CN203229972U - Basement external wall post-pouring-band prefabricated blocking hanging plate - Google Patents

Basement external wall post-pouring-band prefabricated blocking hanging plate Download PDF

Info

Publication number
CN203229972U
CN203229972U CN 201320200906 CN201320200906U CN203229972U CN 203229972 U CN203229972 U CN 203229972U CN 201320200906 CN201320200906 CN 201320200906 CN 201320200906 U CN201320200906 U CN 201320200906U CN 203229972 U CN203229972 U CN 203229972U
Authority
CN
China
Prior art keywords
basement
prefabricated
external wall
hanging plate
ater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320200906
Other languages
Chinese (zh)
Inventor
张洪波
陈云
赵君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao No 1 Construction Group Co Ltd
Original Assignee
Qingdao No 1 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao No 1 Construction Group Co Ltd filed Critical Qingdao No 1 Construction Group Co Ltd
Priority to CN 201320200906 priority Critical patent/CN203229972U/en
Application granted granted Critical
Publication of CN203229972U publication Critical patent/CN203229972U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a basement external wall post-pouring-band prefabricated blocking hanging plate which comprises a reinforced concrete prefabricated plate and fixing members. One ends of the fixing members are prefabricated in the reinforced concrete prefabricated plate while the other ends of the same extend outwards for a certain length to be bound with rebars at a post-poured band to achieve the objective of fixing the prefabricated blocking hanging plate. The basement external wall post-pouring-band prefabricated blocking hanging plate is simple to fabricate, high in strength, tight in blocking of the basement external wall post-poured band, good in waterproof effect and convenient for subsequent work like plastering, waterproof material paving and pasting and basement backfilling, construction period is shortened, and the basement external wall post-pouring-band prefabricated blocking hanging plate is obvious in economic effect and quality effect and has good popularization and application value.

Description

The prefabricated shutoff link plate in a kind of outer wall of basement ater-casting
Technical field
The present invention relates to construction engineering technical field, relate in particular to the prefabricated shutoff link plate in a kind of outer wall of basement ater-casting in the building construction process.
Background technology
In Designing Structures of High Rising Buildings, be to solve the settlement difference problem, can stay the construction ater-casting that connects basement roof, base plate and exterior wall for one every 30~40m along foundation length, stitch wide should not be less than 800mm.The ater-casting concrete is generally built after its both sides concreting finished 2 months again.At present, processing method to the outer wall of basement ater-casting mainly contains two kinds: the one, any measure of sealing is not in advance taked in the ater-casting, treat to build the ater-casting again after the concreting of both sides, ater-casting finished 2 months, do outer wall of basement waterproof, basement backfill then; The 2nd, outer wall of basement waterproof, basement backfill are done in the sealing in advance of laying bricks at the place, ater-casting then.All there are many deficiencies in these two kinds of job practicess: method one, the ater-casting processing time is longer, delays external wall waterproof, basement backfill, easily causes construction delay.Method two, though can do outer wall of basement waterproof, basement backfill in advance, construction is complicated, construction quality is difficult to be guaranteed.
Summary of the invention
Deficiency at the prior art existence, technical problem to be solved by this invention is, provide a kind of outer wall of basement ater-casting prefabricated shutoff link plate, it makes simple, the intensity height, easy construction can be sealed the ater-casting in advance, that guarantees work such as outer wall of basement waterproof, basement backfill carries out the reduction of erection time smoothly.
For solving the problems of the technologies described above, the technical solution used in the present invention is: the prefabricated shutoff link plate in a kind of outer wall of basement ater-casting comprises reinforced concrete prefabricated board, fixture.In reinforced concrete prefabricated board, the protruding certain-length of the other end carries out colligation with place, ater-casting reinforcing bar to described fixture one end in advance.
Above-mentioned reinforced concrete prefabricated board two ends are arc.
Above-mentioned fixture is U-shaped, can make of Φ 10 round steel.
The advantage of the prefabricated shutoff link plate in a kind of outer wall of basement of the present invention ater-casting is: make simple, the intensity height, shutoff to the outer wall of basement ater-casting is closely knit, good water-proof effect, and conveniently plaster, the carrying out of follow-up work such as waterproofing materials paving, basement backfill, shortened the duration, economic effect and mass effect are obvious, have application value preferably.
Description of drawings
Fig. 1 is structural representation of the present invention;
Fig. 2 is the A-A sectional drawing of Fig. 1;
Fig. 3 is the sectional drawing of embodiment;
1. reinforced concrete prefabricated boards among the figure, 2. fixture, 3. longitudinal reinforcement, 4. transverse reinforcement, 5. outer wall of basement.
The specific embodiment
Below in conjunction with drawings and the specific embodiments the present invention is described in further details.
As shown in Figure 1, 2, 3, the prefabricated shutoff link plate in a kind of outer wall of basement ater-casting, the ater-casting is of a size of 800mm among this embodiment, so prefabricated shutoff link plate size adopts 1100mm * 300mm.In advance in reinforced concrete prefabricated board (1), the other end is protruding, is connected with ater-casting longitudinal reinforcement (3) colligation with fixture (2) one ends.Prefabricated shutoff link plate is by foundation bottom upwards discharging, fixing successively, and the prefabricated shutoff link plate of topmost size is as the criterion with field measurement actual quantities size.After the shutoff of outer wall of basement ater-casting finished, can carry out work such as external wall plastering, waterproofing materials paving, basement backfill.
For shutoff closely knit, described reinforced concrete prefabricated board length than the long 300mm of ater-casting width about.Be easy construction, described reinforced concrete prefabricated board width is about 300mm.For making things convenient for the paving with waterproofing materials of plastering of reinforced concrete prefabricated board and body of wall junction, both sides, ater-casting, arc is made at described reinforced concrete prefabricated board two ends.Described fixture is U-shaped, makes of Φ 10 round steel, and in described reinforced concrete prefabricated board, the protruding certain-length of the other end carries out colligation with place, ater-casting reinforcing bar to the one end, reaches the purpose of fixing prefabricated shutoff link plate in advance, and fixture is 2.
The prefabricated shutoff link plate in a kind of outer wall of basement of the present invention ater-casting is made simple, the intensity height, shutoff to the outer wall of basement ater-casting is closely knit, good water-proof effect, and conveniently plaster, the carrying out of follow-up work such as waterproofing materials paving, basement backfill, shortened the duration, economic effect and mass effect are obvious, have application value preferably.
Certainly, above-mentioned explanation is not to be limitation of the present invention, and the present invention also is not limited to above-mentioned giving an example; those skilled in the art; in essential scope of the present invention, the variation of making, remodeling, interpolation or replacement all should belong to protection scope of the present invention.

Claims (3)

1. prefabricated shutoff link plate in outer wall of basement ater-casting, it comprises reinforced concrete prefabricated board, fixture, it is characterized in that: in reinforced concrete prefabricated board, the protruding certain-length of the other end carries out colligation with place, ater-casting reinforcing bar to described fixture one end in advance.
2. the prefabricated shutoff link plate in a kind of outer wall of basement ater-casting according to claim 1, it is characterized in that: described reinforced concrete prefabricated board two ends are arc.
3. the prefabricated shutoff link plate in a kind of outer wall of basement ater-casting according to claim 1, it is characterized in that: described fixture is U-shaped, can make of Φ 10 round steel.
CN 201320200906 2013-04-21 2013-04-21 Basement external wall post-pouring-band prefabricated blocking hanging plate Expired - Fee Related CN203229972U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320200906 CN203229972U (en) 2013-04-21 2013-04-21 Basement external wall post-pouring-band prefabricated blocking hanging plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320200906 CN203229972U (en) 2013-04-21 2013-04-21 Basement external wall post-pouring-band prefabricated blocking hanging plate

Publications (1)

Publication Number Publication Date
CN203229972U true CN203229972U (en) 2013-10-09

Family

ID=49286105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320200906 Expired - Fee Related CN203229972U (en) 2013-04-21 2013-04-21 Basement external wall post-pouring-band prefabricated blocking hanging plate

Country Status (1)

Country Link
CN (1) CN203229972U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103615019A (en) * 2013-12-16 2014-03-05 中建八局第四建设有限公司 Method for plugging outer wall post-cast strip in advance
CN104594389A (en) * 2015-01-22 2015-05-06 甘肃省建设投资(控股)集团总公司 Post-cast strip external wall plugging structure with elastic water stoppers
CN104947683A (en) * 2015-05-22 2015-09-30 中建三局第一建设工程有限责任公司 Hanging plate used for preventing leakage of side wall of foundation pit and construction method thereof
CN110080308A (en) * 2019-05-08 2019-08-02 浙江大东吴集团建设有限公司 A kind of novel late poured band structure and its construction method
CN112112295A (en) * 2020-09-08 2020-12-22 中建四局第五建筑工程有限公司 Reinforcing construction method for post-cast strip of post-sealed outer wall

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103615019A (en) * 2013-12-16 2014-03-05 中建八局第四建设有限公司 Method for plugging outer wall post-cast strip in advance
CN103615019B (en) * 2013-12-16 2016-04-27 中建八局第四建设有限公司 The method for blocking in advance of post-pouring belt of outer wall
CN104594389A (en) * 2015-01-22 2015-05-06 甘肃省建设投资(控股)集团总公司 Post-cast strip external wall plugging structure with elastic water stoppers
CN104947683A (en) * 2015-05-22 2015-09-30 中建三局第一建设工程有限责任公司 Hanging plate used for preventing leakage of side wall of foundation pit and construction method thereof
CN104947683B (en) * 2015-05-22 2016-11-30 中建三局第一建设工程有限责任公司 For preventing link plate and the construction method thereof of foundation pit side-wall seepage
CN110080308A (en) * 2019-05-08 2019-08-02 浙江大东吴集团建设有限公司 A kind of novel late poured band structure and its construction method
CN112112295A (en) * 2020-09-08 2020-12-22 中建四局第五建筑工程有限公司 Reinforcing construction method for post-cast strip of post-sealed outer wall

Similar Documents

Publication Publication Date Title
CN203229972U (en) Basement external wall post-pouring-band prefabricated blocking hanging plate
CN202000380U (en) Basement outer wall post-pouring belt backfill protective plate
CN201280725Y (en) Post-casting construction precast slab for basement of buildings
CN203755352U (en) Prefabricated slab for closing basement post-pouring settlement belt
CN206174146U (en) Assembly type structure's assembly node
CN205296388U (en) Apron is sealed to garage wall post -cast strip
CN105064555A (en) Structural wallboard for superimposed decorative layer and insulating layer and construction method
CN104712079B (en) The assembled polypropylene fibre sludge ceramsite concrete wall and its construction method connected based on mat surface
CN204551547U (en) Outer wall of basement vertical ater-casting plugging device
CN108643585A (en) Precast concrete sandwich heat preservation Side fascia and its preparation construction method
CN105019579A (en) Masonry filler wall reinforcement and plastering constructional column and construction method thereof
CN201891133U (en) Manual assembled type self-waterproof late poured band prefabricated slab of basement outer wall
CN104763074A (en) Rough surface connection based assembly steel fiber regeneration brick concrete wall and construction method thereof
CN203007997U (en) Precast concrete plank aproll
CN202482889U (en) Underground diaphragm wall of interlocked prefabricated pile
CN204676607U (en) Poured band of outer wall of basement plugging structure
CN204690770U (en) A kind of cinder concrete loose tool plate that can multi-facetedly be located by connecting
CN104675014B (en) The assembled steel fiber sludge Ceramsite Concrete Wall and its construction method connected based on horse tooth trough
CN208604640U (en) A kind of quick construction structure of post-pouring belt of outer wall
CN206971379U (en) Precast beam and column connected node
CN206174293U (en) Prefabricated constructional column
CN205636642U (en) Prefabricated drainage type net roof beam
CN105401681B (en) A kind of quick-assembling pitched roof and its method of construction based on assembled composite wall structure system
CN204626473U (en) Basement roof waterproof construction
CN211901889U (en) Concrete-plastic composite pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131009

Termination date: 20170421

CF01 Termination of patent right due to non-payment of annual fee