CN113127997A - 一种输电钢管塔用五环板节点环板作用力计算方法 - Google Patents

一种输电钢管塔用五环板节点环板作用力计算方法 Download PDF

Info

Publication number
CN113127997A
CN113127997A CN202110477933.XA CN202110477933A CN113127997A CN 113127997 A CN113127997 A CN 113127997A CN 202110477933 A CN202110477933 A CN 202110477933A CN 113127997 A CN113127997 A CN 113127997A
Authority
CN
China
Prior art keywords
ring plate
spring support
ring
node
acting force
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110477933.XA
Other languages
English (en)
Other versions
CN113127997B (zh
Inventor
卫思彤
孙清
王虎长
王学明
袁俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Jiaotong University
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Original Assignee
Xian Jiaotong University
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Jiaotong University, Northwest Electric Power Design Institute of China Power Engineering Consulting Group filed Critical Xian Jiaotong University
Priority to CN202110477933.XA priority Critical patent/CN113127997B/zh
Publication of CN113127997A publication Critical patent/CN113127997A/zh
Application granted granted Critical
Publication of CN113127997B publication Critical patent/CN113127997B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/17Mechanical parametric or variational design
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • G06F30/23Design optimisation, verification or simulation using finite element methods [FEM] or finite difference methods [FDM]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/02Reliability analysis or reliability optimisation; Failure analysis, e.g. worst case scenario performance, failure mode and effects analysis [FMEA]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/14Force analysis or force optimisation, e.g. static or dynamic forces

Abstract

本发明公开了一种输电钢管塔用五环板节点环板作用力计算方法,该方法包括如下步骤:根据作用于五环板节点上的外载荷以及外载荷作用于五环板节点的位置和角度,计算作用在五环板节点上的等效弯矩和集中作用力;然后基于五环板节点的受力特点将五环板节点简化为刚梁‑弹簧支座力学模型,本发明将节点板等效成刚梁,五个环板依次等效成五个弹簧支座,考虑了环板所在截面刚度对其所受作用力大小的影响,对获取的五个环板对应力学模型上五个弹簧支座刚度采用本发明方法进行修正,提高了五环板节点环板作用力的计算精确度;基于修正后的弹簧支座刚度计算弹簧支座变形量;将修正后的弹簧支座变形和其自身的弹簧支座变形量相乘得到环板作用力。本发明可用于指导实际工程的五环板节点设计,从而为实际钢管塔结构提供更为合理的节点布置型式;不仅可以改善节点的受力性能,提高节点区域的局部稳定性,还能充分利用和发挥节点的承载能力和变形能力,减少不必要的钢材浪费。保证节点区域具有良好的受力性能对提高输电钢管塔结构的稳定性和安全性都具有重要意义。

Description

一种输电钢管塔用五环板节点环板作用力计算方法
技术领域
本发明属于结构设计领域,具体涉及一种输电钢管塔用五环板节点环板作用力计算方法。
背景技术
随着电网大发展,同塔双回甚至同塔多回线路日益增多,使得铁塔越来越高,荷载越来越大。钢管塔因其具有良好的力学性能和显著的经济优势在我国特高压和大跨越输电线路中得到了广泛应用。
为了方便施工,钢管塔节点普遍采用插板连接,国内外对钢管塔管板节点的研究主要集中在两环板节点极限承载力方面,对横担与塔身的连接节点研究较少,现有的设计理论尚不完善。横担和塔身连接节点作为钢管塔的关键受力部位,来自不同方向的构件在此交汇,受力状态复杂多变,局部稳定性问题非常突出。为了防止节点发生局部变形失稳,使其具有良好的变形和承载性能,实际工程中已采用了环形加劲板(下文简称环板)改善节点的受力性能。横担下平面与塔身连接部位常采用五环板节点,在进行节点设计时,需要确定各个环板的作用力,然而,国内现行规范仅给出了两环板、三环板和四环板节点环板作用力的计算方法,对于五环板节点环板作用力的计算方法尚未给出,设计人员在确定此类节点各个环板作用力时常依赖于以往的设计经验,五环板节点设计面临很多不确定因素。因此,亟需提出一种能准确得到五环板节点环板作用力计算方法指导五环板节点设计。
发明内容
本发明的目的在于提供一种输电钢管塔用五环板节点环板作用力计算方法,以克服现有技术的不足,给出五环节点所受外荷载分配在各个环板上的作用力,为五环板节点设计提供理论支撑。
为达到上述目的,本发明采用如下技术方案:
一种输电钢管塔用五环板节点环板作用力计算方法,包括以下步骤:
S1,根据作用于五环板节点上的外载荷以及外载荷作用于五环板节点的位置和角度,计算作用在五环板节点上的等效弯矩和集中作用力;
S2,基于五环板节点的受力特点将五环板节点简化为刚梁-弹簧支座力学模型,预设五环板节点布置形式,并将五个环板分别命名为环板1、环板2、环板3、环板4和环板5,分别计算每个环板对应力学模型上弹簧支座刚度;
S3,基于五环板节点五个环板的设置位置,对获取的五个环板对应力学模型上五个弹簧支座刚度k1、k2、k3、k4和k5进行修正,计算得到修正后五个弹簧支座刚度kZ1、kZ2、kZ3、kZ4和kZ5
kZ1=y1k1=(1-δ2)k1
kZ2=y2k2=k2,y2=1
Figure BDA0003047755840000021
kZ4=y4k4=k4,y4=1
kZ5=y5k5=(1-δ4)k5
式中:
Figure BDA0003047755840000022
Figure BDA0003047755840000023
Figure BDA0003047755840000031
Figure BDA0003047755840000032
其中,B为节点板长度,mm;tg为节点板厚度,mm;H为节点板高度,mm;d2为第二环板位置,mm;d3为第三环板位置,mm;d4为第四环板位置,mm;
S4,根据修正后的五个弹簧支座刚度kZ1、kZ2、kZ3、kZ4和kZ5分别计算得到五个弹簧支座变形量;
S5,将每个环板对应的力学模型上修正后的弹簧支座刚度和其自身的弹簧支座变形量相乘即可得到该环板的反向作用力大小。
进一步的,作用于五环板节点上的外载荷为F1、F2、F3,外荷载F1、F2、F3作用于五环板节点上的位置分别为e1,e2、e3,外荷载F1、F2、F3作在其各自位置对应的角度分别为θ1,θ2、θ3,计算作用在五环板节点上的等效弯矩M和集中作用力P:
M=F1sinθ1×e1+F2sinθ2×e2+F3 sinθ3×e3
P=F1sinθ1+F2 sinθ2+F3 sinθ3
进一步的,作用于五环板节点上的作用力为拉力或者压力。
进一步的,环板等效的弹簧支座刚度计算公式为:
Figure BDA0003047755840000033
式中:
E—钢材的弹性模量;
G—钢材的剪切模量,取
Figure BDA0003047755840000041
JZ—截面惯性矩;
Figure BDA0003047755840000042
Be—钢管的有效宽度,取
Figure BDA0003047755840000043
r—计算系数,
Figure BDA0003047755840000044
D—主管外径;
tm—主管壁厚;
R—环板高度;
tr—环板厚度;
ψ—钢管有效宽度修正系数,ψ=1-1.07e-αβ
α、β均为计算系数,取α=0.073(tr/tm)0.23,β=(R/tm)1.03
y0—截面中性轴高度,
Figure BDA0003047755840000045
R'—截面中性轴到圆环中心的距离,
Figure BDA0003047755840000046
A—截面毛截面面积,取A=Betm+Rtr
ξ—截面剪应力不均匀系数,取
Figure BDA0003047755840000047
χ—计算系数,取
Figure BDA0003047755840000051
进一步的,根据修正后的弹簧支座刚度kZ1、kZ2、kZ3、kZ4和kZ5,计算第一环板对应的弹簧支座变形量bZ1
Figure BDA0003047755840000052
式中:
s15=kZ1+(1-c2)kZ2+(1-c3)kZ3+(1-c4)kZ4
s25=c2(1-c2)kZ2+c3(1-c3)kZ3+c4(1-c4)kZ4
s35=c2kZ2+c3kZ3+c4kZ4+kZ5
s45=c2 2kZ2+c3 2kZ3+c4 2kZ4+kZ5
c2=d2/B
c3=d3/B
c4=d4/B。
进一步的,根据第一环板对应的弹簧支座变形量bZ1计算第五环板对应的弹簧支座变形量bZ5
Figure BDA0003047755840000053
进一步的,根据第一环板对应的弹簧支座变形量bZ1和第五环板对应的弹簧支座变形量bZ5,计算第二环板对应的弹簧支座变形量bZ2
bZ2=(1-c2)bZ1+c2bZ5
进一步的,根据第一环板对应的弹簧支座变形量bZ1和第五环板对应的弹簧支座变形量bZ5,计算第三环板对应的弹簧支座变形量bZ3
bZ3=(1-c3)bZ1+c3bZ5
进一步的,根据第一环板对应的弹簧支座变形量bZ1和第五环板对应的弹簧支座变形量bZ5,计算第四环板对应的弹簧支座变形量bZ4
bZ4=(1-c4)bZ1+c4bZ5
进一步的,将修正后第一个弹簧支座刚度kZ1以及第一个弹簧支座变形量bZ1相乘即可得到第一个环板的作用力大小:
Pv1=-R1=-kZ1×bZ1
进一步的,将修正后第二环板对应的弹簧支座刚度kZ2以及第二环板对应的弹簧支座变形量bZ2相乘即可得到第二个环板的作用力大小:
Pv2=-R2=-kZ2×bZ2
进一步的,将修正后第三环板对应的弹簧支座刚度kZ3以及第三环板对应的弹簧支座变形量bZ3相乘即可得到第三个环板的作用力大小:
Pv3=-R3=-kZ3×bZ3
进一步的,将修正后第四个弹簧支座刚度kZ3以及第四个弹簧支座变形量bZ3相乘即可得到第四个环板的作用力大小:
Pv4=-R4=-kZ4×bZ4
进一步的,将修正后第五个弹簧支座刚度kZ5以及第五个弹簧支座变形量bZ5相乘即可得到第五个环板的作用力大小:
Pv5=-R5=-kZ5×bZ5
与现有技术相比,本发明具有以下有益的技术效果:
本发明一种输电钢管塔用五环板节点环板作用力计算方法:根据作用于五环板节点上的外载荷以及外载荷作用于五环板节点的位置和角度,计算作用在五环板节点上的等效弯矩和集中作用力;然后基于五环板节点的受力特点将五环板节点简化为刚梁-弹簧支座力学模型,本发明将节点板等效成刚梁,五个环板依次等效成五个弹簧支座,考虑了环板所在截面刚度对其所受作用力大小的影响,对获取的五个环板对应力学模型上五个弹簧支座刚度采用本发明方法进行修正,提高了五环板节点环板作用力的计算精确度;基于修正后的弹簧支座刚度和其自身的弹簧支座变形量能够得到任意布置形式的五环板节点环板作用力。本发明可为实际工程的五环板节点设计提供理论支撑,通过更为合理的节点布置型式,不仅可以改善节点的受力性能,提高节点区域的局部稳定性,还能充分利用和发挥节点的承载能力和变形能力,减少不必要的钢材浪费。保证横担和塔身连接部位节点区域具有良好的受力性能对提高输电钢管塔结构的稳定性和安全性都具有重要意义。
附图说明
图1是本发明实施例中五环板节点的刚梁弹簧支座力学模型计算简图。
图2是本发明实施例中五环板节点受力简图。
图3是本发明实施例中五环板节点几何参数示意图。
图4是本发明实施例中五环板节点环板作用力采用不同计算方法的结果对比图。
图5是本发明实施例中五环板节点环板作用力计算方法流程图。
具体实施方式
下面结合附图对本发明做进一步详细描述:
基于五环板节点的受力特点,将五环板节点简化为刚梁-弹簧支座力学模型,如图1所示,节点板等效成刚梁,五个环板分别等效为五个弹簧支座,外荷载作用下产生的弹簧支座反力大小R即为环板作用力大小Pv;依次计算五个弹簧支座的刚度和变形,两者相乘即得到环板作用力。
如图5所示,一种输电钢管塔用五环板节点环板作用力计算方法,包括以下步骤:
S1,根据作用于五环板节点上的外载荷以及外载荷作用于五环板节点的位置和角度,计算作用在五环板节点上的等效弯矩M和集中作用力P,其中作用力为压力或拉力;
如图2所示的五环板节点,其中已知外荷载F1、F2、F3大小,外荷载F1、F2、F3作用于五环板节点上的位置分别为e1,e2、e3,外荷载F1、F2、F3作在其各自位置对应的角度分别为θ1,θ2、θ3,计算作用在五环板节点上的等效弯矩M和集中作用力P:
M=F1 sinθ1×e1+F2 sinθ2×e2+F3 sinθ3×e3
P=F1 sinθ1+F2 sinθ2+F3 sinθ3
S2,基于五环板节点的受力特点,将五环板节点简化为刚梁-弹簧支座力学模型,预设五环板节点布置形式,并将五个环板分别命名为环板1、环板2、环板3、环板4和环板5,分别计算五个环板对应力学模型上位置的刚度;
本申请将五环板节点简化为刚梁-弹簧支座力学模型,五个环板分别等效为五个弹簧支座,分别计算五个弹簧支座刚度k1(第一弹簧支座刚度)、k2(第二弹簧支座刚度)、k3(第三弹簧支座刚度)、k4(第四弹簧支座刚度)和k5(第五弹簧支座刚度);
五个环板等效成的弹簧支座刚度计算公式采用下式进行计算:
Figure BDA0003047755840000081
式中:
E—钢材的弹性模量(MPa);
G—钢材的剪切模量(MPa),取
Figure BDA0003047755840000091
JZ—截面惯性矩(mm4);
Figure BDA0003047755840000092
Be—钢管的有效宽度(mm),取
Figure BDA0003047755840000093
r—计算系数,
Figure BDA0003047755840000094
D—主管外径(mm);
tm—主管壁厚(mm);
R—环板高度(mm);
tr—环板厚度(mm);
ψ—钢管有效宽度修正系数,ψ=1-1.07e-αβ
α、β均为计算系数,取α=0.073(tr/tm)0.23,β=(R/tm)1.03
y0—截面中性轴高度(mm),
Figure BDA0003047755840000095
R'—截面中性轴到圆环中心的距离(mm),
Figure BDA0003047755840000096
A—截面毛截面面积(mm2),取A=Betm+Rtr
ξ—截面剪应力不均匀系数,取
Figure BDA0003047755840000097
χ—计算系数,取
Figure BDA0003047755840000101
主管几何参数:主管外径D,主管壁厚tm;节点板几何参数:节点板长度B,节点板厚度tg,节点板高度H;五环板节点上的五个环板由一侧至另一侧分别为第一环板(环板1)、第二环板(环板2)、第三环板(环板3)、第四环板(环板4)和第五环板(环板5),五个环板的几何参数分别为:第一环板高度R1,第一环板厚度tr1;第二环板高度R2,第二环板厚度tr2;第三环板高度R3,第三环板厚度tr3;第四环板高度R4,第四环板厚度tr4;第五环板高度R5,第五环板厚度tr5;五个环板中其中两个环板对应力学模型上的弹簧支座分别位于节点板的两端,本申请取第一环板位置d1=0;第二环板位置d2,第三环板位置d3,第四环板位置d4,第五环板位置d5=B;钢材的弹性模量E,钢材的泊松比ν。
S3,基于五环板节点五个环板的设置位置,对获取的每个环板对应力学模型上位置的弹簧刚度进行修正,本申请针对五个弹簧支座刚度k1、k2、k3、k4和k5进行修正,计算得到修正后弹簧支座刚度kZ1、kZ2、kZ3、kZ4和kZ5,修正公式如下:
kZ1=y1k1=(1-δ2)k1(y1≥0)
kZ2=y2k2=k2,y2=1
Figure BDA0003047755840000102
kZ4=y4k4=k4,y4=1
kZ5=y5k5=(1-δ4)k5(y5≥0)
式中:
Figure BDA0003047755840000111
Figure BDA0003047755840000112
Figure BDA0003047755840000113
Figure BDA0003047755840000114
S4,根据修正后的五个弹簧支座刚度kZ1、kZ2、kZ3、kZ4和kZ5计算五个弹簧支座变形量bZ1、bZ2、bZ3、bZ4和bZ5
计算五个弹簧支座变形bZ1、bZ2、bZ3、bZ4和bZ5采用下式:
Figure BDA0003047755840000115
Figure BDA0003047755840000116
bZ2=(1-c2)bZ1+c2bZ5
bZ3=(1-c3)bZ1+c3bZ5
bZ4=(1-c4)bZ1+c4bZ5
式中的计算参数有:
s15=kZ1+(1-c2)kZ2+(1-c3)kZ3+(1-c4)kZ4
s25=c2(1-c2)kZ2+c3(1-c3)kZ3+c4(1-c4)kZ4
s35=c2kZ2+c3kZ3+c4kZ4+kZ5
s45=c2 2kZ2+c3 2kZ3+c4 2kZ4+kZ5
c2=d2/B
c3=d3/B
c4=d4/B;
S5,将修正后五个弹簧支座刚度kZ1、kZ2、kZ3、kZ4、kZ5和五个弹簧支座变形量bZ1、bZ2、bZ3、bZ4、bZ5相乘即可得到五个环板反向作用力大小:
Pv1=-R1=-kZ1×bZ1
Pv2=-R2=-kZ2×bZ2
Pv3=-R3=-kZ3×bZ3
Pv4=-R4=-kZ4×bZ4
Pv5=-R5=-kZ5×bZ5
实施例:
如图5所示,本实施方式中五环板节点环板作用力具体的计算步骤如下:
步骤一:计算作用在五环板节点上的等效弯矩M和集中作用力P;
如图2所示,对于所选取的五环板节点算例,F1、F2、F3大小及其作用角度θ1,θ2、θ3和作用位置e1,e2、e3分别为:F1=20.57kN,θ1=50°,e1=294.96mm;F2=-20kN,θ2=52°,e2=516.65mm;F3=150kN,θ3=90°,e3=490.5mm。
M=F1sinθ1×e1+F2sinθ2×e2+F3sinθ3×e3
=20.57×sin50°×294.96-20×sin52°×516.65+150×sin90°×490.5
=57938.32kN/mm
P=F1sinθ1+F2 sinθ2+F3sinθ3
=20.57×sin50°-20.57×sin52°+150×sin90°
=150kN
步骤二:根据五环板节点上五环板布置形式,预设五环板节点布置形式,提取关键几何参数及材料参数
如图3所示,本实施例的主管几何参数:主管外径D=273mm,主管壁厚tm=7mm;节点板几何参数:节点板长度B=819mm,节点板厚度tg=16mm,节点板高度H=279mm;环板几何参数:环板1高度R1=80mm,环板1厚度tr1=10mm,环板1位置d1=0;环板2高度R2=120mm,环板2厚度tr2=12mm,环板2位置d2=270.27mm;环板3高度R3=150mm,环板3厚度tr3=14mm,环板3位置d3=409.5mm;环板4高度R4=120mm,环板4厚度tr4=12mm,环板4位置d4=548.73mm;环板5高度R5=80mm,环板5厚度tr5=10mm,环板5位置d5=819mm;钢材的弹性模量E=206000MPa,钢材的泊松比ν=0.3。
步骤三:根据预设的五环板节点布置形式,分别计算每个环板对应力学模型上相应位置的弹簧支座刚度k1、k2、k3、k4和k5
环板1对应的弹簧支座1刚度k1求解过程:
Figure BDA0003047755840000131
Figure BDA0003047755840000132
α=0.073(tr1/tm)0.23=0.073×(10/7)0.23=0.0792
β=(R1/tm)1.03=(80/7)1.03=12.295
ψ=1-1.07e-αβ=1-1.07×e-0.0792×12.295=0.5959
Figure BDA0003047755840000133
A=Betm+R1tr1=33.596×7+80×10=1035.172mm2
Figure BDA0003047755840000134
Figure BDA0003047755840000135
Figure BDA0003047755840000141
Figure BDA0003047755840000142
Figure BDA0003047755840000143
Figure BDA0003047755840000151
环板1对应的弹簧支座1刚度:k1=154344kN/mm;
重复上述计算过程可分别求得:环板2对应的弹簧支座2刚度:k2=336790kN/mm,环板3对应的弹簧支座3刚度k3=511056kN/mm,环板4对应的弹簧支座4刚度:k4=336790kN/mm,环板5对应的弹簧支座5刚度:k5=154344kN/mm
步骤四:基于五环板节点五个环板的设置位置,对五个弹簧支座刚度k1、k2、k3、k4和k5进行修正,计算得到修正后五个弹簧支座刚度kZ1、kZ2、kZ3、kZ4和kZ5
Figure BDA0003047755840000152
Figure BDA0003047755840000153
Figure BDA0003047755840000154
kZ1=y1k1=(1-δ2)k1=(1-0.380)×154344=95673kN/mm
kZ2=y2k2=k2=336790kN/mm
Figure BDA0003047755840000161
kZ4=y4k4=k4=336790kN/mm
kZ5=y5k5=(1-δ4)k5=(1-0.380)×154344=95673kN/mm
步骤五:根据修正后的五个弹簧支座刚度kZ1、kZ2、kZ3、kZ4和kZ5计算五个弹簧支座变形量bZ1、bZ2、bZ3、bZ4和bZ5
计算参数求解:
c2=d2/B=270.27/819=0.33
c3=d3/B=490.5/819=0.5
c4=d4/B=548.73/819=0.67
s15=kZ1+(1-c2)kZ2+(1-c3)kZ3+(1-c4)kZ4
=95673+(1-0.33)×336790+(1-0.5)×565228+(1-0.67)×336790
=715077kN/mm
s25=c2(1-c2)kZ2+c3(1-c3)kZ3+c4(1-c4)kZ4
=0.33×(1-0.33)×336790+0.5×(1-0.5)×565228+0.67×(1-0.67)×336790
=290236kN/mm
s35=c2kZ2+c3kZ3+c4kZ4+kZ5
=0.33×336790+0.5×565228+0.67×336790+95673
=715077kN/mm
s45=c2 2kZ2+c3 2kZ3+c4 2kZ4+kZ5
=0.332×336790+0.52×565228+0.672×336790+95673
=424866kN/mm
Figure BDA0003047755840000171
Figure BDA0003047755840000172
bZ2=(1-c2)bZ1+c2bZ5=(1-0.33)×(-1.320×10-4)+0.33×(-0.778×10-4)
=-1.141×10-4mm
bZ3=(1-c3)bZ1+c3bZ5=(1-0.50)×(-1.320×10-4)+0.50×(-0.778×10-4)
=-1.049×10-4mm
bZ4=(1-c4)bZ1+c4bZ5=(1-0.67)×(-1.320×10-4)+0.67×(-0.778×10-4)
=-0.957×10-4mm
步骤六:分别将修正后的五个弹簧刚度和对应的弹簧支座变形量相乘,依次计算五个环板作用力Pv1-Pv5
根据步骤四计算得到kZ1-kZ5和步骤五计算得到的bZ1-bZ5,计算五个环板上的作用力:
Pv1=-R1=-kZ1×bZ1=-95673×(-1.320×10-4)=12.63kN;
Pv2=-R2=-kZ2×bZ2=-336790×(-1.141×10-4)=38.43kN;
Pv3=-R3=-kZ3×bZ3=-565228×(-1.049×10-4)=59.29kN;
Pv4=-R4=-kZ4×bZ4=-336790×(-0.957×10-4)=32.23kN;
Pv5=-R5=-kZ5×bZ5=-95673×(-0.778×10-4)=7.44kN。
表1五环板节点环板作用力不同计算方法对比结果
Figure BDA0003047755840000181
借助大型通用有限元分析软件Ansys对五环板节点实施例进行了分析,获得各个环板上作用力,表1列出了本实施例五环板节点环板作用力采用本发明的计算结果和相应的Ansys有限元结果,两者的数值非常接近,最大的误差不超过2kN;从图4的对比结果也可以看出,采用本发明方法得到的五个环板作用力和Ansys有限元分析结果吻合良好,说明本发明得到的环板作用力符合五环板节点的真实受力情况,可用于计算横担和塔身连接部位的五环板节点环板作用力。
由上述对比结果可知,本发明一种输电钢管塔用五环板节点环板作用力计算方法,能够精确地计算五环板节点环板作用力,计算结果符合节点的真实受力情况,可供实际工程节点设计参考,填补了现有设计规范对五环板节点环板作用力计算方法的空白,为横担和塔身连接部位的关键受力节点设计提供了理论依据。采用本发明得到的五环板节点布置型式合理,对改善节点的受力性能,充分发挥节点的承载能力和变形能力具有重要意义。进一步可为我国特高压线路的建设和安全运行提供技术支撑,对特高压输电线路杆塔结构设计技术的提高具有重要意义。

Claims (10)

1.一种输电钢管塔用五环板节点环板作用力计算方法,其特征在于,包括以下步骤:
S1,根据作用于五环板节点上的外载荷以及外载荷作用于五环板节点的位置和角度,计算作用在五环板节点上的等效弯矩和集中作用力;
S2,基于五环板节点的受力特点将五环板节点简化为刚梁-弹簧支座力学模型,预设五环板节点布置形式,并将五个环板分别命名为环板1、环板2、环板3、环板4和环板5,分别计算每个环板对应力学模型上弹簧支座刚度;
S3,基于五环板节点五个环板的设置位置,对获取的五个环板对应力学模型上五个弹簧支座刚度k1、k2、k3、k4和k5进行修正,计算得到修正后五个弹簧支座刚度kZ1、kZ2、kZ3、kZ4和kZ5
kZ1=y1k1=(1-δ2)k1
kZ2=y2k2=k2,y2=1
Figure FDA0003047755830000011
kZ4=y4k4=k4,y4=1
kZ5=y5k5=(1-δ4)k5
式中:
Figure FDA0003047755830000012
Figure FDA0003047755830000013
Figure FDA0003047755830000014
Figure FDA0003047755830000015
其中,B为节点板长度,mm;tg为节点板厚度,mm;H为节点板高度,mm;d2为第二环板位置,mm;d3为第三环板位置,mm;d4为第四环板位置,mm;
S4,根据修正后的五个弹簧支座刚度kZ1、kZ2、kZ3、kZ4和kZ5分别计算得到五个弹簧支座变形量;
S5,将每个环板对应的力学模型上修正后的弹簧支座刚度和其自身的弹簧支座变形量相乘即可得到该环板的反向作用力大小。
2.根据权利要求1所述的一种输电钢管塔用五环板节点环板作用力计算方法,其特征在于,作用于五环板节点上的外载荷为F1、F2、F3,外荷载F1、F2、F3作用于五环板节点上的位置分别为e1,e2、e3,外荷载F1、F2、F3作用在其各自位置对应的角度分别为θ1,θ2、θ3,计算作用在五环板节点上的等效弯矩M和集中作用力P:
M=F1sinθ1×e1+F2sinθ2×e2+F3sinθ3×e3
P=F1sinθ1+F2sinθ2+F3sinθ3
3.根据权利要求1所述的一种输电钢管塔用五环板节点环板作用力计算方法,其特征在于,作用于五环板节点上的集中作用力为拉力或者压力。
4.根据权利要求2所述的一种输电钢管塔用五环板节点环板作用力计算方法,其特征在于,环板等效的弹簧支座刚度计算公式为:
Figure FDA0003047755830000021
式中:
E—钢材的弹性模量;
G—钢材的剪切模量,取
Figure FDA0003047755830000031
JZ—截面惯性矩;
Figure FDA0003047755830000032
Be—钢管的有效宽度,取
Figure FDA0003047755830000033
r—计算系数,
Figure FDA0003047755830000034
D—主管外径;
tm—主管壁厚;
R—环板高度;
tr—环板厚度;
ψ—钢管有效宽度修正系数,ψ=1-1.07e-αβ
α、β均为计算系数,取α=0.073(tr/tm)0.23,β=(R/tm)1.03
y0—截面中性轴高度,
Figure FDA0003047755830000035
R'—截面中性轴到圆环中心的距离,
Figure FDA0003047755830000036
A—截面毛截面面积,取A=Betm+Rtr
ξ—截面剪应力不均匀系数,取
Figure FDA0003047755830000037
χ—计算系数,取
Figure FDA0003047755830000041
5.根据权利要求4所述的一种输电钢管塔用五环板节点环板作用力计算方法,其特征在于,根据修正后的弹簧支座刚度kZ1、kZ2、kZ3、kZ4和kZ5,计算第一环板对应的弹簧支座变形量bZ1
Figure FDA0003047755830000042
式中:
s15=kZ1+(1-c2)kZ2+(1-c3)kZ3+(1-c4)kZ4
s25=c2(1-c2)kZ2+c3(1-c3)kZ3+c4(1-c4)kZ4
s35=c2kZ2+c3kZ3+c4kZ4+kZ5
s45=c2 2kZ2+c3 2kZ3+c4 2kZ4+kZ5
c2=d2/B
c3=d3/B
c4=d4/B。
6.根据权利要求5所述的一种输电钢管塔用五环板节点环板作用力计算方法,其特征在于,根据第一环板对应的弹簧支座变形量bZ1计算第五环板对应的弹簧支座变形量bZ5
Figure FDA0003047755830000043
7.根据权利要求5所述的一种输电钢管塔用五环板节点环板作用力计算方法,其特征在于,根据第一环板对应的弹簧支座变形量bZ1和第五环板对应的弹簧支座变形量bZ5,计算第二环板对应的弹簧支座变形量bZ2
bZ2=(1-c2)bZ1+c2bZ5
根据第一环板对应的弹簧支座变形量bZ1和第五环板对应的弹簧支座变形量bZ5,计算第三环板对应的弹簧支座变形量bZ3
bZ3=(1-c3)bZ1+c3bZ5
根据第一环板对应的弹簧支座变形量bZ1和第五环板对应的弹簧支座变形量bZ5,计算第四环板对应的弹簧支座变形量bZ4
bZ4=(1-c4)bZ1+c4bZ5
8.根据权利要求5所述的一种输电钢管塔用五环板节点环板作用力计算方法,其特征在于,将修正后第一个弹簧支座刚度kZ1以及第一个弹簧支座变形量bZ1相乘即可得到第一个环板的作用力大小:
Pv1=-R1=-kZ1×bZ1
将修正后第二环板对应的弹簧支座刚度kZ2以及第二环板对应的弹簧支座变形量bZ2相乘即可得到第二个环板的作用力大小:
Pv2=-R2=-kZ2×bZ2
将修正后第三环板对应的弹簧支座刚度kZ3以及第三环板对应的弹簧支座变形量bZ3相乘即可得到第三个环板的作用力大小:
Pv3=-R3=-kZ3×bZ3
9.根据权利要求8所述的一种输电钢管塔用五环板节点环板作用力计算方法,其特征在于,将修正后第四个弹簧支座刚度kZ3以及第四个弹簧支座变形量bZ3相乘即可得到第四个环板的作用力大小:
Pv4=-R4=-kZ4×bZ4
10.根据权利要求6所述的一种输电钢管塔用五环板节点环板作用力计算方法,其特征在于,将修正后第五个弹簧支座刚度kZ5以及第五个弹簧支座变形量bZ5相乘即可得到第五个环板的作用力大小:
Pv5=-R5=-kZ5×bZ5
CN202110477933.XA 2021-04-29 2021-04-29 一种输电钢管塔用五环板节点环板作用力计算方法 Active CN113127997B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110477933.XA CN113127997B (zh) 2021-04-29 2021-04-29 一种输电钢管塔用五环板节点环板作用力计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110477933.XA CN113127997B (zh) 2021-04-29 2021-04-29 一种输电钢管塔用五环板节点环板作用力计算方法

Publications (2)

Publication Number Publication Date
CN113127997A true CN113127997A (zh) 2021-07-16
CN113127997B CN113127997B (zh) 2023-06-02

Family

ID=76780628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110477933.XA Active CN113127997B (zh) 2021-04-29 2021-04-29 一种输电钢管塔用五环板节点环板作用力计算方法

Country Status (1)

Country Link
CN (1) CN113127997B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113673131A (zh) * 2021-08-27 2021-11-19 河南城建学院 输电钢管塔管板节点加劲板分配荷载计算方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103913377A (zh) * 2014-03-10 2014-07-09 河北省电力勘测设计研究院 钢管塔节点力学试验方法
JP2016059116A (ja) * 2014-09-08 2016-04-21 日本電信電話株式会社 橋梁添架ケーブル保護管の補修用ソケット
CN207331432U (zh) * 2017-08-04 2018-05-08 广西路桥工程集团有限公司 一种新型钢管混凝土柱
US20200246123A1 (en) * 2010-08-10 2020-08-06 Brad K. Stroud Method, Apparatus And Kit For Artificial Insemination Of Bovine
CN112084555A (zh) * 2020-08-11 2020-12-15 重庆瑜煌电力设备制造有限公司 钢管塔环向加劲肋真型试验数据节点环板承载力计算方法
CN112115625A (zh) * 2020-08-11 2020-12-22 重庆瑜煌电力设备制造有限公司 特高压输电铁塔真型试验数据节点主管承载力的计算方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20200246123A1 (en) * 2010-08-10 2020-08-06 Brad K. Stroud Method, Apparatus And Kit For Artificial Insemination Of Bovine
CN103913377A (zh) * 2014-03-10 2014-07-09 河北省电力勘测设计研究院 钢管塔节点力学试验方法
JP2016059116A (ja) * 2014-09-08 2016-04-21 日本電信電話株式会社 橋梁添架ケーブル保護管の補修用ソケット
CN207331432U (zh) * 2017-08-04 2018-05-08 广西路桥工程集团有限公司 一种新型钢管混凝土柱
CN112084555A (zh) * 2020-08-11 2020-12-15 重庆瑜煌电力设备制造有限公司 钢管塔环向加劲肋真型试验数据节点环板承载力计算方法
CN112115625A (zh) * 2020-08-11 2020-12-22 重庆瑜煌电力设备制造有限公司 特高压输电铁塔真型试验数据节点主管承载力的计算方法

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
A. NIJHUIS ET AL: "Spatial Periodic Bending and Critical Current of Bronze and PIT Nb3Sn Strands in a Steel Tube", 《IEEE》 *
周凌宇等: "外接式组合桁架节点初始转动刚度研究", 《工程力学》 *
施菁华等: "特高压输电线路钢管塔主材次应力研究", 《中国电业(技术版)》 *
朱雯瑞等: "500/220kV多回窄基钢管塔塔脚节点极限承载力有限元分析", 《电网与清洁能源》 *
蔡钦: "四管组合柱钢管塔变坡节点设计与有限元分析", 《东北电力技术》 *
邓洪洲等: "输电钢管塔典型塔脚节点承载力研究", 《工程力学》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113673131A (zh) * 2021-08-27 2021-11-19 河南城建学院 输电钢管塔管板节点加劲板分配荷载计算方法
CN113673131B (zh) * 2021-08-27 2024-03-15 河南城建学院 输电钢管塔管板节点加劲板分配荷载计算方法

Also Published As

Publication number Publication date
CN113127997B (zh) 2023-06-02

Similar Documents

Publication Publication Date Title
Zhao et al. Springback equation of small curvature plane bending
CN101220616B (zh) 加劲钢套筒屈曲约束支撑构件
CN113127997A (zh) 一种输电钢管塔用五环板节点环板作用力计算方法
CN111589904B (zh) 一种大直径钢管矫正对接方法
CN113221214B (zh) 一种输电钢管塔用四环板节点环板作用力计算方法
CN101927278A (zh) 采用六辊矫直机实现薄壁无缝钢管精密矫直的方法
CN113239430B (zh) 一种输电钢管塔用三环板节点环板作用力计算方法
CN101954394A (zh) 不锈钢波纹板的连续辊式冷弯成形方法
CN207813077U (zh) 一种木结构传统民居梁柱榫卯节点加固纠偏装置
CN107784138B (zh) 基于结构力学分析的点云重力变形修正方法
CN112100771B (zh) 一种钢轨三点反弯横向矫直过程支距优化方法
CN207160309U (zh) 半刚性节点摩擦耗能器
CN105927028A (zh) K节点斜材受压承载力的计算方法及装置
CN201579602U (zh) 一种数控机床角度辅助工作台组件
CN116226986A (zh) 一种拉索无应力长度计算方法
CN107256294B (zh) 一种基于等效刚度法的sss离合器动力学建模方法
CN114626127A (zh) 一种输电塔主材弯矩调整系数的计算方法、系统及设备
CN113305508A (zh) 超大、超重倒圆台形节点的加工方法
CN109783864A (zh) 不等边角钢交叉斜材稳定承载力的计算方法
Sawko Effect of strain hardening on the elasto-plastic behaviour of beams and grillages.
CN204892634U (zh) 简易钢管矫正装置
Xu et al. The design and optimization of large-scales heavy gantry NC machining center based on finite element method
CN114297902B (zh) 约束混凝土组合柱在偏压作用下承载力的计算方法
CN114861254B (zh) 一种桥梁用钢管钢纤维混凝土结构抗弯刚度的计算方法
CN109514201A (zh) 一种重型越野汽车车架加强板的冷冲压工艺

Legal Events

Date Code Title Description