CN112431219A - Quick installation method for vertical continuous casting machine vertical surface foundation embedded iron part - Google Patents
Quick installation method for vertical continuous casting machine vertical surface foundation embedded iron part Download PDFInfo
- Publication number
- CN112431219A CN112431219A CN202011326055.3A CN202011326055A CN112431219A CN 112431219 A CN112431219 A CN 112431219A CN 202011326055 A CN202011326055 A CN 202011326055A CN 112431219 A CN112431219 A CN 112431219A
- Authority
- CN
- China
- Prior art keywords
- embedded iron
- buried
- iron pieces
- embedded
- continuous casting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 title claims abstract description 93
- 238000000034 method Methods 0.000 title claims abstract description 22
- 238000009434 installation Methods 0.000 title claims abstract description 16
- 238000009749 continuous casting Methods 0.000 title claims abstract description 9
- 229910052742 iron Inorganic materials 0.000 claims abstract description 37
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 11
- 239000010959 steel Substances 0.000 claims abstract description 11
- 238000003466 welding Methods 0.000 claims abstract description 10
- 238000005259 measurement Methods 0.000 claims abstract description 4
- 238000010276 construction Methods 0.000 description 6
- 230000008901 benefit Effects 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000007547 defect Effects 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004513 sizing Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/44—Foundations for machines, engines or ordnance
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
- E02D2300/0029—Steel; Iron
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention relates to a quick installation method of a vertical continuous casting machine vertical surface foundation embedded iron part, which comprises the following steps: prefabricating pre-buried iron pieces and arranging the pre-buried iron pieces according to the size of a drawing; step two: measuring the distance length from the embedded iron piece to the ground, and processing the steel bars to be welded according to the measurement; step three: welding the steel bars and the embedded iron pieces, controlling the length from the embedded iron pieces to the ground and the distance between the embedded iron pieces, and welding to form a whole; step four: hoisting the welded embedded iron member until the wallboard is fixed with the template; step five: the pre-buried ironware can not produce the skew because of the vibration when concreting. The invention improves the installation speed and precision of the pre-buried iron piece.
Description
Technical Field
The invention relates to the field of embedded iron part installation, in particular to a quick installation method for an embedded iron part of a vertical surface foundation of a vertical continuous casting machine.
Background
In the pre-embedded iron part construction of the traditional continuous casting machine, the construction period is short, the number is large, the hoisting is difficult, and the installation speed cannot keep up with the progress all the time. With the development of a large number of fine projects in China, particularly precise and accurate telephone projects, the requirement on the installation accuracy of pre-embedded iron pieces is high. The accuracy of pre-embedded iron part manufacturing and installation needs to be improved, the efficiency of pre-embedded iron part installation is increased, and time is saved for later installation engineering to improve benefits. The existing general manufacturing and installing method can not ensure the accuracy of the embedded iron parts in the construction process, the later-stage pouring is completed, the embedded iron parts cannot be found, the embedded iron parts are off tracking, the situation that the embedded iron parts go deep into concrete is comparatively all the same, and the later-stage embedded iron part welding construction difficulty is greatly deepened.
Disclosure of Invention
The invention aims to overcome the defects of the prior art, provides a quick mounting method for a vertical foundation embedded iron piece of a vertical continuous casting machine, overcomes the defects of the old manufacturing and mounting technical method, improves the mounting accuracy of the pre-embedded iron piece, and improves the mounting speed of the pre-embedded iron piece.
In order to solve the technical problem, the invention is realized as follows:
a quick installation method for vertical continuous casting machine facade foundation embedded iron parts is characterized by comprising the following steps:
the method comprises the following steps: prefabricating pre-buried iron pieces and arranging the pre-buried iron pieces according to the size of a drawing;
step two: measuring the distance length from the embedded iron piece to the ground, and processing the steel bars to be welded according to the measurement;
step three: welding the steel bars and the embedded iron pieces, controlling the length from the embedded iron pieces to the ground and the distance between the embedded iron pieces, and welding to form a whole;
step four: hoisting the welded embedded iron member until the wallboard is fixed with the template;
step five: the pre-buried ironware can not produce the skew because of the vibration when concreting.
The invention has the beneficial effects that: the method is practical, and according to the method provided by the application, the installation is more convenient and faster, the time is saved, and the construction speed and the accuracy of the pre-buried iron part are greatly improved;
the method has the advantages that the effect is remarkable, the accuracy of pre-embedded iron part installation can be improved according to the method, and the method is more convenient to use in the later period.
The method can obviously improve the construction speed, improve the accuracy of the embedded iron part and avoid the later benefit loss.
Drawings
The invention is described in further detail below with reference to the following figures and embodiments:
FIG. 1 is a schematic diagram of the process.
Detailed Description
As shown in fig. 1: a quick installation method for vertical continuous casting machine vertical surface foundation embedded iron parts is disclosed, wherein the method comprises the following steps:
1. arranging the processed pre-buried iron pieces according to the drawing size
2. Fixed-length processing welding reinforcing steel bar
3. The embedded iron piece and the steel bar are connected to form an integral hoisting;
the method comprises the following specific steps:
1. prefabricating embedded iron pieces 1 and arranging according to the drawing size interval 2;
2. measuring the distance length 4 from the embedded iron piece to the ground, and processing the steel bars 3 to be welded according to the measurement;
3. welding the steel bars and the embedded iron pieces, controlling the length from the embedded iron pieces to the ground and the distance between the embedded iron pieces, and welding to form a whole; and (5) hoisting and fixing.
4. Hoisting the welded embedded iron member until the wallboard is fixed with the template;
5. the pre-buried ironware can not produce the skew because of the vibration when concreting.
