CN211250594U - Pouring mold for pre-buried hand hole position wallboard - Google Patents

Pouring mold for pre-buried hand hole position wallboard Download PDF

Info

Publication number
CN211250594U
CN211250594U CN201921536336.4U CN201921536336U CN211250594U CN 211250594 U CN211250594 U CN 211250594U CN 201921536336 U CN201921536336 U CN 201921536336U CN 211250594 U CN211250594 U CN 211250594U
Authority
CN
China
Prior art keywords
fixed
hole site
mold
pouring
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921536336.4U
Other languages
Chinese (zh)
Inventor
胡兴文
杜娟娟
刘海鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhongtian Building Industrialization Co ltd
Original Assignee
Zhejiang Zhongtian Building Industrialization Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhongtian Building Industrialization Co ltd filed Critical Zhejiang Zhongtian Building Industrialization Co ltd
Priority to CN201921536336.4U priority Critical patent/CN211250594U/en
Application granted granted Critical
Publication of CN211250594U publication Critical patent/CN211250594U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a pouring mould of pre-buried hand hole site wallboard, including the base to and vertical fixation is in a pair of first side form and a pair of second side form of base top, second side form be located between two first side forms, first side form on set up one row of reinforcing bar hole perpendicular first side form surface, the top of second side form is fixed with the hole site mould support of at least one L type, the one end of hole site mould support is equipped with the fixing base, the fixing base pass through the top of bolt fastening at the second side form, the other end bottom of hole site mould support is vertical to be fixed with a connecting rod, the bottom of connecting rod is fixed with a hole site mould. The utility model has the advantages of simple and reasonable structure, convenient to use fixes the hole site mould through hole site mould support to directly reserve the hole site of socket when pouring.

Description

Pouring mold for pre-buried hand hole position wallboard
Technical Field
The utility model relates to a pouring mould of pre-buried hand hole position wallboard.
Background
The assembled reinforced concrete structure is one of the important directions of the development of the building structure in China, compared with a cast-in-place construction method, the assembled construction can better meet the requirements of land saving, energy saving, water saving, environmental protection and the like of green construction, the negative influence on the environment is reduced, the development of the industrialization of the building in China is facilitated, the production efficiency is improved, the energy is saved, the green and environment-friendly building is developed, and the improvement and the guarantee of the quality of the building engineering are facilitated.
Because the wall panel needs to be provided with the socket groove for installing the socket, the wall panel with the embedded hand hole position can be directly poured when the wall panel is poured in order to save the socket groove during assembly, however, the pouring mold is still lacked at present.
SUMMERY OF THE UTILITY MODEL
To the above problem, the utility model provides a pouring mould of pre-buried hand hole site wallboard has effectively solved the problem pointed out in the background art.
The utility model adopts the technical proposal that:
the utility model provides a casting mold of pre-buried hand hole position wallboard, includes the base to and vertical fixation is in a pair of first side form and a pair of second side form of base top, second side form be located between two first side forms, first side form on set up one row of reinforcing bar hole perpendicular first side form surface, the top of second side form is fixed with the hole site mould support of at least one L type, the one end of hole site mould support is equipped with the fixing base, the fixing base pass through the top of bolt fastening at the second side form, the vertical connecting rod that is fixed with in other end bottom of hole site mould support, the bottom of connecting rod is fixed with a hole site mould.
The hole site mould support is welded with the connecting rod, and the connecting rod and the hole site mould are integrated into one piece, can take out the hole site mould from the wallboard through the connecting rod after pouring.
Preferably, a row of bolt holes are formed in the top of the second side die at equal intervals along the second side die, and the bolts penetrate through the fixing seat and then are matched and fixed with the bolt holes.
The hole site mould support can select suitable bolt hole to fix according to the fixed position of hole site mould to be applicable to the pouring of the different wallboard in hole site position.
Preferably, the bottom of the reinforcing steel bar hole is sealed in the first side die, and the top of the reinforcing steel bar hole extends out of the first side die.
Preferably, the first side die and the second side die are fixed on the base through bolts, and the base is fixed on the ground through bolts.
The utility model has the advantages of simple and reasonable structure, convenient to use fixes the hole site mould through hole site mould support to directly reserve the hole site of socket when pouring.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Detailed Description
The present invention will be described in further detail below with reference to specific embodiments and with reference to the attached drawings.
Example 1
As shown in fig. 1, a pouring mold of pre-buried hand hole position wallboard, including base 1 to and vertical fixation at a pair of first side form 2 and a pair of second side form 3 of base 1 top, second side form 3 be located between two first side forms 2, first side form 2 on set up one row of perpendicular first side form 2 surperficial reinforcing bar hole 4, the top of second side form 3 is fixed with the hole site mould support 5 of at least one L type, the one end of hole site mould support 5 is equipped with fixing base 6, fixing base 6 pass through bolt 7 and fix the top at second side form 3, the vertical connecting rod 8 that is fixed with in other end bottom of hole site mould support 5, the bottom of connecting rod 8 is fixed with a hole site mould 9.
A row of bolt holes 10 have been seted up along second side mould 3 equidistance in the top of second side mould 3, bolt 7 pass behind the fixing base 6 and match with bolt holes 10 and fix.
The bottom of the reinforcing steel bar hole 4 is sealed in the first side die 2, and the top of the reinforcing steel bar hole extends out of the first side die 2.
The first side die 2 and the second side die 3 are fixed on the base 1 through bolts, and the base 1 is fixed on the ground through bolts.
The utility model discloses an installation method:
the base 1 is fixed on the ground through bolts, the first side die 2 and the second side die 3 are fixed on the base 1 through bolts, and the hole site die support 5 is fixed on the second side die 3 through bolts 7.
The utility model discloses a theory of operation:
in an initial state, the hole site mold support 5 is not installed and fixed on the second side mold 3, before pouring, a steel bar piece is firstly placed on the base 1, part of steel bars of the steel bar piece extend out of the steel bar holes 4, then the hole site mold support 5 is fixed on the second side mold 3, the fixing seat 6 is matched and fixed through a proper bolt hole 10, then pouring is carried out, after pouring is completed, the connecting rod 8 and the hole site mold support 5 are cut off, then the hole site mold support 5 is detached, the hole site mold 9 is detached, a formed wallboard is taken down through a crane, and then next pouring is carried out.

Claims (4)

1. A pouring mould for pre-buried hand hole position wall boards is characterized by comprising a base (1), and a pair of first side molds (2) and a pair of second side molds (3) which are vertically fixed above the base (1), the second side die (3) is positioned between the two first side dies (2), the first side dies (2) are provided with a row of reinforcing steel bar holes (4) vertical to the surfaces of the first side dies (2), the top of the second side die (3) is fixed with at least one L-shaped hole site die support (5), one end of the hole site die support (5) is provided with a fixed seat (6), the fixed seat (6) is fixed at the top of the second side die (3) through a bolt (7), a connecting rod (8) is vertically fixed at the bottom of the other end of the hole site mold support (5), and a hole site mold (9) is fixed at the bottom of the connecting rod (8).
2. The pouring mold for the pre-buried hand hole position wallboard of claim 1, characterized in that a row of bolt holes (10) are formed in the top of the second side mold (3) at equal intervals along the second side mold (3), and the bolts (7) penetrate through the fixing seat (6) and then are matched and fixed with the bolt holes (10).
3. The pouring mold for the embedded hand hole position wallboard according to claim 1, wherein the bottom of the reinforcing steel bar hole (4) is sealed in the first side mold (2), and the top of the reinforcing steel bar hole extends out of the first side mold (2).
4. The pouring mold for the pre-buried hand hole position wallboard according to claim 1, characterized in that the first side mold (2) and the second side mold (3) are fixed on the base (1) through bolts, and the base (1) is fixed on the ground through bolts.
CN201921536336.4U 2019-09-16 2019-09-16 Pouring mold for pre-buried hand hole position wallboard Active CN211250594U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921536336.4U CN211250594U (en) 2019-09-16 2019-09-16 Pouring mold for pre-buried hand hole position wallboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921536336.4U CN211250594U (en) 2019-09-16 2019-09-16 Pouring mold for pre-buried hand hole position wallboard

Publications (1)

Publication Number Publication Date
CN211250594U true CN211250594U (en) 2020-08-14

Family

ID=71955788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921536336.4U Active CN211250594U (en) 2019-09-16 2019-09-16 Pouring mold for pre-buried hand hole position wallboard

Country Status (1)

Country Link
CN (1) CN211250594U (en)

Similar Documents

Publication Publication Date Title
CN103061267A (en) Construction method of combined prefabricated bridge anti-collision wall
CN109914644A (en) A kind of assembled heat insulation masonry wall and preparation method thereof
CN204456428U (en) A kind of entirety being installed on composite wallboard is waftd window
CN211250594U (en) Pouring mold for pre-buried hand hole position wallboard
CN211250599U (en) Take pouring mould of window frame wallboard
CN211250567U (en) Pouring die for balcony
CN211250565U (en) Pouring die for beam
CN107891511B (en) Separated prefabricated bay window die
CN110616737A (en) Method for improving positioning qualification rate of pipe gallery embedded part
CN215055273U (en) A assembled template for installing support bracket embedded box
CN211250563U (en) Pouring die for bearing wall board
CN212001240U (en) Accurate positioner of street lamp basis and built-in fitting
CN211849566U (en) Roughing mill body reserved bolt hole support-free template
CN210828837U (en) Prefabricated window component that wafts of assembled building
CN203188402U (en) Supporting device for pouring shear wall
CN113323262A (en) 3D printed prefabricated wall module, wall and construction method of wall
CN207775931U (en) A kind of suspension and support fastener inserts
CN202440827U (en) U-shaped groove foundation of prefabricated building
CN211114123U (en) A pre-buried bolt fixing device for hoisting prefabricated staircase
CN216640446U (en) Flood bank protection slope module
CN204676886U (en) House column apparatus for pouring
CN218028146U (en) Prefabricated assembled template that foundation engineering used
CN215215367U (en) Winch ground anchor die carrier for coal mine
CN217631252U (en) Concrete turn-ups one shot forming die set
CN214614156U (en) Prefabricated reinforced concrete forming die

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant