CN211691524U - Prefabricated post positioner - Google Patents

Prefabricated post positioner Download PDF

Info

Publication number
CN211691524U
CN211691524U CN201922116160.3U CN201922116160U CN211691524U CN 211691524 U CN211691524 U CN 211691524U CN 201922116160 U CN201922116160 U CN 201922116160U CN 211691524 U CN211691524 U CN 211691524U
Authority
CN
China
Prior art keywords
frame body
steel plate
base
frame
connecting steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922116160.3U
Other languages
Chinese (zh)
Inventor
王丹
杨鹏博
贾王龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201922116160.3U priority Critical patent/CN211691524U/en
Application granted granted Critical
Publication of CN211691524U publication Critical patent/CN211691524U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a prefabricated post positioner, including universal wheel and base steel connecting plate, the universal wheel is installed in base steel connecting plate lower part, characterized by: a through hole is formed in the base connecting steel plate, a positioning rod is arranged in the through hole, and the bottom end of the positioning rod can be inserted into the ground; the front end of the base connecting steel plate is provided with a frame connecting steel plate, and the rear end, the left side and the right side of the base connecting steel plate are provided with handrails; the prefabricated column is also provided with a frame which is enclosed on the prefabricated column and consists of a left frame body and a right frame body; the front of the frame connecting steel plate is connected with the left frame body or the right frame body; the left frame body and the right frame body which are respectively and fixedly connected to the two frame connecting plates are connected through steel pins after being butted. The device has strong integrity, convenient operation, can obviously improve the construction speed of the prefabricated column, can be used repeatedly, can achieve the aim without using redundant manpower and auxiliary equipment, can greatly improve the installation efficiency, and can save the cost.

Description

Prefabricated post positioner
Technical Field
The utility model belongs to the technical field of building engineering, specifically be the positioner of prefabricated post that uses in the construction of prefabricated post.
Background
With the development of economy in China, the building fields such as industry, civilian use, municipal use and the like are developed vigorously, the structure of the prefabricated column of the factory building frame is widely applied, and the installation efficiency of the prefabricated column is required to be high in order to ensure the requirement of the construction period. Meanwhile, the requirements of saving time, labor and expenses are met.
The existing prefabricated column is used for determining the position by using a central line during hoisting, after a column base is inserted into a cup opening, a height mark on a column body is used for controlling elevation, eight wood wedges or steel wedges are used for placing into the cup opening from four sides of the column, and a crowbar or a jack is used for prying the column base, so that the installation central line of the column is aligned with the central line of the cup opening.
SUMMERY OF THE UTILITY MODEL
The to-be-solved problem of the utility model is that prefabricated post installation correction is loaded down with trivial details among the prior art, easily hinders the defect of shaft, provides the solution of being convenient for prefabricated post central line adjustment and installation.
In order to realize the purpose of the utility model, the utility model provides a concrete means:
the utility model provides a precast column positioner, includes universal wheel and base steel connecting plate, and the universal wheel is installed in base steel connecting plate lower part, characterized by: a through hole is formed in the base connecting steel plate, a positioning rod is arranged in the through hole, and the bottom end of the positioning rod can be inserted into the ground; the front end of the base connecting steel plate is provided with a frame connecting steel plate, and the rear end, the left side and the right side of the base connecting steel plate are provided with handrails; the prefabricated column is also provided with a frame which is enclosed on the prefabricated column and consists of a left frame body and a right frame body; the front of the frame connecting steel plate is connected with the left frame body or the right frame body; the left frame body and the right frame body which are respectively and fixedly connected to the two frame connecting plates are connected through steel pins after being butted.
The device has strong integrity and convenient operation, can obviously improve the construction speed of the prefabricated column and can be used repeatedly. The device is simple and easy to operate, convenient to operate and low in cost, can achieve the purpose without using redundant manpower and auxiliary equipment, can greatly improve the installation efficiency, and can save the cost.
Drawings
FIG. 1 is a view of the structure of the present invention;
FIG. 2 is a view of the structure of the ground fixing structure of the device;
fig. 3 is an enlarged view of point a (frame pin joint structure) in fig. 1.
Detailed Description
The technical solution of the present invention will be described in detail, clearly and completely with reference to the accompanying drawings and examples of the present invention.
As shown in figures 1-3, the prefabricated column positioning device comprises a base connecting steel plate 1, a steel bar 2, universal wheels 3, a frame connecting steel plate 4, handrails 5 and a frame 6. The frame 6 is used to lock the prefabricated column 7 cylinder. The universal wheel 3 is arranged at the lower part of the base connecting steel plate 1. Establish the through-hole on the base connecting steel plate 1, establish rod iron 2 in the through-hole, the 2 bottoms of rod iron insert ground, realize this device and ground fixed. The front end of the base connecting plate 1 of the utility model is provided with a frame connecting steel plate 4, and the rear end, the left and the right sides of the base connecting steel plate 1 are provided with handrails 5; a frame 6 surrounding the prefabricated column 7 is also arranged, and the frame 6 consists of a left frame body 61 and a right frame body 62; the front surface of the frame connecting steel plate 4 is connected with the left frame body 61 or the right frame body 62; the left frame body 61 and the right frame body 62 which are respectively and fixedly connected to the two frame connecting steel plates 4 are connected with each other through a steel pin 8 after being butted.
In this example, the prefabricated column 7 with the cross section of 600 × 900 needs to be hoisted, and the left frame body 61 and the right frame body 62 of the frame 6 are fixedly connected to form a surrounding frame with a cross section of 605 × 905.
The prefabricated column installation based on the device comprises the following specific steps:
firstly, placing a prefabricated column into a cup mouth by using a crane to suspend;
secondly, enclosing the prefabricated column by a frame of the device, and locking the left frame and the right frame by using a steel pin;
thirdly, because the frame 5 is rigidly connected with the two trolleys on the ground, the trolleys on the two sides are pushed to enable the central line of the prefabricated column and the central line of the foundation pit to be in a straight line to finish position correction;
and fourthly, when the position is adjusted, inserting a steel rod into the ground through a hole in the base connecting steel plate for fixing, and simultaneously adjusting the verticality of the prefabricated column, and filling grouting material.
The utility model discloses make prefabricated post installation become simple, convenient, need not use unnecessary manual work and auxiliary assembly can reach the purpose, practice thrift the cost when improving the labor rate.

Claims (1)

1. The utility model provides a precast column positioner, includes universal wheel and base steel connecting plate, and the universal wheel is installed in base steel connecting plate lower part, characterized by: a through hole is formed in the base connecting steel plate, a positioning rod is arranged in the through hole, and the bottom end of the positioning rod can be inserted into the ground; the front end of the base connecting steel plate is provided with a frame connecting steel plate, and the rear end, the left side and the right side of the base connecting steel plate are provided with handrails; the prefabricated column is also provided with a frame which is enclosed on the prefabricated column and consists of a left frame body and a right frame body; the front of the frame connecting steel plate is connected with the left frame body or the right frame body; the left frame body and the right frame body which are respectively and fixedly connected to the two frame connecting plates are connected through steel pins after being butted.
CN201922116160.3U 2019-11-29 2019-11-29 Prefabricated post positioner Active CN211691524U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922116160.3U CN211691524U (en) 2019-11-29 2019-11-29 Prefabricated post positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922116160.3U CN211691524U (en) 2019-11-29 2019-11-29 Prefabricated post positioner

Publications (1)

Publication Number Publication Date
CN211691524U true CN211691524U (en) 2020-10-16

Family

ID=72788993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922116160.3U Active CN211691524U (en) 2019-11-29 2019-11-29 Prefabricated post positioner

Country Status (1)

Country Link
CN (1) CN211691524U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984590A (en) * 2019-11-29 2020-04-10 中国二十二冶集团有限公司 Prefabricated column positioning device and installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984590A (en) * 2019-11-29 2020-04-10 中国二十二冶集团有限公司 Prefabricated column positioning device and installation method
CN110984590B (en) * 2019-11-29 2024-04-26 中国二十二冶集团有限公司 Prefabricated column installation method

Similar Documents

Publication Publication Date Title
CN207294093U (en) A kind of large span steel truss integral lifting apparatus
CN206143757U (en) It expands bored concrete pile stake pipe and pile driver to add elongated immersed tube rammer
CN203546728U (en) Improved installation fixing device of top-down steel pipe column
CN107059911A (en) A kind of prefabricated assembled basis and its assemble method
CN211691524U (en) Prefabricated post positioner
CN210685444U (en) Quick leveling, mounting and supporting device for prefabricated external wall panel
CN111519681A (en) Tool and method for backfilling fertilizer groove of deep foundation pit
CN219239021U (en) Hoisting tool for PC prefabricated part of assembled building
CN111622347A (en) Cross-shaped node connecting structure of assembled frame structure and construction method thereof
CN108661301B (en) Modular assembly platform for vertical frames of well frames and use method
CN108035552B (en) Assembled concrete member reinforcing bar magnetic suspension connection positioner
CN206319628U (en) One kind building assembled wallboard fitting machine
CN110984590A (en) Prefabricated column positioning device and installation method
CN208280143U (en) A kind of Two bors d's oeuveres channel steel upright post
CN203022761U (en) Novel vertical shaft formwork
CN202577282U (en) Molding equipment of cast-in-situ hollow piles
CN212249282U (en) Steel constructs straightness fine setting instrument that hangs down of post
CN213740636U (en) Cast-in-place construction auxiliary device of continuous case roof beam cantilever of variable cross section
CN211621558U (en) Bored concrete pile steel reinforcement cage elevation control mounting structure
CN108798042B (en) Steel pipe column integrated construction verticality adjusting method
CN206815366U (en) A kind of prefabricated assembled basis
CN215516375U (en) Manhole hoisting device for foundation reinforcement cage
CN112323990A (en) Method for connecting assembled floor slab and structural column
CN113957904B (en) Magnetic connection and locking device for steel pipe inner support and steel waist beam
CN212832343U (en) PC post installation auxiliary tool assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant