CN102434159B CN201110382824.6A CN201110382824A CN102434159B CN 102434159 B CN102434159 B CN 102434159B CN 201110382824 A CN201110382824 A CN 201110382824A CN 102434159 B CN102434159 B CN 102434159B
Authority
CN
China
Prior art keywords
mining
annular solid
ore bed
ore
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110382824.6A
Other languages
Chinese (zh)
Other versions
CN102434159A (en
Inventor
赵光天
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang YongChang Meter Co Ltd
Original Assignee
Zhejiang YongChang Meter Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang YongChang Meter Co Ltd filed Critical Zhejiang YongChang Meter Co Ltd
Priority to CN201110382824.6A priority Critical patent/CN102434159B/en
Publication of CN102434159A publication Critical patent/CN102434159A/en
Application granted granted Critical
Publication of CN102434159B publication Critical patent/CN102434159B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention belongs to the field of mineral mining, in particular to a mining method for an ore bed. The mining method comprises the following steps of: mining in a large-section tunneling way; during mining, building annular bodies with upper, lower, left and right faces on four walls of a mined vacant mining area by using reinforced concrete structures; building a section of annular body once a section is mined forward; building an integrated structure by using two adjacent annular bodies; building vertical beams for supporting at intervals between the upper and lower inner walls of the annular bodies; performing anti-permeation and anti-leakage treatment on the inner wall faces of the annular bodies; and forming a mine cave after the ore bed is mined completely. The method has the advantages that: during mining, the annular bodies with reinforced concrete structures which are subjected to anti-permeation and anti-leakage treatment are built on the four walls of the mined vacant mining area, and the operating space under the ore bed is large, so that modern large-scale operation can be realized; and the danger coefficient of mining worker operation is lowered, the mine cave can be reused after mining is completed, the comprehensive mining cost is low, waste of resources is not caused, and the method is suitable for mining various minerals.

Description

A kind of exploitation method of ore bed
Technical field
The invention belongs to mineral mining field, refer in particular to a kind of exploitation method of ore bed.
Background technology
At present, the quarry in mineral deposit generally need to first build the sensible ore body in a series of tunnels, make the complete lifting of ground and underground formation, transportation, ventilate, the system such as draining and power supply, so that personnel, material, equipment, power and fresh air are made a gift to someone underground, simultaneously ore, barren rock, pit water, dirty air etc. is delivered to ground, the mining space of the method is less, some large-scale machineries can not enter minery, and the mineral in ore bed can not gather completely, once there is security incident in ore bed, cutter's safety can not get ensureing, after mineral mining, also need backfill, to prevent landslide.
Summary of the invention
The object of this invention is to provide a kind of mineral in ore bed can collections completely, and can ensure cutter's safety, after mineral have gathered, do not need backfill and abandoned mine can be fully utilized, the mineral mining method that integrated cost is low.
The object of the present invention is achieved like this: a kind of exploitation method of ore bed, adopt the mode of large section driving to dig up mine, in the time of mining, the wall of exploiting vacant mining area is built into the annular solid of four faces up and down with reinforced concrete structure, often exploit forward one section and just construct one section of annular solid, adjacent two annular solids are built into integral structure, the vertical beam that between inwall, interval build support is used up and down at annular solid, the internal face of annular solid is carried out to Anti-steam-leakage, preventing water leakage processing, the hole, ore deposit of formation production or life use after coal mining completes.
Above-mentioned the internal face of annular solid is carried out to the concrete mode that Anti-steam-leakage, preventing water leakage process be: the mode by injection or slip casting or surface plastic spraying is processed the internal face of annular solid.
Outer setting in minery has the ventilation equipment to minery by fresh air conveying, is provided with gas boring and surveying and warning device in minery.
The import and export in the hole, ore deposit of above-mentioned production or life use are through waterproof, anti-gas-leak and withstand voltage shutoff, in hole, ore deposit, by turnover feed channel, be in communication with the outside, in turnover feed channel, one-way vent valve is set, form large-scale capable of storing air energy tank, with the air of capable of storing air energy tank stores, can be able to generate electricity as required and use for productive life at any time.
The present invention compared to existing technology outstanding advantage is:
When 1, the present invention digs up mine, at the wall of exploiting vacant mining area, construct the annular solid of reinforced concrete structure, and the internal face of annular solid is carried out to Anti-steam-leakage, preventing water leakage processing, working space under ore bed is large, can consider more mechanization, automation, electrification, informationalized operation, and the mineral in ore bed can be gathered completely, and existing mineral mining mode can cause the huge waste of mineral resources;
2, after working seam of the present invention completes, form to produce or the hole, ore deposit of life use can be used as energy storage facility and utilizes again, and traditional mineral mining mode all needs mine to carry out backfill after exploitation the security incident causing to avoid mine to subside;
3, the present invention greatly reduces the danger coefficient of cutter's operation, and the integrated cost of mining is low, is applicable to the exploitation of various mineral.
4. the present invention improves like mining cost outwardly, as after adding, becomes the use of air energy storage canister, and its integrated cost reduces greatly so.
Accompanying drawing explanation
Fig. 1 is the exploitation schematic diagram with invention.
Fig. 2 is that the A-A of Fig. 1 is to sectional view.
Fig. 3 is that the B-B of Fig. 1 is to sectional view.
In figure: 1-ground, the 2-earth's crust, 3-ore bed, 4-annular solid, 5-vertical beam.
The specific embodiment
Below in conjunction with accompanying drawing, with specific embodiment, the invention will be further described, referring to Fig. 1-3;
A kind of exploitation method of ore bed, adopt the mode of large section driving to dig up mine, in the time of mining, the wall of exploiting vacant mining area is built into the annular solid 4 of four faces up and down with reinforced concrete structure, often exploit forward one section and just construct one section of annular solid 4, adjacent two annular solids 4 are built into integral structure, the vertical beam 5 that between inwall, interval build support is used up and down at annular solid, the internal face of annular solid 4 is carried out to Anti-steam-leakage, preventing water leakage is processed, the hole, ore deposit of formation production or life use after coal mining completes, the Anti-steam-leakage of the internal face of annular solid 4, preventing water leakage is processed and can be prevented the landslide of generation side, hole, ore deposit, and can stop water and gas in ore bed to permeate in hole, ore deposit.
Above-mentioned the internal face of annular solid 4 is carried out to the concrete mode that Anti-steam-leakage, preventing water leakage process be: the mode by injection or slip casting or surface plastic spraying is processed the internal face of annular solid 4.
Outer setting in minery has the ventilation equipment to minery by fresh air conveying, in minery, be provided with gas boring and surveying and warning device, in the outlet of mine, be also provided with gas control and do not execute, the gas that ventilation equipment displacement can be gone out is collected utilization, to avoid the waste of the energy.
The primary condition of gas explosion is: in (1) air, the concentration of gas generally will reach 5%-16%.(2) temperature of lighting gas explosion will reach 650-750 ℃, and can meet the sensitive period of gas explosion.(3) in air, oxygen concentration must be greater than 12%.Above three conditions must meet simultaneously, and gas just can be blasted.Under ventilation state, in air, oxygen concentration is generally all greater than 12%; The powerful ventilation equipment of hole, ore deposit of the present invention outer setting, even if concentration is also not easy to reach 5% one 16% in the situation that of Gas, and the hole, ore deposit building by annular solid 4 has larger space, control spark also comparatively easy, so greatly reduce the possibility of gas explosion, even if generation gas explosion, the larger space that the hole, ore deposit that annular solid 4 builds has can minimize the impact of blast, thereby the disaster of other that avoid causing, compare gas explosion, the landslide of hole, ore deposit is only cutter's biggest threat.
The import and export in the hole, ore deposit of above-mentioned production or life use, through waterproof, anti-gas-leak and withstand voltage shutoff, are in communication with the outside by turnover feed channel in hole, ore deposit, in turnover feed channel, one-way vent valve are set, and form large-scale capable of storing air energy tank.
Above-described embodiment is only preferred embodiment of the present invention, not limits the scope of the invention according to this, therefore: all equivalences of doing according to structure of the present invention, shape, principle change, within all should being covered by protection scope of the present invention.

Claims (4)

1. the exploitation method of an ore bed, it is characterized in that: adopt the mode of large section driving to dig up mine, in the time of mining, the wall of exploiting vacant mining area is built into the annular solid of four faces up and down with reinforced concrete structure, often exploit forward one section and just construct one section of annular solid, adjacent two annular solids are built into integral structure, the vertical beam that between inwall, interval build support is used up and down at annular solid, the internal face of annular solid is carried out to Anti-steam-leakage, preventing water leakage processing, the hole, ore deposit of formation production or life use after coal mining completes.
2. the exploitation method of a kind of ore bed according to claim 1, is characterized in that: described the internal face of annular solid is carried out to the concrete mode that Anti-steam-leakage, preventing water leakage process be: the mode by injection or slip casting or surface plastic spraying is processed the internal face of annular solid.
3. the exploitation method of a kind of ore bed according to claim 1, is characterized in that: the outer setting in minery has the ventilation equipment to minery by fresh air conveying, is provided with gas boring and surveying and warning device in minery.
4. according to the exploitation method of a kind of ore bed described in claim 1-3 any one, it is characterized in that: the import and export in the hole, ore deposit of described production or life use are through waterproof, anti-gas-leak and withstand voltage shutoff, in hole, ore deposit, by turnover feed channel, be in communication with the outside, in turnover feed channel, one-way vent valve is set, hole, ore deposit forms large-scale capable of storing air energy tank.
CN201110382824.6A 2011-11-28 2011-11-28 Mining method for ore bed Expired - Fee Related CN102434159B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110382824.6A CN102434159B (en) 2011-11-28 2011-11-28 Mining method for ore bed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110382824.6A CN102434159B (en) 2011-11-28 2011-11-28 Mining method for ore bed

Publications (2)

Publication Number Publication Date
CN102434159A CN102434159A (en) 2012-05-02
CN102434159B true CN102434159B (en) 2014-03-05

Family

ID=45982480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110382824.6A Expired - Fee Related CN102434159B (en) 2011-11-28 2011-11-28 Mining method for ore bed

Country Status (1)

Country Link
CN (1) CN102434159B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109236294A (en) * 2018-09-12 2019-01-18 程昌胜 A kind of environment-friendly type anti-collapse recovery method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457654A (en) * 2018-02-10 2018-08-28 广西华洋矿源材料有限公司 A kind of production practice of Pb-Zn deposits
CN108425673A (en) * 2018-02-10 2018-08-21 广西华洋矿源材料有限公司 A kind of production practice of copper mine

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4213653A (en) * 1978-04-17 1980-07-22 Bechtel International Corporation Method of mining of thick seam materials
CN1067290A (en) * 1991-05-28 1992-12-23 枣庄市联营石膏矿 Room-and-pilar type caving for mine
RU2130552C1 (en) * 1997-08-07 1999-05-20 Санкт-Петербургский государственный горный институт им.Г.В.Плеханова (технический университет) Method for protection of interchamber pillars from destruction
CN1664310A (en) * 2005-02-28 2005-09-07 清华大学 Control method for coal mine detached island coal pillar rock burst

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4213653A (en) * 1978-04-17 1980-07-22 Bechtel International Corporation Method of mining of thick seam materials
CN1067290A (en) * 1991-05-28 1992-12-23 枣庄市联营石膏矿 Room-and-pilar type caving for mine
RU2130552C1 (en) * 1997-08-07 1999-05-20 Санкт-Петербургский государственный горный институт им.Г.В.Плеханова (технический университет) Method for protection of interchamber pillars from destruction
CN1664310A (en) * 2005-02-28 2005-09-07 清华大学 Control method for coal mine detached island coal pillar rock burst

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109236294A (en) * 2018-09-12 2019-01-18 程昌胜 A kind of environment-friendly type anti-collapse recovery method

Also Published As

Publication number Publication date
CN102434159A (en) 2012-05-02

Similar Documents

Publication Publication Date Title
CN110593874B (en) Full-filling method for strong and weak full mining of coal mine
CN112360462B (en) Mining process for filling and grouting short-wall fully-mechanized mining gangue
CN107893658B (en) Big thick ore body stage open stope afterwards filling mining methods in pole under strong ground pressure ring border
WO2016045440A1 (en) Mining method
CN112593853B (en) Construction method for coal mine waste filling and water-reducing mining
CN109882239B (en) Open-pit end slope coal-pressing radial filling mining method
CN102011611A (en) Strip-type filling method of high water-swelling material for controlling movement and deformation of overlying strata
CN206600186U (en) A kind of Technique of Coal Mine Drainage underground storage
CN111691885B (en) Efficient filling mining method for ultra-thick coal seam
CN102094647A (en) Safe and efficient fully-mechanized mining method for thin coal seam under two hard conditions
CN103726858A (en) Underground large-scale cave depot project sphere-cylinder combination excavation method
CN102434159B (en) Mining method for ore bed
CN113958365A (en) Short and long wall discontinuous filling mining cooperated with basic group solid waste CO2Sealing system and method
CN105507947A (en) Networked gangue filling method
CN103174424B (en) Breast and pillar method under long-wall arrangement
CN202731927U (en) Tunnel construction device
CN110714759B (en) Method for mining lost coal
CN104481571A (en) Mine coal ash grouting fire preventing and extinguishing method
CN101915122B (en) Construction method of underground large water-flow mine emergency water sump
CN104088633A (en) Self-walking drill type coal mining machine used at open mine end slope
CN108331580B (en) Clean and efficient coal mining method
CN203950907U (en) The blind big gun of a kind of detection signal transmitting antenna
CN115977724A (en) Coal-based solid waste slurry filling and synergic mineralization CO sequestration 2 Method (2)
CN203978432U (en) Certainly formula coal-winning machine is bored in the walking of a kind of Lu Jingduan nation
CN102865080A (en) Induced fracture engineering arrangement and non-blasting mining process for high-geostress hard rock

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140305

Termination date: 20151128

CF01 Termination of patent right due to non-payment of annual fee