CN112431219A - Quick installation method for vertical continuous casting machine vertical surface foundation embedded iron part - Google Patents

Quick installation method for vertical continuous casting machine vertical surface foundation embedded iron part Download PDF

Info

Publication number
CN112431219A
CN112431219A CN202011326055.3A CN202011326055A CN112431219A CN 112431219 A CN112431219 A CN 112431219A CN 202011326055 A CN202011326055 A CN 202011326055A CN 112431219 A CN112431219 A CN 112431219A
Authority
CN
China
Prior art keywords
embedded iron
buried
iron pieces
embedded
continuous casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011326055.3A
Other languages
Chinese (zh)
Inventor
张涛
桂怀亮
徐兰朵
王玉芹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd, Shanghai Ershiye Construction Co Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN202011326055.3A priority Critical patent/CN112431219A/en
Publication of CN112431219A publication Critical patent/CN112431219A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a quick installation method of a vertical continuous casting machine vertical surface foundation embedded iron part, which comprises the following steps: prefabricating pre-buried iron pieces and arranging the pre-buried iron pieces according to the size of a drawing; step two: measuring the distance length from the embedded iron piece to the ground, and processing the steel bars to be welded according to the measurement; step three: welding the steel bars and the embedded iron pieces, controlling the length from the embedded iron pieces to the ground and the distance between the embedded iron pieces, and welding to form a whole; step four: hoisting the welded embedded iron member until the wallboard is fixed with the template; step five: the pre-buried ironware can not produce the skew because of the vibration when concreting. The invention improves the installation speed and precision of the pre-buried iron piece.

Description

Quick installation method for vertical continuous casting machine vertical surface foundation embedded iron part
Technical Field
The invention relates to the field of embedded iron part installation, in particular to a quick installation method for an embedded iron part of a vertical surface foundation of a vertical continuous casting machine.
Background
In the pre-embedded iron part construction of the traditional continuous casting machine, the construction period is short, the number is large, the hoisting is difficult, and the installation speed cannot keep up with the progress all the time. With the development of a large number of fine projects in China, particularly precise and accurate telephone projects, the requirement on the installation accuracy of pre-embedded iron pieces is high. The accuracy of pre-embedded iron part manufacturing and installation needs to be improved, the efficiency of pre-embedded iron part installation is increased, and time is saved for later installation engineering to improve benefits. The existing general manufacturing and installing method can not ensure the accuracy of the embedded iron parts in the construction process, the later-stage pouring is completed, the embedded iron parts cannot be found, the embedded iron parts are off tracking, the situation that the embedded iron parts go deep into concrete is comparatively all the same, and the later-stage embedded iron part welding construction difficulty is greatly deepened.
Disclosure of Invention
The invention aims to overcome the defects of the prior art, provides a quick mounting method for a vertical foundation embedded iron piece of a vertical continuous casting machine, overcomes the defects of the old manufacturing and mounting technical method, improves the mounting accuracy of the pre-embedded iron piece, and improves the mounting speed of the pre-embedded iron piece.
In order to solve the technical problem, the invention is realized as follows:
a quick installation method for vertical continuous casting machine facade foundation embedded iron parts is characterized by comprising the following steps:
the method comprises the following steps: prefabricating pre-buried iron pieces and arranging the pre-buried iron pieces according to the size of a drawing;
step two: measuring the distance length from the embedded iron piece to the ground, and processing the steel bars to be welded according to the measurement;
step three: welding the steel bars and the embedded iron pieces, controlling the length from the embedded iron pieces to the ground and the distance between the embedded iron pieces, and welding to form a whole;
step four: hoisting the welded embedded iron member until the wallboard is fixed with the template;
step five: the pre-buried ironware can not produce the skew because of the vibration when concreting.
The invention has the beneficial effects that: the method is practical, and according to the method provided by the application, the installation is more convenient and faster, the time is saved, and the construction speed and the accuracy of the pre-buried iron part are greatly improved;
the method has the advantages that the effect is remarkable, the accuracy of pre-embedded iron part installation can be improved according to the method, and the method is more convenient to use in the later period.
The method can obviously improve the construction speed, improve the accuracy of the embedded iron part and avoid the later benefit loss.
Drawings
The invention is described in further detail below with reference to the following figures and embodiments:
FIG. 1 is a schematic diagram of the process.
Detailed Description
As shown in fig. 1: a quick installation method for vertical continuous casting machine vertical surface foundation embedded iron parts is disclosed, wherein the method comprises the following steps:
1. arranging the processed pre-buried iron pieces according to the drawing size
2. Fixed-length processing welding reinforcing steel bar
3. The embedded iron piece and the steel bar are connected to form an integral hoisting;
the method comprises the following specific steps:
1. prefabricating embedded iron pieces 1 and arranging according to the drawing size interval 2;
2. measuring the distance length 4 from the embedded iron piece to the ground, and processing the steel bars 3 to be welded according to the measurement;
3. welding the steel bars and the embedded iron pieces, controlling the length from the embedded iron pieces to the ground and the distance between the embedded iron pieces, and welding to form a whole; and (5) hoisting and fixing.
4. Hoisting the welded embedded iron member until the wallboard is fixed with the template;
5. the pre-buried ironware can not produce the skew because of the vibration when concreting.
Example (b):
(1) firstly, pre-buried iron pieces are prefabricated and arranged according to the interval size of a drawing.
(2) And (5) sizing and processing the steel bars to be welded.
(3) According to the ground clearance of the pre-buried iron member of the drawing, the pre-buried iron member and the steel bar are welded to form a whole, and the hoisting is fixed.

Claims (1)

1. A quick installation method for vertical continuous casting machine facade foundation embedded iron parts is characterized by comprising the following steps:
the method comprises the following steps: prefabricating pre-buried iron pieces and arranging the pre-buried iron pieces according to the size of a drawing;
step two: measuring the distance length from the embedded iron piece to the ground, and processing the steel bars to be welded according to the measurement;
step three: welding the steel bars and the embedded iron pieces, controlling the length from the embedded iron pieces to the ground and the distance between the embedded iron pieces, and welding to form a whole;
step four: hoisting the welded embedded iron member until the wallboard is fixed with the template;
step five: the pre-buried ironware can not produce the skew because of the vibration when concreting.
CN202011326055.3A 2020-11-24 2020-11-24 Quick installation method for vertical continuous casting machine vertical surface foundation embedded iron part Pending CN112431219A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011326055.3A CN112431219A (en) 2020-11-24 2020-11-24 Quick installation method for vertical continuous casting machine vertical surface foundation embedded iron part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011326055.3A CN112431219A (en) 2020-11-24 2020-11-24 Quick installation method for vertical continuous casting machine vertical surface foundation embedded iron part

Publications (1)

Publication Number Publication Date
CN112431219A true CN112431219A (en) 2021-03-02

Family

ID=74693848

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011326055.3A Pending CN112431219A (en) 2020-11-24 2020-11-24 Quick installation method for vertical continuous casting machine vertical surface foundation embedded iron part

Country Status (1)

Country Link
CN (1) CN112431219A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001140348A (en) * 1999-11-17 2001-05-22 Daiwa House Ind Co Ltd Structure of steel framed concrete foundation and column
CN101307603A (en) * 2008-06-06 2008-11-19 中冶天工上海十三冶建设有限公司 Column base anchor bolt moving-out type fixing rack construction method
CN103088843A (en) * 2013-03-04 2013-05-08 济南城建集团有限公司 Comprehensive pipe gallery pre-buried iron piece installing construction method
CN109306740A (en) * 2017-07-27 2019-02-05 五冶集团上海有限公司 A kind of installation method of embedded iron parts
CN110984397A (en) * 2019-11-11 2020-04-10 朱崇峰 Self-adjusting building embedded part and embedding method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001140348A (en) * 1999-11-17 2001-05-22 Daiwa House Ind Co Ltd Structure of steel framed concrete foundation and column
CN101307603A (en) * 2008-06-06 2008-11-19 中冶天工上海十三冶建设有限公司 Column base anchor bolt moving-out type fixing rack construction method
CN103088843A (en) * 2013-03-04 2013-05-08 济南城建集团有限公司 Comprehensive pipe gallery pre-buried iron piece installing construction method
CN109306740A (en) * 2017-07-27 2019-02-05 五冶集团上海有限公司 A kind of installation method of embedded iron parts
CN110984397A (en) * 2019-11-11 2020-04-10 朱崇峰 Self-adjusting building embedded part and embedding method thereof

Similar Documents

Publication Publication Date Title
CN104975716A (en) Construction method for employing dismounting-free formwork in casting constructional column and ring beam concrete
CN103485370B (en) A kind of concrete construction control method preventing wallboard harmful cracks
CN112431219A (en) Quick installation method for vertical continuous casting machine vertical surface foundation embedded iron part
CN201292673Y (en) Floor concrete casting thickness controller
CN112411798A (en) Synchronous construction method for prefabricated guide wall and main structure of toilet
CN206408951U (en) A kind of architectural industrialization project conversion layer position level ladder muscle
CN205907609U (en) Supplementary utensil in pre -buried hole of bridge supporting base stone location
CN110205943B (en) Construction method for prefabricated simply-supported small box girder end cross beam
CN210264015U (en) Tool type rear-added structural plate quick connecting structure
CN104015261B (en) Combined, scalable prefabricated concrete element built-in fitting positions loose tool and construction technology thereof
CN113503032A (en) Double-sided superposed shear wall cavity concrete pouring tool
CN202644483U (en) Pier large steel template
CN102051888B (en) Method for constructing built-in foundation bolt regulating hole of equipment foundation
CN207509468U (en) A kind of assembly concrete post mold
CN101782330B (en) Method for processing and building overhauling working lining bricks of vertical type vacuum refining furnace hearth
CN204551274U (en) For the location structure that template of pier column of bridge is installed
CN219006422U (en) Prefabricated cushion cap template of foam concrete
CN102116049A (en) Drainage channel and method for pouring same
CN205438876U (en) Whole shaping design die carrier of plate -girder steel reinforcement cage
CN217324775U (en) Pre-buried reinforcing bar slot-in type tram prefabricated track roof beam and precast pile connection structure
CN218147809U (en) High-speed railway prestressing force letter box girder end seals anchor device
CN211762449U (en) Evaporate and press aerated concrete block wall body to bury a mounting structure
CN216974242U (en) Tool for quickly positioning during installation of prefabricated staircase
CN218541008U (en) Novel structure is handled to superimposed sheet makeup board seam
CN213703848U (en) Precast beam steel base

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210302