CN112482775B - 主体框架施工中梯度收分角框柱插筋的定位方法 - Google Patents
主体框架施工中梯度收分角框柱插筋的定位方法 Download PDFInfo
- Publication number
- CN112482775B CN112482775B CN202011334337.8A CN202011334337A CN112482775B CN 112482775 B CN112482775 B CN 112482775B CN 202011334337 A CN202011334337 A CN 202011334337A CN 112482775 B CN112482775 B CN 112482775B
- Authority
- CN
- China
- Prior art keywords
- layer
- rear corner
- dowel
- section
- corner column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/12—Mounting of reinforcing inserts; Prestressing
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
- G01C15/002—Active optical surveying means
- G01C15/004—Reference lines, planes or sectors
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011334337.8A CN112482775B (zh) | 2020-11-24 | 2020-11-24 | 主体框架施工中梯度收分角框柱插筋的定位方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011334337.8A CN112482775B (zh) | 2020-11-24 | 2020-11-24 | 主体框架施工中梯度收分角框柱插筋的定位方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112482775A CN112482775A (zh) | 2021-03-12 |
CN112482775B true CN112482775B (zh) | 2022-01-14 |
Family
ID=74934165
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011334337.8A Active CN112482775B (zh) | 2020-11-24 | 2020-11-24 | 主体框架施工中梯度收分角框柱插筋的定位方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112482775B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113183326A (zh) * | 2021-04-09 | 2021-07-30 | 中铁六局集团太原铁路建设有限公司 | 一种复杂地质条件下拌和站筒仓补装的施工工法 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102213032A (zh) * | 2010-04-09 | 2011-10-12 | 上海市第七建筑有限公司 | 结构柱钢筋连接的施工方法 |
CN103161313B (zh) * | 2013-03-14 | 2015-06-10 | 中国华冶科工集团有限公司 | 填充墙构造柱主筋与框架梁的连接方法 |
CN106168068A (zh) * | 2016-08-04 | 2016-11-30 | 中国十七冶集团有限公司 | 一种构造柱插筋、拉结筋插筋定位安装方法 |
-
2020
- 2020-11-24 CN CN202011334337.8A patent/CN112482775B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN112482775A (zh) | 2021-03-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105220874B (zh) | 地下室超高外墙自撑单侧支模体系的施工方法 | |
CN109577534A (zh) | 基于工具式吊模装配式叠合楼板及施工方法 | |
CN104695557A (zh) | 钢结构建筑预埋地脚螺栓一次到位施工方法 | |
CN106087746A (zh) | 一种现浇箱梁膺架施工方法以及桥梁 | |
CN108035554A (zh) | 超高层建筑框架柱的型钢柱支撑架施工方法 | |
KR101274481B1 (ko) | 커플러가 구비된 사전 매립형 앵커프레임 및 이를 이용한 철골기둥 앵커링 공법 | |
CN102877649A (zh) | 装配式混凝土结构隔层浇筑施工方法 | |
CN108756226A (zh) | 圆形柱模板施工工艺 | |
CN102251657A (zh) | 一种装配式框架梁板的起拱支模方法 | |
CN112482775B (zh) | 主体框架施工中梯度收分角框柱插筋的定位方法 | |
KR20150029512A (ko) | 건축용 수평구조프레임 구조 및 이를 이용한 지하건축물의 시공방법 | |
CN112376917A (zh) | 主体框架施工中梯度收分角框柱插筋的定位装置 | |
CN116427622A (zh) | 一种地下车库半埋入式钢管混凝土柱脚结构及其施工方法 | |
CN114575593A (zh) | 超荷载小净距梁可调式盘扣模板支撑架及其施工方法 | |
CN107575023A (zh) | 一种滑模构件及应用其的沉井刃脚层滑模施工方法 | |
CN110644624A (zh) | 一种建筑连接节点及其施工方法 | |
CN114214917A (zh) | 钢管混凝土系杆拱桥及施工方法 | |
CN214575803U (zh) | 主体框架施工中梯度收分角框柱插筋的定位装置 | |
CN106032704A (zh) | 一种以混凝土柱支顶后浇带两侧结构的施工方法 | |
CN104264682A (zh) | 一种锚拉护壁桩首层加混凝土梁支撑技术 | |
CN209958813U (zh) | 钢筋混凝土柱改造加固结构 | |
JP5954835B2 (ja) | 擁壁構造及び擁壁の施工方法 | |
CN105756377A (zh) | 一种泳池及其施工方法 | |
CN109812001A (zh) | 一种超高层双层工字钢悬挑支撑体系的施工方法 | |
KR20190066754A (ko) | 기둥단위 지지구조를 가진 역타공법용 거푸집 지지구조 및 이를 이용한 지하구조물의 시공방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Zhonglei Inventor after: Wang Hong Inventor after: Meng Xiangwei Inventor after: Zhang Yinyu Inventor after: Guo Hengwei Inventor after: Wang Yong Inventor after: Zhao Zhihong Inventor after: Hong Yao Inventor after: Li Jiangtao Inventor before: Li Zhonglei Inventor before: Zhang Jianqing Inventor before: Guo Hengwei Inventor before: Wang Hong Inventor before: Wang Yong Inventor before: Zhang Yinyu Inventor before: Hong Yao Inventor before: Dai Kai Inventor before: Li Jiangtao |
|
GR01 | Patent grant | ||
GR01 | Patent grant |