RU2130552C1 - Method for protection of interchamber pillars from destruction - Google Patents

Method for protection of interchamber pillars from destruction Download PDF

Info

Publication number
RU2130552C1
RU2130552C1 RU97113843A RU97113843A RU2130552C1 RU 2130552 C1 RU2130552 C1 RU 2130552C1 RU 97113843 A RU97113843 A RU 97113843A RU 97113843 A RU97113843 A RU 97113843A RU 2130552 C1 RU2130552 C1 RU 2130552C1
Authority
RU
Russia
Prior art keywords
pillar
drilled
piles
holes
bore
Prior art date
Application number
RU97113843A
Other languages
Russian (ru)
Other versions
RU97113843A (en
Inventor
И.Э. Богуславский
Э.И. Богуславский
Ю.В. Шувалов
Н.В. Ковтун
Д.С. Крузин
Original Assignee
Санкт-Петербургский государственный горный институт им.Г.В.Плеханова (технический университет)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Санкт-Петербургский государственный горный институт им.Г.В.Плеханова (технический университет) filed Critical Санкт-Петербургский государственный горный институт им.Г.В.Плеханова (технический университет)
Priority to RU97113843A priority Critical patent/RU2130552C1/en
Application granted granted Critical
Publication of RU2130552C1 publication Critical patent/RU2130552C1/en
Publication of RU97113843A publication Critical patent/RU97113843A/en

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

FIELD: mining industry. SUBSTANCE: method can be used in underground development of thick horizontal and slightly inclined mineral and non-metallic deposits, including protection and supporting of interchamber pillars. According to method, created over external perimeter of pillar is holding support. For this purpose, bore-holes are drilled in chamber floor over external perimeter of pillar. Then, vertical piles are installed in drilled bore-holes. Piles are rigidly secured to each other by guys which are inserted through horizontal bore-holes drilled in pillar. Installed between piles along pillar contour is vertical shuttering and free space between pillar and shuttering is filled with hardening material. Utilization of aforesaid method allows to substantially enhance safety of pillars due to high stability of built reinforced concrete structure. EFFECT: higher efficiency. 2 dwg

Description

Изобретение относится к горному делу и может быть использовано при подземной разработке мощных горизонтальных и пологопадающих рудных и нерудных месторождений, в частности, для охраны и поддержания междукамерных целиков (МКЦ). The invention relates to mining and can be used in underground mining of powerful horizontal and dipping ore and non-metallic deposits, in particular, for the protection and maintenance of inter-chamber pillars (MCC).

Известен способ предохранения целиков от разрушения [1]. Он заключается в поддержании целика с обеих сторон с помощью закладочного материала, подаваемого в очистную камеру после первичной выемки. A known method of protecting the pillars from destruction [1]. It consists in maintaining the pillar on both sides with the help of the filling material supplied to the treatment chamber after the initial excavation.

Однако известный способ обладает недостатками, связанными с невысокой устойчивостью, значительной трудоемкостью и большими материальными затратами. However, the known method has the disadvantages associated with low stability, considerable complexity and high material costs.

Задачей предлагаемого изобретения является повышение устойчивости МКЦ и снижение трудовых и материальных затрат на ее достижение. The task of the invention is to increase the stability of the MCC and reduce labor and material costs to achieve it.

Поставленная задача достигается тем, что по внешнему контуру целика в почве камеры бурят скважины, устанавливают в них жесткие вертикальные сваи, которые закрепляют между собой стяжками, пропущенными по пробуренным сквозь целик горизонтальным скважинам, устанавливают между сваями вертикальную опалубку вдоль контура целика и заполняют свободное пространство между целиком и опалубкой твердеющей закладкой. The problem is achieved by the fact that along the external contour of the pillar in the soil of the chamber, wells are drilled, rigid vertical piles are installed in them, which are fixed together with screeds, passed through the horizontal wells drilled through the whole pillar, installed vertical formwork between the piles along the contour of the pillar and fill the free space between whole and formwork hardening bookmark.

Предлагаемый способ позволяет сформировать надежное защитное устройство при невысоких затратах, которое обеспечит устойчивость МКЦ. The proposed method allows to form a reliable protective device at low cost, which will ensure the stability of the MCC.

Сущность предлагаемого изобретения поясняется нижеследующим описанием и прилагаемыми к нему чертежами, где на фиг. 1 изображен поперечный разрез междукамерного барьерного целика, на фиг. 2 - план по разрезу А-А фиг. 1. The essence of the invention is illustrated by the following description and the accompanying drawings, where in FIG. 1 is a cross-sectional view of an interchamber barrier pillar; FIG. 2 is a plan along section AA of FIG. 1.

1- междукамерный барьерный целик; 2 - скважины в почве камеры; 3 - вертикальные сваи; 4 - горизонтальные скважины в целике; 5 - металлические стяжки; 6 - вертикальная опалубка; 7 - твердеющая закладка. 1 - interchamber barrier pillar; 2 - wells in the chamber soil; 3 - vertical piles; 4 - horizontal wells as a whole; 5 - metal ties; 6 - vertical formwork; 7 - hardening bookmark.

Предлагаемый способ осуществляются следующим образом. В почве камеры вдоль стенок целика 1 по всей его длине бурят вертикальные скважины 2, в которых закрепляют железобетонные трубы 3. На уровне верхней и нижней границ данных труб в целике бурятся горизонтальные скважины 4, через которые сквозь целик пропускаются металлические стяжки (тросы) 5. Стяжки жестко закрепляются на трубах 3 сверху и снизу. Пространство между целиком 1 и сформированным каркасом (опалубкой) 6 заполняется твердеющей закладкой 7, обеспечивающей после затвердевания неподвижность, жесткость и устойчивость всей конструкции. The proposed method is carried out as follows. In the soil of the chamber, vertical boreholes 2 are drilled along the walls of the pillar 1 along its entire length 2, in which reinforced concrete pipes 3 are fixed. At the level of the upper and lower boundaries of these pipes, horizontal boreholes 4 are completely drilled through which metal ties (cables) are passed through the entirety 5. Couplers are rigidly fixed on pipes 3 above and below. The space between the whole 1 and the formed frame (formwork) 6 is filled with a hardening tab 7, which after hardening provides immobility, rigidity and stability of the entire structure.

Использование предлагаемого способа позволит значительно повысить сохранность МКЦ за счет высокой устойчивости сформированной железобетонной конструкции. Using the proposed method will significantly increase the safety of the MCC due to the high stability of the formed reinforced concrete structure.

Литература, принятая во внимание:
[1] Авторское свидетельство СССР N 1555490, М.Кл.5 E 21 C 41/16, 1988 .
Literature taken into account:
[1] Copyright certificate of the USSR N 1555490, M. Cl. 5 E 21 C 41/16, 1988.

Claims (1)

Способ предохранения междукамерных целиков от разрушения, заключающийся в создании по внешнему контуру целика поддерживающей опоры, отличающийся тем, что по внешнему контуру целика в почву камеры бурят скважины, устанавливают в них вертикальные сваи, которые жестко закрепляют между собой стяжками, пропущенными по пробуренным сквозь целик горизонтальным скважинам, устанавливают между сваями вертикальную опалубку вдоль контура целика и заполняют свободное пространство между целиком и опалубкой твердеющей закладкой. A method of protecting interchamber pillars from destruction, which consists in creating a supporting support along the outer contour of the pillar, characterized in that wells are drilled along the outer contour of the pillar into the chamber’s soil, vertical piles are installed in them, which are rigidly fixed to each other with screeds passed through the horizontal drilled through the pillar to the wells, a vertical formwork is installed between the piles along the contour of the pillar and the free space between the whole and the formwork is filled with a hardening tab.
RU97113843A 1997-08-07 1997-08-07 Method for protection of interchamber pillars from destruction RU2130552C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU97113843A RU2130552C1 (en) 1997-08-07 1997-08-07 Method for protection of interchamber pillars from destruction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU97113843A RU2130552C1 (en) 1997-08-07 1997-08-07 Method for protection of interchamber pillars from destruction

Publications (2)

Publication Number Publication Date
RU2130552C1 true RU2130552C1 (en) 1999-05-20
RU97113843A RU97113843A (en) 1999-06-20

Family

ID=20196269

Family Applications (1)

Application Number Title Priority Date Filing Date
RU97113843A RU2130552C1 (en) 1997-08-07 1997-08-07 Method for protection of interchamber pillars from destruction

Country Status (1)

Country Link
RU (1) RU2130552C1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102434159A (en) * 2011-11-28 2012-05-02 浙江永昌仪表有限公司 Mining method for ore bed
CN110486016A (en) * 2019-08-16 2019-11-22 山东科技大学 A method of improving strip coal pillar stability
CN110617080A (en) * 2019-09-10 2019-12-27 太原理工大学 Narrow coal pillar anchor cable wall type reinforcing device and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102434159A (en) * 2011-11-28 2012-05-02 浙江永昌仪表有限公司 Mining method for ore bed
CN102434159B (en) * 2011-11-28 2014-03-05 浙江永昌仪表有限公司 Mining method for ore bed
CN110486016A (en) * 2019-08-16 2019-11-22 山东科技大学 A method of improving strip coal pillar stability
CN110617080A (en) * 2019-09-10 2019-12-27 太原理工大学 Narrow coal pillar anchor cable wall type reinforcing device and method

Similar Documents

Publication Publication Date Title
JP6636773B2 (en) Construction structure and construction method of tunnel lining body
WO2004048754A1 (en) Structure of intermediate wall of three arch excavated tunnel and method for constructing the same
CN107700498A (en) Multi-thread crossings on different level abnormal shape deep foundation pit supporting structure and its construction method
CN107724436A (en) A kind of post-cast strip Seepage method
CN107869351A (en) A kind of method of the high narrow large-scale solution cavity Cavity treatment security protection of type
CN107044135A (en) A kind of tunnel portal excavates the construction method built
CN207452911U (en) A kind of multi-thread crossings on different level abnormal shape deep foundation pit supporting structure
RU2130552C1 (en) Method for protection of interchamber pillars from destruction
JPH04213695A (en) Segment for shield tunnel
CN114856693B (en) A kind of point pillar ore body filling and extraction method
JPH0913872A (en) Excavating construction method for tunnel with large cross section of arch type
JP2001003677A (en) Workstation type tunnel widening device and method
RU2060398C1 (en) Method for preparation of waterproofing stopping for operation under emergency conditions
CN203925505U (en) A kind of preliminary bracing structure and constructing structure of underground construction
US620101A (en) Art of constructing tunnels
CN207062996U (en) Cross the constructing structure of urban road underpass
US2059774A (en) Method of construction subways
CN214787406U (en) I-steel self-filling roadside support facility
CN108330987A (en) Netting safeguard structure between a kind of foundation pit pile
GB496581A (en) An improved method of driving tunnels under water or in water-bearing strata
IL34532A (en) System for the deepening of the bottom in front of moles and retaining walls of marine and river installations and the re-inforced moles so obtained
JPS59114336A (en) How to build underground structures
JP2792632B2 (en) Construction method of foundation pile
KR100507729B1 (en) Process for setting up structures for excavation of underground
JP4319122B2 (en) Branch and junction structure of branching tunnel and its construction method