Example (b):
(1) firstly, pre-buried iron pieces are prefabricated and arranged according to the interval size of a drawing.
(2) And (5) sizing and processing the steel bars to be welded.
(3) According to the ground clearance of the pre-buried iron member of the drawing, the pre-buried iron member and the steel bar are welded to form a whole, and the hoisting is fixed.
Claims (1)
1. A quick installation method for vertical continuous casting machine facade foundation embedded iron parts is characterized by comprising the following steps:
the method comprises the following steps: prefabricating pre-buried iron pieces and arranging the pre-buried iron pieces according to the size of a drawing;
step two: measuring the distance length from the embedded iron piece to the ground, and processing the steel bars to be welded according to the measurement;
step three: welding the steel bars and the embedded iron pieces, controlling the length from the embedded iron pieces to the ground and the distance between the embedded iron pieces, and welding to form a whole;
step four: hoisting the welded embedded iron member until the wallboard is fixed with the template;
step five: the pre-buried ironware can not produce the skew because of the vibration when concreting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011326055.3A CN112431219A (en) | 2020-11-24 | 2020-11-24 | Quick installation method for vertical continuous casting machine vertical surface foundation embedded iron part |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011326055.3A CN112431219A (en) | 2020-11-24 | 2020-11-24 | Quick installation method for vertical continuous casting machine vertical surface foundation embedded iron part |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112431219A true CN112431219A (en) | 2021-03-02 |
Family
ID=74693848
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011326055.3A Pending CN112431219A (en) | 2020-11-24 | 2020-11-24 | Quick installation method for vertical continuous casting machine vertical surface foundation embedded iron part |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112431219A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001140348A (en) * | 1999-11-17 | 2001-05-22 | Daiwa House Ind Co Ltd | Structure of steel framed concrete foundation and column |
CN101307603A (en) * | 2008-06-06 | 2008-11-19 | 中冶天工上海十三冶建设有限公司 | Column base anchor bolt moving-out type fixing rack construction method |
CN103088843A (en) * | 2013-03-04 | 2013-05-08 | 济南城建集团有限公司 | Comprehensive pipe gallery pre-buried iron piece installing construction method |
CN109306740A (en) * | 2017-07-27 | 2019-02-05 | 五冶集团上海有限公司 | A kind of installation method of embedded iron parts |
CN110984397A (en) * | 2019-11-11 | 2020-04-10 | 朱崇峰 | Self-adjusting building embedded part and embedding method thereof |
-
2020
- 2020-11-24 CN CN202011326055.3A patent/CN112431219A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001140348A (en) * | 1999-11-17 | 2001-05-22 | Daiwa House Ind Co Ltd | Structure of steel framed concrete foundation and column |
CN101307603A (en) * | 2008-06-06 | 2008-11-19 | 中冶天工上海十三冶建设有限公司 | Column base anchor bolt moving-out type fixing rack construction method |
CN103088843A (en) * | 2013-03-04 | 2013-05-08 | 济南城建集团有限公司 | Comprehensive pipe gallery pre-buried iron piece installing construction method |
CN109306740A (en) * | 2017-07-27 | 2019-02-05 | 五冶集团上海有限公司 | A kind of installation method of embedded iron parts |
CN110984397A (en) * | 2019-11-11 | 2020-04-10 | 朱崇峰 | Self-adjusting building embedded part and embedding method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104975716A (en) | Construction method for employing dismounting-free formwork in casting constructional column and ring beam concrete | |
CN103485370B (en) | A kind of concrete construction control method preventing wallboard harmful cracks | |
CN112431219A (en) | Quick installation method for vertical continuous casting machine vertical surface foundation embedded iron part | |
CN201292673Y (en) | Floor concrete casting thickness controller | |
CN112411798A (en) | Synchronous construction method for prefabricated guide wall and main structure of toilet | |
CN206408951U (en) | A kind of architectural industrialization project conversion layer position level ladder muscle | |
CN205907609U (en) | Supplementary utensil in pre -buried hole of bridge supporting base stone location | |
CN110205943B (en) | Construction method for prefabricated simply-supported small box girder end cross beam | |
CN210264015U (en) | Tool type rear-added structural plate quick connecting structure | |
CN104015261B (en) | Combined, scalable prefabricated concrete element built-in fitting positions loose tool and construction technology thereof | |
CN113503032A (en) | Double-sided superposed shear wall cavity concrete pouring tool | |
CN202644483U (en) | Pier large steel template | |
CN102051888B (en) | Method for constructing built-in foundation bolt regulating hole of equipment foundation | |
CN207509468U (en) | A kind of assembly concrete post mold | |
CN101782330B (en) | Method for processing and building overhauling working lining bricks of vertical type vacuum refining furnace hearth | |
CN204551274U (en) | For the location structure that template of pier column of bridge is installed | |
CN219006422U (en) | Prefabricated cushion cap template of foam concrete | |
CN102116049A (en) | Drainage channel and method for pouring same | |
CN205438876U (en) | Whole shaping design die carrier of plate -girder steel reinforcement cage | |
CN217324775U (en) | Pre-buried reinforcing bar slot-in type tram prefabricated track roof beam and precast pile connection structure | |
CN218147809U (en) | High-speed railway prestressing force letter box girder end seals anchor device | |
CN211762449U (en) | Evaporate and press aerated concrete block wall body to bury a mounting structure | |
CN216974242U (en) | Tool for quickly positioning during installation of prefabricated staircase | |
CN218541008U (en) | Novel structure is handled to superimposed sheet makeup board seam | |
CN213703848U (en) | Precast beam steel base |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210302 |