CN110016919A - A kind of aging blocks install the minimally invasive foundation pit structure of elevator and construction method additional - Google Patents

A kind of aging blocks install the minimally invasive foundation pit structure of elevator and construction method additional Download PDF

Info

Publication number
CN110016919A
CN110016919A CN201810023528.9A CN201810023528A CN110016919A CN 110016919 A CN110016919 A CN 110016919A CN 201810023528 A CN201810023528 A CN 201810023528A CN 110016919 A CN110016919 A CN 110016919A
Authority
CN
China
Prior art keywords
foundation pit
cushion cap
concrete
foundation
hoistway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810023528.9A
Other languages
Chinese (zh)
Inventor
刘淑君
王文书
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mercedes Elevator (suzhou) Co Ltd
Original Assignee
Mercedes Elevator (suzhou) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mercedes Elevator (suzhou) Co Ltd filed Critical Mercedes Elevator (suzhou) Co Ltd
Priority to CN201810023528.9A priority Critical patent/CN110016919A/en
Publication of CN110016919A publication Critical patent/CN110016919A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of aging blocks to install the minimally invasive foundation pit structure of elevator and construction method additional, comprising the following steps: 1. determine position according to design and verify underground structure using detection detector;2. punching using dedicated pile foundation, while carrying out stake holes protection;3. sinking steel reinforcement cage;4. casting concrete cushion cap foundation stake, and it is laid with cushion cap foundation;5. being laid with pad soil layer on the cushion cap foundation, and waterproof layer is done on top;6. the hoistway foundation pit walls concrete of the short column concrete of casting concrete pier base cushion cap and certain altitude;7. the pre-buried steel construction of depth;8. by hoistway foundation pit walls concrete placings to required height;9. backfilling earthwork compacting, and carry out gutter on the outside of hoistway.The construction method has avoids underground utilities in advance, does not generate destruction to original building, small from heavy load, structure is simple, and easy for construction, the period is short, top hoistway easy to operate advantage easy for installation.

Description

A kind of aging blocks install the minimally invasive foundation pit structure of elevator and construction method additional
Technical field
Present invention relates particularly to a kind of aging blocks to install the minimally invasive foundation pit structure of elevator and construction method additional.
Background technique
It is existing to use more traditional construction with installation elevator foundation pit construction in building (i.e. old building) to existing --- row's (drop) water --- deep-cuts the earthwork --- pouring frame -- backfilling of earthwork --- supporting construction --- base to method flow: earth excavation Hole monitoring.It is lower to dig the rectangular cube space for being greater than required elevator, casting concrete ground cushion cap in required space Basis, building screw-thread steel 14 are implanted into, and pour well enclosure, backfilling of earthwork, polyurethane water-proof layer, screed using template.But in this way Construction method exist and need a large amount of drainings, a large amount of earthwork accumulation, occupied space is big, and construction equipment, personnel requirement are more, construction The problem of period length, so that such construction method influences resident living.And integral shift is needed when encountering underground utilities.
Summary of the invention
The present invention has invented a kind of aging blocks and has installed the minimally invasive foundation pit structure of elevator additional and apply aiming at the problem that background technique is proposed Work method, the foundation pit structure and construction method have avoids underground utilities in advance, and does not generate destruction to original building, from heavy duty Lotus is small, and structure is simple, easy for construction, and the period is short, and top hoistway easy to operate is easy for installation.
The technical scheme is that a kind of aging blocks install the minimally invasive foundation pit structure of elevator, the stake including being set to bottommost additional Based platform basis is equipped with pad soil layer on the basis of the pile supported platform, and pad soil layer top is equipped with waterproof layer, does on the waterproof layer double Layer steel mesh pile supported platform, four Angle Positions of the pile supported platform are provided with the short column of pier base cushion cap for stretching out pile supported platform Concrete, and steel construction is provided on the short column concrete of the pier base cushion cap, hoistway foundation pit walls concrete and pre-buried steel construction are set.
The present invention also provides the construction methods that a kind of aging blocks install the minimally invasive foundation pit structure of elevator additional, specifically include following step It is rapid:
1. according to designing determining position and verifying underground structure using detection detector;
2. punching using dedicated pile foundation, while carrying out stake holes protection;
3. sinking steel reinforcement cage;
4. casting concrete cushion cap foundation stake, and it is laid with cushion cap foundation;
5. being laid with pad soil layer on the cushion cap foundation, and waterproof layer is done on top;
6. the hoistway foundation pit walls concrete of the short column concrete of casting concrete pier base cushion cap and certain altitude;
7. the pre-buried steel construction of depth;
8. by hoistway foundation pit walls concrete placings to required height;
9. backfilling earthwork compacting, and carry out gutter on the outside of hoistway.
It further, further include being laid with two-layer two-way reinforcement on the waterproof layer and pouring coagulation in the step 6 Soil forms pier base cushion cap.
Further, in the step 7, the steel construction is embedded in advance on the short column concrete of the concrete pier base cushion cap.
Further, the steel construction is solid by the pre-buried steel structure bottom greater than 12mm of bottom welding 250--300 Fixed board simultaneously welds pre-buried steel structure bottom stiffening plate welding fabrication.
Further, the steel construction with top hoistway steel structure connection at weld on reserved steel construction and hoistway in advance Portion's hoistway is connected and fixed plate, at the same steel construction side weld in advance reserved steel construction and first floor door opening crossbeam connection fixture with Facilitate installation door opening steel construction.
It is had the advantage that compared with the existing technology in the present invention
1. this method has by verifying underground structure using detection detector in advance and avoids underground utilities in advance, so that not Destruction is generated to original building, so that easy for construction, cycle time.
2. small from heavy load, structure is simple.
3. it is convenient to connect with top hoistway structure.
Detailed description of the invention
The invention will be further described with reference to the accompanying drawings and embodiments:
Fig. 1 is to install elevator shaft foundation pit structure floor map additional;
Fig. 2 be in Fig. 1 A to elevational schematic view;
Fig. 3 be in Fig. 1 B, D to elevational schematic view;
Fig. 4 be in Fig. 1 C to elevational schematic view;
Fig. 5 is pre-buried steel construction and hoistway foundation pit cushion cap plan view;
Fig. 6 connect facade arrangement schematic diagram with hoistway foundation pit cushion cap for pre-buried steel construction;
Fig. 7 is pre-buried steel structural plan schematic diagram;
Fig. 8 is pre-buried steel structural facades schematic diagram;
Fig. 9 is the construction method schematic diagram for installing elevator shaft foundation pit structure additional;
Wherein: 1, pile supported platform basis, 2, pad soil layer, 3, waterproof layer, 4, pile foundation support table, 5, the short column concrete of pier base cushion cap, 6, well Road foundation pit walls concrete, 7, steel construction, 8, well enclosure outer guard backfill, 9, household elevator grade platform, 10, pre-buried steel knot Structure lower tie plate, 11, pre-buried steel structure bottom stiffening plate, 12, reserved steel construction and first floor door opening crossbeam connection fixture, 13, it reserves steel construction and top hoistway is connected and fixed plate.
Specific embodiment
Embodiment: in conjunction with shown in Fig. 1-9, for a kind of construction of the aging blocks installation minimally invasive foundation pit structure of elevator provided by the invention Method, comprising the following steps:
1 primarily determines elevator shaft position in conjunction with original building architectural characteristic according to Design Requirement Drawing, uses professionally test Survey detector underground structure verify checking and verify, such as encounter in drawing when conflicting underground structure, in time to drawing and Construction location is finely adjusted, or takes corresponding spare measure scheme.
2 Comprehensive Correlation stakes, pier, well foundation structure three's feature are selected and use pier foundation structure in aging blocks installation elevator, With the latest equipment drilling device specially designed, punching construction is carried out using taper pier form, it is desirable that drilling pier diameter exists 400-600mm, depth is at 3 meters --- between 6 meters (with specific reference to original building and sub-surface structure, design requirement determines size), and Pay attention to the protection of pier foundation hole.
It has accomplished fluently after the acceptance(check) of pier hole discharge for 3 pairs and has tied up hanging for steel reinforcement cage or prefabricated steel core pier in advance It puts, pour pier shaft concrete and conserves, pour pier foundation and select C30 concrete, implanted reinforced bar cage is selected for building HRB400 grades of screw-thread steel >=14mm.
4 carry out the excavation of foundation pit earthwork according to design requirement, and base compacting is laid with and pads soil layer, and the pad soil thickness >= 100mm, and waterproof layer is laid on top.
5 are laid with two-layer two-way reinforcement and casting concrete formation pier base cushion cap on the waterproof layer, this pier base cushion cap thickness >=200 are spent, steel bar stress uses HRB400 grades of reinforcing bars, diameter >=12mm in arrangement of reinforcement, and it is straight to be distributed arrangement of reinforcement by spacing 100-200mm Diameter 8--10mm, spacing 200-300;At pier based platform base position (i.e. at 4 angles), high about 500 high stress steel are reserved Muscle, casting concrete are C30 concrete;Pier base cushion cap pours completion, reaches requirement flatness and meets design requirement.
6 carry out the short column concrete of casting concrete pier base cushion cap in pier base cushion cap top reserved steel bar, and surrounding pours certain height The hoistway foundation pit walls concrete of degree;The short column concrete of the pier base cushion cap and hoistway foundation pit walls concrete are poured using being first put into plank and do mould Method.
7 on pier base cushion cap short column concrete top, and it is short vertical that pre-buried steel construction prefabricated in factory is placed on pier base cushion cap Steel column is formed on column concrete, the verticality and size for correcting 4 steel columns meet design drawing requirement;Continue to do mould using plank The method that is poured of method, 300mm at the top of plank height to pre-buried steel column after plank is adjusted, pours C30 concrete Concrete is fully embedded steel construction in concrete, is embedded to steel construction size in 800mm--1000mm;It is corrected again after pre-buried The size and verticality of steel construction centainly guarantee that the position dimension of pre-buried steel construction and verticality are requiring error range.? Can by the short column concrete of production pier base cushion cap and the step for pour 500 hoistway foundation pit walls in the short column concrete of pier base cushion cap it is also straight It connects and uses pre-buried steel construction instead, step method: 4 Prefabricated steel constructions are placed by figure in pier base cushion cap foundation position, and use bilateral mould Plate carries out overlay film, and the verticality and size for correcting 4 steel columns meet design drawing requirement;The method for continuing to do mould using plank The method poured, form height after template is adjusted, pour C30 concrete coagulation to pre-buried steel column top 300mm Soil is fully embedded steel construction in concrete, is embedded to steel construction size in 1300mm--1500mm or so;It is corrected again after pre-buried The size and verticality of steel construction centainly guarantee that the position dimension of pre-buried steel construction and verticality are requiring error range.
8 backfill earthwork protective layer compactings, and carry out gutter on the outside of hoistway;Behind equal concrete settings jail, verifying is qualified Afterwards, plank is removed, earthwork when with earth excavation carries out protection accumulation to hoistway foundation pit periphery, tamps, and form elevator Foundation pit is highest point, and gutter on the outside of hoistway.
After 9 equal hoistways foundation pit solidifications are solid, the steel superstructure hoistway frame produced in factory, with pre-buried steel construction Abutting joint is carried out to fix.
Certainly the above embodiments merely illustrate the technical concept and features of the present invention, and its object is to allow be familiar with technique People can understand the content of the present invention and implement it accordingly, it is not intended to limit the scope of the present invention.It is all according to this hair The modification that the Spirit Essence of bright main technical schemes is done, should be covered by the protection scope of the present invention.

Claims (6)

1. a kind of aging blocks install the minimally invasive foundation pit structure of elevator additional, it is characterised in that: the pile supported platform basis including being set to bottommost, Pad soil layer is equipped on the basis of the pile supported platform, pad soil layer top is equipped with waterproof layer, does double layer bar stake on the waterproof layer Based platform, four Angle Positions of the pile supported platform are provided with the short column concrete of pier base cushion cap for stretching out pile supported platform, and described It is provided with steel construction on the short column concrete of pier base cushion cap, hoistway foundation pit walls concrete and pre-buried steel construction are set.
2. the construction method that a kind of aging blocks install the minimally invasive foundation pit structure of elevator additional, it is characterised in that: specifically includes the following steps:
1. according to designing determining position and verifying underground structure using detection detector;
2. punching using dedicated pile foundation, while carrying out stake holes protection;
3. sinking steel reinforcement cage;
4. casting concrete cushion cap foundation stake, and it is laid with cushion cap foundation;
5. being laid with pad soil layer on the cushion cap foundation, and waterproof layer is done on top;
6. the hoistway foundation pit walls concrete of the short column concrete of casting concrete pier base cushion cap and certain altitude;
7. the pre-buried steel construction of depth;
8. by hoistway foundation pit walls concrete placings to required height;
9. backfilling earthwork compacting, and carry out gutter on the outside of hoistway.
3. the construction method that a kind of aging blocks according to claim 2 install the minimally invasive foundation pit structure of elevator additional, which is characterized in that It further include double layer bar pile supported platform being done on the waterproof layer, and tap deeply in quadrangle pile foundation position in the step 6 The short column concrete of pier base cushion cap is done on muscle to platform.
4. the construction method that a kind of aging blocks according to claim 2 install the minimally invasive foundation pit structure of elevator additional, which is characterized in that institute It states in step 7, the steel construction is embedded in advance on the short column concrete of the concrete pier base cushion cap.
5. a kind of aging blocks according to claim 2 or 4 install the construction method of the minimally invasive foundation pit structure of elevator additional, feature exists In the steel construction is to weld the pre-buried steel structure bottom fixed plate greater than 12mm of 250--300 by bottom and weld pre-buried Steel construction lower part stiffening plate welding fabrication.
6. a kind of aging blocks according to claim 2 or 4 install the construction method of the minimally invasive foundation pit structure of elevator additional, feature exists Reserved steel construction is being welded in advance with steel superstructure junction and top hoistway is connected and fixed plate in, the steel construction, simultaneously Weld reserved steel construction and first floor door opening crossbeam connection fixture in advance in steel construction side to facilitate installation door opening steel construction.
CN201810023528.9A 2018-01-10 2018-01-10 A kind of aging blocks install the minimally invasive foundation pit structure of elevator and construction method additional Pending CN110016919A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810023528.9A CN110016919A (en) 2018-01-10 2018-01-10 A kind of aging blocks install the minimally invasive foundation pit structure of elevator and construction method additional

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810023528.9A CN110016919A (en) 2018-01-10 2018-01-10 A kind of aging blocks install the minimally invasive foundation pit structure of elevator and construction method additional

Publications (1)

Publication Number Publication Date
CN110016919A true CN110016919A (en) 2019-07-16

Family

ID=67188140

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810023528.9A Pending CN110016919A (en) 2018-01-10 2018-01-10 A kind of aging blocks install the minimally invasive foundation pit structure of elevator and construction method additional

Country Status (1)

Country Link
CN (1) CN110016919A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110904992A (en) * 2019-12-11 2020-03-24 杭州西奥电梯现代化更新有限公司 Elevator foundation member for integrally assembling elevator and construction method thereof
CN111677317A (en) * 2020-04-29 2020-09-18 成都建工第二建筑工程有限公司 Method and structure for installing elevator in existing building
CN115262577A (en) * 2022-08-05 2022-11-01 茅金声 Steel-concrete frame member for ladder well foundation pit and construction method thereof
CN115506621A (en) * 2022-09-27 2022-12-23 浙江中天精诚装饰集团有限公司 Indoor additional elevator structure and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090044195A (en) * 2007-10-31 2009-05-07 대림산업 주식회사 Core and construction method thereof for extension of elevator operation floor and elevation of seismic resistant performance in remodeling of structure
CN203741872U (en) * 2014-03-03 2014-07-30 广州市鲁班建筑工程技术有限公司 Structure for improving elevator shaft through stiff beam
CN104452795A (en) * 2014-12-12 2015-03-25 北京筑福国际工程技术有限责任公司 Additional elevator foundation structure of old building and construction method of additional elevator foundation structure
CN106939683A (en) * 2017-03-09 2017-07-11 广东易佳梯科技有限公司 A kind of existing building installs elevator hoistways additional

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090044195A (en) * 2007-10-31 2009-05-07 대림산업 주식회사 Core and construction method thereof for extension of elevator operation floor and elevation of seismic resistant performance in remodeling of structure
CN203741872U (en) * 2014-03-03 2014-07-30 广州市鲁班建筑工程技术有限公司 Structure for improving elevator shaft through stiff beam
CN104452795A (en) * 2014-12-12 2015-03-25 北京筑福国际工程技术有限责任公司 Additional elevator foundation structure of old building and construction method of additional elevator foundation structure
CN106939683A (en) * 2017-03-09 2017-07-11 广东易佳梯科技有限公司 A kind of existing building installs elevator hoistways additional

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110904992A (en) * 2019-12-11 2020-03-24 杭州西奥电梯现代化更新有限公司 Elevator foundation member for integrally assembling elevator and construction method thereof
CN110904992B (en) * 2019-12-11 2020-10-02 杭州西奥电梯现代化更新有限公司 Elevator foundation member for integrally assembling elevator and construction method thereof
CN111677317A (en) * 2020-04-29 2020-09-18 成都建工第二建筑工程有限公司 Method and structure for installing elevator in existing building
CN115262577A (en) * 2022-08-05 2022-11-01 茅金声 Steel-concrete frame member for ladder well foundation pit and construction method thereof
CN115506621A (en) * 2022-09-27 2022-12-23 浙江中天精诚装饰集团有限公司 Indoor additional elevator structure and construction method

Similar Documents

Publication Publication Date Title
CN104975622B (en) Correction and reinforcement method for precast pile foundation of high-rise building
CN110016919A (en) A kind of aging blocks install the minimally invasive foundation pit structure of elevator and construction method additional
CN102392458B (en) Piling beam cofferdam construction method used for bare rock foundation construction in water
CN106958256A (en) A kind of placement layer by layer, the open caisson construction technique repeatedly sunk
CN104846840B (en) A kind of shallow embedding reinforcement of soft soil integrated pipe canal device and construction method
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN106088127A (en) Open caisson construction method
CN110485429A (en) A kind of prestressing force fashioned iron assembled combination inner support construction method
CN106436788A (en) Foundation reinforcement and inclination correction method for friction piles of high-rise building
CN106013053A (en) Steel sheet pile support construction method for building underground garage open caisson
CN104264683B (en) Building concave shape ultra-deep foundation pit subregion supporting method is protected for three around literary composition
WO2023213117A1 (en) Widening structure and construction method for existing subgrade embankment wall section near river
CN106065628B (en) Based on the major diameter running water pipe security protection construction method faced forever with reference to theory
CN108035379B (en) Comprehensive pipe gallery and construction method thereof
CN102493485B (en) Method for building slope protection retaining wall during filling
CN114837088A (en) Construction method of bearing platform on highway
CN112456353B (en) Construction method of fixed foundation of movable arm tower crane and movable arm tower crane structure
CN109577322A (en) A kind of constructing device for inside soil body existing pile foundation pile extension
CN109914470A (en) A kind of road shoulder barricade and its construction method
CN113089687A (en) Slope protection method and device
CN110904992B (en) Elevator foundation member for integrally assembling elevator and construction method thereof
CN110241863B (en) Soft soil foundation pit excavation process pipe gallery deformation control device and control method thereof
CN110805049B (en) Construction method of mountain slope ultra-thickness spray anchor permanent supporting structure
CN218148483U (en) Tower crane foundation structure
CN109024657B (en) Construction method of super high-rise core tube deep pit edge tower crane foundation under complex conditions

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190716