JPH0611980B2 - Construction method of revetment using natural stone - Google Patents

Construction method of revetment using natural stone

Info

Publication number
JPH0611980B2
JPH0611980B2 JP62237467A JP23746787A JPH0611980B2 JP H0611980 B2 JPH0611980 B2 JP H0611980B2 JP 62237467 A JP62237467 A JP 62237467A JP 23746787 A JP23746787 A JP 23746787A JP H0611980 B2 JPH0611980 B2 JP H0611980B2
Authority
JP
Japan
Prior art keywords
concrete
block
revetment
natural
blocks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP62237467A
Other languages
Japanese (ja)
Other versions
JPS6480611A (en
Inventor
満州美 川瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP62237467A priority Critical patent/JPH0611980B2/en
Publication of JPS6480611A publication Critical patent/JPS6480611A/en
Publication of JPH0611980B2 publication Critical patent/JPH0611980B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】 《産業上の利用分野》 この発明は、自然石を護岸の法面に敷き並べる護岸の施
工方法の改良に関する。
[Detailed Description of the Invention] << Industrial application field >> The present invention relates to an improvement in a construction method of a revetment in which natural stones are laid on a slope of a revetment.

《従来の技術》 自然石を用いた親水護岸の施工方法としては、従来から
護岸の法面に捨てコンクリートの打設を含む基礎工を施
した後、玉石、砕石、半割玉石などの比較的大形の自然
石を敷き並べ、その後コンクリートを打設して前記自然
石の頂部の一部を露出した状態で法面の築造を完成する
ようにしている。
《Conventional technology》 As a construction method of hydrophilic revetment using natural stone, after performing basic work including placing concrete on the slope of the revetment, it has been relatively common to use cobbles, crushed stones, and half cobblestones. Large natural stones are laid side by side and then concrete is poured to complete the construction of the slope with a part of the top of the natural stone exposed.

しかしながら、この工法では以下の問題点があった。However, this method has the following problems.

《発明が解決しようとする問題点》 すなわち、この工法では斜面上での自然石の敷き並べ作
業となるので、比較的勾配が急な場所では、クレーンに
よる石の吊込み作業からコンクリート打設作業に至るま
での間に前記自然石の座りが不安定であり、作業員の安
全性確保に問題があった。
<Problems to be solved by the invention> In other words, since this method involves laying natural stones on slopes, in a place where the slope is relatively steep, stone lifting work using a crane to concrete placing work During this period, the sitting of the natural stone was unstable, and there was a problem in ensuring the safety of workers.

また、近年需要が高まりつつある親水護岸では特に視覚
的な見栄え効果を配慮する必要があるが、前記のごとく
自然石は大きさや形状が不揃いであり、これらのことを
配慮せずに不揃いのまま敷き並べたままでは、仕上り状
態の見栄えが低下する。逆に大きさや形状を揃えながら
配列しようとすると、これらの作業全般に亘り現場作業
者の熟練と感に頼り、工期も遅れがちとなっていた。
In addition, it is necessary to pay particular attention to the visual appearance effect of hydrophilic revetments, which have been in increasing demand in recent years, but as mentioned above, natural stones are not uniform in size and shape. If they are laid side by side, the appearance of the finished product will deteriorate. On the contrary, if the size and shape are to be arranged while being arranged, the work period tends to be delayed due to the skill and feeling of the site workers throughout the work.

さらに、河川では雨季や乾季で水位が異なり、水位の低
い時期に集中して工事を行わなければならないが、工期
が長くなると、仮設工事についやされる費用にも大きく
影響を及ぼす結果にもつながり兼ねなかった。
Furthermore, in rivers, the water level differs in the rainy season and the dry season, and construction work must be concentrated during periods when the water level is low. I could not do it.

ところで、この種の自然石を敷き並べる工法に替わる工
法としては、適度な大きさのプレキャストコンクリート
製のタイルブロックを敷き並べる工法もある。
By the way, as an alternative to the method of laying natural stones of this kind, there is also a method of laying tile blocks made of precast concrete of appropriate size.

この工法では規格化された平板状のタイルブロックを敷
き並べるだけで良いので、作業員の熟練を要することが
なく、工期が短縮でき、仕上りも均一であり、しかも設
置作業時の座りも良好であるため、作業員の安全性確保
の上からも好適である。
With this method, it is only necessary to lay out standardized flat tile blocks, so it does not require the skill of the worker, the construction period can be shortened, the finish is uniform, and the seating during installation work is also good. Therefore, it is preferable from the viewpoint of ensuring the safety of workers.

しかし、このタイルブロックは単位体積当りの重量が自
然石を用いた場合よりも軽く、法面に対する鎮圧効果が
少なく、重量を自然石並みに確保しようとするとタイル
ブロック一枚当りの体積を極めて大きなものとせざるを
得なくなり、運搬などにも支障をきたすほか、自然石を
用いた場合よりも製作費用などの点で高価となってい
た。
However, the weight per unit volume of this tile block is lighter than that when natural stone is used, and the effect of suppressing the slope is small, and when trying to secure the weight as natural stone, the volume per tile block is extremely large. In addition to being obliged to use it, it hinders transportation, etc., and it was more expensive in terms of production cost than using natural stone.

この発明は以上の問題点を解決するもので、その目的
は、自然石の持つ体積当りの重量の大きさというメリッ
トを生かしつつ、欠点であった作業性の低さを改善する
ようにした自然石を用いた護岸の施工方法を提供するも
のである。
This invention solves the above problems, and its purpose is to improve the low workability, which was a drawback, while taking advantage of the large weight per volume of natural stone. It provides a method of constructing a revetment using stone.

《問題点を解決するための手段》 前記目的を達成するため、この発明は、河川などの水際
における法面に自然石を敷き並べた後に前記自然石間を
コンクリートによって固定するようにした護岸の施工方
法において、あらかじめ複数の自然石の下方部分に一次
コンクリートを打設して、前記各自然石の上方が露出し
た状態のコンクリート製ブロックを形成し、該ブロック
を前記法面に敷き並べた後、前記自然石の頂部の一部を
露出した状態で前記ブロック上に二次コンクリートを打
設し、複数のブロックを一体化することを要旨とする。
<< Means for Solving Problems >> In order to achieve the above-mentioned object, the present invention is directed to a seawall in which natural stones are fixed by concrete after laying natural stones on the slope at the waterside of a river or the like. In the construction method, the primary concrete is placed in advance in the lower part of the plurality of natural stones in advance to form a concrete block in which the upper side of each of the natural stones is exposed, and the blocks are laid on the slope. The gist is that a plurality of blocks are integrated by placing secondary concrete on the blocks with part of the tops of the natural stones exposed.

《作用》 敷き並べ方法は従来のタイルブロックとほぼ同様であ
り、傾斜面であっても安定した状態で敷き並べることが
できる。
<< Operation >> The laying and laying method is almost the same as that of the conventional tile block, and the laying and laying can be performed in a stable state even on an inclined surface.

また、ブロックの形成時に自然石の大きさを揃えること
によって、配列された各石間に極端な不揃いを生ずるこ
とがない。
Further, by aligning the sizes of the natural stones when forming the blocks, no extreme irregularity occurs between the arranged stones.

《実施例》 以下、この発明の一実施例を図面を用いて詳細に説明す
る。
<< Embodiment >> An embodiment of the present invention will be described in detail below with reference to the drawings.

第1図(a)〜(c)はこの発明にかかる護岸の施工方
法を示している。
1 (a) to 1 (c) show a method of constructing a seawall according to the present invention.

図において、所定の勾配に形成された親水護岸壁を構成
する地盤Eの法面E1には捨てコンクリート1が打設さ
れ、この表面に玉石ブロック2が敷き並べられ、その後
二次コンクリート3が打設され、玉石ブロック2の頂部
の一部を露出した状態で前記二次コンクリート3を平坦
化し、工事を完了する。
In the figure, a waste concrete 1 is cast on a slope E1 of a ground E constituting a hydrophilic revetment wall formed in a predetermined gradient, and a cobblestone block 2 is laid on the surface, and then a secondary concrete 3 is cast. The secondary concrete 3 is flattened with a part of the top of the cobblestone block 2 exposed to complete the construction.

前記各玉石ブロック2は、予め工場などで製作されたも
のであり、この実施例では大きさが類似する二つの自然
の玉石4の底部を一定の厚みおよび外形寸法の鉄筋コン
クリート製のタイル状ブロック5で一体化したものであ
る。
Each of the cobblestone blocks 2 is manufactured in advance in a factory or the like, and in this embodiment, the bottoms of two natural cobblestones 4 having similar sizes are made of a reinforced concrete tile block 5 having a constant thickness and outer dimensions. It is integrated with.

その製作方法としては、第2図(a),(b)に示すよ
うに一定の型枠6内に複数の鉄筋7を平行に配筋すると
ともに、補強用鉄筋8をX状に交差した状態で配筋し、
鉄筋7の上部に前記一対の玉石4を並列状態に設置し、
次いで、型枠6内に一次コンクリートを流し込み、固化
させた後型枠6から脱型することによって一定寸法のブ
ロック5上に二つの玉石4を並列状態に一体化した玉石
ブロック2が完成する。
As a manufacturing method thereof, as shown in FIGS. 2 (a) and 2 (b), a plurality of reinforcing bars 7 are arranged in parallel in a fixed mold 6 and reinforcing reinforcing bars 8 are crossed in an X shape. With the
Install the pair of cobblestones 4 in parallel on the upper part of the reinforcing bar 7,
Next, by pouring the primary concrete into the mold 6 and solidifying it and then removing it from the mold 6, a cobblestone block 2 in which two cobblestones 4 are integrated in parallel on the block 5 having a certain size is completed.

なお、前記補強用鉄筋8の両端は上部にコ字形に折曲げ
られ、前記タイルブロック5の左右上部に突出する把手
部8aを形成し、クレーンでの吊込み作業の簡素化を図
っている。
In addition, both ends of the reinforcing bar 8 are bent in a U shape in the upper part to form a handle part 8a projecting to the upper left and right parts of the tile block 5 so as to simplify the lifting work by a crane.

したがって、このようにユニット化された玉石ブロック
2を敷き並べる作業は、従来のコンクリート製のタイル
ブロックの敷設作業と全く同様な作業形態であり、クレ
ーンなどを用いて玉石ブロック2の集積場所から設置場
所に順次移動しつつ設置することで、例えば第3図
(a)に示すごとく列毎に継目をずらして間をあけずに
密集配列したり、格子状に密集配列することで敷き並べ
作業を完了する。そして、この作業は単に平板状のブロ
ック2を配列するだけであるから、設置状態では法面E
1に安定して配列され、また作業者にとっても熟練を必
要とせず、作業時間も極端に短縮できる。
Therefore, the work of laying and arranging the cobblestone blocks 2 unitized in this way is exactly the same as the conventional laying work of the concrete tile blocks, and the cobblestone blocks 2 are installed from the accumulation place by using a crane or the like. For example, as shown in FIG. 3 (a), by installing the cells while sequentially moving to a place, the rows can be arranged closely by arranging the seams with no gaps, or by arranging them densely in a grid pattern. Complete. And since this work only arranges the flat block 2, the slope E
1 is stably arranged, no skill is required for the operator, and the working time can be extremely shortened.

その後、二次コンクリート3を玉石ブロック2の表面に
打設し、タイルブロック5上を平らにならすことで、第
3図(b)に示すように玉石4の頂部の一部を露出した
状態で施工が完了する。
After that, the secondary concrete 3 is cast on the surface of the cobblestone 2 and the top of the tile block 5 is flattened so that a part of the top of the cobblestone 4 is exposed as shown in FIG. 3 (b). Construction is complete.

この場合、補強用鉄筋8の把手部8aは、二次コンクリ
ート3中に埋設され、一次,二次コンクリート3間に介
在して両者間の接合強度を補強する。
In this case, the handle portion 8a of the reinforcing bar 8 is embedded in the secondary concrete 3 and is interposed between the primary and secondary concrete 3 to reinforce the joint strength between them.

なお、二次コンクリート3を打設する前に把手部8aに
からませて縦横に配筋を施せばさらに接合強度が増加す
る。
If the secondary concrete 3 is entangled with the handle portion 8a and vertical and horizontal reinforcement is applied before the concrete is placed, the joint strength is further increased.

施工完了状態では、従来の玉石を配列した護岸とまった
く同様の外観であり、玉石4の重量に応じた鎮圧効果も
全く同様である。
In the completed construction state, the appearance is exactly the same as that of a conventional revetment in which boulders are arranged, and the compression effect according to the weight of the boulders 4 is also completely the same.

さらには前記玉石4の露出表面は前記ブロック化のため
の加工時において大きさを揃えているので、ほぼ一定の
形状となり、配列状態における外観も良好となる。
Furthermore, since the exposed surface of the cobblestone 4 is made uniform in size during the processing for forming the block, it has a substantially constant shape, and the appearance in the array state is also good.

なお、以上の実施例では二つの玉石4をブロック化した
が、一つ或いは三つ以上をまとめてブロック化してもよ
いことは勿論であり、ブロック化するときの成形性や敷
き並べる際の作業性を考慮することで個数が定まること
になる。また、玉石以外の例えば砕石、半割玉石など自
然石一般も適用できることは勿論である。
In addition, although the two cobblestones 4 are made into blocks in the above-mentioned examples, it is a matter of course that one or three or more may be collectively made into blocks, and the formability at the time of making blocks and the work at the time of laying them out The number will be determined by considering the sex. Further, it goes without saying that other natural stones such as crushed stone and half-broken stone other than cobblestone can be applied.

《効果》 以上実施例によって詳細に説明したように、この発明方
法によれば、敷き並べ方法がコンクリートブロックとほ
ぼ同様であり、傾斜面であっても安定した状態で敷き並
べることができ、しかも施工速度も従来の自然石を敷き
並べる場合に比べて極端に向上し、さらには施工完了状
態では従来の施工方法と全く同一の外観および自然石に
よる法面の鎮圧効果を得られる。
<< Effects >> As described in detail with reference to the above examples, according to the method of the present invention, the laying and arranging method is almost the same as that of the concrete block, and the lining and laying can be performed in a stable state even on an inclined surface, and The construction speed is also significantly improved compared to the conventional case of laying natural stones, and in the completed state, the appearance and the effect of suppressing the slopes by natural stones are exactly the same as the conventional construction method.

また、この発明方法によれば、ブロックの成形時に自然
石の大きさを揃えることによって、配列された各石間に
極端な不揃いを生ずることがなく、従来のように熟練者
の手によらずとも見栄えが良好となる。
Further, according to the method of the present invention, by arranging the sizes of the natural stones at the time of forming the block, an extreme unevenness is not caused between the arranged stones, and it does not depend on an expert's hand as in the past. Both look good.

したがって、この発明方法によれば、特に河川の親水護
岸のごとく見栄え上も配慮しなくてはならない場所であ
って、渇水期のみが施工期間である施工場所などに好適
である。
Therefore, according to the method of the present invention, it is particularly suitable for a construction site where the appearance must be considered, such as a water revetment of a river, and the construction period is only during the dry season.

【図面の簡単な説明】[Brief description of drawings]

第1図(a),(b),(c)はこの発明方法の施工順
序を示す断面説明図、第2図(a),(b)は玉石ブロ
ックの施工順序を示す説明図、第3図(a),(b)は
玉石ブロックの敷き並べ状態および二次コンクリート打
設状態の説明図である。 1……捨てコンクリート、2……玉石ブロック 3……二次コンクリート、4……玉石(自然石) 5……タイルブロック
FIGS. 1 (a), (b), and (c) are cross-sectional explanatory views showing the construction sequence of the method of the present invention, and FIGS. 2 (a) and (b) are explanatory diagrams showing the construction sequence of the cobblestone block. Drawing (a) and (b) is explanatory drawing of the laid state of a cobblestone block, and a secondary concrete pouring state. 1 …… Abandoned concrete, 2 …… Boulder block 3 …… Secondary concrete, 4 …… Boulder (natural stone) 5 …… Tile block

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】河川などの水際における法面に自然石を敷
き並べた後に前記自然石間をコンクリートによって固定
するようにした護岸の施工方法において、あらかじめ複
数の自然石の下方部分に一次コンクリートを打設して、
前記各自然石の上方が露出した状態のコンクリート製ブ
ロックを形成し、該ブロックを前記法面に敷き並べた
後、前記自然石の頂部の一部を露出した状態で前記ブロ
ック上に二次コンクリートを打設し、複数のブロックを
一体化することを特徴とする自然石を用いた護岸の施工
方法。
1. A method of constructing a revetment in which natural stones are laid on the slopes at the waterside of a river or the like and then fixed between the natural stones by concrete, in which primary concrete is preliminarily placed under the plurality of natural stones. Place it,
A concrete block is formed in a state where the upper part of each of the natural stones is exposed, and the blocks are laid on the slope, and then secondary concrete is placed on the block with a part of the top of the natural stone exposed. A method of constructing a revetment using natural stone, which is characterized by placing a block and integrating a plurality of blocks.
JP62237467A 1987-09-24 1987-09-24 Construction method of revetment using natural stone Expired - Lifetime JPH0611980B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62237467A JPH0611980B2 (en) 1987-09-24 1987-09-24 Construction method of revetment using natural stone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62237467A JPH0611980B2 (en) 1987-09-24 1987-09-24 Construction method of revetment using natural stone

Publications (2)

Publication Number Publication Date
JPS6480611A JPS6480611A (en) 1989-03-27
JPH0611980B2 true JPH0611980B2 (en) 1994-02-16

Family

ID=17015765

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62237467A Expired - Lifetime JPH0611980B2 (en) 1987-09-24 1987-09-24 Construction method of revetment using natural stone

Country Status (1)

Country Link
JP (1) JPH0611980B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11851301B2 (en) 2021-06-01 2023-12-26 Ricoh Company, Ltd. Sheet processing apparatus, image forming apparatus, and image forming system

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0733652B2 (en) * 1989-12-25 1995-04-12 昌司 行本 Revetment method
JPH0720168Y2 (en) * 1989-12-25 1995-05-15 昌司 行本 Revival revetment block
JPH0738357Y2 (en) * 1990-06-27 1995-08-30 昌司 行本 Revetment structure
JPH0457519U (en) * 1990-09-19 1992-05-18
JPH04166507A (en) * 1990-10-30 1992-06-12 Masashi Yukimoto Block work for consolidation of foundation of natural stone
JPH068425U (en) * 1992-01-31 1994-02-04 共和コンクリート工業株式会社 Wave-dissipating root block
CN115045233B (en) * 2022-07-20 2023-04-07 水利部交通运输部国家能源局南京水利科学研究院 Anti-ice pushing and scouring dam slope protection and construction method thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5976647U (en) * 1982-11-12 1984-05-24 菱和コンクリ−ト工業株式会社 concrete block

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11851301B2 (en) 2021-06-01 2023-12-26 Ricoh Company, Ltd. Sheet processing apparatus, image forming apparatus, and image forming system

Also Published As

Publication number Publication date
JPS6480611A (en) 1989-03-27

Similar Documents

Publication Publication Date Title
DK1540087T3 (en) Protective element for a breakwater or wave inhibitory construction
CN105421188B (en) The construction method of assembled temporary road
CN105350559B (en) A kind of construction method of diamond dust structural floor suitable for large-sized workshop
CN103469806A (en) Construction method for replacing brick forming die with prefabricated concrete foundation bearing platform side die
CN109208632A (en) A kind of precast hollow module block type concrete retaining wall
CN217150344U (en) Rubble concrete lays structure
CN204825557U (en) Job site interim construction road combination ground structure
JPH0611980B2 (en) Construction method of revetment using natural stone
CN105951842B (en) Reversed beam styrofoam fetal membrane construction method under raft plate
CN104594633A (en) Construction method and template structure for umbrella-shaped spatial curved-surface bare concrete
CN105332386A (en) Structure construction method for tower crane foundation serving as basement bottom plate
CN208023601U (en) A kind of prefabricated pile foundation support table side form of mutual buckle type
CN209066480U (en) A kind of precast hollow module block type concrete retaining wall
CN109811613A (en) A kind of interim ground installation and its integral construction method
JPH05230845A (en) L-shaped block retaining wall structure and construction method thereof
CN108130889A (en) Pump lock main body bottom plate and flow channel layer side wall step construction joint method for production
JP4170955B2 (en) Construction method of concrete structure using residual formwork and soil concrete
CN108532985A (en) Foundation beam board construction method
CN217325465U (en) Frame type construction elevator foundation
CN218147591U (en) Prefabricated sidewalk plate
KR20160125586A (en) block assembly for retaining wall and building methods thereof
KR100341856B1 (en) Method of embanking in shore
EP2576910B1 (en) Method and element
JPS6016527B2 (en) Seawall formation method and locking member used therein
JP2002121738A (en) Cylindrical block for banking method and banking method using the block