CN111206631A - 一种水囊整体抬升建筑物纠偏方法 - Google Patents
一种水囊整体抬升建筑物纠偏方法 Download PDFInfo
- Publication number
- CN111206631A CN111206631A CN202010050791.4A CN202010050791A CN111206631A CN 111206631 A CN111206631 A CN 111206631A CN 202010050791 A CN202010050791 A CN 202010050791A CN 111206631 A CN111206631 A CN 111206631A
- Authority
- CN
- China
- Prior art keywords
- water bag
- water
- building
- lifting
- forced landing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D35/00—Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
本发明公开了一种水囊整体抬升建筑物纠偏方法,针对因各种原因引起的建筑物不均匀沉降发生的倾斜,采用在倾斜建筑底部放置柔性管状抬升水囊,通过往水囊中注水加压抬升建筑物相对沉降较大一侧达到纠偏目的,解决了倾斜建筑物刚度差纠偏风险大的难题。简便可靠,纠偏过程中倾斜率容易控制,本发明纠偏效果直观明了,能够保证纠偏过程完全在控制之下,并且不影响建筑的正常使用。利于环境保护、扬尘治理,可获得更好的经济效益和社会效益。
Description
技术领域
本发明涉及建筑施工领域,具体涉及一种水囊整体抬升建筑物纠偏方法。
背景技术
目前,由于设计施工的原因,以及使用维护不当、周围深基坑或地下水下降等原因,造成为数不少的既有建筑产生不均匀沉降,这些正常使用的建筑本身完好,而建筑倾斜率超标影响安全使用,如果拆除重建,会造成极大的浪费,而且过程长、投入大,还会造成相当大的资源浪费和建筑垃圾排放,建筑整体纠偏是消除倾斜建筑安全隐患的有效方法。
常用建筑顶升纠偏方法主要有锚杆静压桩顶升法、千斤顶顶升法等,需要设置锚杆桩、顶升梁及顶升基础,还需要增加临时支撑,对建筑采取加固措施等,工期长、投入大,拆除临时措施又产生大量建筑垃圾和废弃物,不利于资源节约、环境保护,而且顶升位置只能间隔布置,不能连续布置顶升点,对于整体性能差的建筑纠偏存在极大的安全隐患,为满足纠偏作业往往需要拆除建筑首层,纠偏施工期间建筑物无法正常使用;此外掏土迫降法、堆载迫降法等,难以很好地控制倾斜率和纠偏速度,纠偏效果不理想。
发明内容
本发明的目的针对现有技术问题,通过在建筑基础下布置若干条柔性封闭水囊,并在囊中注水加压,水囊体积扩大抬升建筑沉降一侧,使倾斜建筑恢复到原来的标高,从而提供一种水囊整体抬升建筑物纠偏方法。
本发明是按照下述方法进行的:
步骤1:在拟纠偏建筑相对沉降最大的一侧和对侧开挖工作沟,在建筑基础下地基土中水平成孔;
步骤2:从两侧孔中分别安放抬升侧水囊、迫降侧水囊,应自建筑一端开始成孔,每钻成一个孔立即安放一条水囊;
步骤3:将抬升侧水囊、迫降侧水囊抽真空,然后启动水泵,水箱中的水经过主管道进入支管,最后分别注入抬升侧水囊、迫降侧水囊,当注水压力与基础底压力平衡时,关闭抬升侧阀门、迫降侧阀门,为保证地基土的稳定,成孔应间隔进行,直到全部水囊安装注水加压完成;
步骤4:打开抬升侧阀门,同时启动抬升侧的水泵并增加压力,打开迫降侧阀门释放迫降侧水囊压力,抬升侧水囊的折皱在压力作用下被撑开,体积膨胀为扩张态水囊,地基土在扩张态水囊位置被抬升高度h,迫降侧水囊中的水排出压力下降体积缩小为压缩态水囊,迫降侧建筑基础下降,拟纠偏建筑在抬升侧水囊、迫降侧水囊共同作用下恢复至原来的水平状态;
步骤5:自建筑一端开始逐个排空扩张态水囊、压缩态水囊中的水,水囊抽真空后从孔中拉出,地基土中遗留孔洞用干混砂浆封堵;
步骤6:如果经过一次抬升建筑物仍然达不到纠偏标准,可以按照前述步骤,在第一次抬升侧水囊、迫降侧水囊下再钻孔,放置水囊进行二次抬升,直至倾斜建筑恢复水平状态;
步骤7:待拟纠偏建筑不再倾斜,全部水囊拉出,地基土中孔洞封堵完毕,回填压实工作沟,恢复室外地坪。
本发明的技术效果:
本发明通过在建筑基础下布置若干条柔性封闭水囊,并在囊中注水加压,水囊体积扩大抬升建筑沉降一侧,使倾斜建筑恢复到原来的标高。本发明采用全新的纠偏理念,有别于传统纠偏工法,通过布置可重复使用的水囊,抬升建筑物相对沉降最大的一侧,达到纠偏目的,整个纠偏过程安全可靠,能够保证纠偏过程完全在控制之下,并且不影响建筑的正常使用。抬升水囊可以重复循环使用,如果建筑长度过长,还可以使用多节水囊组合接长。与传统做法相比,减少建筑垃圾排放、节约成本、缩短工期,避免资源浪费,比传统做法更加环保,具有更大的经济效益和社会效益。
附图说明
图1是工作沟及设备布置图
图2是水囊布置立面图
图3是水囊布置平面图
图4是纠偏后效果示意图
图5是水囊加压前状态
图6是抬升侧水囊加压后工作状态
图7是迫降侧水囊加压后工作状态
图中,标号1:工作沟;标号2:建筑基础;标号3:地基土;标号4:抬升侧水囊;标号5:迫降侧水囊;标号6:水箱;标号7:主管道;标号8:支管;标号9:抬升侧阀门;标号10:水泵;标号11:迫降侧阀门;标号12:扩张态水囊;标号13:压缩态水囊。
