CN212832343U - PC post installation auxiliary tool assembly - Google Patents

PC post installation auxiliary tool assembly Download PDF

Info

Publication number
CN212832343U
CN212832343U CN202020921691.XU CN202020921691U CN212832343U CN 212832343 U CN212832343 U CN 212832343U CN 202020921691 U CN202020921691 U CN 202020921691U CN 212832343 U CN212832343 U CN 212832343U
Authority
CN
China
Prior art keywords
column
hoisting
positioning
tool
structure surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020921691.XU
Other languages
Chinese (zh)
Inventor
王红军
张锋
崔建平
刘瑞牛
李列娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Scegc No2 Construction Engineering Group Co ltd
Original Assignee
Scegc No2 Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Scegc No2 Construction Engineering Group Co ltd filed Critical Scegc No2 Construction Engineering Group Co ltd
Priority to CN202020921691.XU priority Critical patent/CN212832343U/en
Application granted granted Critical
Publication of CN212832343U publication Critical patent/CN212832343U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a PC post installation auxiliary tool assembly, which comprises a hoisting tool and a positioning tool, wherein the hoisting tool is integrally of an L-shaped structure and comprises a first structure surface attached to the top end of a PC post and a second structure surface attached to the side wall of the PC post, and a hoisting part is arranged at the joint of the first structure surface and the second structure surface; the whole T type structure that is of location frock includes transverse orientation pole and the longitudinal orientation pole with PC post lateral wall laminating, all be equipped with the location portion fixed with PC post installation rim of a cup on transverse orientation pole and the longitudinal orientation pole. The hoisting tool can enable the PC column after hoisting to reach a vertical state, reduces the swing of the transferring process, is safer, can save the time of transferring and putting in the process of installing the cup opening, reduces manual auxiliary work and improves the construction safety. The positioning tool can limit the PC column, reduce the adjusting difficulty, improve the installation efficiency and save certain tools and labor force.

Description

PC post installation auxiliary tool assembly
Technical Field
The utility model relates to a PC post technical field especially relates to a tooling assembly is assisted in PC post installation.
Background
PC columns are the english abbreviation for concrete precast elements and are known in the field of housing industrialization as PC building blocks. Such as prefabricated reinforced concrete column foundation, prefabricated steel structure steel column foundation, street lamp billboard column reinforced concrete foundation and prefabricated floor slab. The corresponding traditional cast-in-place concrete needs site moulding, site pouring and site maintenance. The concrete prefabricated member is widely applied to the fields of buildings, traffic, water conservancy and the like, and plays an important role in national economy. Compared with cast-in-place concrete, the prefabricated concrete member produced in factory has many advantages, safe manufacture, reliable quality, high production speed, low cost and greatly reduced environmental pollution.
The PC column is prefabricated and formed in a factory, is horizontally placed after being transported to a site, needs to be hoisted and then is placed into a prefabricated installation cup mouth on the site for installation and fixation, when the PC column is prefabricated in the factory, a lifting hook is prefabricated on the side wall of the PC column, so that the hoisting can be conveniently carried out on the site, and after the PC column is hoisted by the lifting hook, the PC column is still inclined, and when the PC column is placed into the installation cup mouth, the PC column needs to be manually assisted to be vertical, so that the PC column has great potential safety hazard and wastes time and labor; meanwhile, when the PC column is placed in an installation cup mouth for positioning, the installation accuracy is difficult to ensure due to the fact that the positioning accuracy is high and the PC column is long and heavy.
Disclosure of Invention
In view of the existing problems, the utility model aims to provide a PC column installation auxiliary tool assembly, which comprises a hoisting tool and a positioning tool, wherein the hoisting tool is integrally of an L-shaped structure and comprises a first structure surface attached to the top end of the PC column and a second structure surface attached to the side wall of the PC column, and a hoisting part is arranged at the joint of the first structure surface and the second structure surface; the whole T type structure that is of location frock includes transverse orientation pole and the longitudinal orientation pole with PC post lateral wall laminating, all be equipped with the location portion fixed with PC post installation rim of a cup on transverse orientation pole and the longitudinal orientation pole. The hoisting tool can enable the PC column to be vertical after being hoisted, so that the PC column can be conveniently and smoothly placed into the mounting cup mouth, swing in the dispatching and transporting process and manual auxiliary work are reduced, and the construction safety is improved; the location frock can carry on spacingly to the PC post, reduces the degree of difficulty of adjustment, improves the installation effectiveness, can save certain instrument and labour simultaneously.
In order to achieve the above object, the utility model adopts the following technical scheme: a PC post installation auxiliary tool assembly characterized in that: the hoisting tool is of an L-shaped structure integrally and comprises a first structure surface attached to the top end of the PC column and a second structure surface attached to the side wall of the PC column, and a hoisting part is arranged at the joint of the first structure surface and the second structure surface; the whole T type structure that is of location frock includes transverse orientation pole and the longitudinal orientation pole with PC post lateral wall laminating, all be equipped with the location portion fixed with PC post installation rim of a cup on transverse orientation pole and the longitudinal orientation pole.
Preferably, the first structure surface and the second structure surface are sequentially and uniformly provided with a first positioning hole and a second positioning hole.
Preferably, the hoisting part is a circular hoisting ring.
Preferably, the positioning part comprises a positioning block which is arranged at one end of the transverse positioning rod far away from the longitudinal positioning rod and is fixedly arranged at the two ends of the longitudinal positioning rod, and the positioning block is provided with a mounting hole.
The utility model has the advantages that: (1) the hoisting tool can enable the PC column after hoisting to reach a vertical state, reduces the swing of the transferring process, is safer, can save the time of transferring and putting in the process of installing the cup opening, reduces manual auxiliary work and improves the construction safety. (2) The positioning tool can limit the PC column, reduce the adjusting difficulty, improve the installation efficiency and save certain tools and labor force.
Drawings
Fig. 1 is the utility model discloses lift by crane frock elevation.
Fig. 2 is the utility model discloses lift by crane frock left side view.
Fig. 3 is the utility model discloses lift by crane frock top view.
Fig. 4 is the utility model discloses location frock structure sketch map.
Fig. 5 is the PC column hoisting process state diagram of the present invention.
Fig. 6 is the schematic view of the PC column of the present invention in a vertical position.
Fig. 7 is a schematic diagram of the positioning state of the PC column of the present invention.
Detailed Description
In order to make those skilled in the art better understand the technical solution of the present invention, the following describes the technical solution of the present invention with reference to the accompanying drawings and embodiments.
Referring to the attached drawings 1-7, the PC column installation auxiliary tool assembly comprises a lifting tool 1 and a positioning tool 2, wherein the lifting tool 1 is integrally of an L-shaped structure, preferably formed by welding 8mm thick steel plates, and comprises a first structure surface 1a attached to the top end of a PC column 3 and a second structure surface 1b attached to the side wall of the PC column 3, a lifting part 4 is arranged at the joint of the first structure surface 1a and the second structure surface 1b, the lifting part 4 is lifted through lifting equipment, one end of the PC column 3 which is horizontally placed in a prefabricated mode is lifted into a vertical shape, and then the PC column is placed into a prefabricated installation cup opening 5 to be installed and fixed.
Further, in order to increase the reliability of attaching and hoisting the hoisting tool 1 and the PC column 3, the first structure surface 1a and the second structure surface 1b are sequentially and uniformly provided with a first positioning hole 101 and a second positioning hole 102. The PC column 3 is embedded with embedded steel bars 31 corresponding to the first positioning holes 101 and embedded holes 32 having side walls corresponding to the second positioning holes 102. Before hoisting, the hoisting tool 1 is attached to the hoisting end and the side wall of the PC column 3 on the ground, embedded steel bars 31 are inserted into the first positioning holes 101, the second positioning holes 102 correspond to the embedded holes 32, the hoisting tool 1 is integrally attached and fixed (preferably, fixed through expansion bolts) to the PC column 3 through the second positioning holes 102 and the embedded holes 32, and finally, the hoisting part 4 (preferably, a steel 20mm circular hoisting ring welded and fixed to the hoisting tool 1) is hoisted through hoisting equipment, so that the PC column 3 is vertically placed into the mounting cup mouth 5 and is mounted and fixed through the positioning tool 2. The hoisting tool 1 can enable the hoisted PC column 3 to reach a vertical state, reduce swing in the process of transferring and transporting, is safer, and can save time in the process of transferring and placing the installation cup mouth 5.
Further in order to install PC post 3 fast, accurate and laborsaving for the convenience, location frock 2 is whole for T type structure (preferably 100mm 100mmH shaped steel welding forms), includes transverse orientation pole 2a and the longitudinal orientation pole 2b with the 3 lateral wall laminating of PC post, all be equipped with on transverse orientation pole 2a and the longitudinal orientation pole 2b with the fixed location portion of 3 installation rim of a cup 5 of PC post. During the use, earlier fix location frock 2 monolithic stationary at installation rim of a cup 5 edge through the locating part, and make the accurate position of 2a of transverse orientation pole and 2b inside walls of longitudinal positioning pole for laminating PC post 3 installation, then put into installation rim of a cup 5 with the PC post 3 of hoist and mount coming, and make the lateral wall laminate in proper order on 2a of transverse orientation pole and 2b inside walls of longitudinal positioning pole, then can choose jack 7 for use and exert external force on the lateral wall of the PC post 3 of not laminating with location frock 2, finely tune the plane position and the straightness that hangs down of PC post 3, make it reach the construction requirement. Use this location frock 2 can carry on spacingly to PC post 3, reduce the degree of difficulty of adjustment, improve the installation effectiveness, can save certain instrument and labour simultaneously.
Further in order to facilitate the quick and fastening installation of location frock 2, location portion include keep away from longitudinal positioning rod 2b one end at transverse positioning rod 2a, and longitudinal positioning rod 2b both ends all be equipped with 5 marginal fixed mounting's of installation rim of a cup locating piece 6 (preferably 8mm thick steel plate), the mounting hole 61 has been seted up on locating piece 6. During the specific installation, hug closely locating piece 6 at 5 edge surfaces of installation rim of a cup, through expansion bolts and mounting hole 61's cooperation, will fix a position 2 monolithic stationary in 5 edges of installation rim of a cup.
The principle of the utility model is that: when the positioning tool is used, the positioning tool 2 is integrally fixed at the edge of the mounting cup opening 5 through the positioning block 6, and the inner side walls of the transverse positioning rod 2a and the longitudinal positioning rod 2b are adjusted to be in accurate positions attached to the PC column 3; then lift by crane through hoist and mount frock 1, 3 one end lifts by crane into the vertical form with the level PC post that places, then puts into prefabricated installation rim of a cup 5 in the installation fixed to make the lateral wall laminate in proper order on transverse positioning pole 2a and longitudinal positioning pole 2b inside wall, then choose for use jack 7 to exert external force on the lateral wall of PC post 3 not laminating with location frock 2, finely tune the plane position and the straightness that hangs down of PC post 3, make it reach the construction requirement.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (4)

1. A PC post installation auxiliary tool assembly characterized in that: the hoisting tool comprises a hoisting tool (1) and a positioning tool (2), wherein the hoisting tool (1) is integrally of an L-shaped structure and comprises a first structure surface (1a) attached to the top end of a PC (polycarbonate) column (3) and a second structure surface (1b) attached to the side wall of the PC column (3), and a hoisting part (4) is arranged at the joint of the first structure surface (1a) and the second structure surface (1 b); the positioning tool (2) is integrally of a T-shaped structure and comprises a transverse positioning rod (2a) and a longitudinal positioning rod (2b) which are attached to the side wall of the PC column (3), and positioning portions fixed with the PC column (3) mounting cup opening (5) are arranged on the transverse positioning rod (2a) and the longitudinal positioning rod (2 b).
2. A PC column mounting aid kit as claimed in claim 1, wherein: and the first structure surface (1a) and the second structure surface (1b) are sequentially and uniformly provided with a first positioning hole (101) and a second positioning hole (102).
3. A PC pole mounting aid kit as claimed in claim 2, wherein: the hoisting part (4) is a circular hoisting ring.
4. A PC pole mounting aid kit as claimed in claim 3, wherein: the positioning part comprises a positioning block (6) which is arranged at one end of the transverse positioning rod (2a) far away from the longitudinal positioning rod (2b) and at two ends of the longitudinal positioning rod (2b) and fixedly installed with the edge of the mounting cup opening (5), and a mounting hole (61) is formed in the positioning block (6).
CN202020921691.XU 2020-05-27 2020-05-27 PC post installation auxiliary tool assembly Active CN212832343U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020921691.XU CN212832343U (en) 2020-05-27 2020-05-27 PC post installation auxiliary tool assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020921691.XU CN212832343U (en) 2020-05-27 2020-05-27 PC post installation auxiliary tool assembly

Publications (1)

Publication Number Publication Date
CN212832343U true CN212832343U (en) 2021-03-30

Family

ID=75168142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020921691.XU Active CN212832343U (en) 2020-05-27 2020-05-27 PC post installation auxiliary tool assembly

Country Status (1)

Country Link
CN (1) CN212832343U (en)

Similar Documents

Publication Publication Date Title
CN210315639U (en) Accurate positioning auxiliary structure of major diameter steel core concrete column socket joint formula column base
CN212832343U (en) PC post installation auxiliary tool assembly
CN110344535A (en) A kind of prefabricated assembled combined wall board and construction method realized concealed beam and exempt from formwork
CN213011533U (en) Assembled concrete prefabricated staircase hoist
CN217128951U (en) Adjustable independent support construction structures in basement post-cast strip
CN211691524U (en) Prefabricated post positioner
CN203007965U (en) Steel hanging box system for underwater high-rise pile cap construction
CN211229781U (en) Novel prefabricated hollow enclosure
CN212001240U (en) Accurate positioner of street lamp basis and built-in fitting
CN211735427U (en) Adjustable forming lattice column jig frame
CN211420889U (en) Temporary limiting device for linear adjustment of PC track beam
CN210858229U (en) Assembled precast concrete enclosure
CN217174890U (en) Tool for positioning street lamp basic embedded part
CN110820596A (en) Temporary limiting device for linear adjustment of PC track beam and using method
CN113503032A (en) Double-sided superposed shear wall cavity concrete pouring tool
CN112323990A (en) Method for connecting assembled floor slab and structural column
CN220868882U (en) Reusable bearing device with assembled structure
CN212335664U (en) Supporting and linear adjustment temporary fixing device for pc track beam
CN211250594U (en) Pouring mold for pre-buried hand hole position wallboard
CN215670050U (en) Assembled balcony prefabricated part
CN217399716U (en) General prefabricated assembled main transformer basis of cavity body
CN214614156U (en) Prefabricated reinforced concrete forming die
CN218540756U (en) Light prefabricated tower mast flange foundation
CN211736484U (en) Assembled prestressing force board reinforcing apparatus that shears
CN220580266U (en) Precast concrete side wall structure for transformer substation based on digital assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant