CN104975716A - Construction method for employing dismounting-free formwork in casting constructional column and ring beam concrete - Google Patents

Construction method for employing dismounting-free formwork in casting constructional column and ring beam concrete Download PDF

Info

Publication number
CN104975716A
CN104975716A CN201410132340.XA CN201410132340A CN104975716A CN 104975716 A CN104975716 A CN 104975716A CN 201410132340 A CN201410132340 A CN 201410132340A CN 104975716 A CN104975716 A CN 104975716A
Authority
CN
China
Prior art keywords
build
constructional column
shaped hollow
stones
laying bricks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410132340.XA
Other languages
Chinese (zh)
Inventor
孙成伟
顾亮
陈建国
薛辉
彭华华
李波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU ZHONGRUN CONSTRUCTION GROUP CO Ltd
Jiangsu Nantong No 2 Construction Group Co Ltd
Original Assignee
JIANGSU ZHONGRUN CONSTRUCTION GROUP CO Ltd
Jiangsu Nantong No 2 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ZHONGRUN CONSTRUCTION GROUP CO Ltd, Jiangsu Nantong No 2 Construction Group Co Ltd filed Critical JIANGSU ZHONGRUN CONSTRUCTION GROUP CO Ltd
Priority to CN201410132340.XA priority Critical patent/CN104975716A/en
Publication of CN104975716A publication Critical patent/CN104975716A/en
Pending legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention relates to a construction method for employing dismounting-free formwork in casting constructional column and ring beam concrete. The method consists of the following steps of: (1) designing different specification and dimension requirements of a U-shaped hollow formwork; (2) regulating a mechanical mold or an artificially made mold according to the specification and dimension requirements of the U-shaped hollow formwork; (3) fixing a steel wire mesh in the mechanical mold or the artificially made mold, and binding a steel bar on the constructional column; (4) casting pre-mixed high-grade mortar, and simultaneously building the U-shaped hollow formwork and a wall body; (5) compacting the mortar through jolt-ramming operation and performing maintenance; and (6) building the building body to the ring beam, waist beam and windowsill height position. The construction method has the beneficial effects that the high-strength cement mortar is used for prefabricating the formwork or a U-shaped hollow building block; the formwork and the building body are simultaneously built; the problem of installing a formwork for concrete casting of constructional column and ring beam can be solved; the construction flow process simplification is facilitated; the construction speed is high; the construction period can be reduced; the operation is simple; the work efficiency is high; the construction cost is low; the energy is saved; and the environment is protected.

Description

A kind ofly build the construction method that form removal shell exempted from by constructional column and collar tie beam concrete
Technical field
The present invention relates to construction techniques, particularly relate to and a kind ofly build the construction method that form removal shell exempted from by constructional column and collar tie beam concrete.
Background technology
In building engineering field, building all needs the concrete component of the casts in situs such as design structure post, collar tie beam, waist rail, windowsill concrete belt, to reach the requirement of antidetonation and building member resistance to overturning, these components generally carry out second time and build after agent structure completes, build component and bring very large difficulty and shortcoming to installing template construction, wherein be mainly manifested in: 1. operation is many, quality control key link is many, complicated operation; 2. timber and artificial input amount are comparatively large, and not energy-conservation not material-saving, efficiency are low; 3. the Forming Quality of concrete component is poor, is one of main common fault in current architecture construction; 4. construction cost is high, more construction enterprises construct this procedure all occur lose phenomenon; 5. the requirement of the batch production of building industry, assemblingization development prospect is lagged behind.
Therefore, how upgrading traditional construction technique and reducing construction input is the practical problem faced in construction, for above aspect, needs effectively to innovate prior art.
Summary of the invention
For above defect, the invention provides and a kind ofly build the construction method that form removal shell exempted from by constructional column and collar tie beam concrete, what supported by this double concreting exempts from form removal shell, accurately can control the concrete formation quality of the component such as constructional column and collar tie beam, and as the prefabricated mortar formwork that constructional materials forever uses, traditional construction manpower and material input can be reduced, save timber, environmental protection, to solve many deficiencies of prior art.
For achieving the above object, the present invention is by the following technical solutions:
Build the construction method that form removal shell exempted from by constructional column and collar tie beam concrete, be made up of following steps:
(1) carry out construction lofting by architectural design drawing, the constructional column and the collar tie beam that carry out building design, and design specification and the dimensional requirement of different U-shaped hollow mould;
(2) adjust machine die or manual manufacture mould according to the specification of U-shaped hollow mould and dimensional requirement, make it meet modulus requirement, and load and transport the position of building by laying bricks or stones to job site;
(3) at machine die or manual manufacture mould internal fixtion φ 0.7mm steel fabric sheet and its mesh is 10 × 10mm, constructional column reinforcing bar binding;
(4) in machine die or manual manufacture mould, build the high grade mortar of mixing in advance, carry out the thick high strength cement mortar of building wall 15-20mm, U-shaped hollow mould and body of wall are built by laying bricks or stones jointly;
(5) shake the closely knit and maintenance of rramming slurry, build height by laying bricks or stones when 1.0m, build the constructional column concrete in U-shaped hollow mould, then continue to build by laying bricks or stones;
(6) be transported to job site and build use by laying bricks or stones, build by laying bricks or stones to collar tie beam, waist rail, windowsill height and position, build fine strain of millet U-shaped hollow mould by laying bricks or stones, the distributing bar designed by placing in it, concreting;
(7) masonry, U-shaped hollow mould build constructional column concrete is continued to build by laying bricks or stones;
(8), while building wall completes, complete constructional column, concreting work that collar tie beam, windowsill bear down on one.
Described U-shaped hollow mould is cuboid with opening or cube structure.
Of the present inventionly build the beneficial effect that constructional column and collar tie beam concrete exempt from the construction method of form removal shell and be:
(1) by adopting the prefabricated formwork of high-strength cement mortar or U-shaped building-block, formwork and masonry are built by laying bricks or stones simultaneously, can solve a difficult problem for constructional column, collar tie beam formwork concreting; Utilize U-shaped hollow mould as the mould of concrete formation, with block with pouring concrete, after body of wall completes, constructional column, collar tie beam have been constructed simultaneously, U-shaped hollow mould has arrangement of steel wires mesh sheet in high-strength cement mortar pre-formed, U-shaped hollow mould thickness is 15-20mm, and its size can all kinds of shape of Prefabrication, specification and size according to the design shape of building construction post, collar tie beam;
(2) be conducive to simplifying construction process, speed of application is fast, can save the construction period, the flow process of original body of wall is for building → installing ring beam template → build collar tie beam → build by laying bricks or stones → install template → build constructional column → form removable by laying bricks or stones, totally seven procedures, now only need to build by laying bricks or stones and can complete construction with concreting two procedures, the per pass body of wall production duration shortened to 1 day by 3 days and completes;
(3) simple to operate, work work efficiency is high, originally complete the body of wall that 2.5m is high, 4.0m is long, 2m is thick, need artificial 3.2 work days (bricklayer 2 work day, carpenter 1 work day, bar bender 0.2 work day), now only need 2.2 work days (bricklayer 2 work day, bar bender 0.2 work day);
(4) construction cost is low, and original concreting that need complete by installing wooden form becomes exempts from form erecting technology, and through measuring and calculating, every 2.5m height constructional column can save construction cost 102 yuan, and energy-conserving and environment-protective, do not use timber, decreases timber and uses and low-carbon environment-friendly.
Accompanying drawing explanation
With reference to the accompanying drawings the present invention is described in further detail below.
Fig. 1 builds the square U-shaped formwork schematic diagram that the construction method of form removal shell exempted from by constructional column and collar tie beam concrete described in the embodiment of the present invention;
Fig. 2 builds the square U-shaped formwork top view that the construction method of form removal shell exempted from by constructional column and collar tie beam concrete described in the embodiment of the present invention;
Fig. 3 builds the cuboid U-shaped formwork schematic diagram that the construction method of form removal shell exempted from by constructional column and collar tie beam concrete described in the embodiment of the present invention;
Fig. 4 builds the cuboid U-shaped formwork top view that the construction method of form removal shell exempted from by constructional column and collar tie beam concrete described in the embodiment of the present invention;
Fig. 5 builds the allosome U-shaped formwork schematic diagram that the construction method of form removal shell exempted from by constructional column and collar tie beam concrete described in the embodiment of the present invention;
Fig. 6 builds the allosome U-shaped formwork top view that the construction method of form removal shell exempted from by constructional column and collar tie beam concrete described in the embodiment of the present invention;
Fig. 7 builds the formwork structure material composition schematic diagram that the construction method of form removal shell exempted from by constructional column and collar tie beam concrete described in the embodiment of the present invention.
In figure:
1, the thick high strength cement mortar of 15-20mm; 2, φ 0.7mm steel fabric sheet;
Detailed description of the invention
As shown in figs. 1-7, described in the embodiment of the present invention, build the construction method that form removal shell exempted from by constructional column and collar tie beam concrete, form primarily of following steps:
(1) carry out construction lofting by architectural design drawing, the constructional column and the collar tie beam that carry out building design, and design specification and the dimensional requirement of all kinds of U-shaped hollow mould;
(2) adjust machine die or manual manufacture mould according to the specification of U-shaped hollow mould and dimensional requirement, make it meet modulus requirement, and load and transport the position of building by laying bricks or stones to job site;
(3) at machine die or manual manufacture mould internal fixtion φ 0.7mm steel fabric sheet 2 and its mesh is 10 × 10mm, constructional column reinforcing bar binding;
(4) in machine die or manual manufacture mould, build the high grade mortar of mixing in advance, carry out the thick high strength cement mortar 1 of building wall 15-20mm, U-shaped hollow mould and body of wall are built by laying bricks or stones jointly;
(5) shake the closely knit and maintenance of rramming slurry, build height by laying bricks or stones when 1.0m, build the constructional column concrete in U-shaped hollow mould, then continue to build by laying bricks or stones;
(6) be transported to job site and build use by laying bricks or stones, build by laying bricks or stones to collar tie beam, waist rail, windowsill height and position, build beam U-shaped hollow mould by laying bricks or stones, the distributing bar designed by placing in it, concreting;
(7) masonry, U-shaped hollow mould build constructional column concrete is continued to build by laying bricks or stones;
(8), while building wall completes, complete constructional column, concreting work that collar tie beam, windowsill bear down on one.
The above-mentioned description to embodiment can understand and apply this case technology for the ease of those skilled in the art, person skilled in the art obviously can make various amendment to these examples easily, and General Principle described herein is applied in other embodiment and need not through performing creative labour.Therefore, this case is not limited to above embodiment, and those skilled in the art is according to the announcement of this case, and the improvement made for this case and amendment all should in the protection domains of this case.

