CN109915140A - Press control method to a kind of irregular gob-surrounded pillar roadway bump - Google Patents
Press control method to a kind of irregular gob-surrounded pillar roadway bump Download PDFInfo
- Publication number
- CN109915140A CN109915140A CN201910296245.6A CN201910296245A CN109915140A CN 109915140 A CN109915140 A CN 109915140A CN 201910296245 A CN201910296245 A CN 201910296245A CN 109915140 A CN109915140 A CN 109915140A
- Authority
- CN
- China
- Prior art keywords
- release
- irregular
- danger zone
- drilling
- transitional region
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Abstract
Press control method to irregular gob-surrounded pillar roadway bump of the invention, it is as follows: in the return airway for irregular gob-surrounded pillar of constructing, it is arranged along low stress area cut-off, using fender location as irregular area, irregular area corresponding coal column side location is determined as impact danger zone, using the both wings of impact danger zone as risk transitional region;During return airway driving, conventional large diameter borehole destressing method is taken transitional region first, advanced release is carried out, is further continued for tunneling after each release;When entering danger zone, then conventional large diameter borehole destressing method is taken, so that being converted into weak burst trend with the coal body of burst trend, finally walk out transitional region, until shock hazard completely eliminates, is further continued for tunneling.
Description
Technical field
The invention belongs to coal mining technology fields.
Background technique
There is irregular gob-surrounded pillar, often after regular stope completes exploitation in order to as far as possible in some old coal mines of China
Reclaiming coal resource needs to carry out remnants of defeated troops' exploitation to these gob-surrounded pillars.Need to arrange working face, development work (work before exploitation
Make face crossheading) form ventilation, traffic condition.Gob-surrounded pillar especially irregular type gob-surrounded pillar is in development work, usually companion
With damaging impact press.The reason is that irregular coal column causes stress field that significant changes occur, when headwork carries out, destroy
The distribution of original stress, when pressure reaches certain numerical value, which can occur unstability, induce large area bump.At present
The prevention and treatment of the bump of irregular coal pillar mining and the control method in routine work face are essentially identical, and solution danger is mainly taken to arrange
It applies, including coal-bed flooding, strong supporting, the strong release in coal seam, disconnected top, disconnected bottom etc..These measures in the specific implementation process, due to companion
With the construction of getting working face, it is easier to irregular area cause locality stress concentrate, increase occur bump can
Energy property implements coal-bed flooding method and is equally difficult to reach preferable effect, and up to the present there are no fundamentally reach complete
The degree of control.Therefore the improvement of the bump during irregular coal column tunnelling is particularly important.
Summary of the invention
The purpose of the present invention is for part present in Controlling of Coal Outburst during irregular coal column tunnelling at present
High stress leads to high risk problem, proposes the control method of the new stress transfer of one kind, energy dissipation.
The technical scheme is that a kind of irregular gob-surrounded pillar roadway bump press control method, it is as follows:
One, the arrangement and region division of return airway
In the return airway for the irregular gob-surrounded pillar of constructing, arranged along low stress area cut-off, and between goaf there are
The shield lane fender of 3.0 ~ 4.0m width, and constructed according to coal seam conditions and meet production, other tunnels that ventilation needs;Working face
After the completion of crossheading construction, it will form some outwardly projecting locations along goaf side and greater than the fender location of 7-8m width,
Using these locations as irregular area, by irregular area corresponding gob-surrounded pillar side location according to previous mining Practice and punching
Hit and show carry out analogy, determine impact danger zone, using the both wings within the scope of the 30-50m of impact danger zone as
Risk transitional region;
Two, Length discrepancy drilling release
During return airway driving, when driving arrives transitional region, conventional major diameter is taken to bore transitional region first
Hole destressing method, carries out advanced release, and drilling is arranged in crossheading section center and helps position, the drilling of center close to two
It is crept into towards tunneling direction, the drilling for helping position close to two and tunneling direction are crept into 30-45 degree level angle to diagonally forward, drilling
Depth is the 1/2 or 1/3 of transitional region length, that is, divides 2 times or 3 releases, be further continued for tunneling after each release, ensures heading driver
The safety of work carries out, until driving arrives danger zone;When entering danger zone, then take conventional large diameter borehole release
Method carries out advanced release, and drilling depth is 2-3 times of transition region large diameter borehole, can once bore the deep transition region for reaching front
Disposable release is realized in domain, and into drilling, water filling softens coal seam again after release, so that it is weak that there is the coal body of burst trend to be converted into
Burst trend;Then start driving and ride out danger zone;When into next transitional region, according still further to a upper transition region
The pressure relief method in domain carries out release, finally walks out transitional region;
Three, validity check
In danger zone during tunnelling, advanced validity check is carried out using traditional drilling cuttings method;I.e. in exploitation tunnel
With the perforating in front of tunneling of 42 drill bit of ф, eye depth 7.0-8.0m, 0 ~ 3 ° of the elevation angle;When drilling cuttings method, which is examined, occurs exceeded, continue pair
Danger zone carries out release, until shock hazard completely eliminates, is further continued for tunneling.
The positive effect of the present invention is: the principle by taking preparatory stress transfer, energy dissipation and water filling softening solves
Controlling of Coal Outburst problem during irregular pillar face tunnelling, it is ensured that headwork safety.
Illustrate implementation of the invention with reference to the accompanying drawing.
Detailed description of the invention
Fig. 1 is the roadway layout and region division plan view of embodiment;Fig. 2 is the large diameter borehole release signal of embodiment
Figure.
Specific embodiment
Those skilled in the art are according to the technical solution of summary of the invention, roadway layout shown in FIG. 1 and region division plane
Figure and large diameter borehole release schematic diagram, that is, implementable, this will not be detailed here.
Claims (1)
1. control method is pressed to a kind of irregular gob-surrounded pillar roadway bump, as follows:
(1) arrangement and region division of return airway
In the return airway for the irregular gob-surrounded pillar of constructing, arranged along low stress area cut-off, and between goaf there are
The shield lane fender of 3.0 ~ 4.0m width, and constructed according to coal seam conditions and meet production, other tunnels that ventilation needs;Working face
After the completion of crossheading construction, it will form some outwardly projecting locations along goaf side and greater than the fender location of 7-8m width,
Using these locations as irregular area, by irregular area corresponding gob-surrounded pillar side location according to previous mining Practice and punching
Hit and show carry out analogy, determine impact danger zone, using the both wings within the scope of the 30-50m of impact danger zone as
Risk transitional region;
(2) Length discrepancy drilling release
During return airway driving, when driving arrives transitional region, conventional major diameter is taken to bore transitional region first
Hole destressing method, carries out advanced release, and drilling is arranged in crossheading section center and helps position, the drilling of center close to two
It is crept into towards tunneling direction, the drilling for helping position close to two and tunneling direction are crept into 30-45 degree level angle to diagonally forward, drilling
Depth is the 1/2 or 1/3 of transitional region length, that is, divides 2 times or 3 releases, be further continued for tunneling after each release, ensures heading driver
The safety of work carries out, until driving arrives danger zone;When entering danger zone, then take conventional large diameter borehole release
Method carries out advanced release, and drilling depth is 2-3 times of transition region large diameter borehole, can once bore the deep transition region for reaching front
Disposable release is realized in domain, and into drilling, water filling softens coal seam again after release, so that it is weak that there is the coal body of burst trend to be converted into
Burst trend;Then start driving and ride out danger zone;When into next transitional region, according still further to a upper transition region
The pressure relief method in domain carries out release, finally walks out transitional region;
(3) validity check
In danger zone during tunnelling, advanced validity check is carried out using traditional drilling cuttings method;I.e. in exploitation tunnel
With the perforating in front of tunneling of 42 drill bit of ф, eye depth 7.0-8.0m, 0 ~ 3 ° of the elevation angle;When drilling cuttings method, which is examined, occurs exceeded, continue pair
Danger zone carries out release, until shock hazard completely eliminates, is further continued for tunneling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910296245.6A CN109915140A (en) | 2019-04-13 | 2019-04-13 | Press control method to a kind of irregular gob-surrounded pillar roadway bump |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910296245.6A CN109915140A (en) | 2019-04-13 | 2019-04-13 | Press control method to a kind of irregular gob-surrounded pillar roadway bump |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109915140A true CN109915140A (en) | 2019-06-21 |
Family
ID=66969731
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910296245.6A Withdrawn CN109915140A (en) | 2019-04-13 | 2019-04-13 | Press control method to a kind of irregular gob-surrounded pillar roadway bump |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109915140A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110500095A (en) * | 2019-09-20 | 2019-11-26 | 西安科技大学 | Slim hole pressure relief method under a kind of equivalent area |
CN111350548A (en) * | 2020-04-28 | 2020-06-30 | 天地科技股份有限公司 | Ground sound early warning method and device for rock burst of excavation roadway |
CN112483185A (en) * | 2020-12-18 | 2021-03-12 | 山东科技大学 | Method for observing rock burst danger range under three-dimensional coal pillar |
CN112901169A (en) * | 2021-01-19 | 2021-06-04 | 安徽理工大学 | Impact instability judging and anti-impact mining method for asymmetrical island working surface |
CN113530545A (en) * | 2021-08-31 | 2021-10-22 | 徐州格润矿山技术开发有限公司 | Isolated grouting and filling mining method for overlying rock of island working face |
CN114086957A (en) * | 2021-11-23 | 2022-02-25 | 陕西正通煤业有限责任公司 | Anti-impact method for roadway staggered arrangement of high impact dangerous island working surface of coal mine |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1664310A (en) * | 2005-02-28 | 2005-09-07 | 清华大学 | Control method for coal mine detached island coal pillar rock burst |
CN102296957A (en) * | 2011-07-22 | 2011-12-28 | 山东科技大学 | Method of transfixing and distressing with one explosion during tunneling of seam roadway with rock burst |
CN102296958A (en) * | 2011-07-22 | 2011-12-28 | 山东科技大学 | Method for preventing rock burst by artificial space defect body |
CN102322262A (en) * | 2011-09-12 | 2012-01-18 | 山东科技大学 | Colliery isolated island coal column crossheading bump control method |
CN102383728A (en) * | 2011-09-12 | 2012-03-21 | 山东科技大学 | Coal mine rockburst defect segmentation and control method |
CN102425416A (en) * | 2011-09-12 | 2012-04-25 | 山东科技大学 | Coal mine high stress area roadway driving face impact ground pressure control method |
CN104453899A (en) * | 2014-11-06 | 2015-03-25 | 大同煤矿集团有限责任公司 | Safety recovery method of island working surface under complicated condition |
CN106285674A (en) * | 2016-10-20 | 2017-01-04 | 山东科技大学 | The method of impact soft seam tunnel with meeting head on release pressure energy |
CN108386192A (en) * | 2018-01-31 | 2018-08-10 | 中国矿业大学 | A kind of method of active Enhanced support and active release prevention bump |
-
2019
- 2019-04-13 CN CN201910296245.6A patent/CN109915140A/en not_active Withdrawn
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1664310A (en) * | 2005-02-28 | 2005-09-07 | 清华大学 | Control method for coal mine detached island coal pillar rock burst |
CN102296957A (en) * | 2011-07-22 | 2011-12-28 | 山东科技大学 | Method of transfixing and distressing with one explosion during tunneling of seam roadway with rock burst |
CN102296958A (en) * | 2011-07-22 | 2011-12-28 | 山东科技大学 | Method for preventing rock burst by artificial space defect body |
CN102322262A (en) * | 2011-09-12 | 2012-01-18 | 山东科技大学 | Colliery isolated island coal column crossheading bump control method |
CN102383728A (en) * | 2011-09-12 | 2012-03-21 | 山东科技大学 | Coal mine rockburst defect segmentation and control method |
CN102425416A (en) * | 2011-09-12 | 2012-04-25 | 山东科技大学 | Coal mine high stress area roadway driving face impact ground pressure control method |
CN104453899A (en) * | 2014-11-06 | 2015-03-25 | 大同煤矿集团有限责任公司 | Safety recovery method of island working surface under complicated condition |
CN106285674A (en) * | 2016-10-20 | 2017-01-04 | 山东科技大学 | The method of impact soft seam tunnel with meeting head on release pressure energy |
CN108386192A (en) * | 2018-01-31 | 2018-08-10 | 中国矿业大学 | A kind of method of active Enhanced support and active release prevention bump |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110500095A (en) * | 2019-09-20 | 2019-11-26 | 西安科技大学 | Slim hole pressure relief method under a kind of equivalent area |
CN111350548A (en) * | 2020-04-28 | 2020-06-30 | 天地科技股份有限公司 | Ground sound early warning method and device for rock burst of excavation roadway |
CN112483185A (en) * | 2020-12-18 | 2021-03-12 | 山东科技大学 | Method for observing rock burst danger range under three-dimensional coal pillar |
CN112901169A (en) * | 2021-01-19 | 2021-06-04 | 安徽理工大学 | Impact instability judging and anti-impact mining method for asymmetrical island working surface |
CN113530545A (en) * | 2021-08-31 | 2021-10-22 | 徐州格润矿山技术开发有限公司 | Isolated grouting and filling mining method for overlying rock of island working face |
CN114086957A (en) * | 2021-11-23 | 2022-02-25 | 陕西正通煤业有限责任公司 | Anti-impact method for roadway staggered arrangement of high impact dangerous island working surface of coal mine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109915140A (en) | Press control method to a kind of irregular gob-surrounded pillar roadway bump | |
CN110005431A (en) | A kind of irregular gob-surrounded pillar working face Controlling of Coal Outburst method | |
CN106907175B (en) | The efficient extraction coal roadway stripe gas of bottom plate concordant long drilled holes staged fracturing and region outburst elimination method | |
CN104100266B (en) | The method of preventing and treating gob side entry bump | |
CN103557000B (en) | Method for preventing gob-side entry rock burst through side-drawing filling | |
CN109763822A (en) | Face in steep thick coal seam Multi sectional is without coal column placement method between coal column staggered floor Hu Xiang and section | |
CN110173264B (en) | Method for preventing and treating hard roof roadway rock burst through roof breakage and conventional pressure relief | |
CN107178366B (en) | A kind of stoping method of column ore body | |
CN102425416A (en) | Coal mine high stress area roadway driving face impact ground pressure control method | |
CN105298496B (en) | Complete adopt of reserved working face coal column is set to fill coal-mining method entirely | |
CN108397227A (en) | A kind of progressive extinction roadway layout method of tendency | |
CN104481578A (en) | Gas control method for large-mining-height working face of high gas coal seam | |
CN102518471A (en) | Rock burst energy releasing method of roadway of high stress area in coal mine | |
CN104847406B (en) | Method for fracturing retained filled wall of adjacent coal face | |
CN107304676A (en) | A kind of prevention and controls for leaving bump under coal column | |
CN107120137B (en) | A kind of coal roadway tunneling is along seat earth Deephole pre-splitting blasting pumping method | |
CN109915143A (en) | The control method of not wide protection pillar working face bump | |
CN103939099A (en) | Method for controlling strong shock risk coal seam group rock burst | |
CN102383728A (en) | Coal mine rockburst defect segmentation and control method | |
CN102518436A (en) | Method for controlling tectonic rock burst in coal mine tunneling | |
CN102797492B (en) | Arrangement method for precracking roof for roof-cutting roadway | |
CN106545296A (en) | A kind of surface drilling grouting treatment method of deep mining coal seam base plate limestone water damage | |
CN102425418A (en) | Method for controlling rock burst in artificial defect body of coal mine structural area | |
CN106930766A (en) | Great burying TBM construction tunnel rock burst processing structures | |
CN109915141A (en) | The control method of not wide protection pillar mining roadway bump |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 266590 No. 579, Bay Road, Huangdao District, Shandong, Qingdao Applicant after: Shandong University of Science and Technology Address before: 271000 Shandong Province, Tai'an city Taishan District mountain Street No. 223 Tai'an campus of Shandong University of Science and Technology Applicant before: Shandong University of Science and Technology |
|
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190621 |