area cut-off, using fender location as irregular area, irregular area corresponding coal column side location is determined as impact danger zone, using the both wings of impact danger zone as risk transitional region;During return airway driving, conventional large diameter borehole destressing method is taken transitional region first, advanced release is carried out, is further continued for tunneling after each release;When entering danger zone, then conventional large diameter borehole destressing method is taken, so that being converted into weak burst trend with the coal body of burst trend, finally walk out transitional region, until shock hazard completely eliminates, is further continued for tunneling.

Description

Press control method to a kind of irregular gob-surrounded pillar roadway bump
Technical field
The invention belongs to coal mining technology fields.
Background technique
There is irregular gob-surrounded pillar, often after regular stope completes exploitation in order to as far as possible in some old coal mines of China Reclaiming coal resource needs to carry out remnants of defeated troops' exploitation to these gob-surrounded pillars.Need to arrange working face, development work (work before exploitation Make face crossheading) form ventilation, traffic condition.Gob-surrounded pillar especially irregular type gob-surrounded pillar is in development work, usually companion With damaging impact press.The reason is that irregular coal column causes stress field that significant changes occur, when headwork carries out, destroy The distribution of original stress, when pressure reaches certain numerical value, which can occur unstability, induce large area bump.At present The prevention and treatment of the bump of irregular coal pillar mining and the control method in routine work face are essentially identical, and solution danger is mainly taken to arrange It applies, including coal-bed flooding, strong supporting, the strong release in coal seam, disconnected top, disconnected bottom etc..These measures in the specific implementation process, due to companion With the construction of getting working face, it is easier to irregular area cause locality stress concentrate, increase occur bump can Energy property implements coal-bed flooding method and is equally difficult to reach preferable effect, and up to the present there are no fundamentally reach complete The degree of control.Therefore the improvement of the bump during irregular coal column tunnelling is particularly important.
Summary of the invention
The purpose of the present invention is for part present in Controlling of Coal Outburst during irregular coal column tunnelling at present High stress leads to high risk problem, proposes the control method of the new stress transfer of one kind, energy dissipation.
The technical scheme is that a kind of irregular gob-surrounded pillar roadway bump press control method, it is as follows:
One, the arrangement and region division of return airway
In the return airway for the irregular gob-surrounded pillar of constructing, arranged along low stress area cut-off, and between goaf there are The shield lane fender of 3.0 ~ 4.0m width, and constructed according to coal seam conditions and meet production, other tunnels that ventilation needs;Working face After the completion of crossheading construction, it will form some outwardly projecting locations along goaf side and greater than the fender location of 7-8m width, Using these locations as irregular area, by irregular area corresponding gob-surrounded pillar side location according to previous mining Practice and punching Hit and show carry out analogy, determine impact danger zone, using the both wings within the scope of the 30-50m of impact danger zone as Risk transitional region;
Two, Length discrepancy drilling release
During return airway driving, when driving arrives transitional region, conventional major diameter is taken to bore transitional region first Hole destressing method, carries out advanced release, and drilling is arranged in crossheading section center and helps position, the drilling of center close to two It is crept into towards tunneling direction, the drilling for helping position close to two and tunneling direction are crept into 30-45 degree level angle to diagonally forward, drilling Depth is the 1/2 or 1/3 of transitional region length, that is, divides 2 times or 3 releases, be further continued for tunneling after each release, ensures heading driver The safety of work carries out, until driving arrives danger zone;When entering danger zone, then take conventional large diameter borehole release Method carries out advanced release, and drilling depth is 2-3 times of transition region large diameter borehole, can once bore the deep transition region for reaching front Disposable release is realized in domain, and into drilling, water filling softens coal seam again after release, so that it is weak that there is the coal body of burst trend to be converted into Burst trend;Then start driving and ride out danger zone;When into next transitional region, according still further to a upper transition region The pressure relief method in domain carries out release, finally walks out transitional region;
Three, validity check
In danger zone during tunnelling, advanced validity check is carried out using traditional drilling cuttings method;I.e. in exploitation tunnel With the perforating in front of tunneling of 42 drill bit of ф, eye depth 7.0-8.0m, 0 ~ 3 ° of the elevation angle;When drilling cuttings method, which is examined, occurs exceeded, continue pair Danger zone carries out release, until shock hazard completely eliminates, is further continued for tunneling.
The positive effect of the present invention is: the principle by taking preparatory stress transfer, energy dissipation and water filling softening solves Controlling of Coal Outburst problem during irregular pillar face tunnelling, it is ensured that headwork safety.
Illustrate implementation of the invention with reference to the accompanying drawing.
Detailed description of the invention
Fig. 1 is the roadway layout and region division plan view of embodiment;Fig. 2 is the large diameter borehole release signal of embodiment Figure.
Specific embodiment
Those skilled in the art are according to the technical solution of summary of the invention, roadway layout shown in FIG. 1 and region division plane Figure and large diameter borehole release schematic diagram, that is, implementable, this will not be detailed here.

Claims (1)

1. control method is pressed to a kind of irregular gob-surrounded pillar roadway bump, as follows:
(1) arrangement and region division of return airway
In the return airway for the irregular gob-surrounded pillar of constructing, arranged along low stress area cut-off, and between goaf there are The shield lane fender of 3.0 ~ 4.0m width, and constructed according to coal seam conditions and meet production, other tunnels that ventilation needs;Working face After the completion of crossheading construction, it will form some outwardly projecting locations along goaf side and greater than the fender location of 7-8m width, Using these locations as irregular area, by irregular area corresponding gob-surrounded pillar side location according to previous mining Practice and punching Hit and show carry out analogy, determine impact danger zone, using the both wings within the scope of the 30-50m of impact danger zone as Risk transitional region;
(2) Length discrepancy drilling release
During return airway driving, when driving arrives transitional region, conventional major diameter is taken to bore transitional region first Hole destressing method, carries out advanced release, and drilling is arranged in crossheading section center and helps position, the drilling of center close to two It is crept into towards tunneling direction, the drilling for helping position close to two and tunneling direction are crept into 30-45 degree level angle to diagonally forward, drilling Depth is the 1/2 or 1/3 of transitional region length, that is, divides 2 times or 3 releases, be further continued for tunneling after each release, ensures heading driver The safety of work carries out, until driving arrives danger zone;When entering danger zone, then take conventional large diameter borehole release Method carries out advanced release, and drilling depth is 2-3 times of transition region large diameter borehole, can once bore the deep transition region for reaching front Disposable release is realized in domain, and into drilling, water filling softens coal seam again after release, so that it is weak that there is the coal body of burst trend to be converted into Burst trend;Then start driving and ride out danger zone;When into next transitional region, according still further to a upper transition region The pressure relief method in domain carries out release, finally walks out transitional region;
(3) validity check
In danger zone during tunnelling, advanced validity check is carried out using traditional drilling cuttings method;I.e. in exploitation tunnel With the perforating in front of tunneling of 42 drill bit of ф, eye depth 7.0-8.0m, 0 ~ 3 ° of the elevation angle;When drilling cuttings method, which is examined, occurs exceeded, continue pair Danger zone carries out release, until shock hazard completely eliminates, is further continued for tunneling.
CN201910296245.6A 2019-04-13 2019-04-13 Press control method to a kind of irregular gob-surrounded pillar roadway bump CN109915140A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910296245.6A CN109915140A (en) 2019-04-13 2019-04-13 Press control method to a kind of irregular gob-surrounded pillar roadway bump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910296245.6A CN109915140A (en) 2019-04-13 2019-04-13 Press control method to a kind of irregular gob-surrounded pillar roadway bump

Publications (1)

Publication Number Publication Date
CN109915140A true CN109915140A (en) 2019-06-21

Family

ID=66969731

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910296245.6A CN109915140A (en) 2019-04-13 2019-04-13 Press control method to a kind of irregular gob-surrounded pillar roadway bump

Country Status (1)

Country Link
CN (1) CN109915140A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110500095A (en) * 2019-09-20 2019-11-26 西安科技大学 Slim hole pressure relief method under a kind of equivalent area
CN111350548A (en) * 2020-04-28 2020-06-30 天地科技股份有限公司 Ground sound early warning method and device for rock burst of excavation roadway

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1664310A (en) * 2005-02-28 2005-09-07 清华大学 Control method for coal mine detached island coal pillar rock burst
CN102296958A (en) * 2011-07-22 2011-12-28 山东科技大学 Method for preventing rock burst by artificial space defect body
CN102296957A (en) * 2011-07-22 2011-12-28 山东科技大学 Method of transfixing and distressing with one explosion during tunneling of seam roadway with rock burst
CN102322262A (en) * 2011-09-12 2012-01-18 山东科技大学 Colliery isolated island coal column crossheading bump control method
CN102383728A (en) * 2011-09-12 2012-03-21 山东科技大学 Coal mine rockburst defect segmentation and control method
CN102425416A (en) * 2011-09-12 2012-04-25 山东科技大学 Coal mine high stress area roadway driving face impact ground pressure control method
CN104453899A (en) * 2014-11-06 2015-03-25 大同煤矿集团有限责任公司 Safety recovery method of island working surface under complicated condition
CN106285674A (en) * 2016-10-20 2017-01-04 山东科技大学 The method of impact soft seam tunnel with meeting head on release pressure energy
CN108386192A (en) * 2018-01-31 2018-08-10 中国矿业大学 A kind of method of active Enhanced support and active release prevention bump

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1664310A (en) * 2005-02-28 2005-09-07 清华大学 Control method for coal mine detached island coal pillar rock burst
CN102296958A (en) * 2011-07-22 2011-12-28 山东科技大学 Method for preventing rock burst by artificial space defect body
CN102296957A (en) * 2011-07-22 2011-12-28 山东科技大学 Method of transfixing and distressing with one explosion during tunneling of seam roadway with rock burst
CN102322262A (en) * 2011-09-12 2012-01-18 山东科技大学 Colliery isolated island coal column crossheading bump control method
CN102383728A (en) * 2011-09-12 2012-03-21 山东科技大学 Coal mine rockburst defect segmentation and control method
CN102425416A (en) * 2011-09-12 2012-04-25 山东科技大学 Coal mine high stress area roadway driving face impact ground pressure control method
CN104453899A (en) * 2014-11-06 2015-03-25 大同煤矿集团有限责任公司 Safety recovery method of island working surface under complicated condition
CN106285674A (en) * 2016-10-20 2017-01-04 山东科技大学 The method of impact soft seam tunnel with meeting head on release pressure energy
CN108386192A (en) * 2018-01-31 2018-08-10 中国矿业大学 A kind of method of active Enhanced support and active release prevention bump

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110500095A (en) * 2019-09-20 2019-11-26 西安科技大学 Slim hole pressure relief method under a kind of equivalent area
CN111350548A (en) * 2020-04-28 2020-06-30 天地科技股份有限公司 Ground sound early warning method and device for rock burst of excavation roadway

Similar Documents

Publication Publication Date Title
CN102900460B (en) Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam
CN103278055B (en) Roof-cutting pressure relief method in hard-roof deep-hole pre-splitting blasting
CN104863629B (en) A kind of method taking out absciss layer gas and draining slip casting under overlying strata using combined drilling and counterboring
CN103670496B (en) Single low permeability outburst coal seam gob side entry retaining with take out section coal-bed gas method in advance
CN106150503B (en) A kind of method that tight roof is administered in hydraulic fracturing
CN104481539B (en) From kerve tight-face blasting caved stopes
CA3044307C (en) Stress-transfer method in tunnel with high ground pressure based on fracturing ring
CN103742148B (en) The soft coal-mining method covering the descending waste filling of supporting of a kind of half-edge coal seam
CN103821558B (en) Coal mine gob filling mining and gob side entry retaining filling process
CN108442930B (en) A kind of Medium Thickness And Medium Slope Angle metal ore mining methods
CN103953343A (en) Method for controlling roof caving under condition of hardroof in coal seam
CN102704933A (en) Isolated-section grouting filling coal-mining method for mining overburden rock
CN102678117B (en) Directional hydraulic fracturing method based on energizing blasting
CN105240013A (en) Longwall mining N00 construction method
CN104806244A (en) Filling mining method for slant middle-thick ore body
CN102080518B (en) Method for extracting gas from coal seam roof complex branched well
CN102678120B (en) Method for releasing pressure and removing danger of rock burst
CN107044289B (en) A kind of bored grouting blocks the water damage control method of overlying strata water producing fractures main channel
CN102778182B (en) Beside-roadway topping pressure relief method of roadway driving along gob of small coal pillar influenced by dynamic pressure
CN104533452B (en) A kind of underground coal mine crushes coal body stagewise grouting strengthening method
CN106499395B (en) The quick-fried power of shallow bore hole rock drilling-scraper cooperates with haulage Sublevel room mining
CN107083988B (en) Mining induced fissure band gas drainage technical method based on km directional drilling
CN103821516B (en) The method of secondary release preventing and treating bump
CN103233738B (en) Comprehensive weakening method of top coal of heavy-pitch super high seam
Deng et al. Feasibility analysis of gob-side entry retaining on a working face in a steep coal seam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 266590 No. 579, Bay Road, Huangdao District, Shandong, Qingdao

Applicant after: Shandong University of Science and Technology