Claims (2)

1. build the construction method that form removal shell exempted from by constructional column and collar tie beam concrete, it is characterized in that, be made up of following steps:
(1) carry out construction lofting by architectural design drawing, the constructional column and the collar tie beam that carry out building design, and design specification and the dimensional requirement of different U-shaped hollow mould;
(2) adjust machine die or manual manufacture mould according to the specification of U-shaped hollow mould and dimensional requirement, make it meet modulus requirement, and load and transport the position of building by laying bricks or stones to job site;
(3) at machine die or manual manufacture mould internal fixtion φ 0.7mm steel fabric sheet and its mesh is 10 × 10mm, constructional column reinforcing bar binding;
(4) in machine die or manual manufacture mould, build the high grade mortar of mixing in advance, carry out the thick high strength cement mortar of building wall 15-20mm, U-shaped hollow mould and body of wall are built by laying bricks or stones jointly;
(5) shake the closely knit and maintenance of rramming slurry, build height by laying bricks or stones when 1.0m, build the constructional column concrete in U-shaped hollow mould, then continue to build by laying bricks or stones;
(6) be transported to job site and build use by laying bricks or stones, build by laying bricks or stones to collar tie beam, waist rail, windowsill height and position, build beam U-shaped hollow mould by laying bricks or stones, the distributing bar designed by placing in it, concreting;
(7) masonry, U-shaped hollow mould build constructional column concrete is continued to build by laying bricks or stones;
(8), while building wall completes, complete constructional column, concreting work that collar tie beam, windowsill bear down on one.
2. according to claim 1ly build the construction method that form removal shell exempted from by constructional column and collar tie beam concrete, it is characterized in that: described U-shaped hollow mould is cuboid with opening or cube structure.
CN201410132340.XA 2014-04-02 2014-04-02 Construction method for employing dismounting-free formwork in casting constructional column and ring beam concrete Pending CN104975716A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410132340.XA CN104975716A (en) 2014-04-02 2014-04-02 Construction method for employing dismounting-free formwork in casting constructional column and ring beam concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410132340.XA CN104975716A (en) 2014-04-02 2014-04-02 Construction method for employing dismounting-free formwork in casting constructional column and ring beam concrete

Publications (1)

Publication Number Publication Date
CN104975716A true CN104975716A (en) 2015-10-14

Family

ID=54272644

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410132340.XA Pending CN104975716A (en) 2014-04-02 2014-04-02 Construction method for employing dismounting-free formwork in casting constructional column and ring beam concrete

Country Status (1)

Country Link
CN (1) CN104975716A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107327019A (en) * 2017-07-05 2017-11-07 宁波二十冶建设有限公司 One kind exempts from template cast-in-situ steel reinforced concrete collar tie beam structure and its construction method
CN108179880A (en) * 2018-01-16 2018-06-19 杨阳 A kind of wall structure column and collar tie beam exempt from formwork construction technique
CN108625531A (en) * 2017-03-16 2018-10-09 中建四局第三建筑工程有限公司 A kind of construction method pouring constructional column concrete non-dismantling formwork
CN108748649A (en) * 2018-05-30 2018-11-06 中国五冶集团有限公司 A kind of building windowsill concrete bears down on one mold, structure and construction method
CN108915148A (en) * 2018-08-14 2018-11-30 中国电建集团重庆工程有限公司 A kind of constructional column closing U-shaped concrete segment and its construction method
CN109537808A (en) * 2018-10-26 2019-03-29 中交第航务工程局有限公司 A kind of masonry panel constructional column exempts from the construction method of formwork
CN109723224A (en) * 2018-12-19 2019-05-07 中交一航局安装工程有限公司 It is a kind of to exempt from formwork collar tie beam casting craft applied to subway house construction engineering
CN109797965A (en) * 2018-12-27 2019-05-24 广西宏发重工机械有限公司 Constructional column formwork and preparation method thereof
CN110295741A (en) * 2019-04-28 2019-10-01 中国一冶集团有限公司 Masonry structure collar tie beam formwork construction method
CN110863591A (en) * 2019-11-21 2020-03-06 中国二十冶集团有限公司 Mold device for manufacturing T-shaped cavity concrete module and using method thereof
CN110863590A (en) * 2019-11-21 2020-03-06 中国二十冶集团有限公司 Mold device for manufacturing + type cavity concrete module and using method thereof
CN111005558A (en) * 2019-07-01 2020-04-14 中国二十冶集团有限公司 Mould for manufacturing basic cavity concrete mould and using method thereof
CN111173198A (en) * 2019-09-02 2020-05-19 威海建设集团股份有限公司 Construction method of wall-attached constructional column for constructional engineering
CN111622505A (en) * 2020-05-06 2020-09-04 中国建筑一局(集团)有限公司 Construction column chiseling-free construction method beneficial to controlling construction column top sealing quality
CN113389302A (en) * 2021-07-15 2021-09-14 雷玉哲 Secondary structure formwork-supporting-free method
CN115217260A (en) * 2022-06-27 2022-10-21 广东省第四建筑工程有限公司 Prefabricated hollow concrete formwork and assembling construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4015387A (en) * 1973-08-30 1977-04-05 Tramex S.A. Prefabricated structural elements for partitions and walls of buildings and partitions and walls consisting of such elements
CN2239997Y (en) * 1995-08-28 1996-11-13 周长春 Ring beam capable of making prefabricated floor slab monolithic pure at the support
CN2305454Y (en) * 1997-08-14 1999-01-27 柏飞 Disassembling-free framework for concrete column and beam
CN201056838Y (en) * 2007-06-04 2008-05-07 王福生 Detaching-free disposal template
CN103015704A (en) * 2012-12-13 2013-04-03 清华大学建筑设计研究院有限公司 Slab column-shear wall structure building based on precast reinforced concrete hollow formworks and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4015387A (en) * 1973-08-30 1977-04-05 Tramex S.A. Prefabricated structural elements for partitions and walls of buildings and partitions and walls consisting of such elements
CN2239997Y (en) * 1995-08-28 1996-11-13 周长春 Ring beam capable of making prefabricated floor slab monolithic pure at the support
CN2305454Y (en) * 1997-08-14 1999-01-27 柏飞 Disassembling-free framework for concrete column and beam
CN201056838Y (en) * 2007-06-04 2008-05-07 王福生 Detaching-free disposal template
CN103015704A (en) * 2012-12-13 2013-04-03 清华大学建筑设计研究院有限公司 Slab column-shear wall structure building based on precast reinforced concrete hollow formworks and construction method thereof

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625531A (en) * 2017-03-16 2018-10-09 中建四局第三建筑工程有限公司 A kind of construction method pouring constructional column concrete non-dismantling formwork
CN107327019A (en) * 2017-07-05 2017-11-07 宁波二十冶建设有限公司 One kind exempts from template cast-in-situ steel reinforced concrete collar tie beam structure and its construction method
CN108179880A (en) * 2018-01-16 2018-06-19 杨阳 A kind of wall structure column and collar tie beam exempt from formwork construction technique
CN108748649A (en) * 2018-05-30 2018-11-06 中国五冶集团有限公司 A kind of building windowsill concrete bears down on one mold, structure and construction method
CN108915148A (en) * 2018-08-14 2018-11-30 中国电建集团重庆工程有限公司 A kind of constructional column closing U-shaped concrete segment and its construction method
CN109537808A (en) * 2018-10-26 2019-03-29 中交第航务工程局有限公司 A kind of masonry panel constructional column exempts from the construction method of formwork
CN109723224A (en) * 2018-12-19 2019-05-07 中交一航局安装工程有限公司 It is a kind of to exempt from formwork collar tie beam casting craft applied to subway house construction engineering
CN109797965A (en) * 2018-12-27 2019-05-24 广西宏发重工机械有限公司 Constructional column formwork and preparation method thereof
CN110295741A (en) * 2019-04-28 2019-10-01 中国一冶集团有限公司 Masonry structure collar tie beam formwork construction method
CN111005558A (en) * 2019-07-01 2020-04-14 中国二十冶集团有限公司 Mould for manufacturing basic cavity concrete mould and using method thereof
CN111173198A (en) * 2019-09-02 2020-05-19 威海建设集团股份有限公司 Construction method of wall-attached constructional column for constructional engineering
CN110863591A (en) * 2019-11-21 2020-03-06 中国二十冶集团有限公司 Mold device for manufacturing T-shaped cavity concrete module and using method thereof
CN110863590A (en) * 2019-11-21 2020-03-06 中国二十冶集团有限公司 Mold device for manufacturing + type cavity concrete module and using method thereof
CN111622505A (en) * 2020-05-06 2020-09-04 中国建筑一局(集团)有限公司 Construction column chiseling-free construction method beneficial to controlling construction column top sealing quality
CN113389302A (en) * 2021-07-15 2021-09-14 雷玉哲 Secondary structure formwork-supporting-free method
CN115217260A (en) * 2022-06-27 2022-10-21 广东省第四建筑工程有限公司 Prefabricated hollow concrete formwork and assembling construction method thereof

Similar Documents

Publication Publication Date Title
CN104975716A (en) Construction method for employing dismounting-free formwork in casting constructional column and ring beam concrete
CN103469825B (en) The prefabricated water resistant template in ater-casting and mounting method
CN207616844U (en) Foundation platform precast concrete side form and molding machine
CN107268782A (en) A kind of prefabricated frame posture device and its implementation
CN205712498U (en) A kind of precast wall body and prefabricated post or the attachment structure of dry wall
CN107740522A (en) The attachment structure and its construction method of prefabricated regeneration monolith plate and composite beam
CN206737210U (en) A kind of non-dismantling formwork
CN203229972U (en) Basement external wall post-pouring-band prefabricated blocking hanging plate
CN102535841A (en) Construction technology of prefabricated wall panel
CN205115941U (en) Building block of concatenation formula concrete road
CN108625531A (en) A kind of construction method pouring constructional column concrete non-dismantling formwork
CN110344535A (en) A kind of prefabricated assembled combined wall board and construction method realized concealed beam and exempt from formwork
CN103590515B (en) A kind of self-balancing precast surface, cast-in-place core filler wall
CN106285001B (en) A kind of facet integration segment quickly intersects flowing water construction method
CN204850139U (en) Prefabricated assembled concrete shear force wall that reinforcing bar dislocation was laid
CN204676607U (en) Poured band of outer wall of basement plugging structure
CN207363074U (en) A kind of connection structure of prefabricated regeneration monolith plate and composite beam
CN204311649U (en) Prefabrication and assembly construction boxlike reinforcement side fascia with ribbing and exterior wall
CN203256930U (en) Connection structure for concrete wall body and masonry wall face
CN204163266U (en) The large plate of hollow lath component building hollow wall
CN203668894U (en) Concrete prefabricated form structure allowing rapid installation
CN106968366B (en) Construction method for pouring constructional column without dismantling formwork
CN104790565A (en) Cast-in-site ardealite load bearing wall composite structure main building construction method
CN210002951U (en) integrally-installed house system with concrete structure steel bar templates
CN103526877B (en) A kind of precast concrete

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151014