CN113793117A - BIM-based remote supervision method for building construction - Google Patents
BIM-based remote supervision method for building construction Download PDFInfo
- Publication number
- CN113793117A CN113793117A CN202110991896.4A CN202110991896A CN113793117A CN 113793117 A CN113793117 A CN 113793117A CN 202110991896 A CN202110991896 A CN 202110991896A CN 113793117 A CN113793117 A CN 113793117A
- Authority
- CN
- China
- Prior art keywords
- terminal
- project
- unit
- construction
- monitoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 28
- 238000009435 building construction Methods 0.000 title claims abstract description 24
- 238000012544 monitoring process Methods 0.000 claims abstract description 54
- 238000010276 construction Methods 0.000 claims abstract description 44
- 238000012545 processing Methods 0.000 claims abstract description 36
- 238000004891 communication Methods 0.000 claims description 12
- 238000012986 modification Methods 0.000 claims description 5
- 230000004048 modification Effects 0.000 claims description 5
- 239000000463 material Substances 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 4
- 239000004035 construction material Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Economics (AREA)
- Marketing (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Data Mining & Analysis (AREA)
- Primary Health Care (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Selective Calling Equipment (AREA)
Abstract
The invention discloses a BIM-based remote supervision method for building construction, which comprises the following steps: s1: building a model based on BIM; s2: the construction project is divided into sub-project modules according to the construction model, and the construction steps are determined; s3: establishing a supervision monitoring point according to the sub-project, and determining a monitoring system; s4, remotely observing the construction site through the monitoring system, and remotely commanding and monitoring through the monitoring system; s5, comparing the progress input with the construction model, confirming the construction condition and marking the problematic places; the management personnel use through the cooperation of handling terminal, monitor terminal, storage terminal and receiving operation terminal, have realized project management personnel's remote supervision and the processing of building project, and the job site is observed at any time in the cooperation of staff's accessible receiving operation terminal and monitor terminal, handles management and the record of terminal to the project progress to and the arrangement of project construction order, improved supervision efficiency, reduce the supervision cost.
Description
Technical Field
The invention relates to the technical field of building construction, in particular to a BIM-based remote supervision method for building construction.
Background
During construction, a large project is usually divided into a plurality of sub-projects, and then the sub-projects are constructed together, so that the total construction period can be shortened. And for the supervision of construction, after construction data is collected, a supervisor judges according to experience and drawings.
However, the conventional supervision method in the market generally adopts on-site supervision by workers, and needs managers to know project schedule and project supervision on a construction site, so that a large amount of time and manpower are consumed, and the supervision cost and supervision are increased.
Disclosure of Invention
The invention aims to provide a BIM-based remote monitoring method for building construction, which aims to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme:
a BIM-based remote supervision method for building construction comprises the following steps:
s1: building a model based on BIM;
s2: the construction project is divided into sub-project modules according to the construction model, and the construction steps are determined;
s3: establishing a supervision monitoring point according to the sub-project, and determining a monitoring system;
s4, remotely observing the construction site through the monitoring system, and remotely commanding and monitoring through the monitoring system;
s5, comparing the progress input with the construction model, confirming the construction condition, marking the problematic place and confirming the modification scheme;
s6, checking and accepting the project;
and S7, item summarization.
The utility model provides a building construction uses remote supervision method based on BIM, its supervisory system includes monitor terminal, processing terminal, storage terminal and receipt operation terminal, monitor terminal includes speech unit, monitoring unit and communication unit, processing terminal includes modeling unit, picture, video and audio frequency processing unit, contrast unit, feedback record unit, mark unit and communication unit, and the storage terminal stores the model that the project was constructed and the data that processing terminal and receipt operation terminal produced.
As a further scheme of the invention: the monitoring terminal is electrically connected with the processing terminal and the receiving operation terminal through the communication unit respectively, and the processing terminal is electrically connected with the storage terminal and the receiving operation terminal through the communication unit respectively.
As a still further scheme of the invention: the receiving operation terminal is a mobile phone or a computer.
As a still further scheme of the invention: the model construction and the division of the item into sub-items in S1 and S2 are made by a modeling unit of the processing terminal, and the kind, size, and number of used materials are recorded in the modeling unit.
