CN109829693A - One kind being used for Construction Schedule management system and management method - Google Patents

One kind being used for Construction Schedule management system and management method Download PDF

Info

Publication number
CN109829693A
CN109829693A CN201910053572.9A CN201910053572A CN109829693A CN 109829693 A CN109829693 A CN 109829693A CN 201910053572 A CN201910053572 A CN 201910053572A CN 109829693 A CN109829693 A CN 109829693A
Authority
CN
China
Prior art keywords
information
construction
module
data
electrically connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910053572.9A
Other languages
Chinese (zh)
Inventor
陆佳炯
徐建萍
游平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhedong Construction Co Ltd
Original Assignee
Zhejiang Zhedong Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhedong Construction Co Ltd filed Critical Zhejiang Zhedong Construction Co Ltd
Priority to CN201910053572.9A priority Critical patent/CN109829693A/en
Publication of CN109829693A publication Critical patent/CN109829693A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to technical field of building construction, it is especially a kind of to be used for Construction Schedule management system, including controller, controller is electrically connected with information-storing device, controller is electrically connected with information acquisition module, information acquisition module is acquisition construction speed information, data import modul is to import construction speed information, information acquisition module is electrically connected with wireless receiving transmitting module, wireless receiving transmitting module is connect with information collecting device, carry out data acquisition, controller is electrically connected with progress control module, controller is electrically connected with threedimensional model generation module, threedimensional model generation module is the threedimensional model established according to the information of acquisition, it can intuitively know the progress of engineering, controller is electrically connected with information analysis module, information analysis module is electrically connected with picture recognition module.The invention also provides one kind to be used for Construction Schedule management method.The configuration of the present invention is simple is worthy to be popularized.

Description

One kind being used for Construction Schedule management system and management method
Technical field
The present invention relates to technical field of building construction, more particularly to one kind to be used for Construction Schedule management system.
Background technique
Currently, with industrialization, the quickening of urbanization process, the construction of building is had become the norm.People are paying close attention to The quality of building and the safety of construction are also focused more on while the scale and speed of construction.However, actual conditions are but not It is fully up to expectations.
Data management is that data are effectively collected, store, handle and answered using computer hardware and software technology Process.Its object is to substantially effectively play the effect of data.The key for realizing that data effectively manage is data organization. The inner link between data has been more fully described in the data structure established in Database Systems, convenient for data modification, more Newly with expansion, while the independence of data, reliable, safety and integrity ensure that, reduce data redundancy, therefore improve number According to degree of share and data management efficiency.
Currently, the calculating of projects amount generallys use the method manually calculated, generally by Project Technical personnel and commercial affairs Personnel substantially calculate project amount according to the information for including in construction drawing, and calculation method falls behind, and calculated result is coarse, cannot The particularity of current engineering is fully demonstrated, Management of engineering schedule relies primarily on administrative staff and carries out progress according to past construction experiences Planning and execution, the efficiency of management are low.
Summary of the invention
The purpose of the present invention is to solve existing in the prior art the low disadvantage of the efficiency of management, and the one kind proposed is used for Construction Schedule management system.
To achieve the goals above, present invention employs following technical solutions:
It designs one kind and is electrically connected with information for Construction Schedule management system, including controller, the controller Memory, the information-storing device are the storage received information of processor, and the controller is electrically connected with information collection Module, the information acquisition module are acquisition construction speed information, and the information acquisition module is electrically connected with data and imports mould Block, the data import modul are to import construction speed information, and the information acquisition module is electrically connected with wireless receiving transmitting Module, the wireless receiving transmitting module is connect with information collecting device, carries out data acquisition, and the controller is electrically connected There is progress control module, the progress control module is display Construction Schedule situation, and the controller is electrically connected with three Dimension module generation module, the threedimensional model generation module are the threedimensional models established according to the information of acquisition, can be intuitive Know the progress of engineering, the controller is electrically connected with information analysis module, and the information analysis module is the letter to acquisition Breath is handled and is classified, and the information analysis module is electrically connected with picture recognition module, and described image identification module is pair The image information of acquisition is handled.
Preferably, the controller is connected by conducting wire with external power supply.
Preferably, the data import modul is equipped with USB jack, and USB jack can be with grafting mobile hard disk, by storage Information imports in the processor, generates data form, and the data import modul passes through conducting wire link information input unit, institute Accessing system is needed when stating message input device input information, process is logined and needs by authorization and login key, into system After information can be manually entered by the message input device.
Preferably, the wireless receiving transmitting module is wireless receiving transmitter, the wireless receiving transmitting module and outer The information collecting device in portion is wirelessly connected, and by information collection to critical circuits control point and tracing control, is reached to engineering The purpose of progress control, while ensuring implementing for engineering objective, it is final to guarantee that engineering complete as scheduled.
Preferably, the progress control module includes security control unit, quality monitor unit, construction material unit and applies Work planning unit, the security control unit are the monitorings to construction safety environment, by camera and dust concentration detector, Camera monitor worker whether safe construction, the air quality of dust concentration detector test construction site, it is ensured that safe construction, The quality monitor unit is detected to the engineering of completion, is made detailed appraisal report to the result of detection and is signed, The construction material unit is the type, model and quantity for showing material in inventory, it is ensured that under instock construction material is enough The construction in one stage then needs to be replenished in time for material deficiency, avoids influencing to construct, includes in the construction plan unit Arrangement and method for construction and material purchases scheme, arrangement and method for construction is detailed to record the engineering completed in every period, and arrangement and method for construction is according to gas It waits and is set with the case where process work post, avoided the occurrence of by the case where forked working, setting scheme according to weather in a work surface Bad weather schedule delays can effectively be avoided.
The invention also provides one kind to be used for Construction Schedule management method, includes the following steps:
S1: by information acquisition module acquire construction plan, work progress, construction speed real time data, pass through Processor is passed to, through data analysis module to data processing, forms electronic data report, while each engineering project The mobile communication terminal connection management system of responsible person, reports the progress of project;