具体实施方式:
如图所示,本发明按照下述方法进行的:
步骤1:在拟纠偏建筑相对沉降最大的一侧和对侧开挖工作沟1,在建筑基础2下地基土3中水平成孔;
步骤2:从两侧孔中分别安放抬升侧水囊4、迫降侧水囊5,应自建筑一端开始成孔,每钻成一个孔立即安放一条水囊;
步骤3:将抬升侧水囊4、迫降侧水囊5抽真空,然后启动水泵10,水箱6中的水经过主管道7进入支管8,最后分别注入抬升侧水囊4、迫降侧水囊5,当注水压力与基础底压力平衡时,关闭抬升侧阀门9、迫降侧阀门11,为保证地基土的稳定,成孔应间隔进行,直到全部水囊安装注水加压完成;见图2;
步骤4:打开抬升侧阀门9,同时启动抬升侧的水泵10并增加压力,打开迫降侧阀门11释放迫降侧水囊5压力,抬升侧水囊4的折皱在压力作用下被撑开,体积膨胀为扩张态水囊12,地基土3在扩张态水囊12位置被抬升高度h,迫降侧水囊5中的水排出压力下降体积缩小为压缩态水囊13,迫降侧建筑基础2下降,拟纠偏建筑在抬升侧水囊4、迫降侧水囊5共同作用下恢复至原来的水平状态;见图4;
步骤5:自建筑一端开始逐个排空扩张态水囊12、压缩态水囊13中的水,水囊抽真空后从孔中拉出,地基土3中遗留孔洞用干混砂浆封堵;
步骤6:如果经过一次抬升建筑物仍然达不到纠偏标准,可以按照前述步骤,在第一次抬升侧水囊4、迫降侧水囊5下再钻孔,放置水囊进行二次抬升,直至倾斜建筑恢复水平状态;
步骤7:待拟纠偏建筑不再倾斜,全部水囊拉出,地基土3中孔洞封堵完毕,回填压实工作沟1,恢复室外地坪。
本发明的工作原理是:通过在建筑基础下布置若干条柔性封闭水囊,并在囊中注水加压,水囊体积扩大抬升建筑沉降一侧,使倾斜建筑恢复到原来的标高。本发明纠偏效果直观明了,能够保证纠偏过程完全在控制之下,并且不影响建筑的正常使用。抬升水囊可以重复循环使用,如果建筑长度过长,还可以使用多节水囊组合接长。适用于大多数倾斜建筑的纠偏施工,利于环境保护、扬尘治理,可获得更好的经济效益和社会效益。
Claims (1)
1.一种水囊整体抬升建筑物纠偏方法,其特征在于,按照下述方法进行的:
步骤1:在拟纠偏建筑相对沉降最大的一侧和对侧开挖工作沟(1),在建筑基础(2)下地基土(3)中水平成孔;
步骤2:从两侧孔中分别安放抬升侧水囊(4)、迫降侧水囊(5),应自建筑一端开始成孔,每钻成一个孔立即安放一条水囊;
步骤3:将抬升侧水囊(4)、迫降侧水囊(5)抽真空,然后启动水泵(10),水箱(6)中的水经过主管道(7)进入支管(8),最后分别注入抬升侧水囊(4)、迫降侧水囊(5),当注水压力与基础底压力平衡时,关闭抬升侧阀门(9)、迫降侧阀门(11),为保证地基土的稳定,成孔应间隔进行,直到全部水囊安装注水加压完成;
步骤4:打开抬升侧阀门(9),同时启动抬升侧的水泵(10)并增加压力,打开迫降侧阀门(11)释放迫降侧水囊(5)压力,抬升侧水囊(4)的折皱在压力作用下被撑开,体积膨胀为扩张态水囊(12),地基土(3)在扩张态水囊(12)位置被抬升高度h,迫降侧水囊(5)中的水排出压力下降体积缩小为压缩态水囊(13),迫降侧建筑基础(2)下降,拟纠偏建筑在抬升侧水囊(4)、迫降侧水囊(5)共同作用下恢复至原来的水平状态;
步骤5:自建筑一端开始逐个排空扩张态水囊(12)、压缩态水囊(13)中的水,水囊抽真空后从孔中拉出,地基土(3)中遗留孔洞用干混砂浆封堵;
步骤6:如果经过一次抬升建筑物仍然达不到纠偏标准,可以按照前述步骤,在第一次抬升侧水囊(4)、迫降侧水囊(5)下再钻孔,放置水囊进行二次抬升,直至倾斜建筑恢复水平状态;
步骤7:待拟纠偏建筑不再倾斜,全部水囊拉出,地基土(3)中孔洞封堵完毕,回填压实工作沟(1),恢复室外地坪。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010050791.4A CN111206631A (zh) | 2020-01-17 | 2020-01-17 | 一种水囊整体抬升建筑物纠偏方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010050791.4A CN111206631A (zh) | 2020-01-17 | 2020-01-17 | 一种水囊整体抬升建筑物纠偏方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111206631A true CN111206631A (zh) | 2020-05-29 |
Family
ID=70789117
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010050791.4A Pending CN111206631A (zh) | 2020-01-17 | 2020-01-17 | 一种水囊整体抬升建筑物纠偏方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111206631A (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1375756A1 (en) * | 2002-06-12 | 2004-01-02 | AL-FER S.r.l. | Compensation device to be applied on structural beams, foundations, walls, slabs or the like for the compensation of natural subsidences and/or bendings caused by load stresses |
CN1654749A (zh) * | 2005-02-28 | 2005-08-17 | 广州大学 | 建筑物充水式纠倾及基础加固方法 |
JP5820167B2 (ja) * | 2011-07-08 | 2015-11-24 | 泰徳 松中 | 建物支持装置 |
CN108203991A (zh) * | 2018-02-10 | 2018-06-26 | 江苏省安捷岩土工程有限公司 | 一种采用载重气囊纠倾排水沟挡土墙的方法 |
CN110453734A (zh) * | 2019-08-29 | 2019-11-15 | 山东建筑大学 | 一种气囊顶升建筑物纠倾法 |
-
2020
- 2020-01-17 CN CN202010050791.4A patent/CN111206631A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1375756A1 (en) * | 2002-06-12 | 2004-01-02 | AL-FER S.r.l. | Compensation device to be applied on structural beams, foundations, walls, slabs or the like for the compensation of natural subsidences and/or bendings caused by load stresses |
CN1654749A (zh) * | 2005-02-28 | 2005-08-17 | 广州大学 | 建筑物充水式纠倾及基础加固方法 |
JP5820167B2 (ja) * | 2011-07-08 | 2015-11-24 | 泰徳 松中 | 建物支持装置 |
CN108203991A (zh) * | 2018-02-10 | 2018-06-26 | 江苏省安捷岩土工程有限公司 | 一种采用载重气囊纠倾排水沟挡土墙的方法 |
CN110453734A (zh) * | 2019-08-29 | 2019-11-15 | 山东建筑大学 | 一种气囊顶升建筑物纠倾法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110080318B (zh) | 一种桩基础建筑物局部沉降的纠偏方法 | |
CN103195114B (zh) | 一种软弱地质条件下高层建筑基础加固施工方法 | |
WO2021179508A1 (zh) | 一种利用接顶式盾板支架处理隧道塌方的方法 | |
WO2023165563A1 (zh) | 一种无尘厂房地坪抬升加固工艺 | |
CN112554250A (zh) | 一种桩基建筑物微型复合钢管桩托换纠倾结构及其施工方法 | |
CN101148888B (zh) | 气压沉箱锚桩自主纠偏装置 | |
CN108755702B (zh) | 一种地下水位较高的软土地基基坑加固处理方法 | |
CN101824825A (zh) | 一种深基坑明挖施工方法 | |
CN111206631A (zh) | 一种水囊整体抬升建筑物纠偏方法 | |
CN110593920B (zh) | 一种掘进巷道可吸收爆破振动能量的临时防冲支护装置 | |
CN101148889B (zh) | 气压沉箱锚桩支承装置 | |
CN112252312B (zh) | 一种增强phc管桩整体受力性能的施工方法 | |
CN102828534A (zh) | 灾损病害深桩基础建筑物纠倾加固方法 | |
CN201078234Y (zh) | 立井施工过流砂层的整体液压钢板桩帷幕 | |
CN206768840U (zh) | 一种大型建筑工程深基坑多阶式降水回灌体系 | |
CN211773974U (zh) | 一种建筑物纠倾促沉装置 | |
CN113482072A (zh) | 一种软土地基基桩纠偏方法 | |
CN109653213B (zh) | 一种地连墙成槽施工方法 | |
CN205421274U (zh) | 可循环使用、拼装式全钢基坑围护支撑系统 | |
CN111894009A (zh) | 一种逆作法拼装钢板桩支护结构及施工方法 | |
CN201433395Y (zh) | 一种环保挖桩三圆安全护筒 | |
CN217556897U (zh) | 一种斜向扩基支撑桩成形装置 | |
CN110144884A (zh) | 一种桩底沉渣超高压置换喷浆结构及其施工方法 | |
CN203654266U (zh) | 自进式可回收钢管桩 | |
CN219604335U (zh) | 一种用于预制空心桩的桩端联合挤密装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200529 |