As a still further scheme of the invention: the monitoring terminal is provided at the monitoring point in S3.
As a still further scheme of the invention: and S4 monitors the project by receiving the video and the picture shot by the operation terminal observation monitoring unit and processing the comparison result of the comparison unit in the terminal, and commands the site by receiving the operation terminal control voice unit.
As a still further scheme of the invention: and the S5 processes the project picture and video shot by the monitoring unit through the picture, video and audio processing unit, the comparison unit determines the construction progress and construction problems through the shot picture and video and the feedback and record of the feedback recording unit, marks the problem places of the project through the marking unit, and arranges the project progress through the marking unit in sequence.
As a still further scheme of the invention: and S6, remotely monitoring the whole project through the receiving operation terminal through the monitoring terminal to check the project according to the national security standard.
As a still further scheme of the invention: the S7 collates and summarizes the entire project.
Compared with the prior art, the invention has the beneficial effects that:
1. according to the invention, the management personnel can realize the remote supervision of project management personnel and the processing of the construction project through the matched use of the processing terminal, the monitoring terminal, the storage terminal and the receiving operation terminal, and the working personnel can observe the construction site at any time through the matching of the receiving operation terminal and the monitoring terminal, manage and record the project progress by the processing terminal and arrange the project construction sequence, so that the supervision efficiency is improved, and the supervision cost is reduced.
2. The invention realizes the remote acceptance of the project through the operation terminal and the monitoring terminal, and the acceptance is convenient.
Drawings
Fig. 1 is a block diagram of remote supervision for building construction based on BIM.
Fig. 2 is a block diagram of a remote supervision method for building construction based on BIM.
Fig. 3 is a block diagram of a monitoring terminal in a remote supervision method for building construction based on BIM.
Fig. 4 is a block diagram of a processing terminal in a remote supervision method for building construction based on BIM.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 4, in an embodiment of the present invention, a remote monitoring method for building construction based on BIM includes the following steps:
s1: building a model based on BIM;
s2: the construction project is divided into sub-project modules according to the construction model, and the construction steps are determined;
s3: establishing a supervision monitoring point according to the sub-project, and determining a monitoring system;
s4, remotely observing the construction site through the monitoring system, and remotely commanding and monitoring through the monitoring system;
s5, comparing the progress input with the construction model, confirming the construction condition, marking the problematic place and confirming the modification scheme;
s6, checking and accepting the project;
and S7, item summarization.
The utility model provides a building construction uses remote supervision method based on BIM, its supervisory system includes monitor terminal, processing terminal, storage terminal and receipt operation terminal, monitor terminal includes speech unit, monitoring unit and communication unit, processing terminal includes modeling unit, picture, video and audio frequency processing unit, contrast unit, feedback record unit, mark unit and communication unit, and the storage terminal stores the model that the project was constructed and the data that processing terminal and receipt operation terminal produced.
The monitoring terminal is electrically connected with the processing terminal and the receiving operation terminal through the communication unit respectively, and the processing terminal is electrically connected with the storage terminal and the receiving operation terminal through the communication unit respectively.
The receiving operation terminal is a mobile phone or a computer.
The model construction and the division of the item into sub-items in S1 and S2 are made by a modeling unit of the processing terminal, and the kind, size, and number of used materials are recorded in the modeling unit.
The monitor terminal is set at the monitor point in S3, and confirms that there is no blind spot for remote monitor viewing by receiving the monitor line of sight of the monitor terminal at the operation terminal confirmation monitor point.
And S4 monitors the project by receiving the video and the picture shot by the operation terminal observation monitoring unit and processing the comparison result of the comparison unit in the terminal, and commands the site by receiving the operation terminal control voice unit.
The S5 processes the picture and video of the project shot by the monitoring unit through the picture, video and audio processing unit, the comparison unit determines the progress of the construction and the problem of the construction through the shot picture and video and the feedback and record of the feedback recording unit, and confirms the amount of the construction material, and marks the problem place of the project through the marking unit, and arranges the progress of the project through the marking unit in sequence.
S6 carries out project acceptance to the whole project according to the national safety standard by receiving remote supervision of the operation terminal through the monitoring terminal, realizes remote acceptance, is convenient to operate, and improves the working efficiency.
The S7 is arranged and summarized for the whole project to improve the accuracy of the next operation.
The working principle of the invention is as follows:
when the system is used, a manager models a project through a modeling unit in a processing terminal and splits the project to form a sub-project model, confirms the type, quantity and size of construction materials of the project, sets a monitoring terminal at a monitoring point established by the sub-project, observes videos and pictures shot by the monitoring unit through a receiving operation terminal to realize watching of a construction site, controls a voice unit through the receiving operation terminal to command the site, simultaneously marks the problematic places of the project through a marking unit of the processing terminal, arranges the project progress in sequence through the marking unit, processes the feedback problems through a feedback recording unit, and confirms the construction progress through comparison of data and pictures recorded by the feedback recording unit, the data of the video and audio processing unit and the constructed model in a comparison unit in the processing terminal, the remote management of management personnel on the project is realized, and after the project is finished, the receiving operation terminal remotely monitors the whole project through the monitoring terminal and checks the project according to the national safety standard.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes in the embodiments and/or modifications of the invention can be made, and equivalents and modifications of some features of the invention can be made without departing from the spirit and scope of the invention.
Claims (10)
1. A BIM-based remote supervision method for building construction is characterized by comprising the following steps: the method comprises the following steps:
s1: building a model based on BIM;
s2: the construction project is divided into sub-project modules according to the construction model, and the construction steps are determined;
s3: establishing a supervision monitoring point according to the sub-project, and determining a monitoring system;
s4, remotely observing the construction site through the monitoring system, and remotely commanding and monitoring through the monitoring system;
s5, comparing the progress input with the construction model, confirming the construction condition, marking the problematic place and confirming the modification scheme;
s6, checking and accepting the project;
and S7, item summarization.
2. A BIM-based remote supervision method for building construction is characterized by comprising the following steps: the monitoring system comprises a monitoring terminal, a processing terminal, a storage terminal and a receiving operation terminal, wherein the monitoring terminal comprises a voice unit, a monitoring unit and a communication unit, the processing terminal comprises a modeling unit, a picture, video and audio processing unit, a comparison unit, a feedback recording unit, a marking unit and a communication unit, and the storage terminal stores a model constructed by projects and data generated by the processing terminal and the receiving operation terminal.
3. The BIM-based remote supervision method for building construction according to claim 2, characterized in that: the monitoring terminal is electrically connected with the processing terminal and the receiving operation terminal through the communication unit respectively, and the processing terminal is electrically connected with the storage terminal and the receiving operation terminal through the communication unit respectively.
4. The BIM-based remote supervision method for building construction according to claim 2, characterized in that: the receiving operation terminal is a mobile phone or a computer.
5. The BIM-based remote supervision method for building construction according to claim 1, characterized in that: the model construction and the division of the item into sub-items in S1 and S2 are made by a modeling unit of the processing terminal, and the kind, size, and number of used materials are recorded in the modeling unit.
6. The BIM-based remote supervision method for building construction according to claim 2, characterized in that: the monitoring terminal is provided at the monitoring point in S3.
7. The BIM-based remote supervision method for building construction according to claim 1, characterized in that: and S4 monitors the project by receiving the video and the picture shot by the operation terminal observation monitoring unit and processing the comparison result of the comparison unit in the terminal, and commands the site by receiving the operation terminal control voice unit.
8. The BIM-based remote supervision method for building construction according to claim 1, characterized in that: and the S5 processes the project picture and video shot by the monitoring unit through the picture, video and audio processing unit, the comparison unit determines the construction progress and construction problems through the shot picture and video and the feedback and record of the feedback recording unit, marks the problem places of the project through the marking unit, and arranges the project progress through the marking unit in sequence.
9. The BIM-based remote supervision method for building construction according to claim 1, characterized in that: and S6, remotely monitoring the whole project through the receiving operation terminal through the monitoring terminal to check the project according to the national security standard.
10. The BIM-based remote supervision method for building construction according to claim 1, characterized in that: the S7 collates and summarizes the entire project.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110991896.4A CN113793117A (en) | 2021-08-27 | 2021-08-27 | BIM-based remote supervision method for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110991896.4A CN113793117A (en) | 2021-08-27 | 2021-08-27 | BIM-based remote supervision method for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113793117A true CN113793117A (en) | 2021-12-14 |
Family
ID=78876505
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110991896.4A Pending CN113793117A (en) | 2021-08-27 | 2021-08-27 | BIM-based remote supervision method for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113793117A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114896652A (en) * | 2022-03-30 | 2022-08-12 | 重庆伏特猫科技有限公司 | BIM-based industrial building informatization control terminal |
CN118586676A (en) * | 2024-08-02 | 2024-09-03 | 源海世纪控股(山东)有限公司 | Intelligent construction method for BIM model of construction engineering |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110070284A (en) * | 2019-04-17 | 2019-07-30 | 江苏开通建设工程有限公司 | A kind of wisdom beam course management system based on BIM technology |
CN112163746A (en) * | 2020-09-18 | 2021-01-01 | 华航环境发展有限公司 | Building engineering project management system based on BIM and GIS |
CN112598218A (en) * | 2020-11-20 | 2021-04-02 | 广州科腾信息技术有限公司 | Management and control method and system based on electric power construction site |
CN113065756A (en) * | 2021-03-26 | 2021-07-02 | 胡军军 | BIM-based project supervision informatization management system |
CN113177774A (en) * | 2021-04-30 | 2021-07-27 | 重庆天智慧启科技有限公司 | Building construction supervision method based on BIM |
-
2021
- 2021-08-27 CN CN202110991896.4A patent/CN113793117A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110070284A (en) * | 2019-04-17 | 2019-07-30 | 江苏开通建设工程有限公司 | A kind of wisdom beam course management system based on BIM technology |
CN112163746A (en) * | 2020-09-18 | 2021-01-01 | 华航环境发展有限公司 | Building engineering project management system based on BIM and GIS |
CN112598218A (en) * | 2020-11-20 | 2021-04-02 | 广州科腾信息技术有限公司 | Management and control method and system based on electric power construction site |
CN113065756A (en) * | 2021-03-26 | 2021-07-02 | 胡军军 | BIM-based project supervision informatization management system |
CN113177774A (en) * | 2021-04-30 | 2021-07-27 | 重庆天智慧启科技有限公司 | Building construction supervision method based on BIM |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114896652A (en) * | 2022-03-30 | 2022-08-12 | 重庆伏特猫科技有限公司 | BIM-based industrial building informatization control terminal |
CN118586676A (en) * | 2024-08-02 | 2024-09-03 | 源海世纪控股(山东)有限公司 | Intelligent construction method for BIM model of construction engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112018892B (en) | Electric power operation and maintenance remote guidance system | |
CN106650855B (en) | A kind of fire-fighting equipment total management system | |
CN113793117A (en) | BIM-based remote supervision method for building construction | |
CN111768123A (en) | Visual management system for power distribution network construction site | |
CN105449867A (en) | Visual operation process monitoring mistake precaution system and control method | |
CN112232645A (en) | Construction site management system | |
CN111612646A (en) | Networked intelligent secondary operation and maintenance system | |
CN109829693A (en) | One kind being used for Construction Schedule management system and management method | |
CN110430246A (en) | Capital construction security management and control system | |
CN111369220A (en) | Teacher's cloud platform is built to wisdom | |
CN107831738A (en) | The cutter and production planning management system of bearing mnanufacture | |
CN114298574A (en) | On-site cloud management system | |
CN107730212A (en) | A kind of project under construction personnel long-distance real-time management system | |
CN110599368A (en) | DBM intelligent building management tool | |
CN115203789A (en) | Actual measurement data integrated management method and system based on BIM technology | |
CN110400075A (en) | A kind of wisdom building site quality safety management system | |
CN110445763A (en) | A kind of light current intelligent monitor system with safety | |
CN112132300A (en) | Transformer substation maintenance method, device and system | |
CN109754160B (en) | Shield construction supervision system | |
CN116777386A (en) | Intelligent manufacturing collaborative platform management system for beam field | |
CN111062670A (en) | Electrical ticket-based tool cabinet control method and device | |
CN105790974A (en) | Power intensive network management system | |
CN107967524A (en) | A kind of equipment management system, management method and server-side | |
CN210405532U (en) | Engineering on-site monitoring system | |
CN105376790A (en) | Collection and assistance device for data maintained by outdoor communication facility and application method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |