CN113510838B - Construction method of prefabricated pavement slab for fabricated pavement - Google Patents

Construction method of prefabricated pavement slab for fabricated pavement Download PDF

Info

Publication number
CN113510838B
CN113510838B CN202110730056.2A CN202110730056A CN113510838B CN 113510838 B CN113510838 B CN 113510838B CN 202110730056 A CN202110730056 A CN 202110730056A CN 113510838 B CN113510838 B CN 113510838B
Authority
CN
China
Prior art keywords
pouring
lifting
panel
plate
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110730056.2A
Other languages
Chinese (zh)
Other versions
CN113510838A (en
Inventor
吴建明
辛军
宋大伟
李恩亮
施军
樊越
何镛奎
赵修一
雷健
谢佳骏
李旭鹏
马明军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Jiaojian Municipal Engineering Co ltd
Original Assignee
Xinjiang Jiaojian Municipal Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Jiaojian Municipal Engineering Co ltd filed Critical Xinjiang Jiaojian Municipal Engineering Co ltd
Priority to CN202110730056.2A priority Critical patent/CN113510838B/en
Publication of CN113510838A publication Critical patent/CN113510838A/en
Application granted granted Critical
Publication of CN113510838B publication Critical patent/CN113510838B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/24Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
    • B28B11/245Curing concrete articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/02Feeding the unshaped material to moulds or apparatus for producing shaped articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/04Discharging the shaped articles
    • B28B13/06Removing the shaped articles from moulds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels

Abstract

The invention discloses a construction method of an assembled pavement prefabricated road board, which can not only enable better association between road boards and enhance the load transfer capability of seams between the road boards, but also can more effectively ensure the integrity of the prefabricated road board; and the lifting device is arranged, so that the lifting operation can be completed more efficiently. The method comprises the following steps: s1, preparing a pouring base, a pouring frame and a lifting device, wherein a pouring panel is arranged at the upper end of the pouring base, the lower end of the pouring frame is installed on the pouring panel, the lifting device comprises a lifting plate and a lifting block, the lifting plate is spliced with the pouring panel, the pouring base, the pouring panel and the lifting plate enclose a pouring space, the lifting block is fixed at the upper end of the lifting plate, an internal thread hole is vertically formed in the lifting block, and the internal thread hole is sealed through a bolt; s2, pouring concrete in the pouring space; and S3, turning over the prefabricated road plate after the prefabricated road plate is taken down, taking down the bolt from the lifting block, screwing the hanging ring to the lifting block, and lifting the hanging ring to complete the subsequent paving operation.

Description

Construction method of prefabricated pavement slab for fabricated pavement
Technical Field
The invention relates to the technical field of prefabricated roads, in particular to a construction method of a prefabricated road board of an assembled pavement.
Background
With the development of socio-economic, the traffic volume is larger and larger, and the requirements on a traffic network are higher and higher. Particularly in economically developed areas, the requirements on the speed of road construction and maintenance are very high, and the road construction is closely related to economic development. The prefabricated road boards are utilized on the assembled road surface, and the assembled road surface is installed on site, so that a new idea of a road structure form is provided, and the construction and repair work of a road is completed quickly.
The existing prefabricated road plate has several problems, firstly, an assembled road surface structure for laying temporary road surfaces is provided with lifting hooks on a road surface plate for convenient hoisting, and in order not to influence a travelling crane, the upper surface of the rectangular road surface plate is generally provided with four grooves, the lifting hooks are arranged in the grooves to complete hoisting, and the inclination of the lifting hooks is easy to occur in the pre-buried process.
In addition, the existing prefabricated road slab is poured through a formwork and is finished, the prefabricated road slab is lifted after being demolded, however, in the lifting process, two adjacent road slabs are not connected together, in the using process, the gap between the two adjacent road slabs is easily caused to be overlarge, in addition, in the lifting process, the edge knocking and foot dropping are easily generated, the damage of the prefabricated road slabs is even caused in the demolded maintenance process, the integrity of the road after the prefabricated road slab is built is insufficient, and the road is easy to damage.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provides a construction method of an assembled pavement prefabricated road board, the manufactured prefabricated road board not only can enable the road boards to have better correlation, enhance the load transfer capability of seams between the road boards, but also can more effectively ensure the integrity of the prefabricated road board; and the lifting device is arranged, so that the lifting operation can be completed more efficiently.
The purpose of the invention is realized as follows:
a construction method of an assembly type pavement precast road plate,
s1, pouring preparation
Preparing a pouring base, a pouring frame and a lifting device, wherein a pouring panel is arranged at the upper end of the pouring base, the lower end of the pouring frame is arranged on the pouring panel, the lifting device comprises a lifting plate and a lifting block, the lifting plate is spliced with the pouring panel, the pouring base, the pouring panel and the lifting plate enclose a pouring space, the lifting block is welded and fixed at the upper end of the lifting plate, an internal thread hole is vertically formed in the lifting block, the internal thread hole is sealed through a bolt, and a nut of the bolt is abduced through a through hole in the lifting plate;
s2, pouring process
Pouring concrete in the pouring space, taking down the poured prefabricated road plate by using a clamp after concrete curing is finished, separating the pouring base and the pouring panel from the prefabricated road plate, and forming the pouring frame and the prefabricated road plate into a whole;
s3, paving process
And turning over the prefabricated road plate after the prefabricated road plate is taken down to enable the lifting plate and the bolts to be upward, cleaning the plane, taking down the bolts from the lifting blocks during paving, screwing the hanging rings onto the lifting blocks, and lifting the hanging rings to complete subsequent paving operation.
Preferably, the cast panel is a slab or a ribbed panel.
Preferably, the lower end of the pouring frame is provided with a bend, the pouring panel is provided with a clamping groove which is correspondingly bent, the bend clamp of the pouring frame is sleeved on the clamping groove of the pouring panel for positioning, and after the lifting plate is spliced with the pouring panel, the bottom of the pouring frame are bent, and the lifting plate are spliced to form a closed plane;
the side part of the pouring base is uniformly provided with a plurality of pressing devices, and the pouring frame is pressed and fixed on the pouring panel by using the pressing devices.
Preferably, the pressing device comprises a '21274', rotatably assembled and disassembled installation block fixed on the side part of the pouring base, a threaded pressing rod is arranged at the upper end of the installation block, and the lower end of the threaded pressing rod presses and fixes the pouring frame on the pouring panel by screwing the threaded pressing rod.
Preferably, in step S1, the nut of the bolt is flush with the lower surface of the lifting plate.
Preferably, connecting steel bars are pre-embedded in the pouring frame, so that the pouring frame and the prefabricated road board are integrated into a whole.
Due to the adoption of the technical scheme, the prefabricated road plate structure manufactured by the invention is smoother due to the regular appearance of the pouring frame, better connection and narrower gaps can be formed among roads, prefabricated road plates and between adjacent prefabricated road plates, collision and damage can not occur between adjacent prefabricated road plates due to the protection of the pouring frame, and the integrity of the prefabricated road plates can be effectively ensured; and the lifting device is arranged, so that the lifting operation can be completed more efficiently.
Drawings
FIG. 1 is an assembly diagram of a pouring base and a pouring frame;
FIG. 2 is an enlarged partial schematic view of FIG. 1;
FIG. 3 is a schematic top view of FIG. 1;
fig. 4 and 5 are schematic structural views (after being turned over) of the hoisting device.
Detailed Description
Referring to fig. 1 to 5, a construction method of an assembled pavement prefabricated road slab comprises the following steps:
the setting is pour the frame, pours the closed frame that the frame was enclosed for the board of thin wall and transversal personally submitting "L" type, and the frame can enclose into required shape's cuboid, cube, shapes such as hexagonal prism, specifically can be according to the required panel in road surface and decide (with the cuboid as leading, the prefabricated road panel later stage that the cuboid was pour and is formed is laid more in a flexible way).
The method comprises the following steps of arranging a pouring base, arranging a pouring panel on the pouring base, wherein the pouring panel is a plane or is provided with a panel with patterns, the pattern of the panel with the patterns can be printed out, and the shape of the pouring panel corresponds to the bottom outline of a bending edge of a pouring frame. The pouring frame can be clamped to the pouring panel in a sleeved mode, a lifting device is arranged on the narrow bent edge of the pouring frame and comprises a lifting plate and a lifting block, an inner threaded hole is formed in the lifting block, a through hole is formed in the lifting plate and can penetrate through a bolt matched with the lifting block, the bolt can be set to be an inner hexagon bolt or a common bolt, and the end portion of the bolt is flush with the plane of the lifting plate. The pouring panel is provided with a position space matched with the plane of the lifting plate, the lifting plate and the pouring panel can be guaranteed, and the narrow bending edge of the pouring frame is flush with the matching level of the pouring panel. And embedding connecting steel bars in the pouring frame. Be equipped with closing device on pouring the base, be used for compressing tightly when pouring the frame. The pressing device comprises a '21274', rotatably assembled and disassembled installation block fixed on the side part of the pouring base, a threaded pressing rod is arranged at the upper end of the installation block, and the lower end of the threaded pressing rod presses and fixes the pouring frame on the pouring panel by screwing the threaded pressing rod.
Pouring: after the pouring base is placed, the narrow bending edge of the pouring frame is matched with the pouring panel in a clamping sleeve mode, the pouring panel, the bending edge of the bottom of the pouring frame and the lifting plate form a closed plane, the pouring frame is tightly pressed by using a pressing device, the pouring frame is tightly attached to the base, concrete pouring is carried out in the space formed by the pouring frame and the pouring base, and after concrete curing is finished, the pouring forming panel can be taken down by using a clamp.
The use and paving process comprises the following steps: the panel takes off the back, can overturn, when mating formation, after the clearance plane, takes off the bolt from hoisting accessory, revolves rings to lifting plate on, lifts by crane rings alright accomplish the follow-up operation of mating formation.
The overall assembly mode of the pouring frame and the pouring base is as shown in fig. 1-3, the pouring frame and the pouring base are assembled and installed in the mode shown in fig. 1-3 before pouring (fig. 1-3 are modes of a typical cuboid prefabricated road plate, other modes can be supplemented), the embedded part of reinforcing steel bars is omitted in fig. 1-3, the reinforcing steel bars are connected with the pouring frame in a conventional pre-installation mode, a protective layer is reserved at the bottom, and pouring is carried out after the embedded installation is finished.
The patent has the following innovation points:
(1) The innovation of the prefabricating method is that a frame is enclosed by thin-wall L-shaped plates, and the effect of the frame is the same as that of a traditional prefabricated formwork, so that concrete can be poured into a designed shape. After the pouring is finished, the frame and the concrete are integrated, the integrity of the prefabricated road plate is better protected, and the load transfer capability of seams between plates can be enhanced.
(2) According to a new method, a set of complete device is provided, the pouring panel on the pouring base is matched with the pouring frame to complete pouring, the pouring base is reusable, and when prefabricating, the pouring panel is matched with the pouring frame to process the pouring frame according to requirements.
(3) The hoisting device arranged on the pouring frame is composed of a hoisting plate, a hoisting block and a bolt as shown in fig. 4, and the integral structure is simple, but the integral hoisting function can be achieved. When pouring, the hoisting device is partially embedded into the prefabricated road plate, the assembly and disassembly are flexible, the bolts are detached, and hoisting can be carried out by utilizing the hoisting rings to complete subsequent pavement.
In addition, as shown in fig. 5, the lifting device can also adopt another structure, the lifting plate and the lifting block are welded through the auxiliary plate, and the part of the bolt extending out of the lifting block is packaged through the plugging plate, so that the bolt can be conveniently taken down in the later period.
Finally, it is noted that the above-mentioned preferred embodiments illustrate rather than limit the invention, and that, although the invention has been described in detail with reference to the above-mentioned preferred embodiments, it will be understood by those skilled in the art that various changes in form and detail may be made therein without departing from the scope of the invention as defined by the appended claims.

Claims (5)

1. A construction method of an assembled pavement prefabricated road plate is characterized by comprising the following steps:
s1, pouring preparation
Preparing a pouring base, a pouring frame and a lifting device, wherein the upper end of the pouring base is provided with a pouring panel, the lower end of the pouring frame is installed on the pouring panel, the lifting device comprises a lifting plate and a lifting block, the lifting plate is spliced with the pouring panel, the pouring base, the pouring panel and the lifting plate enclose a pouring space, the lifting block is welded and fixed to the upper end of the lifting plate, an internal thread hole is vertically formed in the lifting block, the internal thread hole is sealed through a bolt, and a through hole is formed in the lifting plate to enable a nut of the bolt to move away;
the lower end of the pouring frame is provided with a bend, the pouring panel is provided with a clamping groove which is correspondingly bent, the bending clamping sleeve of the pouring frame is sleeved on the clamping groove of the pouring panel for positioning, and after the lifting plate is spliced with the pouring panel, the bottom of the pouring frame are bent, and the lifting plate are spliced to form a closed plane;
a plurality of pressing devices are uniformly arranged on the side part of the pouring base, and the pouring frame is pressed and fixed on the pouring panel by using the pressing devices;
s2, pouring process
Pouring concrete in the pouring space, taking down the poured prefabricated road plate by using a clamp after concrete curing is finished, separating the pouring base and the pouring panel from the prefabricated road plate, and forming the pouring frame and the prefabricated road plate into a whole;
s3, paving process
And turning over the prefabricated road plate after the prefabricated road plate is taken down to enable the lifting plate and the bolts to be upward, cleaning the plane, taking down the bolts from the lifting blocks during paving, screwing the hanging rings onto the lifting blocks, and lifting the hanging rings to complete subsequent paving operation.
2. The construction method of the fabricated pavement precast road slab according to claim 1, characterized in that: the pouring panel is a flat plate or a panel with patterns.
3. The construction method of the fabricated pavement precast road slab according to claim 1, wherein: the pressing device comprises a '21274', a mounting block which is rotatably assembled and disassembled and is fixed on the side part of the pouring base, a threaded pressing rod is arranged at the upper end of the mounting block, and the lower end of the threaded pressing rod presses and fixes the pouring frame on the pouring panel by screwing the threaded pressing rod.
4. The construction method of the fabricated pavement precast road slab according to claim 1, characterized in that: in step S1, the nut of the bolt is flush with the lower surface of the lifting plate.
5. The construction method of the fabricated pavement precast road slab according to claim 1, wherein: connecting steel bars are pre-embedded in the pouring frame, so that the pouring frame and the prefabricated road board are integrated into a whole.
CN202110730056.2A 2021-06-29 2021-06-29 Construction method of prefabricated pavement slab for fabricated pavement Active CN113510838B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110730056.2A CN113510838B (en) 2021-06-29 2021-06-29 Construction method of prefabricated pavement slab for fabricated pavement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110730056.2A CN113510838B (en) 2021-06-29 2021-06-29 Construction method of prefabricated pavement slab for fabricated pavement

Publications (2)

Publication Number Publication Date
CN113510838A CN113510838A (en) 2021-10-19
CN113510838B true CN113510838B (en) 2022-12-13

Family

ID=78066392

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110730056.2A Active CN113510838B (en) 2021-06-29 2021-06-29 Construction method of prefabricated pavement slab for fabricated pavement

Country Status (1)

Country Link
CN (1) CN113510838B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1172124A (en) * 1966-07-11 1969-11-26 Hubert Henri Beaupere Rotary Mould
DE2421985A1 (en) * 1974-05-07 1975-11-20 Mannesmann Leichtbau Gmbh Orificed concrete slab maing appts - tapered plug forced out after casting by rotating flanged screw
JP2005262541A (en) * 2004-03-17 2005-09-29 Kyoji Takami Form support device of fixture for forming connection hole and hoisting reversing hole
CN207578675U (en) * 2017-11-27 2018-07-06 吴维祥 A kind of Full-automatic cement pours turn ingot stripper
CN210389590U (en) * 2019-03-27 2020-04-24 宣城市政建设集团有限公司 Prefabricated stand convenient to installation and preparation mould thereof
CN212218844U (en) * 2019-10-30 2020-12-25 中铁四局集团第四工程有限公司 Quick demoulding pre-embedding device

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB818084A (en) * 1955-05-25 1959-08-12 Corning Glass Works Ejecting articles from moulding presses
JP4985328B2 (en) * 2007-11-05 2012-07-25 積水ハウス株式会社 Method for demolding concrete panel and automatic demolding apparatus
CN105563640A (en) * 2015-12-30 2016-05-11 江海燕 Manufacturing process for environment-friendly construction modularization tool type temporary road plate block
CN105603843A (en) * 2015-12-30 2016-05-25 中国建筑第二工程局有限公司 Assembled reinforced concrete prefabricated pavement slab and construction method thereof
CN107571389B (en) * 2017-09-21 2023-06-09 安徽建工建筑工业有限公司 Detachable and reusable wallboard hanging device
CN107989069A (en) * 2017-12-28 2018-05-04 中铁十局集团第五工程有限公司 Pre-embedded bolt, the pre-buried prefabricated piping lane and method for prefabricating for hanging nail
CN208052238U (en) * 2018-03-10 2018-11-06 山东高速轨道设备材料有限公司 A kind of swing hold-down mechanism for during demolding of track slab
CN109295827A (en) * 2018-11-14 2019-02-01 中国建筑第八工程局有限公司 Removable existing pouring type concrete road surface and method of construction
CN110103326A (en) * 2019-05-29 2019-08-09 安徽建工建筑工业有限公司 A kind of prefabricated panel pylon preformed hole and device for hoisting
CN211440457U (en) * 2019-12-25 2020-09-08 上海徽锋人防工程设备有限公司 Concrete civil air defense door pouring bottom plate platform

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1172124A (en) * 1966-07-11 1969-11-26 Hubert Henri Beaupere Rotary Mould
DE2421985A1 (en) * 1974-05-07 1975-11-20 Mannesmann Leichtbau Gmbh Orificed concrete slab maing appts - tapered plug forced out after casting by rotating flanged screw
JP2005262541A (en) * 2004-03-17 2005-09-29 Kyoji Takami Form support device of fixture for forming connection hole and hoisting reversing hole
CN207578675U (en) * 2017-11-27 2018-07-06 吴维祥 A kind of Full-automatic cement pours turn ingot stripper
CN210389590U (en) * 2019-03-27 2020-04-24 宣城市政建设集团有限公司 Prefabricated stand convenient to installation and preparation mould thereof
CN212218844U (en) * 2019-10-30 2020-12-25 中铁四局集团第四工程有限公司 Quick demoulding pre-embedding device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
某工程装配式混凝土叠合板施工分析;张党生;《福建建筑》;20190501(第05期);全文 *

Also Published As

Publication number Publication date
CN113510838A (en) 2021-10-19

Similar Documents

Publication Publication Date Title
CN111021254B (en) Bridge structure capable of improving construction efficiency and construction method thereof
CN110409244B (en) Composite bearing prefabricated road slab and prefabricated pavement construction method
KR100777153B1 (en) Construction method of boundary stone
CN213417462U (en) Novel assembled road
CN113510838B (en) Construction method of prefabricated pavement slab for fabricated pavement
KR20090002212U (en) A Manhole mold device
CN111441239B (en) Prefabricated cover beam prestress deep-buried anchor sleeve and installation process thereof
CN212897576U (en) Template is pour to assembled building leak protection thick liquid crossbeam
CN209854513U (en) Town road curb mounting structure and construction equipment
CN209989660U (en) Interim ground facility
JPH0611980B2 (en) Construction method of revetment using natural stone
JP2618800B2 (en) How to lay concrete blocks
KR200405459Y1 (en) Iron mould
JPH07259048A (en) Concrete block for revetment
KR100953962B1 (en) Floating construction apparatus for boundary stone
CN220598022U (en) Prefabricated integral sidewalk module and die thereof
CN219410557U (en) Cast-in-situ template structure of bridge sidewalk
JP4029058B2 (en) Construction method of approach part of multilevel intersection road
CN217479867U (en) Hoisting structure of fabricated concrete slab
CN212771807U (en) Integrated grid
CN219671076U (en) Longitudinal wet seam connection structure for staggered spliced wide bridge structure
CN218090345U (en) Prefabricated assembled pavement slab
CN219930606U (en) Precast concrete pavement
CN215718838U (en) Bury formula waterstop fixing device in two lining ends in tunnel
JPH0820915A (en) Precast floor slab

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant