CN103411493A - Drilling and powder charging method for goaf-penetrating deep hole presplitting blasting - Google Patents

Drilling and powder charging method for goaf-penetrating deep hole presplitting blasting Download PDF

Info

Publication number
CN103411493A
CN103411493A CN2013103519881A CN201310351988A CN103411493A CN 103411493 A CN103411493 A CN 103411493A CN 2013103519881 A CN2013103519881 A CN 2013103519881A CN 201310351988 A CN201310351988 A CN 201310351988A CN 103411493 A CN103411493 A CN 103411493A
Authority
CN
China
Prior art keywords
goaf
hole
blasting
length
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013103519881A
Other languages
Chinese (zh)
Inventor
王方田
屠世浩
袁永
白庆升
李召鑫
陈芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN2013103519881A priority Critical patent/CN103411493A/en
Publication of CN103411493A publication Critical patent/CN103411493A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

A drilling and powder charging method for goaf-penetrating deep hole presplitting blasting belongs to a drilling and powder charging method used for forced caving of deep hole presplitting blasting for lower coal mining of a goaf. A drilled hole is formed in a cutting hole. When the drilled hole is communicated with the goaf, a seamless steel pipe with the diameter slightly smaller than that of the drilled hole penetrates the goaf and reaches a room working seam goaf top plate, and then a drill bit with the diameter slightly smaller than that of the seamless steel pipe is utilized to conduct secondary drilling to the designed depth. The drilled hole is straight-line-shaped to ensure normal powder charging. In a powder charging process, a wooden tamping bar is utilized to charge a powder roll into a polyvinyl chloride (PVC) sleeve and then charge the powder roll into a blasting hole, the length of a detonating cord is determined according to the length of the blasting hole, and then blasting is conducted. The method has the advantages of being simple in process, good in operability, wide in application range and capable of effectively achieving deep hole presplitting blasting penetrating a thick hard top plate above the goaf, improving drilling blasting efficiency and ensuring safety production of a coal mine.

Description

A kind of goaf deep hole presplitting blasting boreholes loading method of wearing
Technical field
The present invention relates to a kind of deep hole presplitting blasting boreholes loading method, especially a kind of method of passing goaf deep hole presplitting blasting boreholes powder charge of exploiting below formula goaf, room or old working that is applicable to.
Background technology
In coal production, the normal appearance because basic top intensity is large and the thick phenomenon that causes the top board large tracts of land to be pressed in rock stratum.The outstanding large tracts of land top board revealed is the utmost point disrumpent feelings being caving in the short time, cause the cover stress redistribution and produce impact failure power, more seriously adopted the air in space by instantaneous discharge, form the extremely strong hurricane disaster of destructive power, even cause casualties and equipment damage accident, be unfavorable for the safety and high efficiency of coal resources.Practice shows, by presplit blasting top board overhead caving, reducing top board, outstanding to show up long-pending be the effective measures that prevent that the top board large tracts of land from pressing.Because the basic top thickness degree of room formula above goaf is large and lithology is harder, easily cause the top board large tracts of land to carry out the pressure power disaster, therefore need cut intraocular at lower working face of coal seam carries out the presplit blasting overhead caving, reduces the first weight step pitch and carrys out Compressive Strength.But when contiguous seams carries out broadwall under formula goaf, room, because basic top is positioned on the room mining coal seam, deep hole presplitting blasting boreholes and powder charge need be passed formula goaf, room, and these are different from common deep hole presplitting explosion, and boring and powder charge have been proposed to requirements at the higher level.Up to now, there is not yet and wear the report that formula goaf, room borehole charge carries out deep hole presplitting explosion overhead caving.
Summary of the invention
Technical problem: the objective of the invention is to overcome the deficiency in prior art, a kind of goaf deep hole presplitting blasting boreholes loading method of wearing is provided, by adding sleeve splice, creep into, the pvc pipe continuous charging, thereby hole smoothly and charge explosion, for downhole safety exploitation provides safety assurance.
Technical scheme: the goaf deep hole presplitting blasting boreholes loading method of wearing of the present invention comprises the steps:
A, contiguous seams is cut intraocular construction borehole under formula goaf, room, bores be " one " font straight line a plurality of and once creeps into boring along cutting a direction, once creeps into bore diameter and is φ 1, length passes the once boring plagioclase of immediate roof for tilting l 1 , the spacing of wells and the degree of depth are determined according to basic rimrock stone mechanical property and thickness;
When b, boring and goaf are got through, first with diameter, be slightly less than bore diameter φ 1Seamless steel pipe pass goaf, after arriving room mining coal seam goaf top board, the drill bit secondary that is slightly less than seamless steel pipe with diameter creeps into, until projected depth; Described seamless steel pipe diameter is φ 2, length is the secondary drilling plagioclase from origin or beginning to goaf top plate l 2 Described secondary creeps into bore diameter φ 3, length is l 3 - l 2 , complete the construction of borehole;
C, borehole is implemented to powder charge, its process is as follows:
(1) on ground, in advance explosive and stemming are installed, until the advance of the face, together with the timber wedge of plugged perforation, be transported to down-hole during to the powder charge position and install;
(2) first peace and quiet borehole before powder charge, use wooden tamper that powder stick is packed into after the PVC sleeve pipe and packed in the big gun hole, according to the big gun hole length, determine primacord length, at the bottom of powder stick is pushed into to hole, load real, adopt continuous coupling manner powder charge, and adopt double detonator, primacord to ignite, wherein the primacord two ends all extend to the borehole bottom, and fix with stopper, and double detonator exposes the primacord connection in series-parallel with the big gun hole and is connected, the bus of blowing out is unsettled to be hung, adopt the copper core to blow out line, all boreholes all adopt a powder charge of forward, segment blast;
(3) extremely closely knit with yellow mud filling plugged perforation, after completing, plugged perforation carries out line, and then adopt the cap sensitive primacord to blow out.
Beneficial effect, owing to having adopted such scheme, the present invention can make drilling rod pass goaf normal charge, enforcement explosion, to guarantee the successful implementation of basic top presplit blasting.When the present invention exploits below formula goaf, room or old working, by at lower working face of coal seam, cutting intraocular, carry out the presplit blasting overhead caving, efficiently solve and wear the thick plate deep hole presplitting explosion difficult problem of resisting stubbornly of above goaf, for due to the basic top thickness of above goaf and hard, easily cause large tracts of land to press the efficiency of disaster problem, raising drillhole blasting that a new approach is provided, guarantee Safety of Coal Mine Production.Its major advantage has:
(1) efficiently solving boring while wearing goaf or old working creeps into and the continuous charging problem continuously;
(2) adopt the drilling rod of three kinds of different-diameters to realize wearing the goaf powder charge, construction technology is simple, workable;
(3) the method can be used for wearing the empty caves such as formula goaf, room, old working, applied widely.
The accompanying drawing explanation
Fig. 1 is formula goaf, room of the present invention below coal seam deep hole presplitting explosion overhead caving horizontal layout schematic diagram;
Fig. 2 is the A-A profile of Fig. 1;
Fig. 3 (a) is enforcement borehole boring step 1 structural representation of the present invention;
Fig. 3 (b) is enforcement borehole boring step 2 structural representation of the present invention;
Fig. 3 (c) is enforcement borehole boring step 3 structural representation of the present invention.
In figure: the 1-seat earth, the 2-working seam, the 3-immediate roof, 4-room formula coal column, 5-pushes up substantially, the 6-point of cutting of coal face, the 7-haulage way, the 8-tailgate, No. 1 boring-B(1), No. 2 boring-B(2), No. n boring-B(n), No. n+1 boring-B(n+1) L-face length, l 1 -the plagioclase of once holing, l 2 -secondary drilling plagioclase, l 3 -boring total length, D-two drilling horizontal spacings, α-boring and top board angle, φ 1-once creep into bore diameter, φ 2-seamless steel pipe diameter, φ 3-secondary creeps into bore diameter.
The specific embodiment
Below in conjunction with accompanying drawing, one embodiment of the present of invention are further described:
In Fig. 1 Fig. 2, seat earth 1 also can be described as the direct end; Working seam 2 adopts the comprehensive mechanized coal mining method exploitation; Immediate roof 3 is between formula goaf, the room of working seam 2 and top; Room formula coal column 4 is that coal column is left in the formula goaf, room formed after the formula coal-mining method exploitation of employing room, coal seam, top; Basic top 5 i.e. old top; Point of cutting of coal face 6 is tunnels for the installation fully-mechanized mining equipment of digging in coal seam; Haulage way 7 is mainly used in installing rubber conveyer transportation coal; Tailgate 7 is mainly used in discharging the dirty wind in working face.The goaf deep hole presplitting blasting boreholes loading method of wearing of the present invention, concrete steps are as follows:
A, in fully-mechanized mining working, length is below formula goaf, room LThe intraocular of cutting carry out bore operation, contiguous seams is cut intraocular construction borehole under formula goaf, room, along cutting a direction, bore a plurality of borings that are " one " font straight line, as shown in Figure 1: No. 1 boring-B(1), No. 2 boring-B(2), No. n boring-B(n), No. n+1 boring-B(n+1), boring with the immediate roof angle be α, the two parallel spacings of wells are D, after passing immediate roof 3, boring enters goaf, and the employing rig carries out bore operation, once creeps into bore diameter and is φ 1, length passes the once boring plagioclase of immediate roof 3 for tilting l 1 , the spacing of wells and the degree of depth are determined according to basic rimrock stone mechanical property and thickness;
B, once creep into hole and goaf while getting through, enter formula goaf, room due to boring after passing immediate roof 3, first with diameter, be slightly less than and once creep into bore diameter φ 1Seamless steel pipe pass goaf, after arriving room formula goaf top plate, the drill bit secondary that is slightly less than seamless steel pipe with diameter creeps into, until projected depth, and requires boring to be a straight line, to guarantee normal charge; Described seamless steel pipe diameter is φ 2, length is the secondary drilling plagioclase from origin or beginning to room formula goaf top plate l 2 Described secondary creeps into bore diameter φ 3, length is l 3 - l 2 , wherein l 3 For the boring total length, complete the construction of borehole;
C, borehole is implemented to powder charge, its process is as follows:
(1) borehole adopts continuous coupling manner powder charge, first on ground, in advance explosive and stemming is installed, and until the advance of the face, together with the timber wedge of plugged perforation, is transported to down-hole during to the powder charge position and installs;
(2) first peace and quiet borehole before powder charge, used wooden tamper that powder stick is packed into after the PVC sleeve pipe and packed in the big gun hole, determines primacord length according to the big gun hole length, and primacord cuts with sharp knife, forbids impact extruded; At the bottom of powder stick is pushed into to hole, load in fact, yellow mud wants filling closely knit, then blows out.Adopt continuous coupling manner powder charge, and adopt double detonator, primacord to adopt cap sensitive, wherein the primacord two ends all extend to the borehole bottom, and fix with stopper, double detonator exposes the primacord connection in series-parallel with the big gun hole and is connected, the bus of blowing out adopts the copper core to blow out line, must insulation good, and unsettled hanging.All boreholes all adopt a powder charge of forward, segment blast;
(3) extremely closely knit with yellow mud filling plugged perforation, after completing, plugged perforation carries out line, and then adopt the cap sensitive primacord to blow out.

Claims (1)

1. wear goaf deep hole presplitting blasting boreholes loading method for one kind, it is characterized in that, comprise the steps:
A, contiguous seams is cut intraocular construction borehole under formula goaf, room, bores be " one " font straight line a plurality of and once creeps into boring along cutting a direction, once creeps into bore diameter and is φ 1, length passes the once boring plagioclase of immediate roof for tilting l 1 , the spacing of wells and the degree of depth are determined according to basic rimrock stone mechanical property and thickness;
When b, boring and goaf are got through, first with diameter, be slightly less than bore diameter φ 1Seamless steel pipe pass goaf, after arriving room mining coal seam goaf top board, the drill bit secondary that is slightly less than seamless steel pipe with diameter creeps into, until projected depth; Described seamless steel pipe diameter is φ 2, length is the secondary drilling plagioclase from origin or beginning to goaf top plate l 2 Described secondary creeps into bore diameter φ 3, length is l 3 - l 2 , complete the construction of borehole;
C, borehole is implemented to powder charge, its process is as follows:
(1) on ground, in advance explosive and stemming are installed, until the advance of the face, together with the timber wedge of plugged perforation, be transported to down-hole during to the powder charge position and install;
(2) first peace and quiet borehole before powder charge, use wooden tamper that powder stick is packed into after the PVC sleeve pipe and packed in the big gun hole, according to the big gun hole length, determine primacord length, at the bottom of powder stick is pushed into to hole, load real, adopt continuous coupling manner powder charge, and adopt double detonator, primacord to ignite, wherein the primacord two ends all extend to the borehole bottom, and fix with stopper, and double detonator exposes the primacord connection in series-parallel with the big gun hole and is connected, the bus of blowing out is unsettled to be hung, adopt the copper core to blow out line, all boreholes all adopt a powder charge of forward, segment blast;
(3) extremely closely knit with yellow mud filling plugged perforation, after completing, plugged perforation carries out line, and then adopt the cap sensitive primacord to blow out.
CN2013103519881A 2013-08-13 2013-08-13 Drilling and powder charging method for goaf-penetrating deep hole presplitting blasting Pending CN103411493A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013103519881A CN103411493A (en) 2013-08-13 2013-08-13 Drilling and powder charging method for goaf-penetrating deep hole presplitting blasting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013103519881A CN103411493A (en) 2013-08-13 2013-08-13 Drilling and powder charging method for goaf-penetrating deep hole presplitting blasting

Publications (1)

Publication Number Publication Date
CN103411493A true CN103411493A (en) 2013-11-27

Family

ID=49604522

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013103519881A Pending CN103411493A (en) 2013-08-13 2013-08-13 Drilling and powder charging method for goaf-penetrating deep hole presplitting blasting

Country Status (1)

Country Link
CN (1) CN103411493A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104266557A (en) * 2014-07-31 2015-01-07 山东华联矿业股份有限公司 Precontrol roof sublevel ore breaking once shaft forming method
CN103791786B (en) * 2014-03-12 2015-07-08 中铁二局股份有限公司 Underground diaphragm wall bed rock grooving pre-splitting blasting method
CN105865279A (en) * 2016-04-15 2016-08-17 中国矿业大学(北京) Block cutting type cut hole forced caving detonation method
CN106643355A (en) * 2017-01-19 2017-05-10 中国矿业大学(北京) Forced roof caving method for hugely-thick hard roof in deep coal mine
CN109470100A (en) * 2018-12-25 2019-03-15 中矿科创(北京)煤炭技术有限公司 A kind of coal mine roof plate Deephole pre-splitting blasting method
CN110553558A (en) * 2019-07-21 2019-12-10 西山煤电(集团)有限责任公司 Deep hole presplitting blasting method during initial mining and initial setting period of working face of extra-thick coal seam
CN111622758A (en) * 2020-05-15 2020-09-04 中煤科工开采研究院有限公司 Pressure relief method for relieving rock burst disaster
CN112033245A (en) * 2020-09-14 2020-12-04 中国矿业大学(北京) Long-distance blast hole charging device and charging method
CN113654422A (en) * 2021-08-17 2021-11-16 华能铜川照金煤电有限公司西川煤矿分公司 Forced caving technical scheme for advanced presplitting blasting of two ends of working face

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4092045A (en) * 1975-10-06 1978-05-30 Sullivan Thomas M Subterranean hydraulic mining method
DE2815149A1 (en) * 1977-04-28 1978-11-02 Dowa Mining Co METHOD AND DEVICE FOR DRILLING UP A MANHOLE WITH A HOLE OVER THE FULL CROSS SECTION WITHOUT HANDLING
WO2003042489A2 (en) * 2001-11-14 2003-05-22 Halliburton Energy Services, Inc. Method and apparatus for a monodiameter wellbore, monodiameter casing, monobore, and/or monowell
CN101029574A (en) * 2007-04-02 2007-09-05 淮北矿业集团煤业有限责任公司祁南煤矿 Long standpipe gas extraction in worked-out section
CN102967191A (en) * 2012-12-11 2013-03-13 中国神华能源股份有限公司 Blasting method for treatment of gob

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4092045A (en) * 1975-10-06 1978-05-30 Sullivan Thomas M Subterranean hydraulic mining method
DE2815149A1 (en) * 1977-04-28 1978-11-02 Dowa Mining Co METHOD AND DEVICE FOR DRILLING UP A MANHOLE WITH A HOLE OVER THE FULL CROSS SECTION WITHOUT HANDLING
WO2003042489A2 (en) * 2001-11-14 2003-05-22 Halliburton Energy Services, Inc. Method and apparatus for a monodiameter wellbore, monodiameter casing, monobore, and/or monowell
CN101029574A (en) * 2007-04-02 2007-09-05 淮北矿业集团煤业有限责任公司祁南煤矿 Long standpipe gas extraction in worked-out section
CN102967191A (en) * 2012-12-11 2013-03-13 中国神华能源股份有限公司 Blasting method for treatment of gob

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
林光堂: "长距离大倾角小角度穿层钻进技术研究", 《煤炭科技》 *
王方田: "浅埋房式采空区下近距离煤层长壁开采覆岩运动规律及控制", 《中国博士学位论文全文数据库 工程科技Ⅰ辑》 *
秦勇 等: "综放工作面强制放顶的设计与探索", 《煤炭工程》 *
窦林名: "强制放顶炮眼深度的确定", 《江苏煤炭》 *
陈苏社: "综采工作面超深孔爆破强制放顶技术研究", 《煤炭科学技术》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103791786B (en) * 2014-03-12 2015-07-08 中铁二局股份有限公司 Underground diaphragm wall bed rock grooving pre-splitting blasting method
CN104266557A (en) * 2014-07-31 2015-01-07 山东华联矿业股份有限公司 Precontrol roof sublevel ore breaking once shaft forming method
CN105865279A (en) * 2016-04-15 2016-08-17 中国矿业大学(北京) Block cutting type cut hole forced caving detonation method
CN105865279B (en) * 2016-04-15 2017-06-23 中国矿业大学(北京) Stripping and slicing formula cuts an overhead caving blasting method
CN106643355A (en) * 2017-01-19 2017-05-10 中国矿业大学(北京) Forced roof caving method for hugely-thick hard roof in deep coal mine
CN106643355B (en) * 2017-01-19 2019-07-09 中国矿业大学(北京) A kind of overhead caving method of the huge thick tight roof of deep coalmine
CN109470100A (en) * 2018-12-25 2019-03-15 中矿科创(北京)煤炭技术有限公司 A kind of coal mine roof plate Deephole pre-splitting blasting method
CN110553558A (en) * 2019-07-21 2019-12-10 西山煤电(集团)有限责任公司 Deep hole presplitting blasting method during initial mining and initial setting period of working face of extra-thick coal seam
CN111622758A (en) * 2020-05-15 2020-09-04 中煤科工开采研究院有限公司 Pressure relief method for relieving rock burst disaster
CN112033245A (en) * 2020-09-14 2020-12-04 中国矿业大学(北京) Long-distance blast hole charging device and charging method
CN112033245B (en) * 2020-09-14 2021-08-13 中国矿业大学(北京) Long-distance blast hole charging device and charging method
CN113654422A (en) * 2021-08-17 2021-11-16 华能铜川照金煤电有限公司西川煤矿分公司 Forced caving technical scheme for advanced presplitting blasting of two ends of working face

Similar Documents

Publication Publication Date Title
CN103411493A (en) Drilling and powder charging method for goaf-penetrating deep hole presplitting blasting
CN107060760A (en) A kind of method that colliery withdraws tunnel presplit blasting caving release
CN102536239B (en) Long-wall working face coal pillar-free mining method
CN102678120B (en) Method for releasing pressure and removing danger of rock burst
CN104100266B (en) The method of preventing and treating gob side entry bump
CN1664310A (en) Control method for coal mine detached island coal pillar rock burst
CN113404535B (en) Method for preventing rock burst by hydraulic fracturing of coal mine underground
CN207063903U (en) Cloth pore structure is administered on the outstanding top of high-dipping fully-mechanized mining working upper corner
CN103498680B (en) Improve the method for fully mechanized coal face period of beginning mining top-coal recovery rate
CN101876520A (en) Segment pre-blasting technology for steeply dipping hard coal seam roof
CN101737047A (en) Method for mining coal of steeply inclined thin seam
CN107387082A (en) A kind of method for weakening coal seam tight roof
CN107304676A (en) A kind of prevention and controls for leaving bump under coal column
CN112282806B (en) Thick coal seam forced mining roadway blasting pressure relief and long anchor rod cooperative roof control method
CN107120137B (en) A kind of coal roadway tunneling is along seat earth Deephole pre-splitting blasting pumping method
CN101285384B (en) Large diameter, deep borehole and non undercutting mining method
CN103216264B (en) Method for controlling deformation of surrounding rock of basic rimrock layer on presplitting blasting mining roadway
Wang et al. Roof pre-blasting to prevent support crushing and water inrush accidents
CN110966002B (en) Roof cutting pressure relief method based on intensive drilling
CN107152279A (en) Wangeviry stope top plate hydraulic fracturing method for weakening and device
CN115749713A (en) Rock stratum frequency conversion pulse fracture network fracturing method and equipment
CN112983418A (en) Method for hydraulic fracturing pressure relief of coal mine underground coal face withdrawal channel
CN106246184A (en) A kind of recovery method of half-edge coal seam
RU2472936C1 (en) Control method of poorly caving roof at entry of mechanised complex to removal chamber
CN212154765U (en) Deep hole pre-splitting structure for fully mechanized mining face waste rock area

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20131127