CN1319843C - 自适应厂房柱沉降的吊车梁连接方法及结构 - Google Patents
自适应厂房柱沉降的吊车梁连接方法及结构 Download PDFInfo
- Publication number
- CN1319843C CN1319843C CNB200410155442XA CN200410155442A CN1319843C CN 1319843 C CN1319843 C CN 1319843C CN B200410155442X A CNB200410155442X A CN B200410155442XA CN 200410155442 A CN200410155442 A CN 200410155442A CN 1319843 C CN1319843 C CN 1319843C
- Authority
- CN
- China
- Prior art keywords
- crane girder
- factory building
- column
- crane
- vertical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB200410155442XA CN1319843C (zh) | 2004-11-11 | 2004-11-11 | 自适应厂房柱沉降的吊车梁连接方法及结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB200410155442XA CN1319843C (zh) | 2004-11-11 | 2004-11-11 | 自适应厂房柱沉降的吊车梁连接方法及结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1613745A CN1613745A (zh) | 2005-05-11 |
CN1319843C true CN1319843C (zh) | 2007-06-06 |
Family
ID=34766924
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB200410155442XA Expired - Fee Related CN1319843C (zh) | 2004-11-11 | 2004-11-11 | 自适应厂房柱沉降的吊车梁连接方法及结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1319843C (zh) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101875475B (zh) * | 2010-06-01 | 2012-07-25 | 中国核工业华兴建设有限公司 | 一种核电站环吊牛腿及其制作方法 |
CN102815603B (zh) * | 2012-08-20 | 2014-10-01 | 中国核工业华兴建设有限公司 | 一种核电站环吊牛腿及其制作方法 |
CN103331606B (zh) * | 2013-06-18 | 2014-08-13 | 金石机器人常州有限公司 | 大型横梁安装方法 |
CN104310215B (zh) * | 2014-10-17 | 2016-06-22 | 中船第九设计研究院工程有限公司 | 一种防风雨渗漏的吊车梁lb板连接结构 |
CN105545004A (zh) * | 2016-01-21 | 2016-05-04 | 江苏鼎达建筑新技术有限公司 | 一种既有建筑增设电梯的连接装置 |
CN108439203B (zh) * | 2018-04-25 | 2021-04-20 | 中国核电工程有限公司 | 一种吊车梁安装结构 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS50143258A (zh) * | 1974-02-25 | 1975-11-18 | ||
CN85204012U (zh) * | 1985-09-24 | 1986-12-17 | 北京钢铁设计研究总院 | 实腹式钢与混凝土组合吊车梁 |
US4982537A (en) * | 1987-05-06 | 1991-01-08 | Oy Lohja Ab | Device for joining two building units |
CN2117362U (zh) * | 1992-02-24 | 1992-09-30 | 上海起重运输机械厂 | 起重机桥架 |
JP2000153987A (ja) * | 1998-05-28 | 2000-06-06 | Kci Kone Cranes Internatl Corp | 橋形クレ―ン |
CN2627053Y (zh) * | 2003-05-30 | 2004-07-21 | 长安大学 | 桩柱式桥台柔性搭板 |
CN2804039Y (zh) * | 2005-04-26 | 2006-08-09 | 贵阳铝镁设计研究院 | 自适应厂房柱沉降的吊车梁连接结构 |
-
2004
- 2004-11-11 CN CNB200410155442XA patent/CN1319843C/zh not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS50143258A (zh) * | 1974-02-25 | 1975-11-18 | ||
CN85204012U (zh) * | 1985-09-24 | 1986-12-17 | 北京钢铁设计研究总院 | 实腹式钢与混凝土组合吊车梁 |
US4982537A (en) * | 1987-05-06 | 1991-01-08 | Oy Lohja Ab | Device for joining two building units |
CN2117362U (zh) * | 1992-02-24 | 1992-09-30 | 上海起重运输机械厂 | 起重机桥架 |
JP2000153987A (ja) * | 1998-05-28 | 2000-06-06 | Kci Kone Cranes Internatl Corp | 橋形クレ―ン |
CN2627053Y (zh) * | 2003-05-30 | 2004-07-21 | 长安大学 | 桩柱式桥台柔性搭板 |
CN2804039Y (zh) * | 2005-04-26 | 2006-08-09 | 贵阳铝镁设计研究院 | 自适应厂房柱沉降的吊车梁连接结构 |
Also Published As
Publication number | Publication date |
---|---|
CN1613745A (zh) | 2005-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102359180B (zh) | 桁架组合梁与上下层连接的轻钢结构及其施工方法 | |
KR101391637B1 (ko) | 강재트러스를 이용한 복합트러스 거더의 제작공법 | |
CN202248251U (zh) | 桁架组合梁与上下层连接的轻钢结构 | |
CN205012629U (zh) | 装配式模块化悬挑卸料平台 | |
CN107620261A (zh) | 基于横承式便梁的既有铁路轨道加固方法 | |
CN1319843C (zh) | 自适应厂房柱沉降的吊车梁连接方法及结构 | |
CN207714108U (zh) | 一种大跨度多连拱拱式渡槽或桥梁的支撑系统 | |
CN2804039Y (zh) | 自适应厂房柱沉降的吊车梁连接结构 | |
CN111119070B (zh) | 一种采用对称门吊悬拼架设w形钢桁梁的方法 | |
CN215925691U (zh) | 一种桥梁0号块浇筑用承托支架 | |
CN208701907U (zh) | 梁柱接头结构 | |
CN101654904B (zh) | 折角型声屏障吸音板的安装方法 | |
CN111795212B (zh) | 一种横跨基坑管线悬吊方法及悬吊结构 | |
CN2739266Y (zh) | 特制型材及其塔 | |
CN218667827U (zh) | 一种尾矿库框架式排水井修复加固结构 | |
CN204475179U (zh) | 桥梁施工现浇梁、盖梁、系梁混凝土附着式预应力桁架支架 | |
CN116065625A (zh) | 明挖管群结构及明挖施工方法 | |
CN214656470U (zh) | 一种用于独柱墩桥梁抵抗倾覆力矩的限位结构 | |
CN210127028U (zh) | 龙门吊端头井轨道梁及龙门吊端头井轨道的安装组件 | |
CN214062433U (zh) | 一种装配式钢结构临时支撑结构 | |
CN205475849U (zh) | 一种钢结构建筑装配式预制混凝土剪力墙 | |
CN203514339U (zh) | 柱脚基础和基础梁构造 | |
CN203113908U (zh) | 围墙与广告牌合一全装配结构 | |
CN208733836U (zh) | 一种主梁与次梁的连接结构 | |
CN102888935A (zh) | 装配式空腹网格板楼盖结构用剪力预制构件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Hangzhou Hengda Industry Group Co., Ltd. Assignor: Guiyang Aluminium and Magnesium Design Inst. Contract fulfillment period: 2009.8.3 to 2014.8.2 contract change Contract record no.: 2009330001861 Denomination of invention: Connecting method and structure of crane beam for self adaptable column sedimentation Granted publication date: 20070606 License type: Exclusive license Record date: 2009.8.6 |
|
LIC | Patent licence contract for exploitation submitted for record |
Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2009.8.3 TO 2014.8.2; CHANGE OF CONTRACT Name of requester: HANGZHOU HENGDA STEEL INDUSTRY CO.,LTD. Effective date: 20090806 |
|
C56 | Change in the name or address of the patentee |
Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO Free format text: FORMER NAME: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST. |
|
CP03 | Change of name, title or address |
Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2 Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd. Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou Patentee before: Guiyang Aluminium and Magnesium Design Inst. |
|
EM01 | Change of recordation of patent licensing contract |
Change date: 20110610 Contract record no.: 2009330001861 Assignee after: Hangzhou Hengda Steel Structure Co., Ltd. Assignee before: Hangzhou Hengda Industry Group Co., Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20070606 Termination date: 20141111 |
|
EXPY | Termination of patent right or utility model |