CN102877649A - 装配式混凝土结构隔层浇筑施工方法 - Google Patents

装配式混凝土结构隔层浇筑施工方法 Download PDF

Info

Publication number
CN102877649A
CN102877649A CN2012104164603A CN201210416460A CN102877649A CN 102877649 A CN102877649 A CN 102877649A CN 2012104164603 A CN2012104164603 A CN 2012104164603A CN 201210416460 A CN201210416460 A CN 201210416460A CN 102877649 A CN102877649 A CN 102877649A
Authority
CN
China
Prior art keywords
wallboard
concrete structure
stirrup
prefabricated concrete
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012104164603A
Other languages
English (en)
Other versions
CN102877649B (zh
Inventor
李哲龙
刘树茂
刘晓亮
霍晓光
索屹楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
1 ST CONSTRUCTION CO Ltd OF 22 MCC GROUP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 1 ST CONSTRUCTION CO Ltd OF 22 MCC GROUP filed Critical 1 ST CONSTRUCTION CO Ltd OF 22 MCC GROUP
Priority to CN201210416460.3A priority Critical patent/CN102877649B/zh
Publication of CN102877649A publication Critical patent/CN102877649A/zh
Application granted granted Critical
Publication of CN102877649B publication Critical patent/CN102877649B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

一种装配式混凝土结构隔层浇筑施工方法,包括墙板的安装和钢筋的定位、绑扎,该方法从装配墙体的第二层墙板开始,包括连接箍筋的定位,二层墙板的安装,安装二层叠合楼板及钢筋绑扎步骤,本发明在装配式混凝土结构施工过程中采用隔层浇筑的施工方法。解决了墙体竖向钢筋搭接区域内箍筋的安装难的问题。该方法施工简便,易于操作。简化了工序,提高了施工效率,减少了人工的投入,提高了工程质量。

Description

装配式混凝土结构隔层浇筑施工方法
技术领域
本发明涉及一种建筑领域装配式混凝土结构的施工方法,特别是涉及一种装配式混凝土结构隔层浇筑施工方法。
背景技术
在装配式混凝土结构墙体、楼板逐层浇筑施工时,墙体竖向连接筋从底层墙体外伸到下一层一定的搭接长度,在这个搭接长度内由于现在采用的结构体系墙板侧面预留了箍筋,所以在墙板安装特别是墙板节点钢筋绑扎时,给施工带来了很大的难度。
装配式混凝土结构施工的一大优势就是施工效率高、安装快速,其浇注方式采用逐层浇筑,采用逐层浇筑的施工方法,由于竖向连接筋先放入所以增加了现浇节点连接箍筋的安装难度,一方面因为搭接区域的限制增加了施工难度,另一方面钢筋绑扎工序在关键路线上,所以也会使得安装效率大打折扣。
发明内容
本发明的发明目的在于针对现有技术墙板节点钢筋绑扎施工难度大,墙体竖向钢筋搭接区域内箍筋安装难,安装效率低的不足,提供一种在装配式混凝土结构施工过程中采用隔层浇筑的施工方法,施工操作步骤简单、钢筋绑扎容易、装配效率高的装配式混凝土结构隔层浇筑施工方法。
实现上述目的采用以下技术方案:
一种装配式混凝土结构隔层浇筑施工方法,包括墙板的安装和钢筋的定位、绑扎,所述的浇筑施工从装配墙体的第二层墙板开始,其浇筑施工方法包括下述步骤:
A、墙板的安装:
a. 连接箍筋的定位:在首层装配式混凝土结构墙板安装过程中采用逐层浇筑的方法进行连接箍筋的定位,连接箍筋定位后进行首层顶板支撑及叠合楼板的安装浇筑,然后进行二层墙板的安装; 
b. 二层墙板的安装:首先将二层墙板支撑固定,二层墙板支撑固定完毕后,将二层墙板与首层墙板的水平节点的浆锚套筒位置及现浇部分进行固定连接处理;
c.安装二层叠合楼板及钢筋绑扎:先将连接箍筋插入节点内进行定位,然后将竖向连接筋插入连接箍筋内定位、绑扎,竖向连接筋按序绑扎在连接箍筋内,形成捆状结构;
d.支设模板并浇筑混凝土:二层叠合楼板及钢筋安装完毕后在墙体竖向连接节点处支设模板,与二层顶板同时浇筑混凝土。 
作为优选方案,所述的连接箍筋的定位是根据墙体侧面预留的箍筋及横向钢筋确定的,竖向连接筋根据下层墙板预留的竖向连接筋进行定位。
作为优选方案,所述的将二层墙板与首层墙板的水平节点的浆锚套筒位置及现浇部分进行固定连接方法是:将首层墙板的预留筋插入二层墙板的预留孔内,用浆料浇注固定。
作为优选方案,所述的竖向连接筋定位、绑扎的方法是:先放置连接箍筋,然后再从墙板顶部插入竖向连接筋,最后将连接箍筋与竖向连接筋进行绑扎处理。
作为优选方案,所述的竖向连接筋逐层预留,上下层的竖向连接筋相互搭接浇注固定。
作为优选方案,所述的绑扎处理采用钢丝作为绑扎件。
作为优选方案,所述在进行墙体现浇节点钢筋绑扎的同时进行叠合楼板及其支撑装置的安装。
作为优选方案,所述叠合楼板的支撑采用的定位支撑体系,该定位支撑体系由叠合楼板定位支撑装置及顶模支撑装置组成,叠合楼板定位支撑装置装在预制墙体的顶部,顶模支撑装置支撑在预制板下方。
作为优选方案,支撑装置每面墙体上布置一组支撑装置,所述的支撑装置由两个定位支撑件、一个横杆组成,通过调整定位支撑件的高度定位横杆的水平和标高,以此确定预制板的标高。
采用上述技术方案,与现有技术相比,本发明在装配式混凝土结构施工过程中采用隔层浇筑的施工方法。解决了墙体竖向钢筋搭接区域内箍筋的安装难的问题。该方法施工简便,易于操作。简化了工序,提高了施工效率,减少了人工的投入,提高了工程质量。
附图说明
图1是本发明的整体操作示意图。
图2是本发明箍筋的定位示意图,也是图1的节点放大图。
 图3是本发明支设支撑并浇筑混凝土的示意图。
图中,首层墙板1,现浇连接段2,叠合楼板3,二层墙板4, 竖向连接筋5,预留箍筋6,连接箍筋7,水平节点 8,支撑装置9.
具体实施方式
下面结合附图及具体实施例对本发明做进一步的描述。
本实施例是一种装配式混凝土结构隔层浇筑施工方法,是墙体间的竖向连接节点的施工方法。该施工方法的设计思想是:在装配式混凝土结构施工过程中采用隔层浇筑的施工方法,具体操作实施例见图1-图3。
1)隔层浇筑从装配墙体施工的第二层墙板4开始,如图1所示:在首层装配式混凝土结构墙体安装过程中采用逐层浇筑的方法进行连接箍筋7的定位,连接箍筋7为环状结构,暂时不进行绑扎,由于在整个墙体的高度内均有连接箍筋7,所以连接箍筋7的定位需要在主筋安装前提前按成,连接箍筋7的定位是根据墙体侧面预留箍筋6及横向钢筋确定的,竖向连接筋5根据下层墙板预留的竖向连接筋5进行定位。其作用是保证两块预制墙板之间通过现浇段内钢筋的连接实现整体性。待首层顶板支撑及叠合楼板3安装浇筑完成后进行二层墙板的安装。
2)安装二层墙板4:在墙体支撑固定完毕后对墙体水平节点8的浆锚套筒位置及现浇部分进行固定连接处理,固定连接方法是:将首层墙板1的预留筋插入二层墙板的预留孔内,用浆料浇注固定见图1。
3)安装二层叠合楼板3及钢筋绑扎;处理完墙体水平连接节点8后即可进行顶板支撑及叠合楼板3的安装工作,同时进行二层钢筋的绑扎,如图2,先将横向连接箍筋7插入节点8内进行定位,然后将竖向连接钢筋5插入连接箍筋7内定位、绑扎。竖向连接筋5的定位、绑扎的方法是:先放置环状结构的连接箍筋7,然后再从墙板顶部插入竖向连接筋5,最后将连接箍筋7与竖向连接筋5进行绑扎处理。绑扎处理采用钢丝作为绑扎件。绑扎处理后连接箍筋7与竖向连接筋5形成捆状结构。竖向连接筋5逐层预留,上、下层的竖向连接筋5相互搭接浇注固定。
在进行墙体现浇节点钢筋绑扎的同时进行叠合楼板3及其支撑的安装。叠合楼板3的支撑采用的定位支撑体系,该定位支撑体系见图3,由叠合楼板定位支撑装置9及顶模支撑装置组成,叠合楼板定位支撑装置9如附图3所示:装在预制墙体的顶部,每面墙体上布置一组支撑装置9,一组支撑装置9由两个定位支撑件及一个横杆组成,通过调整定位支撑件的高度精确定位横杆的水平和标高,以此确定预制板的标高。在预制板安装就位后再调整顶模支撑装置,使其支撑在预制板下方,以达到支撑效果。这种支撑体系有效地减少了顶板支撑的用量,保证了叠合楼板3施工层下面的活动空间,给钢筋的绑扎及模板的支设提供条件。
4)支设模板并浇筑混凝土见图3:二层叠合楼板及钢筋安装完毕后在墙体竖向连接节点支设模板,与二层顶板同时浇筑混凝土。
以上公开的仅为本发明的具体实施例,但本发明并非局限于此,任何本领域的技术人员能思之的变化,都应落在本发明的保护范围之内。

Claims (9)

1.一种装配式混凝土结构隔层浇筑施工方法,包括墙板的安装和钢筋的定位、绑扎,其特征在于,所述的浇筑施工从装配墙体的第二层墙板开始,其浇筑施工方法包括下述步骤:
A、墙板的安装:
a. 连接箍筋的定位:在首层装配式混凝土结构墙板安装过程中采用逐层浇筑的方法进行连接箍筋的定位,连接箍筋定位后进行首层顶板支撑及叠合楼板的安装浇筑,然后进行二层墙板的安装; 
b. 二层墙板的安装:首先将二层墙板支撑固定,二层墙板支撑固定完毕后,将二层墙板与首层墙板的水平节点的浆锚套筒位置及现浇部分进行固定连接处理;
c.安装二层叠合楼板及钢筋绑扎:先将连接箍筋插入节点内进行定位,然后将竖向连接筋插入连接箍筋内定位、绑扎,竖向连接筋按序绑扎在连接箍筋内,形成捆状结构;
d.支设模板并浇筑混凝土:二层叠合楼板及钢筋安装完毕后在墙体竖向连接节点处支设模板,与二层顶板同时浇筑混凝土。
2.根据权利要求1所述的装配式混凝土结构隔层浇筑施工方法,其特征在于,所述的连接箍筋的定位是根据墙体侧面预留的箍筋及横向钢筋确定的,竖向连接筋根据下层墙板预留的竖向连接筋进行定位。
3.根据权利要求1所述的装配式混凝土结构隔层浇筑施工方法,其特征在于,所述的将二层墙板与首层墙板的水平节点的浆锚套筒位置及现浇部分进行固定连接方法是:将首层墙板的预留筋插入二层墙板的预留孔内,用浆料浇注固定。
4.根据权利要求1所述的装配式混凝土结构隔层浇筑施工方法,其特征在于,所述的竖向连接筋定位、绑扎的方法是:先放置连接箍筋,然后再从墙板顶部插入竖向连接筋,最后将连接箍筋与竖向连接筋进行绑扎处理。
5.根据权利要求4所述的装配式混凝土结构隔层浇筑施工方法,其特征在于,所述的竖向连接筋逐层预留,上下层的竖向连接筋相互搭接浇注固定。
6.根据权利要求4所述的装配式混凝土结构隔层浇筑施工方法,其特征在于,所述的绑扎处理采用钢丝作为绑扎件。
7.根据权利要求1所述的装配式混凝土结构隔层浇筑施工方法,其特征在于,所述在进行墙体现浇节点钢筋绑扎的同时进行叠合楼板及其支撑装置的安装。
8.根据权利要求1所述的装配式混凝土结构隔层浇筑施工方法,其特征在于,所述叠合楼板的支撑采用的定位支撑体系,该定位支撑体系由叠合楼板定位支撑装置及顶模支撑装置组成,叠合楼板定位支撑装置装在预制墙体的顶部,顶模支撑装置支撑在预制板下方。
9.根据权利要求8所述的装配式混凝土结构隔层浇筑施工方法,其特征在于,每面墙体上布置一组支撑装置,所述的支撑装置由两个定位支撑件、一个横杆组成,通过调整定位支撑件的高度定位横杆的水平和标高,以此确定预制板的标高。
CN201210416460.3A 2012-10-27 2012-10-27 装配式混凝土结构隔层浇筑施工方法 Active CN102877649B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210416460.3A CN102877649B (zh) 2012-10-27 2012-10-27 装配式混凝土结构隔层浇筑施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210416460.3A CN102877649B (zh) 2012-10-27 2012-10-27 装配式混凝土结构隔层浇筑施工方法

Publications (2)

Publication Number Publication Date
CN102877649A true CN102877649A (zh) 2013-01-16
CN102877649B CN102877649B (zh) 2014-10-08

Family

ID=47479147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210416460.3A Active CN102877649B (zh) 2012-10-27 2012-10-27 装配式混凝土结构隔层浇筑施工方法

Country Status (1)

Country Link
CN (1) CN102877649B (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104712146A (zh) * 2013-12-12 2015-06-17 中国核工业第五建设有限公司 墙体施工中钢筋绑扎的施工方法
CN105003029A (zh) * 2015-07-22 2015-10-28 山东明达建筑科技有限公司 套筒筋调直对接模板
CN106088354A (zh) * 2016-08-25 2016-11-09 初明进 一种层间连接节点
CN106121051A (zh) * 2016-08-25 2016-11-16 初明进 一种层间连接节点
CN106121050A (zh) * 2016-08-25 2016-11-16 初明进 一种层间连接节点
CN108978935A (zh) * 2018-08-03 2018-12-11 庐江荣睿建设工程有限公司 一种可承重墙体的施工方法
CN109441118A (zh) * 2018-11-27 2019-03-08 中国五冶集团有限公司 一种装配式建筑施工混凝土的布料机浇筑系统及浇筑方法
CN110820999A (zh) * 2019-11-01 2020-02-21 中南林业科技大学 装配式建筑混凝土现浇骨架的施工方法
CN111946050A (zh) * 2020-07-01 2020-11-17 北京住总第六开发建设有限公司 一种应用于装配式工程中的铝合金模板施工方法
CN113136942A (zh) * 2021-03-30 2021-07-20 中国建筑第八工程局有限公司 免灌浆装配式墙体及其施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08113981A (ja) * 1994-10-14 1996-05-07 Kumagai Gumi Co Ltd コンクリート建造物の構築方法
AU2005287894A1 (en) * 2004-09-24 2006-03-30 Formwork Creation Pty Ltd Method and apparatus for construction
JP2009209558A (ja) * 2008-03-03 2009-09-17 Ohbayashi Corp 高強度コンクリートの施工方法
CN101851979A (zh) * 2010-04-02 2010-10-06 清远市建巢工业设计有限公司 一种建筑用预制钢筋混凝土单元体及其构筑建筑物的方法
CN102230315A (zh) * 2011-04-18 2011-11-02 有利华建筑预制件有限公司 多层建筑的预制构件及其半预制构筑方法
CN102425310A (zh) * 2011-12-15 2012-04-25 中国二十二冶集团有限公司 装配式住宅剪力墙结构墙体竖向连接施工方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08113981A (ja) * 1994-10-14 1996-05-07 Kumagai Gumi Co Ltd コンクリート建造物の構築方法
AU2005287894A1 (en) * 2004-09-24 2006-03-30 Formwork Creation Pty Ltd Method and apparatus for construction
JP2009209558A (ja) * 2008-03-03 2009-09-17 Ohbayashi Corp 高強度コンクリートの施工方法
CN101851979A (zh) * 2010-04-02 2010-10-06 清远市建巢工业设计有限公司 一种建筑用预制钢筋混凝土单元体及其构筑建筑物的方法
CN102230315A (zh) * 2011-04-18 2011-11-02 有利华建筑预制件有限公司 多层建筑的预制构件及其半预制构筑方法
CN102425310A (zh) * 2011-12-15 2012-04-25 中国二十二冶集团有限公司 装配式住宅剪力墙结构墙体竖向连接施工方法

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104712146A (zh) * 2013-12-12 2015-06-17 中国核工业第五建设有限公司 墙体施工中钢筋绑扎的施工方法
CN104712146B (zh) * 2013-12-12 2017-06-30 中国核工业第五建设有限公司 墙体施工中钢筋绑扎的施工方法
CN105003029A (zh) * 2015-07-22 2015-10-28 山东明达建筑科技有限公司 套筒筋调直对接模板
CN106088354A (zh) * 2016-08-25 2016-11-09 初明进 一种层间连接节点
CN106121051A (zh) * 2016-08-25 2016-11-16 初明进 一种层间连接节点
CN106121050A (zh) * 2016-08-25 2016-11-16 初明进 一种层间连接节点
CN108978935A (zh) * 2018-08-03 2018-12-11 庐江荣睿建设工程有限公司 一种可承重墙体的施工方法
CN109441118A (zh) * 2018-11-27 2019-03-08 中国五冶集团有限公司 一种装配式建筑施工混凝土的布料机浇筑系统及浇筑方法
CN109441118B (zh) * 2018-11-27 2023-10-13 中国五冶集团有限公司 一种装配式建筑施工混凝土的布料机浇筑系统及浇筑方法
CN110820999A (zh) * 2019-11-01 2020-02-21 中南林业科技大学 装配式建筑混凝土现浇骨架的施工方法
CN111946050A (zh) * 2020-07-01 2020-11-17 北京住总第六开发建设有限公司 一种应用于装配式工程中的铝合金模板施工方法
CN113136942A (zh) * 2021-03-30 2021-07-20 中国建筑第八工程局有限公司 免灌浆装配式墙体及其施工方法
CN113136942B (zh) * 2021-03-30 2023-02-28 中国建筑第八工程局有限公司 免灌浆装配式墙体及其施工方法

Also Published As

Publication number Publication date
CN102877649B (zh) 2014-10-08

Similar Documents

Publication Publication Date Title
CN102877649B (zh) 装配式混凝土结构隔层浇筑施工方法
CN203113553U (zh) 一种装配式混凝土框架剪力墙结构
ES2898608T3 (es) Estructura de edificación de paredes y losas entre pisos monolíticas premoldeadas
CN104452812B (zh) 地下室外墙的施工方法
CN105133791A (zh) 装配式厚板钢骨混凝土柱变截面转换节点结构的施工方法
CN102418385B (zh) 一种新型钢筋砼预制整浇房屋结构体系及施工方法
CN102561553A (zh) 预制钢管混凝土边框剪力墙及其施工方法
CN102116051B (zh) 一种逐层悬挑结构的吊装方法
SG187296A1 (en) A multi-storey building with prefabricated members and a semi-prefabricating construction method thereof
CN105525753A (zh) 一种构造柱与主体结构同时施工的方法及结构
CN107254933A (zh) 高层装配式单排通孔预制剪力墙及其装配结构和施工方法
KR100771144B1 (ko) 복수층의 동시시공을 통한 다층건축물의 수평증축방법
CN105155669A (zh) 暗梁楼板构造柱结构以及施工方法
CN112593632A (zh) 适用于大跨度高净空建筑的装配式梁板结构及其施工方法
CN203742099U (zh) 一种钢筋混凝土预制楼梯构造
CN110644624A (zh) 一种建筑连接节点及其施工方法
CN103194982A (zh) 桥梁边跨现浇段短悬臂支架施工方法
CN207003803U (zh) 高层装配式单排通孔预制剪力墙及其装配结构
CN216194892U (zh) 一种地铁上盖项目施工电梯基础结构
JP5001897B2 (ja) 建物の構築方法
KR101827381B1 (ko) 더블 월 피씨에 의한 구조물의 복수 층 시공구조 및 시공방법
KR101485563B1 (ko) 건축용 수평구조프레임 구조
CN102251673B (zh) 一种钢筋混凝土空心楼板施工方法
KR101315946B1 (ko) 기둥 선행시공을 통한 rc기준층의 공기단축공법
CN206512898U (zh) 一种轻质装配式组合楼板

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA MCC 22 GROUP CORP., LTD.

Free format text: FORMER OWNER: THE 1 ST CONSTRUCTION CO., LTD. OF 22 MCC GROUP

Effective date: 20150128

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150128

Address after: 064000 Hebei province Fengrun District No. 16 Tangshan City road of happiness

Patentee after: China MCC 22 Group Corp., Ltd.

Address before: 064000 Hebei province Fengrun District No. 16 Tangshan City road of happiness

Patentee before: The 1 st Construction Co., Ltd. of 22 MCC Group