CN113503032A - Double-sided superposed shear wall cavity concrete pouring tool - Google Patents
Double-sided superposed shear wall cavity concrete pouring tool Download PDFInfo
- Publication number
- CN113503032A CN113503032A CN202110760436.0A CN202110760436A CN113503032A CN 113503032 A CN113503032 A CN 113503032A CN 202110760436 A CN202110760436 A CN 202110760436A CN 113503032 A CN113503032 A CN 113503032A
- Authority
- CN
- China
- Prior art keywords
- barrel body
- sided
- concrete
- double
- shear wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/025—Buckets specially adapted for use with concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/04—Devices for both conveying and distributing
- E04G21/0418—Devices for both conveying and distributing with distribution hose
- E04G21/0427—Devices for both conveying and distributing with distribution hose on a static support, e.g. crane
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model provides a two-sided coincide shear wall cavity concrete placement instrument which characterized in that: the lifting barrel is a circular truncated cone type barrel body, the upper opening of the barrel body is large, the lower opening of the barrel body is small, four lifting lugs are arranged on the opened circumferential edge of the upper opening of the barrel body in an equal dividing mode, steel wire ropes are arranged in the lifting lugs, four supporting legs are arranged on the circumferential edge of the middle part of the circular truncated cone type barrel body in an equal dividing mode, the bottom of the circular truncated cone type barrel body is closed, and a through hole is formed in the center of a bottom plate of the closed barrel body; the guide pipe comprises a steel guide pipe, a clamp and a soft guide pipe; wherein: one end of the steel conduit is fixedly welded with the through hole of the bottom plate of the barrel body in a matching way, and the other end of the steel conduit is connected with the soft conduit through a hoop. The double-sided superposed shear wall cavity concrete pouring tool has the advantages of simple structure, convenience in manufacturing, reduction in concrete segregation probability, guarantee in concrete construction quality, convenience in concrete construction, waste reduction, low cost, high turnover frequency and labor and material cost saving.
Description
Technical Field
The invention relates to a concrete pouring tool, in particular to a double-faced superposed shear wall cavity concrete pouring tool.
Background
Over the 21 st century, fabricated buildings have met with new opportunities for development against the background of "environmental protection and lack of labor". The assembly type building technology is developed more and more mature under the powerful support of the government, and the assembly type building industry is in a new stage of rapid development by the advantages of industrialization, standardization, design and construction integration, mechanical automation and industrialization.
The assembly type double-sided superposed shear wall structure system is an assembly type structure system introduced from Germany, and has the advantages of short period, easily controlled quality, good component impression, reduced field wet operation, material saving, low carbon, environmental protection and the like. In the field construction process, when finding that the middle 100mm cavity concrete is poured, it is extremely inconvenient, and the waste is more.
The known manner of pouring of cavity concrete therefore suffers from the inconveniences and problems described above.
Disclosure of Invention
The invention aims to provide a safe and reliable double-sided superposed shear wall cavity concrete pouring tool.
In order to achieve the purpose, the technical solution of the invention is as follows:
the utility model provides a two-sided coincide shear force wall cavity concrete placement instrument, two-sided coincide shear force wall thickness is 200mm, and wherein two-sided 50mm is precast concrete, and middle 100mm is cavity cast in situ concrete, and the middle truss steel bar connection that uses, concrete placement instrument include hoist and mount bucket, pipe, its characterized in that:
the hoisting barrel is a circular truncated cone type barrel body, the upper opening of the barrel body is large, the lower opening of the barrel body is small, four lifting lugs are arranged on the opening circumferential edge of the upper opening of the barrel body in an equal dividing mode, and steel ropes are arranged in the lifting lugs to facilitate the hoisting of the hoisting barrel by a tower crane; four support legs are arranged on the circumferential edge of the middle part of the circular table type barrel body in equal intervals so as to keep the stability of the hoisting barrel; the bottom of the circular table type barrel body is closed, and a through hole is formed in the center of a bottom plate of the closed barrel body;
the guide pipe comprises a steel guide pipe, a clamp and a soft guide pipe;
wherein: one end of the steel conduit is fixedly welded with the through hole of the bottom plate of the barrel body in a matching way, and the other end of the steel conduit is connected with the soft conduit through a hoop.
The double-faced superposed shear wall cavity concrete pouring tool can be further realized by adopting the following technical measures.
In the double-sided superposed shear wall cavity concrete pouring tool, the support legs are L-shaped steel bars.
According to the double-faced superposed shear wall cavity concrete pouring tool, the diameter of the upper opening of the barrel body is more than or equal to 700 mm.
According to the double-faced superposed shear wall cavity concrete pouring tool, the diameter of the lower opening of the barrel body is more than or equal to 300 mm.
According to the double-sided superposed shear wall cavity concrete pouring tool, the diameter of the guide pipe is more than or equal to 80 mm.
After the technical scheme is adopted, the double-sided superposed shear wall cavity concrete pouring tool has the following advantages:
1. the pouring tool device has simple structure and convenient manufacture;
2. the segregation probability of the concrete is reduced, the construction quality of the concrete is ensured, the concrete is convenient to construct, and the waste is reduced;
3. low cost, high turnover number, saving labour and material cost.
Drawings
FIG. 1 is a schematic structural view of a casting tool according to an embodiment of the present invention;
FIG. 2 is a schematic view of a casting tool according to an embodiment of the present invention;
fig. 3 is a schematic view of a catheter structure according to an embodiment of the present invention.
Detailed Description
The present invention will be further described with reference to the following examples and the accompanying drawings.
Example 1
According to the double-sided superposed shear wall cavity concrete pouring tool, the thickness of the double-sided superposed shear wall is 200mm, wherein 50mm of double sides are precast concrete, 100mm of the middle is cavity cast-in-place concrete, the middle is connected by using truss steel bars, and the concrete pouring tool comprises a hoisting barrel and a guide pipe.
Referring to fig. 1, fig. 1 is a schematic structural diagram of a casting tool according to an embodiment of the present invention. As shown in the figure, the hoisting barrel is a circular truncated cone type barrel body 1, the upper opening of the barrel body is large, the lower opening of the barrel body is small, four lifting lugs 2 are arranged on the opening circumferential edge of the upper opening of the barrel body in an equal division manner, and steel ropes 3 are arranged in the lifting lugs to facilitate the hoisting of the hoisting barrel by a tower crane; four supporting legs 4 are arranged on the circumferential edge of the middle part of the circular table type barrel body in equal intervals, and a ring rib is additionally arranged at the welding position of the supporting legs so as to keep the stability of the hoisting barrel; the bottom of the circular table type barrel body is closed, and a through hole is formed in the center of a bottom plate of the closed barrel body;
fig. 3 is a schematic view of a catheter structure according to an embodiment of the present invention. The guide pipe 5 comprises a steel guide pipe 51, a clamp 52 and a soft guide pipe 53;
wherein: one end of the steel conduit is fixedly welded with the through hole of the bottom plate of the barrel body in a matching way, and the other end of the steel conduit is connected with the soft conduit through a hoop. The supporting legs are L-shaped steel bars. The diameter of the upper opening of the barrel body is 700 mm. The diameter of the lower opening of the barrel body is 300 mm. The diameter of the conduit is 80 mm.
Example 2
Fig. 2 is a schematic view of a use state of the casting tool according to the embodiment of the present invention. The invention discloses a use method of a double-sided superposed shear wall cavity concrete pouring tool, which comprises the following steps:
1. and placing the pouring tool on the floor 6 stably and standing in the middle of the double-faced superposed wall 7.
2. When concrete is poured, the concrete is poured into the pouring tool through the pump pipe, and the concrete is poured into the cavity of the double-faced superposed shear wall through the pouring tool.
3. The concrete adopts fine aggregate concrete, and the tower crane is used for matching in a movable mode.
4. Vibrating with a vibrating rod with the diameter of 30 mm.
The use attention key points of the double-sided superposed shear wall cavity concrete pouring tool are as follows:
1. the barrel body is manufactured strictly according to the drawing, the welding quality is guaranteed, and slurry cannot leak from the barrel body.
2. In the construction process, the concrete is guaranteed to be poured at a constant speed, and impact rollover is avoided.
3. When the tower crane is used, the tower crane is matched with a moving position, and vibration is timely carried out.
The double-sided superposed shear wall cavity concrete pouring tool has the advantages of being low in production cost and high in turnover frequency, feeding concrete to the bottom of the double-sided superposed wall through the guide pipe, having the function of the guide pipe, reducing the segregation probability of the concrete, guaranteeing the construction quality of the concrete, facilitating the construction of the concrete, reducing waste, saving labor cost and saving material cost.
The double-sided laminated shear wall cavity concrete pouring tool is applied to the Meilongdan residential project, has obvious effect, is uniformly approved by a supervision unit and a construction unit, and is highly praised.
The above embodiments are provided only for illustrating the present invention and not for limiting the present invention, and those skilled in the art can make various changes or modifications without departing from the spirit and scope of the present invention. Accordingly, all equivalents are intended to fall within the scope of the invention, which is defined in the claims.
Claims (5)
1. The utility model provides a two-sided coincide shear force wall cavity concrete placement instrument, two-sided coincide shear force wall thickness is 200mm, and wherein two-sided 50mm is precast concrete, and middle 100mm is cavity cast in situ concrete, and the middle truss steel bar connection that uses, concrete placement instrument include hoist and mount bucket, pipe, its characterized in that:
the hoisting barrel is a circular truncated cone type barrel body, the upper opening of the barrel body is large, the lower opening of the barrel body is small, four lifting lugs are arranged on the opening circumferential edge of the upper opening of the barrel body in an equal dividing mode, and steel ropes are arranged in the lifting lugs to facilitate the hoisting of the hoisting barrel by a tower crane; four support legs are arranged on the circumferential edge of the middle part of the circular table type barrel body in equal intervals so as to keep the stability of the hoisting barrel; the bottom of the circular table type barrel body is closed, and a through hole is formed in the center of a bottom plate of the closed barrel body;
the guide pipe comprises a steel guide pipe, a clamp and a soft guide pipe;
wherein: one end of the steel conduit is fixedly welded with the through hole of the bottom plate of the barrel body in a matching way, and the other end of the steel conduit is connected with the soft conduit through a hoop.
2. The double-sided laminated shear wall cavity concrete casting tool of claim 1, wherein the legs are L-shaped rebar.
3. The double-sided superposed shear wall cavity concrete pouring tool according to claim 1, wherein the diameter of the upper opening of the barrel body is more than or equal to 700 mm.
4. The double-sided superposed shear wall cavity concrete pouring tool according to claim 1, wherein the diameter of the lower opening of the barrel body is more than or equal to 300 mm.
5. The double-sided laminated shear wall cavity concrete casting tool according to claim 1, wherein the diameter of the guide pipe is greater than or equal to 80 mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110760436.0A CN113503032A (en) | 2021-07-06 | 2021-07-06 | Double-sided superposed shear wall cavity concrete pouring tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110760436.0A CN113503032A (en) | 2021-07-06 | 2021-07-06 | Double-sided superposed shear wall cavity concrete pouring tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113503032A true CN113503032A (en) | 2021-10-15 |
Family
ID=78011281
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110760436.0A Pending CN113503032A (en) | 2021-07-06 | 2021-07-06 | Double-sided superposed shear wall cavity concrete pouring tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113503032A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113931453A (en) * | 2021-11-25 | 2022-01-14 | 广东蕉岭建筑工程集团有限公司 | Construction tool for pouring template |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001140256A (en) * | 1999-11-15 | 2001-05-22 | Taisei Corp | Concrete casting device |
CN203320963U (en) * | 2013-06-19 | 2013-12-04 | 中冶天工上海十三冶建设有限公司 | Detachable discharging cylinder for concrete casting |
CN204112742U (en) * | 2014-06-11 | 2015-01-21 | 山东电力建设第一工程公司 | A kind of Electronic control concrete ash bucket |
CN207160013U (en) * | 2017-09-05 | 2018-03-30 | 成都华川公路建设集团有限公司 | One kind pours conduit from gravity |
CN207538471U (en) * | 2017-12-05 | 2018-06-26 | 中铁十二局集团建筑安装工程有限公司 | A kind of funnel poured for post-cast strip |
CN209228058U (en) * | 2018-09-06 | 2019-08-09 | 上海宝冶集团有限公司 | A kind of concrete transportation tooling |
-
2021
- 2021-07-06 CN CN202110760436.0A patent/CN113503032A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001140256A (en) * | 1999-11-15 | 2001-05-22 | Taisei Corp | Concrete casting device |
CN203320963U (en) * | 2013-06-19 | 2013-12-04 | 中冶天工上海十三冶建设有限公司 | Detachable discharging cylinder for concrete casting |
CN204112742U (en) * | 2014-06-11 | 2015-01-21 | 山东电力建设第一工程公司 | A kind of Electronic control concrete ash bucket |
CN207160013U (en) * | 2017-09-05 | 2018-03-30 | 成都华川公路建设集团有限公司 | One kind pours conduit from gravity |
CN207538471U (en) * | 2017-12-05 | 2018-06-26 | 中铁十二局集团建筑安装工程有限公司 | A kind of funnel poured for post-cast strip |
CN209228058U (en) * | 2018-09-06 | 2019-08-09 | 上海宝冶集团有限公司 | A kind of concrete transportation tooling |
Non-Patent Citations (1)
Title |
---|
汪杰等: "《装配式混凝土建筑设计与应用》", 31 May 2018 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113931453A (en) * | 2021-11-25 | 2022-01-14 | 广东蕉岭建筑工程集团有限公司 | Construction tool for pouring template |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113503032A (en) | Double-sided superposed shear wall cavity concrete pouring tool | |
CN108547383B (en) | Hoisting and inclined strut integrated embedded part and using method | |
CN110344535A (en) | A kind of prefabricated assembled combined wall board and construction method realized concealed beam and exempt from formwork | |
CN207177286U (en) | Add region mould after fabricated shear wall is reserved | |
CN208163934U (en) | A kind of septic tank mould | |
CN110524714A (en) | A kind of super-large diameter UHPC tubular pole production technology and horizontal prefab-form system | |
CN211499784U (en) | Pouring module device after secondary hole opening of floor slab | |
CN211229781U (en) | Novel prefabricated hollow enclosure | |
CN202644483U (en) | Pier large steel template | |
CN209412687U (en) | A kind of concrete cast template system for large-scale aqueduct | |
CN216949480U (en) | Bathroom is waterproof and main part concrete once pours can have enough to meet need design mould | |
CN214520882U (en) | Manufacturing device for aluminum mould wall bolt hole plugging block | |
CN216076331U (en) | Interior wall template positioning control device | |
CN211897852U (en) | Hollow slab secondary end-sealing preformed hole template box | |
CN208197138U (en) | Suspender is used in a kind of Precast Concrete Box Girder formwork hoisting and demoulding | |
CN218147809U (en) | High-speed railway prestressing force letter box girder end seals anchor device | |
CN210798476U (en) | Prefabricated enclosure column and enclosure | |
CN216305352U (en) | Reusable embedded rubber sleeve for wall-attached guide seat bolt of integral lifting frame | |
CN212832343U (en) | PC post installation auxiliary tool assembly | |
CN220927931U (en) | Tubular prefabricated bolt hole die | |
CN210368973U (en) | Can have enough to meet need and pour stake core sleeve device | |
CN202985769U (en) | Pipeline mold with operating platform | |
CN220521971U (en) | Round shaping inner mould plate | |
CN212452325U (en) | Device for quickly installing thin-wall hollow pier steel bars | |
CN220218944U (en) | Disassembly-free integrated square pile template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20211015 |