CN210264015U - Tool type rear-added structural plate quick connecting structure - Google Patents

Tool type rear-added structural plate quick connecting structure Download PDF

Info

Publication number
CN210264015U
CN210264015U CN201920348795.3U CN201920348795U CN210264015U CN 210264015 U CN210264015 U CN 210264015U CN 201920348795 U CN201920348795 U CN 201920348795U CN 210264015 U CN210264015 U CN 210264015U
Authority
CN
China
Prior art keywords
light floor
prefabricated light
slab
old
structural slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920348795.3U
Other languages
Chinese (zh)
Inventor
李永胜
李红梅
罗盈洲
刘丽丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau First Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau First Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority to CN201920348795.3U priority Critical patent/CN210264015U/en
Application granted granted Critical
Publication of CN210264015U publication Critical patent/CN210264015U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model provides an add structural slab quick connect structure behind instrument formula, including prefabricated light floor, prefabricated light floor's both ends are reserved there is the reinforcing bar, and the back adds the structural slab and treats the old structural slab at mounted position both ends and the reservation reinforcing bar welded fastening at prefabricated light floor both ends, and cast in situ concrete has been pour with the junction of prefabricated light floor to old structural slab, and pours the department and pass through instrument formula aluminium template die sinking. The problems that the construction period is long, the construction difficulty is high, the turnover cannot be achieved and the like in the traditional mode of adding the structural slab afterwards are solved. Belongs to the technical field of building structure engineering.

Description

Tool type rear-added structural plate quick connecting structure
Technical Field
The utility model relates to an add structural slab quick connect structure behind instrument formula belongs to building structure engineering technical field.
Background
In the rapid development process of buildings in China, a rear plate adding ratio is added in some transformation projects. The traditional mode of adding the structural slab after construction has long construction period, great construction difficulty and no turnover, needs a large construction site and a lot of manpower, and adds the load of the old slab, thereby having certain influence on the stress of the old structural slab and the beam.
Disclosure of Invention
The utility model aims to provide a: the utility model provides a add structural slab quick connect structure behind instrument formula to add structural slab mode construction cycle length, the construction degree of difficulty is big, can not have enough to meet the need the scheduling problem after solving the tradition.
In order to solve the problems, the tool type rear-added structural slab quick connection structure is proposed to be adopted and comprises a prefabricated light floor slab, reinforcing steel bars are reserved at two ends of the prefabricated light floor slab, old structural slabs at two ends of a position, where the rear-added structural slab is to be installed, are welded and fixed with the reserved reinforcing steel bars at two ends of the prefabricated light floor slab, cast-in-place concrete is poured at the joint of the old structural slabs and the prefabricated light floor slab, and the pouring position is subjected to mold assembly through a tool type aluminum template.
Among the aforementioned quick coupling mechanism, the old structural slab department that adds the structural slab after and treat the mounted position both ends is dug and is exposed old structural slab reinforcing bar, old structural slab carries out the single face welding through the reinforcing bar that old structural slab reinforcing bar and prefabricated light floor both ends were reserved.
The specific method comprises the following steps:
firstly, prefabricating a light floor slab in a processing plant, reserving reinforcing steel bars meeting the welding requirement on length at two sides of the prefabricated light floor slab, hoisting the prefabricated light floor slab to a specified position by using a hoisting mode, chiseling old structural slabs at two ends of a position where a post-added structural slab is to be installed by using a percussion drill before the process, wherein the length of the exposed reinforcing steel bars meets the welding requirement; and then, performing single-side welding on the steel bars at the joint of the prefabricated light floor slab and the old structural slab, then using a turnover quick-release tool type aluminum template to mold the joint area, and pouring high-grade 8% micro-expansion concrete after the mold is molded.
Compared with the prior art, the utility model discloses can carry out quick butt joint with old structural slab to modes such as prefabricated light floor with hoist and mount in the work progress, the instrument formula aluminium template that adds can effectively improve the roughness requirement of floor, reduces wrong platform, improves construction quality, and the construction is quick, and the cycle is short, and the construction degree of difficulty is little, and instrument formula aluminium template can be dismantled the turnover fast and use, can solve fabulous the problem that prior art exists.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clearer, the present invention will be described in further detail below.
Example (b):
referring to the attached drawing 1, this embodiment provides a tool type rear-mounted structural slab quick connection structure, including prefabricated light floor 2, the reinforcing bar is reserved at the both ends of prefabricated light floor 2, and the rear-mounted structural slab waits that old structural slab 3 at mounted position both ends and the reserved reinforcing bar welded fastening at prefabricated light floor 2 both ends, and cast-in-place concrete 4 has been pour with the junction of prefabricated light floor 2 to old structural slab 3, and the department of pouring is through 1 dress moulds of tool type aluminum mould board.
The specific method comprises the following steps:
firstly, prefabricating a light floor slab 2 in a processing plant, reserving reinforcing steel bars meeting the welding requirement on length at two sides of the prefabricated light floor slab 2, hoisting the prefabricated light floor slab 2 to a specified position by using a hoisting mode, chiseling old structural slabs 3 at two ends of a position where a post-added structural slab is to be installed by using a percussion drill before the process, wherein the length of the exposed reinforcing steel bars meets the welding requirement; and then, carrying out 8d (d is the diameter of the steel bar) single-side welding on the steel bar at the joint of the prefabricated light floor slab 2 and the old structural slab 3, then using the turnover quick-release tool type aluminum template 1 to mould the joint area, and pouring high-grade 8% micro-expansion concrete after the mould filling is finished.
The above embodiments are only used for illustrating but not limiting the technical solutions of the present invention, and although the present invention is described in detail with reference to the above embodiments, those skilled in the art should understand that: the present invention may be modified or substituted with equivalents without departing from the spirit and scope of the invention, which should be construed as being limited only by the claims.

Claims (2)

1. The utility model provides a add structural slab quick connect structure behind instrument formula which characterized in that: the prefabricated light floor slab comprises a prefabricated light floor slab (2), reinforcing steel bars are reserved at two ends of the prefabricated light floor slab (2), old structural slabs (3) at two ends of a mounting position are welded and fixed with the reserved reinforcing steel bars at two ends of the prefabricated light floor slab (2) through later-added structural slabs, cast-in-place concrete (4) is poured at the joint of the old structural slabs (3) and the prefabricated light floor slab (2), and a pouring position is subjected to formwork assembling through a tool type aluminum formwork (1).
2. The tool type rear-machining structural plate quick connection structure of claim 1, wherein: and chiseling old structural slabs (3) at two ends of the positions of the later-added structural slabs to be installed to expose old structural slab reinforcing steel bars, and performing single-side welding on the old structural slabs (3) through the old structural slab reinforcing steel bars and the reinforcing steel bars reserved at two ends of the prefabricated light floor slab (2).
CN201920348795.3U 2019-03-19 2019-03-19 Tool type rear-added structural plate quick connecting structure Expired - Fee Related CN210264015U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920348795.3U CN210264015U (en) 2019-03-19 2019-03-19 Tool type rear-added structural plate quick connecting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920348795.3U CN210264015U (en) 2019-03-19 2019-03-19 Tool type rear-added structural plate quick connecting structure

Publications (1)

Publication Number Publication Date
CN210264015U true CN210264015U (en) 2020-04-07

Family

ID=70010671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920348795.3U Expired - Fee Related CN210264015U (en) 2019-03-19 2019-03-19 Tool type rear-added structural plate quick connecting structure

Country Status (1)

Country Link
CN (1) CN210264015U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109812045A (en) * 2019-03-19 2019-05-28 中建四局第一建筑工程有限公司 After a kind of tool-type plus structural slab fast joint structure and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109812045A (en) * 2019-03-19 2019-05-28 中建四局第一建筑工程有限公司 After a kind of tool-type plus structural slab fast joint structure and method

Similar Documents

Publication Publication Date Title
Kannan et al. Constructability assessment of climbing formwork systems using building information modeling
CN204001695U (en) A kind of aluminum alloy formwork system that is used in shrinkage joint building operations
CN213710348U (en) Underground station side wall formwork supporting system combined with full support
CN106113230B (en) The non-type prefabricated for bench, template system and its construction method can be had enough to meet the need
CN104294920B (en) The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post and preparation method
CN210264015U (en) Tool type rear-added structural plate quick connecting structure
CN112411798A (en) Synchronous construction method for prefabricated guide wall and main structure of toilet
CN104727446A (en) Construction method of large aluminum alloy formwork at settlement joint
CN204081090U (en) The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post
CN106150086A (en) A kind of cylinder ultra-high performance concrete permanent template and preparation method thereof
CN213572042U (en) Positioning device for semi-prefabricated double-sided overlapped comprehensive pipe gallery side wall with concealed columns
CN206319404U (en) A kind of building precast exterior sheathing
CN110130487B (en) Prefabricated main and secondary beam connecting node and connecting method
CN212957612U (en) Assembly type formwork-dismantling-free structural body formwork and cast-in-place formwork-dismantling-free structural body
CN108691381A (en) A kind of novel architecture laminated floor slab
CN212957653U (en) Aluminum mould bracing reinforced structure
CN211250567U (en) Pouring die for balcony
CN210195229U (en) Assembly type building truss girder and detachable wood formwork combination
CN210002866U (en) Quick mounting and dismounting shaping template for pouring settlement joint shear wall
CN210217180U (en) Special pre-buried piece that hangs of prefabricated component
CN112814150A (en) Rectangular steel sleeve type connection method for basic magnesium sulfate cement concrete assembled frame nodes
CN111706005A (en) Integrated reinforcing steel bar formwork-free cast-in-place concrete beam
CN2926393Y (en) Multifunctional building template
CN217652103U (en) Novel precast concrete frame beam
CN113430941B (en) Construction method for prefabricating inclined beam end single-line box beam on standard single-line box beam template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200407