S2: system acquires project under construction progress by the camera and dust concentration detection device for being installed in each construction site And safe condition data;
S3: system carries out big data integration, analysis to data collected, forms data analytical statement, and generate three-dimensional Simulation drawing;
S4: system is compared according to the information of acquisition with plans, and whether detection construction exceeds the date.
Proposed by the present invention a kind of for Construction Schedule management system, beneficial effect is: the present invention passes through acquisition Acquisition of the module to information, processor handle these data, are analyzed, to find key from the data of these redundancies Data establish threedimensional model, reinforce construction information system management technology, improve construction production efficiency, increase economic efficiency.
Detailed description of the invention
Fig. 1 is a kind of system block diagram for Construction Schedule management system proposed by the present invention;
Fig. 2 is the system block diagram of progress control module in the present invention.
In figure: controller 1, information-storing device 2, information acquisition module 3, data import modul 4, wireless receiving transmitting module 5, progress control module 6, threedimensional model generation module 7, information analysis module 8, picture recognition module 9, security control unit 61, Quality monitor unit 62, construction material unit 63, construction plan unit 64.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Referring to Fig.1-2, a kind of to be used for Construction Schedule management system, including controller 1, controller 1 by conducting wire with External power supply is connected, and controller 1 is electrically connected with information-storing device 2, and information-storing device 2 is the received information of storage processor 1, Controller 1 is electrically connected with information acquisition module 3, and information acquisition module 3 is acquisition construction speed information, information acquisition module 3 It is electrically connected with data import modul 4, data import modul 4 is to import construction speed information, and data import modul 4 is equipped with The information of storage can be imported in processor 1 with grafting mobile hard disk, generate data form, data are led by USB jack, USB jack Enter module 4 by conducting wire link information input unit, message input device needs accessing system when inputting information, and logining process needs Will by authorization and login key, into system after information can be manually entered by message input device.
Information acquisition module 3 is electrically connected with wireless receiving transmitting module 5, and wireless receiving transmitting module 5 is adopted with information Collect equipment connection, carry out data acquisition, wireless receiving transmitting module 5 is wireless receiving transmitter 5, wireless receiving transmitting module 5 It is wirelessly connected with external information collecting device, by information collection to critical circuits control point and tracing control, reaches pair The purpose of Management of engineering schedule, while ensuring implementing for engineering objective, final to guarantee that engineering complete as scheduled, 1 electricity of controller Property be connected with progress control module 6, progress control module 6 is display Construction Schedule situation.
Progress control module 6 includes security control unit 61, quality monitor unit 62, construction material unit 63 and construction meter Unit 64 is drawn, security control unit 61 is the monitoring to construction safety environment, passes through camera and dust concentration detector, camera shooting Head monitoring worker whether safe construction, the air quality of dust concentration detector test construction site, it is ensured that safe construction, quality Monitoring unit 62 is detected to the engineering of completion, is made detailed appraisal report to the result of detection and is signed, material of constructing Material unit 63 is the type, model and quantity for showing material in inventory, it is ensured that instock construction material enough next stages Construction, then needs to be replenished in time for material deficiency, avoids influencing to construct, include in construction plan unit 64 arrangement and method for construction and Material purchases scheme, arrangement and method for construction is detailed to record the engineering completed in every period, and arrangement and method for construction is according to weather and process work The case where kind, sets, and avoids the occurrence of by the way that the case where forked working, setting scheme according to weather can effectively be kept away in a work surface Exempt from bad weather schedule delays.
Controller 1 is electrically connected with threedimensional model generation module 7, and threedimensional model generation module 7 is the information according to acquisition The threedimensional model of foundation, can intuitively know the progress of engineering, and controller 1 is electrically connected with information analysis module 8, information point Analysing module 8 is that the information of acquisition is handled and classified, and information analysis module 8 is electrically connected with picture recognition module 9, image Identification module 9 is handled the image information of acquisition.
The invention also provides one kind to be used for Construction Schedule management method, includes the following steps:
S1: by information acquisition module acquire construction plan, work progress, construction speed real time data, pass through Processor is passed to, through data analysis module to data processing, forms electronic data report, while each engineering project The mobile communication terminal connection management system of responsible person, reports the progress of project;
S2: system acquires project under construction progress by the camera and dust concentration detection device for being installed in each construction site And safe condition data;
S3: system carries out big data integration, analysis to data collected, forms data analytical statement, and generate three-dimensional Simulation drawing;
S4: system is compared according to the information of acquisition with plans, and whether detection construction exceeds the date.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (6)

1. one kind is used for Construction Schedule management system, including controller (1), which is characterized in that the controller (1) is electrically It is connected with information-storing device (2), the information-storing device (2) is the storage received information of the processor (1), the controller (1) it is electrically connected with information acquisition module (3), the information acquisition module (3) is acquisition construction speed information, and the information is adopted Collection module (3) is electrically connected with data import modul (4), and the data import modul (4) is to import construction speed information, described Information acquisition module (3) is electrically connected with wireless receiving transmitting module (5), and the wireless receiving transmitting module (5) is and information Equipment connection is acquired, data acquisition is carried out, the controller (1) is electrically connected with progress control module (6), the progress control Module (6) is display Construction Schedule situation, and the controller (1) is electrically connected with threedimensional model generation module (7), described Threedimensional model generation module (7) is the threedimensional model established according to the information of acquisition, can intuitively know the progress of engineering, institute It states controller (1) to be electrically connected with information analysis module (8), the information analysis module (8) is at the information to acquisition Reason and classification, the information analysis module (8) are electrically connected with picture recognition module (9), and described image identification module (9) is pair The image information of acquisition is handled.
2. according to claim 1 a kind of for Construction Schedule management system, which is characterized in that the controller (1) it is connected by conducting wire with external power supply.
3. according to claim 1 a kind of for Construction Schedule management system, which is characterized in that the data import Module (4) is equipped with USB jack, and USB jack can be imported the information of storage in the processor (1) with grafting mobile hard disk, Data form is generated, the data import modul (4) passes through conducting wire link information input unit, the message input device input Accessing system is needed when information, login process need by authorization and login key, into system after can pass through the information Input unit is manually entered information.
4. according to claim 1 a kind of for Construction Schedule management system, which is characterized in that the wireless receiving Transmitting module (5) be wireless receiving transmitter (5), the wireless receiving transmitting module (5) and external information collecting device without Line connection is achieved the purpose that Management of engineering schedule, simultaneously by information collection to critical circuits control point and tracing control Ensure implementing for engineering objective, it is final to guarantee that engineering complete as scheduled.
5. according to claim 1 a kind of for Construction Schedule management system, which is characterized in that the progress control Module (6) includes security control unit (61), quality monitor unit (62), construction material unit (63) and construction plan unit (64), the security control unit (61) is that the monitoring to construction safety environment is taken the photograph by camera and dust concentration detector As head monitoring worker whether safe construction, the air quality of dust concentration detector test construction site, it is ensured that safe construction, institute Stating quality monitor unit (62) is detected to the engineering of completion, is made detailed appraisal report to the result of detection and is signed Name, the construction material unit (63) is the type, model and quantity for showing material in inventory, it is ensured that instock construction material The construction of enough next stages, then needs to be replenished in time for material deficiency, avoids influencing to construct, the construction plan unit It (64) include arrangement and method for construction and material purchases scheme in, arrangement and method for construction is detailed to record the engineering completed in every period, applies Work scheme is set according to the case where weather and process work post, is avoided the occurrence of by a work surface the case where forked working, according to Weather setting scheme can effectively avoid bad weather schedule delays.
6. a kind of be used for Construction Schedule management method according to claim 1 described in -5, which is characterized in that including walking as follows It is rapid:
S1: by information acquisition module acquire construction plan, work progress, construction speed real time data, by wireless Processor is passed to, through data analysis module to data processing, forms electronic data report, while each engineering project is responsible for The mobile communication terminal connection management system of people, reports the progress of project;
S2: system acquires project under construction progress and peace by the camera and dust concentration detection device for being installed in each construction site Full status data;
S3: system carries out big data integration, analysis to data collected, forms data analytical statement, and generate three-dimensional simulation Figure;
S4: system is compared according to the information of acquisition with plans, and whether detection construction exceeds the date.
CN201910053572.9A 2019-01-21 2019-01-21 One kind being used for Construction Schedule management system and management method Pending CN109829693A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910053572.9A CN109829693A (en) 2019-01-21 2019-01-21 One kind being used for Construction Schedule management system and management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910053572.9A CN109829693A (en) 2019-01-21 2019-01-21 One kind being used for Construction Schedule management system and management method

Publications (1)

Publication Number Publication Date
CN109829693A true CN109829693A (en) 2019-05-31

Family

ID=66860440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910053572.9A Pending CN109829693A (en) 2019-01-21 2019-01-21 One kind being used for Construction Schedule management system and management method

Country Status (1)

Country Link
CN (1) CN109829693A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110210771A (en) * 2019-06-06 2019-09-06 重庆建工第九建设有限公司 A kind of construction information management system and technique based on Building Information Model
CN111754081A (en) * 2020-05-29 2020-10-09 深圳瑞捷工程咨询股份有限公司 Engineering entity quality data management system and method
CN112132543A (en) * 2020-09-25 2020-12-25 广西路桥工程集团有限公司 Engineering project progress management system
CN113506038A (en) * 2021-07-30 2021-10-15 高晓斌 Construction management system and method
CN113793079A (en) * 2021-11-18 2021-12-14 捷宏润安工程顾问有限公司 Engineering cost project management system and method based on big data
CN114943494A (en) * 2022-07-26 2022-08-26 如皋市规划建筑设计院有限公司 Building design progress supervisory systems based on BIM technique

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106897817A (en) * 2017-01-22 2017-06-27 朗坤智慧科技股份有限公司 A kind of construction speed Visualized management system and method based on augmented reality
CN106920049A (en) * 2017-03-28 2017-07-04 内蒙古科技大学 A kind of Project Management System platform based on BIM network technologies
CN107679310A (en) * 2017-09-26 2018-02-09 华北电力大学 The real-time progress 3 D stereo methods of exhibiting of engineering based on BIM and image congruencing technology

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106897817A (en) * 2017-01-22 2017-06-27 朗坤智慧科技股份有限公司 A kind of construction speed Visualized management system and method based on augmented reality
CN106920049A (en) * 2017-03-28 2017-07-04 内蒙古科技大学 A kind of Project Management System platform based on BIM network technologies
CN107679310A (en) * 2017-09-26 2018-02-09 华北电力大学 The real-time progress 3 D stereo methods of exhibiting of engineering based on BIM and image congruencing technology

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
宋文博等: ""BIM技术在建设施工项目中的应用研究"", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *
王怀栋: "工程延期与工程延误", 《建设监理》 *
赵琰韶等: "海阳核电常规岛及BOP工程施工计划过程管理研究", 《工程建设与设计》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110210771A (en) * 2019-06-06 2019-09-06 重庆建工第九建设有限公司 A kind of construction information management system and technique based on Building Information Model
CN110210771B (en) * 2019-06-06 2023-02-03 重庆建工第九建设有限公司 Construction data management system and method based on building information model
CN111754081A (en) * 2020-05-29 2020-10-09 深圳瑞捷工程咨询股份有限公司 Engineering entity quality data management system and method
CN112132543A (en) * 2020-09-25 2020-12-25 广西路桥工程集团有限公司 Engineering project progress management system
CN113506038A (en) * 2021-07-30 2021-10-15 高晓斌 Construction management system and method
CN113793079A (en) * 2021-11-18 2021-12-14 捷宏润安工程顾问有限公司 Engineering cost project management system and method based on big data
CN114943494A (en) * 2022-07-26 2022-08-26 如皋市规划建筑设计院有限公司 Building design progress supervisory systems based on BIM technique

Similar Documents

Publication Publication Date Title
CN109829693A (en) One kind being used for Construction Schedule management system and management method
CN110287859A (en) A kind of personnel's material dispatching system based on artificial intelligence technology
CN104167818B (en) Intelligent remote inspection system in linkage with GIS substation integrated automation system and method
CN103200051A (en) Intelligent substation message simulation testing and association message analysis system and method
CN211509189U (en) Electric power operation field supervision equipment and system
CN108596148A (en) A kind of construction worker's labour state analysis system based on computer vision and method
CN112769908A (en) Cooperative control method and device and electronic equipment
CN109117526A (en) One kind being suitable for mechanical system maintenance of equipment and guides data record and analysis system
CN114548912A (en) Whole-process tracking method and system for building engineering project management
CN114827221A (en) Intelligent community comprehensive intelligent analysis and early warning system and method
CN115393566A (en) Fault identification and early warning method and device for power equipment, storage medium and equipment
CN113807240A (en) Intelligent transformer substation personnel dressing monitoring method based on uncooperative face recognition
CN113922502B (en) Intelligent video operation and maintenance management system and management method
CN111131482A (en) Intelligent monitoring closed-loop operation and maintenance system based on BIM three-terminal synchronous equipment
CN213457742U (en) Welding operation monitoring system
CN107693997A (en) A kind of fire-fighting equipment detection and maintaining management system and management method
CN117171694B (en) Distribution scene safety identification system based on AI technology
CN108776453B (en) Building safety monitoring system based on computer
CN116665419B (en) Intelligent fault early warning system and method based on AI analysis in power production operation
CN112348306A (en) TitanOS artificial intelligence development method and device for power distribution operation inspection
CN111510685A (en) Information output method and device based on three-dimensional model
CN210038807U (en) Intelligent management system of cigarette workshop
KR20230056006A (en) Apparatus for artificial intelligence based safety diagnosis through 3d model and method thereof
CN116523492A (en) Hydropower station supervision method and system, electronic equipment and storage medium
CN115481941A (en) Multifunctional area combined intelligent security management method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190531