CN115233734B - Municipal tunnel construction method - Google Patents

Municipal tunnel construction method Download PDF

Info

Publication number
CN115233734B
CN115233734B CN202211141360.4A CN202211141360A CN115233734B CN 115233734 B CN115233734 B CN 115233734B CN 202211141360 A CN202211141360 A CN 202211141360A CN 115233734 B CN115233734 B CN 115233734B
Authority
CN
China
Prior art keywords
real
computing device
central control
time
hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202211141360.4A
Other languages
Chinese (zh)
Other versions
CN115233734A (en
Inventor
吕鹏
陈世樑
马春芳
程建华
史志龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Luqiao Municipal Engineering Co ltd
Original Assignee
Shanxi Luqiao Municipal Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Luqiao Municipal Engineering Co ltd filed Critical Shanxi Luqiao Municipal Engineering Co ltd
Priority to CN202211141360.4A priority Critical patent/CN115233734B/en
Publication of CN115233734A publication Critical patent/CN115233734A/en
Application granted granted Critical
Publication of CN115233734B publication Critical patent/CN115233734B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Hydrology & Water Resources (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention relates to the technical field of tunnel construction, in particular to a municipal tunnel construction method, which comprises the following steps of S1, arranging enclosing structures on two sides of a path of a tunnel foundation pit; s2, excavating a tunnel foundation pit, detecting real-time relative distances of the enclosure structures on two sides for horizontal supporting, and adjusting the supporting length of the hydraulic stay bar in real time according to real-time supporting pressure; s3, building a tunnel lining in the tunnel foundation pit, and laying an externally attached waterproof layer; and S4, backfilling the residual soil of the tunnel foundation pit, and judging to withdraw the hydraulic support rod according to the backfilling real-time support pressure of the hydraulic support rod to complete tunnel construction. According to the invention, the enclosing structures are arranged on two sides of the path of the tunnel foundation pit, so that the construction space is reduced, the real-time supporting pressure of the hydraulic stay bar is judged by arranging the central control computing device, the hydraulic stay bar is controlled to stretch and contract and bear force, the supporting and arranging efficiency is improved, and the construction efficiency of tunnel construction is improved on the basis of ensuring the construction safety.

Description

Municipal tunnel construction method
Technical Field
The invention relates to the technical field of tunnel construction, in particular to a municipal tunnel construction method.
Background
Municipal tunnels are tunnels built under cities and used for laying various municipal facility underground pipelines, and as the needs of further developing the industry and improving the cultural living conditions of residents in the cities are increased, more and more municipal facilities supply the underground pipelines, such as tap water, sewage, heating, hot water, coal gas, communication, power supply and the like; the development of pipeline systems requires a large number of municipal tunnels to fundamentally solve the problem of the operation level of underground pipeline systems of various municipal facilities; the municipal tunnel is constructed by adopting an open excavation method mostly due to soil property, and particularly, when supporting excavation is adopted, the side wall of a foundation pit generates large pressure, so that a building enclosure generates large deformation, and the construction safety is influenced.
Chinese patent publication No.: CN113389578A, which discloses a supporting structure of a shallow-buried open-cut tunnel; the method is characterized in that a portal frame constructed horizontally is arranged in a support foundation pit to reduce deformation of the support structure, so that in the prior art, the horizontal support of a concrete structure is mostly adopted to support the tunnel foundation pit, the construction amount is greatly increased, the construction period is delayed, and the horizontal support force cannot be uniformly transmitted to the support structure on the side wall of the tunnel foundation pit, so that the support effect is poor.
Disclosure of Invention
Therefore, the invention provides a municipal tunnel construction method which is used for solving the problems that the tunnel foundation pit horizontal support construction amount is large, the efficiency is low and the support effect is poor in the prior art.
In order to achieve the above objects, the present invention provides a municipal tunnel construction method, comprising,
step S1, respectively opening holes downwards on the ground at two sides of a tunnel foundation pit according to the path of the tunnel foundation pit, placing a steel bar frame into the holes, and pouring concrete into the holes to form an enclosure structure at two sides of the tunnel foundation pit;
step S2, excavating the tunnel foundation pit through an excavating device, detecting real-time relative distances of the enclosure structures on two sides of the tunnel foundation pit through a distance measuring device when the enclosure structures on two sides of the tunnel foundation pit are exposed, transmitting the real-time relative distances to a central control computing device connected with the distance measuring device, calculating real-time enclosure deformation distances by the central control computing device according to the real-time relative distances and initial relative distances of the enclosure structures on two sides of the tunnel foundation pit, comparing the real-time enclosure deformation distances with standard enclosure deformation distances set in the central control computing device, determining whether the enclosure structures on two sides are horizontally supported through a hydraulic support rod by the central control computing device according to the real-time excavating depth of the tunnel foundation pit when the real-time enclosure deformation distances do not reach the standard enclosure deformation distances, performing horizontal supporting of the hydraulic support rod on the enclosure structures on two sides when the real-time enclosure deformation distances reach the standard enclosure deformation distances, acquiring the real-time supporting pressure detected by the hydraulic support rod by the central control computing device, and comparing the real-time supporting pressure with the standard supporting pressure set in the central control computing device to determine, and controlling the hydraulic support rod to extend and shrink until the tunnel foundation pit is excavated;
s3, tamping the bottom of the tunnel foundation pit, driving the anchor rod into the tamped bottom of the tunnel foundation pit, pouring a concrete layer at the bottom of the tunnel foundation pit, building a tunnel lining on the concrete layer, and laying an externally-attached waterproof layer outside the tunnel lining;
and S4, backfilling the excavated residual soil of the tunnel foundation pit into the tunnel foundation pit, tamping, detecting the backfill real-time supporting pressure of the hydraulic support rod and transmitting the backfill real-time supporting pressure to the central control computing device when the tunnel foundation pit is backfilled, comparing the backfill real-time supporting pressure with the internally-arranged backfill standard supporting pressure by the central control computing device, controlling the hydraulic support rod to contract by the central control computing device when the backfill real-time supporting pressure is less than or equal to the backfill standard supporting pressure, withdrawing the hydraulic support rod, and when the backfill real-time supporting pressure is greater than the backfill standard supporting pressure, continuously backfilling the residual soil by the central control computing device when the backfill real-time supporting pressure does not reach the backfill standard supporting pressure until the backfill height of the residual soil reaches the supporting position height of the hydraulic support rod, arranging a fixed horizontal support rod at one side of the hydraulic support rod, withdrawing the hydraulic support rod, backfilling the residual soil to be level with the ground outside the tunnel foundation pit, and finishing tunnel construction.
Further, in the step S2, a standard enclosure deformation distance Lb is preset in the central control computing device, the initial relative distance Lc of the enclosure structures on both sides of the tunnel foundation pit is input into the central control computing device, the central control computing device calculates a real-time enclosure deformation distance Ls according to the real-time relative distance Lo and the initial relative distance Lc of the enclosure structures on both sides detected by the distance measuring device, ls = Lc-Lo, the central control computing device compares the real-time enclosure deformation distance Ls with the standard enclosure deformation distance Lb,
when Ls is smaller than Lb, the central control computing device judges that the real-time enclosure deformation distance does not reach the standard enclosure deformation distance, the central control computing device judges that the two side enclosure structures at the position where the real-time enclosure deformation distance is Ls are not horizontally supported, and judges the real-time excavation depth of the tunnel foundation pit so as to determine whether the two side enclosure structures are horizontally supported through the hydraulic support rods;
and when Ls is larger than or equal to Lb, the central control computing device judges that the real-time enclosure deformation distance reaches the standard enclosure deformation distance, and the central control computing device judges that the hydraulic support rods are horizontally supported on the enclosure structures on two sides of which the real-time enclosure deformation distance is Ls.
Further, the central control computing device is internally provided with a maximum excavation supporting depth Hz, when the central control computing device judges that the real-time enclosure deformation distance does not reach the standard enclosure deformation distance, the central control computing device obtains the real-time excavation depth Hs of the tunnel foundation pit, the central control computing device compares the real-time excavation depth Hs with the maximum excavation supporting depth Hz,
when Hs is less than Hz, the central control computing device judges that the real-time excavation depth does not reach the maximum excavation supporting depth, and the central control computing device judges that the enclosure structures on the two sides of the tunnel foundation pit are not horizontally supported;
and when Hs is larger than or equal to Hz, the central control computing device judges that the real-time excavation depth reaches the maximum excavation supporting depth, and the central control computing device judges that the hydraulic support rods are horizontally supported on the enclosure structures on two sides of which the real-time enclosure deformation distance is Ls.
Further, an initial supporting distance Lr of the hydraulic stay is arranged in the central control computing device, when the central control computing device determines that horizontal supporting of the hydraulic stay is performed on a two-side enclosure structure where a real-time enclosure deformation distance is Ls, the hydraulic stay is suspended at a to-be-supported position through a suspension device, the central control computing device controls the hydraulic stay to extend, the extended supporting length is Lk, lk = Ls + Lr, and after the hydraulic stay completes extension supporting, tow nails are respectively driven into the enclosure structures on two sides of the tunnel foundation pit at the supporting position of the hydraulic stay to support the hydraulic stay, a fixed stay is arranged on the lower portion of the hydraulic stay to support the hydraulic stay, and after the setting of the fixed stay is completed, the suspension device is removed.
Furthermore, a standard supporting pressure Pb and a standard supporting pressure difference delta Pb are arranged in the central control computing device, when the hydraulic support rod supports the enclosure structures on two sides of the tunnel foundation pit, the hydraulic support rod detects the real-time supporting pressure Ps of the hydraulic support rod and transmits the detection result to the central control computing device, the central control computing device calculates the real-time supporting pressure difference delta Ps and delta Ps = | Pb-Ps | according to the real-time supporting pressure Ps and the standard supporting pressure Pb of the hydraulic support rod, the central control computing device compares the real-time supporting pressure difference delta Ps with the standard supporting pressure difference delta Pb,
when the delta Ps is less than or equal to the delta Pb, the central control computing device judges that the real-time supporting pressure difference of the hydraulic support rod does not exceed the standard supporting pressure difference, and the central control computing device judges that the supporting length of the hydraulic support rod is not controlled;
when the delta Ps is larger than the delta Pb, the central control computing device judges that the real-time supporting pressure difference of the hydraulic support rod exceeds the standard supporting pressure difference, and the central control computing device compares the real-time supporting pressure with the standard supporting pressure to determine whether to control the supporting length of the hydraulic support rod.
Further, when the central control computing device determines that the real-time supporting pressure difference of the hydraulic support rod exceeds the standard supporting pressure difference, the central control computing device compares the real-time supporting pressure Ps with the standard supporting pressure Pb,
when Ps is less than Pb, the central control computing device determines that the real-time supporting pressure of the hydraulic support rod is lower than the standard supporting pressure, the central control computing device adjusts the supporting length of the hydraulic support rod to Lk ', lk' = Lk + Lk x [ (Pb-Ps)/Pb ], the central control computing device repeats the operation of calculating the real-time supporting pressure difference for determination, and the central control computing device repeats the operation of adjusting the supporting length of the hydraulic support rod according to the determination result until the real-time supporting pressure difference delta Ps 'calculated after adjustment reaches delta Ps' ≦ delta Pb, and the central control computing device stops the extension adjustment of the supporting length of the hydraulic support rod;
when Ps is greater than Pb, the central control computing device determines that the real-time supporting pressure of the hydraulic support rod is higher than the standard supporting pressure, the central control computing device adjusts the set initial supporting distance to Lr ', lr ' = Lr-Lr x [ (Ps-Pb)/Ps ], controls the hydraulic support rod to contract to the supporting length Lk ', lk ' = Ls + Lr ', and repeats the operation of calculating the real-time supporting pressure difference for determination and the operation of adjusting the initial supporting distance according to the determination result until the real-time supporting pressure difference delta Ps ' calculated after adjustment reaches delta Ps ' ≦ delta Pb, and stops adjusting the initial supporting distance.
Further, in the step S4, the excavated dregs of the tunnel foundation pit are backfilled into the tunnel foundation pit with the tunnel lining completed, and the dregs backfilled each time are tamped respectively, wherein the height of the single dregs backfilling cannot be higher than twenty percent of the total depth of the tunnel foundation pit, and the backfilling is stopped until the dregs are backfilled to be level with the ground outside the tunnel foundation pit, so as to complete the tunnel construction.
Furthermore, a backfill standard supporting pressure Pn is arranged in the central control computing device, when the tunnel foundation pit is backfilled with the residue soil, the hydraulic supporting rod detects the backfill real-time supporting pressure Pm of the hydraulic supporting rod and transmits the detection result to the central control computing device, the central control computing device compares the backfill real-time supporting pressure Pm with the backfill standard supporting pressure Pn,
when Pm is less than or equal to Pn, the central control computing device judges that the backfill real-time supporting pressure of the hydraulic stay bar reaches backfill standard supporting pressure, the central control computing device controls the hydraulic stay bar to contract, and the hydraulic stay bar is withdrawn from the tunnel foundation pit through the suspension device;
and when Pm is larger than Pn, the central control computing device judges that the backfill real-time supporting pressure of the hydraulic support rod does not reach the backfill standard supporting pressure, and the residue soil backfill is continued.
Further, when the central control computing device judges that the backfill real-time supporting pressure of the hydraulic stay bar does not reach the backfill standard supporting pressure, muck backfill is continuously carried out in the tunnel foundation pit, if the backfill height of the muck reaches the supporting position height of the hydraulic stay bar, the backfill real-time supporting pressure of the hydraulic stay bar is still higher than the backfill standard supporting pressure, supporting of the fixed horizontal stay bar is carried out on one side of the hydraulic stay bar, the hydraulic stay bar is withdrawn from the tunnel foundation pit through the suspension device, and the length of the fixed horizontal stay bar is equal to the supporting length of the hydraulic stay bar before withdrawal.
Furthermore, the hydraulic support rod comprises a bearing pipe body, a pressure detection device is arranged inside the bearing pipe body and used for detecting the axial pressure on the hydraulic support rod in real time, hydraulic telescopic rods are arranged at two ends of the bearing pipe body, and a support baffle is arranged at the end of each hydraulic telescopic rod and used for supporting the enclosure structures on two sides in the tunnel foundation pit.
Compared with the prior art, the construction method has the advantages that the enclosing structures are arranged on the two sides of the path of the tunnel foundation pit, so that the tunnel foundation pit can be conveniently excavated, meanwhile, slope setting is avoided, the construction space is reduced, the enclosing structures on the two sides are horizontally supported by the aid of the telescopic hydraulic support rods during excavation, real-time support pressure of the hydraulic support rods is judged by the aid of the central control computing device, the support length of the hydraulic support rods is controlled in real time according to a judgment result, a stress interval of the hydraulic support rods is guaranteed, as the hydraulic support rods are arranged according to real-time enclosing deformation distances of the enclosing structures on the two sides, stress of the hydraulic support rods is controlled to enable the integral stability of the enclosing structures, tamping, driving anchor rods into a concrete layer and pouring the concrete layer are carried out at the bottom of the tunnel foundation pit, stability of the bottom of the foundation pit is guaranteed, tunnel lining is built on the upper portion of the concrete layer, tunnel lining is guaranteed not to sink or shift due to residue soil, the fact that the tunnel lining cannot be sunk or shift due to the residue soil is carried out according to stress of the hydraulic support rods during residue soil, safety construction is improved, construction period of the horizontal support structures during backfilling construction is reduced, and construction of the tunnel foundation, and accordingly, and construction efficiency of the backfill foundation construction is greatly improved.
Furthermore, the real-time relative distance of the enclosure structures on the two sides is detected through the distance measuring device, the real-time deformation distance of the enclosure structures on the two sides is calculated through the central control computing device, the judgment is carried out according to the standard enclosure deformation distance set inside the central control computing device, whether horizontal supporting is carried out or not is determined, the control of the enclosure structures on the two sides in the excavation process is guaranteed through the real-time detection of the distance measuring device and the real-time calculation of the central control computing device, the timely horizontal supporting is carried out according to the judgment result, and the safety of tunnel construction is improved.
Further, when the central control computing device judges that the real-time enclosure deformation distance does not reach the standard enclosure deformation distance, the deformation of the enclosure structure is smaller, but the enclosure structure needs to be supported at a fixed position in tunnel construction, and the deeper the excavation depth is, the larger the stress degree of the enclosure structure is, so that the real-time excavation depth is judged, and the maximum excavation supporting depth is set in the central control computing device to limit the set number of horizontal supports, so that the stability of the enclosure structure on two sides of the tunnel foundation pit is guaranteed.
Especially, through set up initial support distance in well accuse accounting device so that the hydraulic pressure vaulting pole carries out initial support to the envelope of both sides, wherein, initial support distance should correspond according to the geological conditions of construction and set up, through squeeze into on the envelope of both sides and drag the nail, can enough carry out the definite of position to the hydraulic pressure vaulting pole, can play the effect of support to the both ends of fixed vaulting pole again, support it through setting up fixed vaulting pole in hydraulic pressure vaulting pole lower part simultaneously, reduced the influence of hydraulic pressure vaulting pole gravity to horizontal support, improved the effect that hydraulic pressure vaulting pole horizontal support.
Particularly, a standard supporting pressure range is formed by setting a standard supporting pressure and a standard supporting pressure difference in the central control computing device, the real-time supporting pressure of the hydraulic strut is judged through the standard supporting pressure range, whether the stress degree of the hydraulic strut which is judged is in the set standard range or not is determined, and when the real-time supporting pressure difference of the hydraulic strut is not beyond the standard supporting pressure difference, the real-time supporting pressure of the hydraulic strut is indicated to be in the standard range, so that the hydraulic strut is not adjusted, and when the real-time supporting pressure difference of the hydraulic strut is beyond the standard supporting pressure difference, the real-time supporting pressure of the hydraulic strut is indicated to be not in the standard range, so that the real-time supporting pressure is compared with the standard supporting pressure, the specific stress condition of the hydraulic strut is determined, and the horizontal supporting can be normally carried out.
Further, when the central control computing device determines that the real-time supporting pressure difference of the hydraulic support rods exceeds the standard supporting pressure difference, the real-time supporting pressure is compared with the standard supporting pressure, and when the real-time supporting pressure of the hydraulic support rods is lower than the standard supporting pressure, the fact that the hydraulic support rods are stressed less and do not achieve an expected supporting effect is indicated, therefore, the central control computing device controls the hydraulic support rods to extend, the supporting force is increased, the horizontal supporting effect is guaranteed, when the real-time supporting pressure is higher than the standard supporting pressure, the fact that the hydraulic support rods are stressed more is indicated, in order to avoid cracking of a concrete enclosure structure caused by the fact that the local supporting pressure is greater, the hydraulic support rods are controlled to contract through a smaller initial supporting distance, the supporting effect of the hydraulic support rods is guaranteed, the supporting real-time pressure is reduced, the central control computing device is convenient to determine other positions, the number of the hydraulic support rods is increased, and the supporting effect is improved.
Furthermore, the backfilled muck is backfilled in batches and tamped, so that the supporting force of the backfilled muck on the enclosing structures on the two sides is increased, the backfilling height of each time is controlled, the pressure influence of the backfilled muck on the finished tunnel lining is reduced, the stability of the tunnel lining is guaranteed, and the safety of the enclosing structures is guaranteed.
Furthermore, the backfill standard supporting pressure is set in the central control computing device, the backfill real-time supporting pressure of the hydraulic stay bar in the muck backfill process is judged, and because the backfill muck can generate horizontal supporting force on the enclosure structure in the muck backfill process, the real-time stress of the hydraulic stay bar is reduced along with the increase of the backfill height, the real-time stress of the hydraulic stay bar is detected, the hydraulic stay bar is judged to be withdrawn, the hydraulic stay bar is recycled, and the utilization rate of the hydraulic stay bar is improved.
Particularly, when the backfill height of the muck reaches the supporting position height of the hydraulic stay bar, the hydraulic stay bar needs to be withdrawn from the foundation pit at the moment, in order to prevent the inward collapse of the enclosing structures at two sides, the backfill loose muck has lower bearing capacity, and large impact is easily generated on the tunnel lining when the enclosing structures collapse, so that the fixed horizontal stay bar is arranged to support the original hydraulic stay bar position, the muck is continuously backfilled, and the stability of the tunnel lining is improved.
Furthermore, the horizontal supporting force of the hydraulic support rod can be accurately detected by arranging the pressure detection device in the bearing pipe body, and meanwhile, the hydraulic telescopic rods are arranged at the two ends of the bearing pipe body respectively, so that the relative movement of the bearing pipe body when the hydraulic support rod is supported and adjusted can be reduced, and the supporting stability of the hydraulic support rod is guaranteed.
Drawings
FIG. 1 is a flow chart of a municipal tunnel construction method according to the embodiment;
FIG. 2 is a schematic structural view of the municipal tunnel construction method according to the embodiment;
fig. 3 is a schematic structural diagram of the hydraulic brace in this embodiment.
Detailed Description
In order that the objects and advantages of the invention will be more clearly understood, the invention is further described below with reference to examples; it should be understood that the specific embodiments described herein are merely illustrative of the invention and do not delimit the invention.
Preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only for explaining the technical principle of the present invention, and do not limit the scope of the present invention.
It should be noted that in the description of the present invention, the terms of direction or positional relationship indicated by the terms "upper", "lower", "left", "right", "inner", "outer", etc. are based on the directions or positional relationships shown in the drawings, which are only for convenience of description, and do not indicate or imply that the device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention.
Furthermore, it should be noted that, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
Referring to fig. 1 and 2, wherein fig. 1 is a flowchart of a municipal tunnel construction method according to this embodiment, and fig. 2 is a schematic structural diagram of the municipal tunnel construction method according to this embodiment, including a tunnel foundation pit 1, a building envelope 2, a distance measuring device 3, a hydraulic brace 4, a towing pin 5, a fixed brace 6, an anchor rod 7, a concrete layer 8, a tunnel lining 9, and a central control computing device (not shown in the drawings),
step S1, respectively opening holes downwards on the ground at two sides of a tunnel foundation pit according to the path of the tunnel foundation pit, placing a steel bar frame into the holes, and pouring concrete into the holes to form an enclosure structure at two sides of the tunnel foundation pit;
step S2, excavating the tunnel foundation pit through an excavating device, detecting real-time relative distances of the enclosure structures on two sides of the tunnel foundation pit through a distance measuring device when the enclosure structures on two sides of the tunnel foundation pit are exposed, transmitting the real-time relative distances to a central control computing device connected with the distance measuring device, calculating real-time enclosure deformation distances by the central control computing device according to the real-time relative distances and initial relative distances of the enclosure structures on two sides of the tunnel foundation pit, comparing the real-time enclosure deformation distances with standard enclosure deformation distances set in the central control computing device, determining whether the enclosure structures on two sides are horizontally supported through a hydraulic support rod by the central control computing device according to the real-time excavating depth of the tunnel foundation pit when the real-time enclosure deformation distances do not reach the standard enclosure deformation distances, performing horizontal supporting of the hydraulic support rod on the enclosure structures on two sides when the real-time enclosure deformation distances reach the standard enclosure deformation distances, acquiring the real-time supporting pressure detected by the hydraulic support rod by the central control computing device, and comparing the real-time supporting pressure with the standard supporting pressure set in the central control computing device to determine, and controlling the hydraulic support rod to extend and shrink until the tunnel foundation pit is excavated;
s3, tamping the bottom of the tunnel foundation pit, driving the anchor rod into the tamped bottom of the tunnel foundation pit, pouring a concrete layer at the bottom of the tunnel foundation pit, building a tunnel lining on the concrete layer, and laying an externally-attached waterproof layer outside the tunnel lining;
and S4, backfilling the excavated residual soil of the tunnel foundation pit into the tunnel foundation pit, tamping, detecting the backfill real-time supporting pressure of the hydraulic support rod and transmitting the backfill real-time supporting pressure to the central control computing device when the tunnel foundation pit is backfilled, comparing the backfill real-time supporting pressure with the internally-arranged backfill standard supporting pressure by the central control computing device, controlling the hydraulic support rod to contract by the central control computing device when the backfill real-time supporting pressure is less than or equal to the backfill standard supporting pressure, withdrawing the hydraulic support rod, and when the backfill real-time supporting pressure is greater than the backfill standard supporting pressure, continuously backfilling the residual soil by the central control computing device when the backfill real-time supporting pressure does not reach the backfill standard supporting pressure until the backfill height of the residual soil reaches the supporting position height of the hydraulic support rod, arranging a fixed horizontal support rod at one side of the hydraulic support rod, withdrawing the hydraulic support rod, backfilling the residual soil to be level with the ground outside the tunnel foundation pit, and finishing tunnel construction.
The building enclosure structures are arranged on two sides of a path of the tunnel foundation pit, the tunnel foundation pit is convenient to excavate, meanwhile, slope setting is avoided, construction space is reduced, when excavation is carried out, the building enclosure structures on two sides are horizontally supported by the aid of the telescopic hydraulic support rods, real-time supporting pressure of the hydraulic support rods is judged by the aid of the central control computing device, supporting lengths of the hydraulic support rods are controlled in real time according to a judgment result, a stress range of the hydraulic support rods is guaranteed, anchor rods are driven into the hydraulic support rods and concrete layers are poured due to the fact that the hydraulic support rods are arranged according to real-time enclosure deformation distances of the building enclosure structures on two sides, the hydraulic support rods are controlled to be stressed to enable the building enclosure structures to be integrally stable, stability of the bottom of the tunnel foundation pit is guaranteed, tunnel lining is built on the upper portion of the concrete layers, tunnel lining is guaranteed not to be sunk or displaced due to backfilled soil, the hydraulic support rods are removed according to the stress of the hydraulic support rods when the backfilled soil, stability of the building tunnel foundation pit is guaranteed, safety of the tunnel is improved, meanwhile, horizontal supporting structures are reduced, construction period of the building enclosure structures is shortened, and construction of the backfilling construction on the foundation is greatly improved.
Specifically, in the step S2, a standard enclosure deformation distance Lb is preset in the central control computing device, the initial relative distance Lc of the enclosure structures on both sides of the tunnel foundation pit is input into the central control computing device, the central control computing device calculates a real-time enclosure deformation distance Ls according to the real-time relative distance Lo and the initial relative distance Lc of the enclosure structures on both sides detected by the distance measuring device, ls = Lc-Lo, the central control computing device compares the real-time enclosure deformation distance Ls with the standard enclosure deformation distance Lb,
when Ls is smaller than Lb, the central control computing device judges that the real-time enclosure deformation distance does not reach the standard enclosure deformation distance, the central control computing device judges that the two side enclosure structures at the position where the real-time enclosure deformation distance is Ls are not horizontally supported, and judges the real-time excavation depth of the tunnel foundation pit so as to determine whether the two side enclosure structures are horizontally supported through the hydraulic support rods;
and when Ls is larger than or equal to Lb, the central control computing device judges that the real-time enclosure deformation distance reaches the standard enclosure deformation distance, and the central control computing device judges that the hydraulic support rods are horizontally supported on the enclosure structures on two sides of which the real-time enclosure deformation distance is Ls.
The real-time relative distance of the building enclosures on the two sides is detected through the distance measuring device, the real-time deformation distance of the building enclosures on the two sides is calculated through the central control computing device, and the judgment is carried out according to the standard building enclosure deformation distance set inside, so that whether horizontal supporting is carried out or not is determined, the real-time detection of the distance measuring device and the real-time calculation of the central control computing device guarantee the controllability of the building enclosures on the two sides in the excavation process, the timely horizontal supporting is carried out according to the judgment result, and the safety of tunnel construction is improved.
Specifically, the maximum excavation supporting depth Hz is arranged in the central control computing device, when the central control computing device judges that the real-time enclosure deformation distance does not reach the standard enclosure deformation distance, the central control computing device obtains the real-time excavation depth Hs of the tunnel foundation pit, the central control computing device compares the real-time excavation depth Hs with the maximum excavation supporting depth Hz,
when Hs is less than Hz, the central control computing device judges that the real-time excavation depth does not reach the maximum excavation supporting depth, and the central control computing device judges that the enclosure structures on the two sides of the tunnel foundation pit are not horizontally supported;
and when Hs is larger than or equal to Hz, the central control computing device judges that the real-time excavation depth reaches the maximum excavation supporting depth, and the central control computing device judges that the hydraulic support rods are horizontally supported on the enclosure structures on two sides of which the real-time enclosure deformation distance is Ls.
When the central control computing device judges that the real-time enclosure deformation distance does not reach the standard enclosure deformation distance, the enclosure deformation is smaller, but the support needs to be carried out at a fixed position in tunnel construction, and the deeper the excavation depth is, the greater the stress degree of the enclosure is, so that the real-time excavation depth is judged, and the maximum excavation support depth is set in the central control computing device to limit the set number of horizontal supports, so that the stability of the enclosures on two sides of the tunnel foundation pit is guaranteed.
Specifically, the initial supporting distance Lr of the hydraulic stay is set in the central control computing device, when the central control computing device determines that horizontal supporting of the hydraulic stay is performed on a two-side enclosure structure where a real-time enclosure deformation distance is Ls, the hydraulic stay is suspended at a to-be-supported position through a suspension device, the central control computing device controls the hydraulic stay to extend, the extended supporting length is Lk, lk = Ls + Lr, and after the hydraulic stay completes extension supporting, tow nails are respectively driven into the enclosure structures on two sides of the tunnel foundation pit at the supporting position of the hydraulic stay to support the hydraulic stay, a fixed stay is set at the lower part of the hydraulic stay to support the hydraulic stay, and after the setting of the fixed stay is completed, the suspension device is removed.
Through set up initial support distance in well accuse computing device so that the hydraulic pressure vaulting pole carries out initial support to the envelope of both sides, wherein, initial support distance should correspond the setting according to the geological conditions of construction, through squeeze into on the envelope of both sides and drag the nail, can enough carry out the affirmation of position to the hydraulic pressure vaulting pole, can play the effect of support again to the both ends of fixed vaulting pole, support it through setting up fixed vaulting pole in hydraulic pressure vaulting pole lower part simultaneously, the influence of hydraulic pressure vaulting pole gravity to the horizontal support has been reduced, the effect of hydraulic pressure vaulting pole horizontal support has been improved.
Specifically, a standard supporting pressure Pb and a standard supporting pressure difference delta Pb are arranged in the central control computing device, when the hydraulic support rods support the enclosure structures on two sides of the tunnel foundation pit, the hydraulic support rods detect the real-time supporting pressure Ps of the hydraulic support rods and transmit the detection result to the central control computing device, the central control computing device calculates the real-time supporting pressure difference delta Ps and delta Ps = | Pb-Ps | according to the real-time supporting pressure Ps and the standard supporting pressure Pb of the hydraulic support rods, the central control computing device compares the real-time supporting pressure difference delta Ps with the standard supporting pressure difference delta Pb,
when the delta Ps is less than or equal to the delta Pb, the central control computing device judges that the real-time supporting pressure difference of the hydraulic support rod does not exceed the standard supporting pressure difference, and the central control computing device judges that the supporting length of the hydraulic support rod is not controlled;
when the delta Ps is larger than the delta Pb, the central control computing device judges that the real-time supporting pressure difference of the hydraulic support rod exceeds the standard supporting pressure difference, and the central control computing device compares the real-time supporting pressure with the standard supporting pressure to determine whether to control the supporting length of the hydraulic support rod.
The standard supporting pressure range is formed by setting the standard supporting pressure and the standard supporting pressure difference in the central control computing device, the real-time supporting pressure of the hydraulic stay bar is judged through the standard supporting pressure range, whether the stress degree of the hydraulic stay bar which is being judged is in the set standard range is determined, when the real-time supporting pressure difference of the hydraulic stay bar does not exceed the standard supporting pressure difference, the real-time supporting pressure of the hydraulic stay bar is indicated to be in the standard range, therefore, the hydraulic stay bar is not adjusted, when the real-time supporting pressure difference of the hydraulic stay bar exceeds the standard supporting pressure difference, the real-time supporting pressure of the hydraulic stay bar is indicated to be out of the standard range, therefore, the real-time supporting pressure is compared with the standard supporting pressure, the specific stress condition of the hydraulic stay bar is determined, and the normal horizontal supporting can be ensured.
Specifically, when the central control computing device determines that the real-time supporting pressure difference of the hydraulic stay bar has exceeded the standard supporting pressure difference, the central control computing device compares the real-time supporting pressure Ps with the standard supporting pressure Pb,
when Ps is less than Pb, the central control computing device judges that the real-time supporting pressure of the hydraulic support rod is lower than the standard supporting pressure, the central control computing device adjusts the supporting length of the hydraulic support rod to Lk ', lk' = Lk + Lk x [ (Pb-Ps)/Pb ], the central control computing device repeats the operation of calculating the real-time supporting pressure difference for judgment, and the central control computing device repeats the operation of adjusting the supporting length of the hydraulic support rod according to the judgment result until the real-time supporting pressure difference delta Ps 'calculated after adjustment reaches delta Ps' to delta Pb, and the central control computing device stops the extension adjustment of the supporting length of the hydraulic support rod;
when Ps is larger than Pb, the central control computing device judges that the real-time supporting pressure of the hydraulic support rod is higher than the standard supporting pressure, the central control computing device adjusts the set initial supporting distance to Lr ', lr ' = Lr-Lr x [ (Ps-Pb)/Ps ], controls the hydraulic support rod to contract to the supporting length Lk ', lk ' = Ls + Lr ', repeats the operation of calculating the real-time supporting pressure difference for judgment, and repeats the operation of adjusting the initial supporting distance according to the judgment result until the real-time supporting pressure difference delta Ps ' calculated after adjustment reaches delta Ps ' ≦ delta Pb, and stops adjusting the initial supporting distance.
When the central control computing device determines that the real-time supporting pressure difference of the hydraulic support rods exceeds the standard supporting pressure difference, the real-time supporting pressure is compared with the standard supporting pressure, and when the real-time supporting pressure of the hydraulic support rods is lower than the standard supporting pressure, the fact that the hydraulic support rods are stressed less and do not achieve an expected supporting effect is indicated.
Specifically, in the step S4, the excavated dregs of the tunnel foundation pit are backfilled into the tunnel foundation pit with the tunnel lining completed, and the dregs backfilled each time are tamped, wherein the height of the backfilled dregs of each time cannot be higher than twenty percent of the total depth of the tunnel foundation pit, and the backfilling is stopped until the dregs are backfilled to be level with the ground outside the tunnel foundation pit, so as to complete the tunnel construction.
Through successive batch of residue soil backfilling and tamping, the supporting force of the backfilled residue soil on the enclosing structures on the two sides is increased, the backfilling height of each time is controlled, the pressure influence of the backfilled residue soil on the finished tunnel lining is reduced, the stability of the tunnel lining is guaranteed, and meanwhile the safety of the enclosing structures is guaranteed.
Specifically, a backfill standard supporting pressure Pn is arranged in the central control computing device, when the tunnel foundation pit is backfilled with the residue soil, the hydraulic supporting rod detects the backfill real-time supporting pressure Pm of the hydraulic supporting rod and transmits the detection result to the central control computing device, the central control computing device compares the backfill real-time supporting pressure Pm with the backfill standard supporting pressure Pn,
when Pm is less than or equal to Pn, the central control computing device judges that the backfill real-time supporting pressure of the hydraulic stay bar reaches the backfill standard supporting pressure, the central control computing device controls the hydraulic stay bar to contract, and the hydraulic stay bar is withdrawn from the tunnel foundation pit through the suspension device;
and when Pm is larger than Pn, the central control computing device judges that the backfill real-time supporting pressure of the hydraulic supporting rod does not reach the backfill standard supporting pressure, and the residue soil backfill is continued.
The backfill standard supporting pressure is set in the central control computing device, the backfill real-time supporting pressure of the hydraulic stay bar in the residue soil backfill process is judged, and because the backfill residue soil can generate horizontal supporting force on the building envelope in the residue soil backfill process, the real-time stress of the hydraulic stay bar is reduced along with the increase of the backfill height, the real-time stress of the hydraulic stay bar is detected, the hydraulic stay bar is withdrawn, the hydraulic stay bar is recycled, and the utilization rate of the hydraulic stay bar is improved.
Specifically, when the central control computing device determines that the backfill real-time supporting pressure of the hydraulic stay bar does not reach the backfill standard supporting pressure, the residual soil is continuously backfilled into the tunnel foundation pit, if the backfill height of the residual soil reaches the supporting position height of the hydraulic stay bar, the backfill real-time supporting pressure of the hydraulic stay bar is still higher than the backfill standard supporting pressure, one side of the hydraulic stay bar is supported by a fixed horizontal stay bar, the hydraulic stay bar is withdrawn from the tunnel foundation pit through a suspension device, and the length of the fixed horizontal stay bar is equal to the supporting length of the hydraulic stay bar before withdrawal.
When the height of the backfilled muck reaches the height of the supporting position of the hydraulic stay bar, the hydraulic stay bar needs to be withdrawn from the foundation pit, in order to prevent the inward collapse of the enclosure structures at two sides, the backfilled loose muck has low bearing capacity, and the tunnel lining is easy to generate large impact when the enclosure structures collapse, so that the original hydraulic stay bar position is supported by the fixed horizontal stay bar, the muck is continuously backfilled, and the stability of the tunnel lining is improved.
Please refer to fig. 3, which is a schematic structural diagram of the hydraulic brace of the present embodiment, including a bearing tube 401, a hydraulic telescopic rod 402, a support baffle 403, and a pressure detecting device 404, wherein,
particularly, the hydraulic support rod comprises a support pipe body, a pressure detection device is arranged inside the support pipe body and used for detecting the axial pressure of the hydraulic support rod in real time, hydraulic telescopic rods are arranged at two ends of the support pipe body, and supporting baffles are arranged at the end portions of the hydraulic telescopic rods and used for supporting the enclosure structures on two sides in the tunnel foundation pit.
Through the horizontal supporting force of the detection hydraulic stay bar that sets up pressure detection device can be accurate in the bearing body, set up hydraulic telescoping rod respectively at bearing body both ends simultaneously, can reduce the relative movement of bearing body when the hydraulic stay bar is being supported and is adjusted, ensured the stability that the hydraulic stay bar was strutted.
So far, the technical solutions of the present invention have been described in connection with the preferred embodiments shown in the drawings, but it is easily understood by those skilled in the art that the scope of the present invention is obviously not limited to these specific embodiments. Equivalent changes or substitutions of related technical features can be made by those skilled in the art without departing from the principle of the invention, and the technical scheme after the changes or substitutions can fall into the protection scope of the invention.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention; various modifications and alterations to this invention will become apparent to those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. A municipal tunnel construction method is characterized by comprising the following steps,
step S1, respectively opening holes downwards on the ground at two sides of a tunnel foundation pit according to the path of the tunnel foundation pit, placing a steel bar frame into the holes, and pouring concrete into the holes to form an enclosure structure at two sides of the tunnel foundation pit;
step S2, excavating the tunnel foundation pit through an excavating device, detecting real-time relative distances of the enclosure structures on two sides of the tunnel foundation pit through a distance measuring device when the enclosure structures on two sides of the tunnel foundation pit are exposed, transmitting the real-time relative distances to a central control computing device connected with the distance measuring device, calculating real-time enclosure deformation distances by the central control computing device according to the real-time relative distances and initial relative distances of the enclosure structures on two sides of the tunnel foundation pit, comparing the real-time enclosure deformation distances with standard enclosure deformation distances set in the central control computing device, determining whether the enclosure structures on two sides are horizontally supported through a hydraulic support rod by the central control computing device according to the real-time excavating depth of the tunnel foundation pit when the real-time enclosure deformation distances do not reach the standard enclosure deformation distances, performing horizontal supporting of the hydraulic support rod on the enclosure structures on two sides when the real-time enclosure deformation distances reach the standard enclosure deformation distances, acquiring the real-time supporting pressure detected by the hydraulic support rod by the central control computing device, and comparing the real-time supporting pressure with the standard supporting pressure set in the central control computing device to determine, and controlling the hydraulic support rod to extend and shrink until the tunnel foundation pit is excavated;
s3, tamping the bottom of the tunnel foundation pit, driving an anchor rod into the tamped bottom of the tunnel foundation pit, pouring a concrete layer at the bottom of the tunnel foundation pit, building a tunnel lining on the concrete layer, and laying an externally-attached waterproof layer outside the tunnel lining;
and S4, backfilling the excavated residual soil of the tunnel foundation pit into the tunnel foundation pit, tamping, detecting the backfill real-time supporting pressure of the hydraulic support rod and transmitting the backfill real-time supporting pressure to the central control computing device when the tunnel foundation pit is backfilled, comparing the backfill real-time supporting pressure with the internally-arranged backfill standard supporting pressure by the central control computing device, controlling the hydraulic support rod to contract by the central control computing device when the backfill real-time supporting pressure is less than or equal to the backfill standard supporting pressure, withdrawing the hydraulic support rod, and when the backfill real-time supporting pressure is greater than the backfill standard supporting pressure, continuously backfilling the residual soil by the central control computing device when the backfill real-time supporting pressure does not reach the backfill standard supporting pressure until the backfill height of the residual soil reaches the supporting position height of the hydraulic support rod, arranging a fixed horizontal support rod at one side of the hydraulic support rod, withdrawing the hydraulic support rod, backfilling the residual soil to be level with the ground outside the tunnel foundation pit, and finishing tunnel construction.
2. The municipal tunnel construction method according to claim 1, wherein in step S2, a standard enclosure deformation distance Lb is preset in the central control computing device, the initial relative distance Lc of the enclosures on both sides of the tunnel foundation pit is input into the central control computing device, the central control computing device calculates a real-time enclosure deformation distance Ls, ls = Lc-Lo, according to the real-time relative distance Lo and the initial relative distance Lc of the enclosures on both sides detected by the distance measuring device, the central control computing device compares the real-time enclosure deformation distance Ls with the standard enclosure deformation distance Lb,
when Ls is smaller than Lb, the central control computing device judges that the real-time enclosure deformation distance does not reach the standard enclosure deformation distance, the central control computing device judges that the two side enclosure structures at the position where the real-time enclosure deformation distance is Ls are not horizontally supported, and judges the real-time excavation depth of the tunnel foundation pit so as to determine whether the two side enclosure structures are horizontally supported through the hydraulic support rods;
and when Ls is larger than or equal to Lb, the central control computing device judges that the real-time enclosure deformation distance reaches the standard enclosure deformation distance, and the central control computing device judges that the hydraulic support rods are horizontally supported on the enclosure structures on two sides of which the real-time enclosure deformation distance is Ls.
3. The municipal tunnel construction method according to claim 2, wherein the central control computing device is provided with a maximum excavation support depth Hz, and when the central control computing device determines that the real-time containment deformation distance does not reach the standard containment deformation distance, the central control computing device obtains a real-time excavation depth Hs of the tunnel foundation pit, compares the real-time excavation depth Hs with the maximum excavation support depth Hz,
when Hs is less than Hz, the central control computing device judges that the real-time excavation depth does not reach the maximum excavation supporting depth, and the central control computing device judges that the enclosure structures on the two sides of the tunnel foundation pit are not horizontally supported;
and when Hs is larger than or equal to Hz, the central control computing device judges that the real-time excavation depth reaches the maximum excavation supporting depth, and the central control computing device judges that the hydraulic support rods are horizontally supported on the enclosure structures on two sides of which the real-time enclosure deformation distance is Ls.
4. The municipal tunnel construction method according to claim 3, wherein an initial support distance Lr of the hydraulic brace is set in the central control computing device, when the central control computing device determines that horizontal support of the hydraulic brace is performed on a two-sided enclosure structure where a real-time enclosure deformation distance is Ls, the hydraulic brace is suspended at a place to be supported through a suspension device, the central control computing device controls the hydraulic brace to extend, the extended support length is Lk, lk = Ls + Lr, after the hydraulic brace is extended, towing nails are respectively driven into the enclosure structures on two sides of the tunnel foundation pit at the support position of the hydraulic brace to support the hydraulic brace, a fixed brace is set at the lower part of the hydraulic brace to support the hydraulic brace, and after the fixed brace is set, the suspension device is removed.
5. The municipal tunnel construction method according to claim 4, wherein a standard support pressure Pb and a standard support pressure difference Δ Pb are provided in the central control computing device, when the hydraulic brace supports the building enclosure on both sides of the tunnel foundation pit, the hydraulic brace detects the real-time support pressure Ps of the hydraulic brace and transmits the detection result to the central control computing device, the central control computing device calculates the real-time support pressure difference Δ Ps, Δ Ps = | Pb-Ps | according to the real-time support pressure Ps and the standard support pressure Pb of the hydraulic brace, the central control computing device compares the real-time support pressure difference Δ Ps with the standard support pressure difference Δ Pb,
when the delta Ps is less than or equal to the delta Pb, the central control computing device judges that the real-time supporting pressure difference of the hydraulic support rod does not exceed the standard supporting pressure difference, and the central control computing device judges that the supporting length of the hydraulic support rod is not controlled;
when the delta Ps is larger than the delta Pb, the central control computing device judges that the real-time supporting pressure difference of the hydraulic support rod exceeds the standard supporting pressure difference, and the central control computing device compares the real-time supporting pressure with the standard supporting pressure to determine whether to control the supporting length of the hydraulic support rod.
6. The municipal tunnel construction method according to claim 5, wherein when the central control computing device determines that the real-time support pressure difference of the hydraulic struts has exceeded the standard support pressure difference, the central control computing device compares the real-time support pressure Ps with the standard support pressure Pb,
when Ps is less than Pb, the central control computing device judges that the real-time supporting pressure of the hydraulic support rod is lower than the standard supporting pressure, the central control computing device adjusts the supporting length of the hydraulic support rod to Lk ', lk' = Lk + Lk x [ (Pb-Ps)/Pb ], the central control computing device repeats the operation of calculating the real-time supporting pressure difference for judgment, and the central control computing device repeats the operation of adjusting the supporting length of the hydraulic support rod according to the judgment result until the real-time supporting pressure difference delta Ps 'calculated after adjustment reaches delta Ps' to delta Pb, and the central control computing device stops the extension adjustment of the supporting length of the hydraulic support rod;
when Ps is greater than Pb, the central control computing device determines that the real-time supporting pressure of the hydraulic support rod is higher than the standard supporting pressure, the central control computing device adjusts the set initial supporting distance to Lr ', lr ' = Lr-Lr x [ (Ps-Pb)/Ps ], controls the hydraulic support rod to contract to the supporting length Lk ', lk ' = Ls + Lr ', and repeats the operation of calculating the real-time supporting pressure difference for determination and the operation of adjusting the initial supporting distance according to the determination result until the real-time supporting pressure difference delta Ps ' calculated after adjustment reaches delta Ps ' ≦ delta Pb, and stops adjusting the initial supporting distance.
7. The municipal tunnel construction method according to claim 1, wherein in step S4, the excavated waste soil of the tunnel foundation pit is backfilled into the tunnel foundation pit with the tunnel lining completed, and the waste soil backfilled each time is tamped, wherein the height of the single waste soil backfilling is not higher than twenty percent of the total depth of the tunnel foundation pit, and the backfilling is stopped until the waste soil backfilling is level with the ground outside the tunnel foundation pit, so as to complete the tunnel construction.
8. The municipal tunnel construction method according to claim 7, wherein a backfill standard support pressure Pn is provided in the central control computing device, and when the tunnel foundation pit is backfilled with muck, the hydraulic brace rod detects a backfill real-time support pressure Pm of the hydraulic brace rod and transmits the detection result to the central control computing device, the central control computing device compares the backfill real-time support pressure Pm with the backfill standard support pressure Pn,
when Pm is less than or equal to Pn, the central control computing device judges that the backfill real-time supporting pressure of the hydraulic stay bar reaches backfill standard supporting pressure, the central control computing device controls the hydraulic stay bar to contract, and the hydraulic stay bar is withdrawn from the tunnel foundation pit through the suspension device;
and when Pm is larger than Pn, the central control computing device judges that the backfill real-time supporting pressure of the hydraulic supporting rod does not reach the backfill standard supporting pressure, and the residue soil backfill is continued.
9. The municipal tunnel construction method according to claim 8, wherein when the central control computing device determines that the backfill real-time support pressure of the hydraulic stay bar does not reach the backfill standard support pressure, the backfilling of the muck into the tunnel foundation pit is continued, and if the backfill height of the muck reaches the support position height of the hydraulic stay bar, the backfill real-time support pressure of the hydraulic stay bar is still higher than the backfill standard support pressure, the hydraulic stay bar is supported by the fixed horizontal stay bar on one side of the hydraulic stay bar, and the hydraulic stay bar is withdrawn from the tunnel foundation pit through the suspension device, wherein the length of the fixed horizontal stay bar is equal to the support length of the hydraulic stay bar before withdrawal.
10. The municipal tunnel construction method according to claim 1, wherein the hydraulic stay bar comprises a bearing tube body, a pressure detection device is arranged inside the bearing tube body and used for detecting the axial pressure to which the hydraulic stay bar is subjected in real time, hydraulic telescopic rods are arranged at two ends of the bearing tube body, and supporting baffles are arranged at the ends of the hydraulic telescopic rods and used for supporting the building enclosure structures at two sides in the tunnel foundation pit.
CN202211141360.4A 2022-09-20 2022-09-20 Municipal tunnel construction method Active CN115233734B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211141360.4A CN115233734B (en) 2022-09-20 2022-09-20 Municipal tunnel construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211141360.4A CN115233734B (en) 2022-09-20 2022-09-20 Municipal tunnel construction method

Publications (2)

Publication Number Publication Date
CN115233734A CN115233734A (en) 2022-10-25
CN115233734B true CN115233734B (en) 2022-11-29

Family

ID=83681805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211141360.4A Active CN115233734B (en) 2022-09-20 2022-09-20 Municipal tunnel construction method

Country Status (1)

Country Link
CN (1) CN115233734B (en)

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4836612A (en) * 1987-08-25 1989-06-06 Serata Geomechanics, Inc. Stress control mining method and apparatus
JP2004052408A (en) * 2002-07-22 2004-02-19 Maeda Corp Tunnel excavating method
JP2007114079A (en) * 2005-10-21 2007-05-10 Katsunobu Takeuchi Subsidence measuring technique and device thereof
CN101457533A (en) * 2007-12-13 2009-06-17 上海隧道工程股份有限公司 Foundation ditch digging real-time detection method
CN103255784A (en) * 2013-04-26 2013-08-21 同济大学 Steel support temperature deforming adjuster
CN105332379A (en) * 2014-08-15 2016-02-17 上海骋浩机械有限公司 Horizontal foundation pit supporting system
JP2018155020A (en) * 2017-03-17 2018-10-04 株式会社東宏 Invert pier and tunnel invert construction method
CN108824449A (en) * 2018-07-26 2018-11-16 中国建筑第八工程局有限公司 Support system and its construction method with underground horizontal support
CN108914991A (en) * 2018-07-24 2018-11-30 胡仲春 Pit retaining monitoring device and pit retaining monitoring method
CN208183817U (en) * 2018-03-10 2018-12-04 浙江海北勘察股份有限公司 A kind of foundation pit enclosure body displacement deformation real-time detection and control system
CN110284505A (en) * 2019-04-29 2019-09-27 中国建筑第二工程局有限公司 The construction method of massif foundation pit
CN111753363A (en) * 2020-07-03 2020-10-09 浙大城市学院 Foundation pit side shield tunnel confining pressure change calculation method considering foundation pit support structure deformation and space effect
CN214101424U (en) * 2021-01-15 2021-08-31 中国建筑第五工程局有限公司 Foundation ditch excavation supporting construction warp atress automatic monitoring early warning system
CN113789822A (en) * 2021-10-20 2021-12-14 宁波数绘信息科技有限公司 Foundation pit monitoring device
CN113882754A (en) * 2021-11-17 2022-01-04 嘉兴市利裕威科技有限公司 Foundation pit enclosure baffle with environment monitoring function for building construction and installation method
CN215868368U (en) * 2021-07-27 2022-02-18 郑州信达智能系统工程有限公司 Entity proportion railway tunnel simulation model

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120213592A1 (en) * 2011-02-18 2012-08-23 David Bruce Nowlin Submerging offshore support structure

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4836612A (en) * 1987-08-25 1989-06-06 Serata Geomechanics, Inc. Stress control mining method and apparatus
JP2004052408A (en) * 2002-07-22 2004-02-19 Maeda Corp Tunnel excavating method
JP2007114079A (en) * 2005-10-21 2007-05-10 Katsunobu Takeuchi Subsidence measuring technique and device thereof
CN101457533A (en) * 2007-12-13 2009-06-17 上海隧道工程股份有限公司 Foundation ditch digging real-time detection method
CN103255784A (en) * 2013-04-26 2013-08-21 同济大学 Steel support temperature deforming adjuster
CN105332379A (en) * 2014-08-15 2016-02-17 上海骋浩机械有限公司 Horizontal foundation pit supporting system
JP2018155020A (en) * 2017-03-17 2018-10-04 株式会社東宏 Invert pier and tunnel invert construction method
CN208183817U (en) * 2018-03-10 2018-12-04 浙江海北勘察股份有限公司 A kind of foundation pit enclosure body displacement deformation real-time detection and control system
CN108914991A (en) * 2018-07-24 2018-11-30 胡仲春 Pit retaining monitoring device and pit retaining monitoring method
CN108824449A (en) * 2018-07-26 2018-11-16 中国建筑第八工程局有限公司 Support system and its construction method with underground horizontal support
CN110284505A (en) * 2019-04-29 2019-09-27 中国建筑第二工程局有限公司 The construction method of massif foundation pit
CN111753363A (en) * 2020-07-03 2020-10-09 浙大城市学院 Foundation pit side shield tunnel confining pressure change calculation method considering foundation pit support structure deformation and space effect
CN214101424U (en) * 2021-01-15 2021-08-31 中国建筑第五工程局有限公司 Foundation ditch excavation supporting construction warp atress automatic monitoring early warning system
CN215868368U (en) * 2021-07-27 2022-02-18 郑州信达智能系统工程有限公司 Entity proportion railway tunnel simulation model
CN113789822A (en) * 2021-10-20 2021-12-14 宁波数绘信息科技有限公司 Foundation pit monitoring device
CN113882754A (en) * 2021-11-17 2022-01-04 嘉兴市利裕威科技有限公司 Foundation pit enclosure baffle with environment monitoring function for building construction and installation method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《软土地层临近隧道深基坑变形控制设计分析与实践》;王卫东;《隧道建设》;20220310;全文 *

Also Published As

Publication number Publication date
CN115233734A (en) 2022-10-25

Similar Documents

Publication Publication Date Title
JP6830748B2 (en) Open caisson construction structure and its construction method
CN101761237B (en) Method for constructing isolation pile for shield tunnel to go through deformation control of buildings and structures at short distance
CN101503879B (en) Pre-control method for preventing inclination of sinking well
CN106759477A (en) A kind of sheltered reverse excavation steel pipe column positioning construction method
CN111962504A (en) Construction method for covering and digging top-down permanent steel pipe column
CN104929136A (en) Urban complex underground obstacle working condition occlusive pile enclosure construction method
CN103967058A (en) Method for in-hole guiding deviation rectification and steel pipe column straightening based on one-column-one-pile back insertion method
CN211472509U (en) A prevent empting formula underground structure supporting device for old city district
CN101929334B (en) Device and method for monitoring penetration of marine petroleum pipe and pile hammering-in method
CN110016919A (en) A kind of aging blocks install the minimally invasive foundation pit structure of elevator and construction method additional
CN108385693B (en) Equal-generation anchor bolt supporting method and system for staged basement supporting
CN115233734B (en) Municipal tunnel construction method
CN101509258A (en) Method for precontrolling subsidence slant of sinking well
CN113431097A (en) Protection structure of shallow foundation building next to deep foundation pit engineering and construction method
CN203475439U (en) Special precast underground wall in precast underground wall based foundation pit support structure construction method
CN207878451U (en) A kind of device using hole rising pouring slurry ground-connecting-wall control influence of foundation excavation
CN211948520U (en) Structure for controlling foundation pit to span existing tunnel to float upwards by adopting hydraulic servo system
CN111877315B (en) Local prefabricated diaphragm wall guide wall under underground facility and construction method
CN209923971U (en) Suspension connecting device for steel pipe column and steel reinforcement cage in reverse construction
CN114703831A (en) Construction method of reinforced concrete cast-in-place pile under complex geological condition
CN107975376A (en) Tunneling shield push pipe and vertical duct connection structure and construction method
CN110331736A (en) A kind of Slarry cycling apptss and corresponding construction for pile foundation in water construction
CN109914423A (en) Pattern foundation pit supporting structure processing method in number library Fang Yudi narrow space
CN109736371A (en) A kind of structures and methods that active control is displaced by disturbance building
CN108978732A (en) One kind closing on the existing bridge bearing platform protection construction of open-cut foundation ditch and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant