CN1654749A - 建筑物充水式纠倾及基础加固方法 - Google Patents

建筑物充水式纠倾及基础加固方法 Download PDF

Info

Publication number
CN1654749A
CN1654749A CN 200510033300 CN200510033300A CN1654749A CN 1654749 A CN1654749 A CN 1654749A CN 200510033300 CN200510033300 CN 200510033300 CN 200510033300 A CN200510033300 A CN 200510033300A CN 1654749 A CN1654749 A CN 1654749A
Authority
CN
China
Prior art keywords
building
water
water bag
filling
hydraulic pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200510033300
Other languages
English (en)
Inventor
孙作玉
吴胜发
王晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou University
Original Assignee
Guangzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou University filed Critical Guangzhou University
Priority to CN 200510033300 priority Critical patent/CN1654749A/zh
Publication of CN1654749A publication Critical patent/CN1654749A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

本发明公开一种建筑物充水式纠倾及基础加固方法,该方法包括以下步骤:1.根据地质条件、载荷大小、建筑物的基础埋深以及水袋的直径D确定水袋的布点密度和钻孔深度H;2.用钻孔机在建筑物1下沉部位侧面的地基上钻斜孔到建筑物下至所需深度H,并进行护壁处理,然后送入水袋;3.将所述的水袋与高压水泵出口连接并将滑动式沉降仪布于待充水水袋正上方的建筑物上;4.启动高压水泵充水,同时利用滑动式沉降仪进行监测,当被测点与参考点差值小于5mm时停止充水;5.撤走滑动式沉降仪和高压水泵,密封好水袋口,对施工现场进行回填清理。本发明具有良好的可控性和工程投资少以及不受地质条件的限制,应用范围广的显著效果。

Description

建筑物充水式纠倾及基础加固方法
技术领域:
本发明涉及一种建筑物的纠倾及建筑物基础加固,适用于建筑物基础的整体或局部加固或纠偏。
背景技术:
建筑结构物往往由于基础不均匀沉降等问题发生倾斜,危害用户安全,严重的会发生倒塌,造成重大的经济损失或人员伤亡事故。为了解决此类问题,有关建筑物基础加固、纠偏的专利技术应运而生。CN 1056329发明专利公开了一种古塔纠偏方法,该方法实质上是把地基本来较坚固的部分软化,然后把被软化的土壤移出,使古塔基础原来沉降较小的一侧逐步加大下沉从而达到纠偏目的。很显然该方法存在下述不足:1、如果建筑物只有局部下沉,也必需把本来大部分坚固的地基软化,使其下沉,工程量大;2、无法把软化的土壤全部移出,本来坚固的部分反遭破坏,可控性差;3、改变了建筑物的高度(尽管不大),影响建筑群的高度规化。CN 1099084和CN 1079129发明专利所公开的方法基本上与上述发明专利相同,也同样存在上述不足。CN 1048062发明专利所公开的实质是一种横向成桩加固法,尽管有加固的作用,但这种横向泥桩的强度有限,不适用于高层建筑或载荷大的建筑。CN 1424469发明专利申请所公开的方法是先用千斤顶或油缸把下沉倾斜的建筑物纠倾,现浇加固梁及抬梁或者切断承重墙或柱进行加固,该方法不仅需要动用大型设备,而且需要对建筑物的地基进行开挖清理,然后进行地下浇注,要求高,施工难度大。
发明内容:
本发明的目的是提供一种新的建筑物纠倾方法,该方法的可控性好,施工方便,投资少。
本发明实现上述目的的技术解决方案是:
一种建筑物充水式纠倾及基础加固方法,该方法包括以下步骤组成:
1、根据地质条件、载荷大小、建筑物的基础埋深以及水袋的直径D确定水袋的布点密度和钻孔深度H;
2、用钻孔机在建筑物下沉部位侧面的地基上钻斜孔到建筑物下至所需深度H,并进行护壁处理,然后送入水袋;
3、布好滑动式沉降仪,将所述的水袋与高压水泵出口连接并将滑动式沉降仪布置于待充水水袋正上方的建筑物上;
4、启动高压水泵充水,同时利用滑动式沉降仪进行监测,当被测点与参考点差值小于5mm时停止充水;
5、撤走滑动式沉降仪和高压水泵,密封好水袋口,对施工现场进行回填清理。
上述的建筑物的纠倾及基础加固方法,步骤1.1所述的水袋的布点密度即相邻两水袋的间距R等于水袋直径D的1.5~4倍。具体数值可根据地质条件确定,土壤的密实度大的R值取上端,土壤疏松的取下端。如果水袋的材料选用具有弹性的,水袋的直径D值应取充水膨胀后的直径。由于土壤内往往有坚硬或锋利异物,而且有较大的腐蚀性,因此所述的水袋材料最好选用强度高、耐磨、抗酸碱及溶剂腐蚀的合成材料,如耐腐蚀金属与塑料的合成材料。
上述的建筑物的纠倾及基础加固方法所述的水袋口与之间高压水泵出口设有单向阀,以便于高压水泵的拆卸撤离。
本发明所述的建筑物充水式纠倾及基础加固方法较现有技术具有下列显著的效果:
1、既可对建筑物进行基础整体加固,也可进行的局部纠偏;
2、由于本发明所述的方法采用高压水泵单点充水施压,且借助于滑动式沉降仪进行监控,因此具有良好的可控性;
3、既没有大的土方工程,也不需要进行地下施工,速度快周期短;
4、不受地质条件的限制,应用范围广。
附图洗明:
说明书附图为本发明的一个具体实施方案的工艺部置示意图。
具体实施方式:
本实施例是使用本发明所述的建筑物充水式纠倾及基础加固方法对一座倾斜的建筑物进行纠偏加固方案。其步骤如下:
1、对被加固的基础的地质情况进行实地勘测,根据地质条件和建筑物的基础埋深确定1)钻孔深度H,以H=建筑物的基础埋深+1.5~4的水袋4直径(D)为宜(参见图1);2)根据地质条件和载荷大小以及水袋4的直径D确定水袋4的布点密度,即相邻两水袋4之间的距离R,以R=1.5~4 D为宜。
2、用钻孔机在建筑物1下沉部位侧面的地基上钻斜孔到建筑物下至所需深度H,并进行膨润土悬液护孔壁或下套管护壁处理,然后送入水袋4(参见图1);
3、将所述的水袋4与高压水泵6出口通过一单向阀3连接,并在待充水水袋4正上方的建筑物1上,把数显滑动式沉降仪5的传感器接于建筑物1的基础2上(参见图1),其中一只传感器设在沉降点,另一只设在参考点(未下沉的部位;
4、启动高压水泵6充水,同时利用数显滑动式沉降仪5进行监测,当被测点与参考点差值小于5mm时停止充水(参见图1);
5、把数显滑动式沉降仪5和高压水泵6撤至下一个布点,密封好水袋口,对施工现场进行回填清理(参见图1)。
接着按步骤1~5所述的方法即可完成整个建筑物纠偏及基础加固处理。

Claims (3)

1、一种建筑物充水式纠倾及基础加固方法,该方法包括以下步骤:
1.1、限据地质条件、载荷大小、建筑物的基础埋深以及水袋的直径D确定水袋的布点密度和钻孔深度H;
1.2、用钻孔机在建筑物下沉部位侧面的地基上钻斜孔到建筑物下至所需深度H,并进行护壁处理,然后送入水袋;
1.3、将所述的水袋与高压水泵出口连接并将滑动式沉降仪布于待充水水袋正上方的建筑物上;
1.4、启动高压水泵充水,同时利用滑动式沉降仪进行监测,当被测点与参考点差值小于5mm时停止充水;
1.5、撤走滑动式沉降仪和高压水泵,密封好水袋口,对施工现场进行回填清理。
2、根据权利要求1所述的基础加固方法,其特征在于步骤1.1所述的水袋的布点密度即相邻两水袋的间距R等于水袋直径D的1.5~4倍。
3、根据权利要求1或2所述的基础加固方法,其特征在于所述的水袋口与之间高压水泵出口设有单向阀。
CN 200510033300 2005-02-28 2005-02-28 建筑物充水式纠倾及基础加固方法 Pending CN1654749A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200510033300 CN1654749A (zh) 2005-02-28 2005-02-28 建筑物充水式纠倾及基础加固方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200510033300 CN1654749A (zh) 2005-02-28 2005-02-28 建筑物充水式纠倾及基础加固方法

Publications (1)

Publication Number Publication Date
CN1654749A true CN1654749A (zh) 2005-08-17

Family

ID=34894367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200510033300 Pending CN1654749A (zh) 2005-02-28 2005-02-28 建筑物充水式纠倾及基础加固方法

Country Status (1)

Country Link
CN (1) CN1654749A (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101845830A (zh) * 2010-06-05 2010-09-29 朱虹 一种沉井纠偏施工方法
CN102071709A (zh) * 2010-11-29 2011-05-25 天津大学 一种可控沉降的基础体系
CN102086650A (zh) * 2010-12-28 2011-06-08 天津大学 一种可控基础沉降的装置
CN102108712A (zh) * 2010-12-28 2011-06-29 天津大学 一种可控沉降的基础体系
CN102251543A (zh) * 2011-05-06 2011-11-23 杭州岩土工程有限公司 一种建筑物纠偏顶升方法
CN104131585A (zh) * 2014-08-18 2014-11-05 慕江源 湿陷性盐渍土地建筑物基础压浆压桩复位法纠偏加固方法
CN107313602A (zh) * 2016-04-26 2017-11-03 湖北建科结构加固有限责任公司 建筑基底为砂换填的射水迫降纠偏方法
CN109024648A (zh) * 2016-12-13 2018-12-18 叶香竹 沉井的纠偏施工方法
CN111206631A (zh) * 2020-01-17 2020-05-29 河南文博建设工程有限公司 一种水囊整体抬升建筑物纠偏方法
CN112196345A (zh) * 2020-09-22 2021-01-08 九州职业技术学院 洗煤塔纠偏加固方法
CN112323881A (zh) * 2019-08-05 2021-02-05 张继红 一种建筑物基础隔离液压控制纠偏方法

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101845830A (zh) * 2010-06-05 2010-09-29 朱虹 一种沉井纠偏施工方法
CN101845830B (zh) * 2010-06-05 2013-08-28 朱虹 一种沉井纠偏施工方法
CN102071709A (zh) * 2010-11-29 2011-05-25 天津大学 一种可控沉降的基础体系
CN102108712A (zh) * 2010-12-28 2011-06-29 天津大学 一种可控沉降的基础体系
CN102108712B (zh) * 2010-12-28 2012-03-21 天津大学 一种可控沉降的基础体系
CN102086650A (zh) * 2010-12-28 2011-06-08 天津大学 一种可控基础沉降的装置
CN102251543A (zh) * 2011-05-06 2011-11-23 杭州岩土工程有限公司 一种建筑物纠偏顶升方法
CN104131585A (zh) * 2014-08-18 2014-11-05 慕江源 湿陷性盐渍土地建筑物基础压浆压桩复位法纠偏加固方法
CN104131585B (zh) * 2014-08-18 2016-06-22 慕江源 湿陷性盐渍土地建筑物基础压浆压桩复位法纠偏加固方法
CN107313602A (zh) * 2016-04-26 2017-11-03 湖北建科结构加固有限责任公司 建筑基底为砂换填的射水迫降纠偏方法
CN109024648A (zh) * 2016-12-13 2018-12-18 叶香竹 沉井的纠偏施工方法
CN112323881A (zh) * 2019-08-05 2021-02-05 张继红 一种建筑物基础隔离液压控制纠偏方法
CN111206631A (zh) * 2020-01-17 2020-05-29 河南文博建设工程有限公司 一种水囊整体抬升建筑物纠偏方法
CN112196345A (zh) * 2020-09-22 2021-01-08 九州职业技术学院 洗煤塔纠偏加固方法

Similar Documents

Publication Publication Date Title
CN1654749A (zh) 建筑物充水式纠倾及基础加固方法
CN107524138B (zh) 一种超深基坑地下连续墙施工方法
CN108086340A (zh) 沉井施工结构及其施工方法
CN108343102A (zh) 一种桩基础沉降加固顶升调平结构及其施工方法
CN204199335U (zh) 一种减小phc管桩施工挤土效应的泄压井
CN107299650B (zh) 一种远距离沉井排土纠偏方法
CN110847224A (zh) 填方边坡重力式挡土墙加固结构及其施工方法
CN102134853A (zh) Ct式锁口钢管桩基坑止水支护装置及工法
CN103266602A (zh) 一种人工挖孔扩径桩及其施工方法
CN113174958A (zh) 一种劣质地况下临近道路基坑施工方法
CN111608210A (zh) 一种饱水粉砂地层承压型抗浮锚杆施工方法
CN112392049A (zh) 一种软弱地层深基坑开挖施工方法
CN1743561A (zh) 新型柱锤强夯置换法
CN114687345A (zh) 基坑围护墙外侧地表沉降或地下管变形的修复方法
CN104652427A (zh) 一种钻孔桩施工方法
CN201943077U (zh) Ct式锁口钢管桩止水帷幕
CN212052725U (zh) 溶洞区桩施工结构
CN113404042A (zh) 桥梁桩位施工方法
CN113216215A (zh) 一种复杂环境下深沟槽支护逆作施工方法
CN117211271A (zh) 海堤深厚填石层灌注桩双护筒定位成桩施工方法
CN107724499A (zh) 污水管道的施工方法与基座
CN208501762U (zh) 一种桩基础沉降加固顶升调平结构
CN112878315A (zh) 基于Civil 3D技术的端承旋挖成孔灌注桩及施工工法
CN207828995U (zh) 沉井施工结构
CN112709252B (zh) 一种半水淹陡峻岩质边坡内的承台施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication