CN111173198A - Construction method of wall-attached constructional column for constructional engineering - Google Patents

Construction method of wall-attached constructional column for constructional engineering Download PDF

Info

Publication number
CN111173198A
CN111173198A CN201910822919.1A CN201910822919A CN111173198A CN 111173198 A CN111173198 A CN 111173198A CN 201910822919 A CN201910822919 A CN 201910822919A CN 111173198 A CN111173198 A CN 111173198A
Authority
CN
China
Prior art keywords
constructional column
type
concrete
cement template
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910822919.1A
Other languages
Chinese (zh)
Inventor
郑振尧
张渤琪
宋文
王青涛
王文超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weihai Lidong Construction Technology Co Ltd
Weihai Construction Group Co ltd
Original Assignee
Weihai Lidong Construction Technology Co Ltd
Weihai Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weihai Lidong Construction Technology Co Ltd, Weihai Construction Group Co ltd filed Critical Weihai Lidong Construction Technology Co Ltd
Priority to CN201910822919.1A priority Critical patent/CN111173198A/en
Publication of CN111173198A publication Critical patent/CN111173198A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/025Buckets specially adapted for use with concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a construction method of a wall-attached constructional column in constructional engineering, and belongs to the field of buildings. The manufacturing cost of the cement template is reduced by utilizing the general design and the industrialized batch production of the constructional column cement template; the cement formwork and the constructional column steel bar are wrapped by utilizing the opening of the constructional column cement formwork; bearing the lateral pressure borne by the constructional column concrete during the pouring by utilizing the mortar bonding strength between the constructional column cement template and the wall building block as well as the self-body; through the application of the formwork-dismantling-free constructional column cement formwork, the synchronous construction of a constructional column and wall building blocks is realized, the construction procedures of constructional column formwork installation and concrete pouring can be completed only by masonry workers, the construction procedures of splicing of constructional column edge grout sealing laths, formwork work formwork installation, concrete work pouring, formwork work formwork dismantling, concrete work chiseling repair and the like which are necessary in the traditional constructional column construction process are eliminated, the construction progress is greatly accelerated, and the formwork loss, waste and rubbish after formwork dismantling are eliminated.

Description

Construction method of wall-attached constructional column for constructional engineering
Technical Field
The invention relates to the field of construction technology of all wall-attached constructional columns in the building process of inner and outer walls of a building in the construction stage of constructional engineering, in particular to a construction method of the wall-attached constructional columns in the constructional engineering.
Background
As is known, the design and construction of the inner and outer walls of the building at present mostly still adopt the traditional design and construction method, in order to meet the earthquake-resistant requirement of the wall and strengthen the integral rigidity of the inner and outer walls, the design of the wall-attached constructional column is a conventional method and is also the specified requirement of the national standard. The traditional construction method still adopts the construction processes of manufacturing and installing constructional column steel bars, building a wall, adhering and adhering constructional column edge grout sealing elastic laths, manufacturing and installing constructional column templates, pouring constructional column concrete on site, removing constructional column templates, performing secondary correction and the like, has diversified operation types and complicated construction procedures, and has continuously rising construction cost under the condition that the existing construction workers are basically in the market requiring party and directly influences the construction progress and quality safety. Because of the objective existence of the construction process, a lot of construction intermittence occurs, normal running water construction cannot be formed, various workers, especially steel bar workers, formwork workers and concrete cannot be intensively and compactly constructed, no matter construction, supervision, construction and sub-packaging units are very painful, the progress is difficult to be improved even if price cost is not considered, the progress problem can be solved in the construction of the assembled wall, but the cost is high, and due to the fact that the existing assembled wall is influenced by materials and installation technologies, a lot of objective problems which are difficult to accept by users can occur subsequently, such as wall cracks, surface layer falling and other difficult problems. How to find or invent a construction method which is convenient to operate, accelerates progress, reduces cost, ensures quality and safety, saves energy and protects environment is a goal pursued by all people in the field of buildings.
Disclosure of Invention
In order to overcome the defects of the prior art, the invention provides the construction method of the constructional engineering wall-attached constructional column, which is convenient for the subsequent pouring of the constructional column concrete while realizing the synchronous construction of the constructional column cement formwork and the wall building blocks, meets the effective combination of the constructional column concrete and the wall, ensures the construction quality of the constructional column, and also realizes the effects of no form removal, easy inspection and good appearance quality.
The technical scheme adopted by the invention for solving the technical problems is as follows: a construction method of a wall-attached constructional column in constructional engineering is characterized in that,
a. designing and factory customizing cement forms for construction columns
One end of the cement template is open so as to be convenient for passing through the constructional column steel bar for installation, and a centering line is arranged on one outer side surface of the cement template so as to ensure accurate installation and positioning;
b. wall body and constructional column paying-off and anchoring steel bar reservation
Positioning and paying off are carried out before constructional column construction, the position of the constructional column, the bottom elevation of a flat belt or a ring beam are determined according to design and standard requirements, the reserved plugging height of the wall body and the top elevation of a mortar leveling layer are calculated and determined according to the beam bottom elevation, the floor elevation and the bottom elevation of the flat belt or the ring beam and the positive modulus principle of the height of the wall body building blocks, and then wall body tie bars and the flat belt or the ring beam are planted and anchoring steel bars are planted;
c. wall and constructional column construction
After all constructional column reinforcing steel bars at the constructional column position in each construction section are installed, synchronous construction of the constructional column and the wall body is started, the thickness of a mortar leveling layer at the bottom of the wall body is determined and leveled, then a cement template with a cleaning opening is built at the constructional column position, the cement template penetrates through the constructional column reinforcing steel bars through the opening to build a bonding floor slab, then another cement template is built on the cement template, and alignment of centering lines on the cement template is ensured;
then, building wall blocks on two sides of the constructional column, after the building of the wall blocks is finished, returning to the position of the constructional column, building another cement template without a cleaning opening, building the wall blocks on two sides of the constructional column, and sequentially and alternately performing building until a construction section needing concrete pouring is reached;
if concrete of a concrete constructional column needs to be poured in stages when a concrete flat belt or a ring beam, a windowsill coping, a window lintel and a door lintel are encountered, firstly, floor ash and sundries at a cleaning opening are removed, the concrete is blocked after the cleaning is finished, small holes are drilled at the upper corner parts of the cement templates at certain intervals to serve as slurry overflow holes and air outlets during concrete pouring, then, the synchronous pouring of horizontal member concrete and constructional column concrete is finished, and when the concrete overflows from the slurry overflow holes, the concrete can be blocked in time by using adhesive tapes;
when the constructional column is constructed to the top of a wall body, arranging anti-corrosion wooden wedges on two sides of a cement template on the top for plugging a gap on the side surface of the cement template, preventing disturbance of the wall body, fixing a horn mouth turnover type concrete pouring hopper and pouring concrete of the constructional column;
if the concrete of constructional column is poured without subsection, when the constructional column needs to be poured to the wall top once, a concrete vibrating opening is arranged at the position of two cement templates which are away from the lower part of the wall top, the cement template at the vibrating opening can adopt a cement template with a cleaning opening, and the cleaning opening at the moment is the vibrating opening.
The invention can also be realized by the following measures:
the constructional column is a straight constructional column, and the construction comprises the following steps:
a. design and manufacture of cement formwork for straight constructional column
Designing and industrially customizing a straight-line constructional column A1 type cement template, a straight-line constructional column A2 type cement template and a straight-line constructional column B type cement template with one open end, wherein a cement template centering hole is formed in the opposite end of the open end in the center, the cleaning hole of the straight-line constructional column A2 type cement template is centrally and downwardly arranged along the long side direction, a centering line is arranged on one outer side of the straight-line constructional column A1 type cement template, the straight-line constructional column A2 type cement template and the straight-line constructional column B type cement template, and a reinforcing axilla is arranged at the end part of the centering line;
b. wall body and straight-line-shaped constructional column paying-off and anchoring steel bar reservation
Positioning and paying off are carried out before the construction of the I-shaped constructional column, the position of the constructional column, the elevation of the flat belt or the ring beam bottom are determined according to drawing design and standard requirements, the reserved plugging height of the wall body and the top elevation of the mortar leveling layer are calculated and determined according to the elevation of the beam bottom, the elevation of a floor slab and the elevation of the flat belt or the ring beam bottom and the principle of positive modulus of the height of the wall body building blocks, and then the wall body tie bars and the flat belt or the ring beam are planted and the anchoring steel bars are planted;
c. wall and straight constructional column construction
After all constructional column reinforcing steel bars at the constructional column position in each construction section are installed, synchronous construction of the I-shaped constructional column and the wall is started, the thickness of a mortar leveling layer at the bottom of the wall is determined and leveled, then an I-shaped constructional column A2 type cement template provided with a cleaning opening is built at the constructional column position, the I-shaped constructional column A2 type cement template penetrates through the constructional column reinforcing steel bars through the opening of the cement template to be built and bonded on a floor slab, then an I-shaped constructional column B type cement template is built on the cement template, the opening part of the I-shaped constructional column B type cement template and the opening part of the I-shaped constructional column A2 type cement template are reversely installed, and alignment of centering lines is ensured;
then, building wall blocks on two sides of the linear constructional column, after two layers of the wall blocks are built, returning to the position of the constructional column, building a linear constructional column A1 type cement template, wherein the opening direction of the linear constructional column A1 type cement template is the same as that of the lower linear constructional column A2 type cement template, building a linear constructional column B type cement template according to the principle that the opening direction is reverse, building wall blocks on two sides of the linear constructional column, and sequentially staggering the wall blocks according to two-layer circulation pace until a construction section needing to be poured with concrete is reached;
if concrete of a concrete constructional column needs to be poured in stages when a concrete flat belt or a ring beam, a windowsill coping, a window lintel and a door lintel are encountered, firstly, floor ash and sundries at a cleaning opening are removed, the concrete is blocked after the cleaning is finished, small holes are drilled at the upper corner parts of the cement templates at certain intervals to serve as slurry overflow holes and air outlets during concrete pouring, then, the synchronous pouring of horizontal member concrete and the concrete of the straight constructional column is finished, and the concrete can be blocked in time by using adhesive tapes when the concrete overflows from the slurry overflow holes;
when the constructional column is constructed to the top of the wall body, arranging anti-corrosion wood wedges on two sides of a cement template of the constructional column at the top for plugging a gap on the side surface of the cement template, pressing the wall body to prevent disturbance of the wall body, fixing a horn mouth turnover type concrete pouring hopper, and then pouring concrete of the constructional column;
if the concrete of constructional column is poured without subsection, when the constructional column needs to be poured to the wall top once, a concrete vibrating opening is arranged at the position of two cement templates which are away from the lower part of the wall top, the cement template at the vibrating opening can adopt a cement template with a cleaning opening, and the cleaning opening at the moment is the vibrating opening.
The constructional column is a cross constructional column, and the construction comprises the following steps:
a. design and manufacture of cement formwork for cross constructional column
Designing and industrially customizing a cross constructional column A1 type cement template with an opening at one end, a cross constructional column A2 type cement template and a cross constructional column B type cement template, wherein a cement template central hole is formed in the other three sides of the cross constructional column A1 type cement template in the center, wing plates are arranged at the two-way corners of the four sides of the cross constructional column A1 type cement template, cleaning openings are formed in the other three sides of the cross constructional column A2 type cement template in the center and are arranged downwards, wing plates are arranged at the two-way corners of the four sides of the cross constructional column A2 type cement template in the two-way direction, peripheral cleaning openings are reserved at the bottoms of the wing plates in a hanging manner, and cement template central holes are formed in the other three sides of the cross constructional column B type cement template in the center; a centering line is arranged on one outer side of the cross constructional column A1 type cement template, the cross constructional column A2 type cement template and the cross constructional column B type cement template so as to ensure accurate installation and positioning;
b. wall body and cross constructional column paying-off and anchoring steel bar reservation
Positioning and paying off are carried out before construction of the cross constructional column, the position of the constructional column, the bottom elevation of a flat belt or a ring beam are determined according to drawing design and specification requirements, the reserved plugging height of the wall and the top elevation of a mortar leveling layer are calculated and determined according to the height elevation of the bottom of the beam, the elevation of a floor and the elevation of the bottom of the flat belt or the ring beam according to the principle of positive modulus of the height of wall building blocks, and then wall tie bars and the flat belt or the ring beam are planted and anchoring steel bars are planted;
c. construction of wall and cross constructional column
After all constructional column reinforcing steel bars at the constructional column position in each construction section are installed, synchronous construction of the cross constructional column and the wall is started, the thickness of a mortar leveling layer at the bottom of the wall is determined and leveled, then a first skin cross constructional column A2 type cement template is built at the constructional column position, a bonding floor slab is built by penetrating the constructional column reinforcing steel bars through the opening of the cement template, a cross constructional column B type cement template is built on the cement template, the opening of the cement template penetrates the constructional column reinforcing steel bars to be bonded with the cross constructional column A2 type cement template below, the opening direction of the cross constructional column B type cement template is reversely installed with the opening direction of the cross constructional column A2 type cement template, and alignment of centering lines is ensured;
then, building wall blocks on two sides of the cross-shaped constructional column, after two layers of the wall blocks are built, returning to the position of the constructional column, then building a cross-shaped constructional column A1 type cement template, wherein the opening direction of the cross-shaped constructional column A1 type cement template is consistent with the opening direction of the cross-shaped constructional column A2 type cement template, building a cross-shaped constructional column B type cement template on the cement template according to the principle that the opening directions are reverse, ensuring that the centering lines are aligned, then returning to build the wall blocks on two sides of the cross-shaped constructional column, and sequentially staggering according to the step of two-layer circulation until a construction section needing to be poured with concrete is reached;
if concrete of a concrete constructional column needs to be poured in stages when a concrete flat belt or a ring beam, a windowsill coping, a window lintel and a door lintel are encountered, firstly, floor ash and sundries at a cleaning opening are removed, the concrete is blocked after the cleaning is finished, small holes are drilled at the upper corner parts of the cement templates at certain intervals to serve as slurry overflow holes and air outlets during concrete pouring, then the synchronous pouring of the horizontal member concrete and the cross constructional column concrete is finished, and the concrete can be blocked in time by using an adhesive tape when the concrete overflows from the slurry overflow holes;
when the constructional column is constructed to the top of the wall body, arranging anti-corrosion wood wedges on two sides of a cement template of the constructional column at the top for plugging a gap on the side surface of the cement template, pressing the wall body to prevent disturbance of the wall body, fixing a horn mouth turnover type concrete pouring hopper, and then pouring concrete of the constructional column;
if the concrete of constructional column is poured without subsection, when the constructional column needs to be poured to the wall top once, a concrete vibrating opening is arranged at the position of two cement templates which are away from the lower part of the wall top, the cement template at the vibrating opening can adopt a cement template with a cleaning opening, and the cleaning opening at the moment is the vibrating opening.
The constructional column is a T-shaped constructional column, and the construction comprises the following steps:
a. design and manufacture of cement formwork for T-shaped constructional column
Designing and industrially customizing a T-shaped constructional column A1 type cement template, a T-shaped constructional column A2 type cement template and a T-shaped constructional column B type cement template with one open end, wherein a cement template centering hole is formed in the opposite end of the open end, the cleaning hole of the T-shaped constructional column A2 type cement template is centrally and downwards arranged along the long side direction, a centering line is arranged on one outer side of the T-shaped constructional column A1 type cement template, the T-shaped constructional column A2 type cement template and the T-shaped constructional column B type cement template, and a reinforcing axilla is arranged at the end part of the centering line;
two wing plates are additionally arranged on the outer side surfaces of the T-shaped tail end directions of the A1 type cement template of the T-shaped constructional column and the A2 type cement template of the T-shaped constructional column, a cement template centering hole is arranged in the center of one surface of the T-shaped constructional column A1 type cement template and the A2 type cement template provided with the wing plates, and a cement template centering hole is arranged in the center of one surface of the T-shaped constructional column B type cement template adjacent to the opening and the opposite surface of the opening;
b. wall body and T-shaped constructional column paying-off and anchoring steel bar reservation
Positioning and paying off are carried out before the construction of the T-shaped constructional column, the position of the constructional column, the elevation of the flat belt or the ring beam bottom are determined according to drawing design and specification requirements, the pre-reserved plugging height of the wall body and the top elevation of the mortar leveling layer are calculated and determined according to the elevation of the beam bottom, the elevation of a floor slab and the elevation of the flat belt or the ring beam bottom and the principle of positive modulus of the height of the wall body building blocks, and then the wall body tie bars and the flat belt or the ring beam are planted and the anchoring steel bars are planted;
c. construction of wall and T-shaped constructional column
After all constructional column reinforcing steel bars at the constructional column position in each construction section are installed, synchronous construction of the T-shaped constructional column and the wall body is started, the thickness of a mortar leveling layer at the bottom of the wall body is determined and leveled, then a first leather T-shaped constructional column A2 type cement template is built at the constructional column position, the direction of a wing plate of the first leather T-shaped constructional column A2 type cement template is consistent with the direction of the tail end of the T shape, the first leather T-shaped constructional column A2 type cement template penetrates through the constructional column reinforcing steel bars through the opening of the first leather T-shaped constructional column A2 type cement template and is bonded to a floor slab through the building of the opening of the first leather T-shaped constructional column A2 type cement template, the opening direction of the T-shaped constructional column B type cement template and the opening direction of the T-shaped constructional column A2;
then, building wall blocks on two sides of the T-shaped constructional column, after two layers of the wall blocks are built, returning to the position of the constructional column, then building a1 type cement template of the T-shaped constructional column, wherein the opening direction of the A1 type cement template of the T-shaped constructional column is consistent with the opening direction of the A2 type cement template of the T-shaped constructional column, building a B type cement template of the T-shaped constructional column on the cement template according to the principle that the opening direction is reverse, ensuring that the centering lines are aligned, then returning to build the wall blocks on two sides of the T-shaped constructional column, and sequentially staggering according to the circulation pace of the two layers until the wall blocks reach a construction section needing concrete pouring;
if concrete of a concrete constructional column needs to be poured in stages when a concrete flat belt or a ring beam, a windowsill coping, a window lintel and a door lintel are encountered, firstly, floor ash and sundries at a cleaning opening are removed, the concrete is blocked after the cleaning is finished, small holes are drilled at the upper corner parts of the cement templates at certain intervals to serve as slurry overflow holes and air outlets during concrete pouring, then the synchronous pouring of horizontal member concrete and T-shaped constructional column concrete is finished, and the concrete can be blocked in time by using an adhesive tape when the concrete overflows from the slurry overflow holes;
when the constructional column is constructed to the top of the wall body, arranging anti-corrosion wood wedges on two sides of a cement template of the constructional column at the top for plugging a gap on the side surface of the cement template, pressing the wall body to prevent disturbance of the wall body, fixing a horn mouth turnover type concrete pouring hopper, and then pouring concrete of the constructional column;
if the concrete of constructional column is poured without subsection, when the constructional column needs to be poured to the wall top once, a concrete vibrating opening is arranged at the position of two cement templates which are away from the lower part of the wall top, the cement template at the vibrating opening can adopt a cement template with a cleaning opening, and the cleaning opening at the moment is the vibrating opening.
The construction column is a corner type construction column, and the construction comprises the following steps:
a. design and manufacture of cement formwork for corner-type constructional column
Designing and factory-customizing a corner type constructional column A1 type cement template, a corner type constructional column A2 type cement template and a corner type constructional column B type cement template,
the corner type constructional column A1 type cement template and the corner type constructional column A2 type cement template are arranged in an L shape, one end of a short side is completely open, a cement template central hole is formed in one vertical side adjacent to the open position in the middle, one end of a corner type constructional column B type cement template is completely open, a cement template central hole is formed in any side adjacent to the open direction in the middle, a cleaning hole is formed in the corner type constructional column A2 type cement template, a centering line is arranged on one outer side of the corner type constructional column A1 type cement template, the corner type constructional column A2 type cement template and the corner type constructional column B type cement template, and a reinforcing armpit is arranged at the end of the corner type constructional column A2 type cement template;
b. wall body and corner type constructional column paying-off and anchoring steel bar reservation
Positioning and paying off are carried out before the construction of the corner-shaped constructional column, the position of the constructional column, the elevation of a flat belt or a ring beam bottom are determined according to drawing design and standard requirements, the height of a wall body reserved plugging layer and the elevation of a mortar leveling layer are calculated and determined according to the elevation of the beam bottom, the elevation of a floor slab and the elevation of the flat belt or the ring beam bottom and the principle of positive modulus of the height of wall body building blocks, and then wall body tie bars and the flat belt or the ring beam are planted and anchoring steel bars are planted;
c. construction of wall and corner constructional column
After all constructional column reinforcing steel bars at the position of a constructional column in each construction section are installed, synchronous construction of the corner constructional column and the wall is started, the thickness of a mortar leveling layer at the bottom of the wall is determined and leveled, then a first skin corner constructional column A2 type cement template is built at the position of the constructional column, the opening direction of the cement template is aligned to a transverse wall, the cement template penetrates through the constructional column reinforcing steel bars through the opening of the cement template and is built and bonded to a floor, then a corner constructional column B type cement template is built on the cement template, the opening direction of the cement template is aligned to a longitudinal wall, namely the opening direction of the corner constructional column A2 type cement template is perpendicular to the opening direction of the corner constructional column B type cement template, the cement template penetrates through the constructional column reinforcing steel bars through the opening of the cement template and is bonded with the corner constructional column A2 type cement template below, and alignment of centering;
then, building wall blocks on two sides of the corner constructional column, after two layers of the wall blocks are built, returning to the position of the constructional column, then building a1 type cement template of the corner constructional column, wherein the opening direction of the A1 type cement template of the corner constructional column is consistent with that of the A2 type cement template of the corner constructional column, building a B type cement template of the corner constructional column on the cement template according to the principle that the opening directions are vertical to each other, ensuring that the centering lines are aligned, then returning to build the wall blocks on two sides of the T-shaped constructional column, and sequentially staggering the wall blocks according to the circulation step of the two layers until the wall blocks reach a construction section needing to be poured with concrete;
if concrete of a concrete constructional column needs to be poured in stages when a concrete flat belt or a ring beam, a windowsill coping, a window lintel and a door lintel are encountered, firstly, floor ash and sundries at a cleaning opening are removed, the concrete is blocked after the cleaning is finished, small holes are drilled at the upper corner parts of the cement templates at certain intervals to serve as slurry overflow holes and air outlets during concrete pouring, then the synchronous pouring of horizontal member concrete and corner type constructional column concrete is finished, and the concrete can be blocked in time by using an adhesive tape when the concrete overflows from the slurry overflow holes;
when the constructional column is constructed to the top of the wall body, arranging anti-corrosion wood wedges on two sides of a cement template of the constructional column at the top for plugging a gap on the side surface of the cement template, pressing the wall body to prevent disturbance of the wall body, fixing a horn mouth turnover type concrete pouring hopper, and then pouring concrete of the constructional column;
if the concrete of constructional column is poured without subsection, when the constructional column needs to be poured to the wall top once, a concrete vibrating opening is arranged at the position of two cement templates which are away from the lower part of the wall top, the cement template at the vibrating opening can adopt a cement template with a cleaning opening, and the cleaning opening at the moment is the vibrating opening.
The constructional column is an edge type constructional column, and the construction comprises the following steps:
a. designing and industrially customizing an edge type constructional column A1 type cement template, an edge type constructional column A2 type cement template and an edge type constructional column B type cement template which are open at one end and are not provided with a cement template central hole, wherein the cleaning port of the edge type constructional column A2 type cement template is centrally arranged and downwards arranged along the long edge direction, a centering line is arranged at one outer side of the edge type constructional column A1 type cement template, the edge type constructional column A2 type cement template and the edge type constructional column B type cement template, and a reinforcing armpit is arranged at the end part of the centering line;
b. wall body and edge type constructional column paying-off and anchoring steel bar reservation
Positioning and paying off are carried out before the construction of the edge type constructional column, the position of the constructional column, the bottom elevation of a flat belt or a ring beam are determined according to drawing design and specification requirements, the reserved plugging height of the wall body and the top elevation of a mortar leveling layer are calculated and determined according to the height elevation of the bottom of the beam, the elevation of a floor slab and the elevation of the bottom of the flat belt or the ring beam and the principle of positive modulus of the height of the wall body building blocks, and then wall body tie bars and the flat belt or the ring beam are planted and anchoring steel bars are planted;
c. wall and edge type constructional column construction
After all constructional column reinforcing steel bars at the position of a constructional column in each construction section are installed, synchronous construction of an edge type constructional column and a wall body is started, the thickness of a mortar leveling layer at the bottom of the wall body is determined and leveled, then a first skin edge type constructional column A2 type cement template is built at the position of the constructional column, the opening direction of the first skin edge type constructional column A2 type cement template is aligned to the direction of the wall body, the first skin wall body building block penetrates through the constructional column reinforcing steel bars through the opening of the first skin wall body building block to be built and bonded on a floor, then a second skin wall body building block is built after the first skin wall body building block is built, the opening direction of the second skin edge type constructional column B type cement template is also aligned to the direction of the wall body, the second skin wall body building block penetrates through the opening of the first skin body building block to be firmly bonded with the edge type constructional column A2 type cement template of a lower skin, alignment of the centering line is ensured, then the second skin wall body building block, building a third skin wall building block, returning to the position of the constructional column after the third skin wall building block is built, and building a fourth skin edge type constructional column B type cement template, wherein the opening directions of all the cement templates are aligned to the same direction of the wall, and the cement templates are sequentially staggered according to a skin-circulation pace until a construction section needing to be poured with concrete is reached;
if concrete of a concrete constructional column needs to be poured in stages when a concrete flat belt or a ring beam, a windowsill coping, a window lintel and a door lintel are encountered, firstly, floor ash and sundries at a cleaning opening are removed, the concrete is blocked after the cleaning is finished, small holes are drilled at the upper corner parts of the cement templates at certain intervals to serve as slurry overflow holes and air outlets during concrete pouring, then the synchronous pouring of horizontal member concrete and edge type constructional column concrete is finished, and the concrete can be blocked in time by using an adhesive tape when the concrete overflows from the slurry overflow holes;
when the constructional column is constructed to the top of the wall body, arranging anti-corrosion wood wedges on two sides of a cement template of the constructional column at the top for plugging a gap on the side surface of the cement template, pressing the wall body to prevent disturbance of the wall body, fixing a horn mouth turnover type concrete pouring hopper, and then pouring concrete of the constructional column;
if the concrete of constructional column is poured without subsection, when the constructional column needs to be poured to the wall top once, a concrete vibrating opening is arranged at the position of two cement templates which are away from the lower part of the wall top, the cement template at the vibrating opening can adopt a cement template with a cleaning opening, and the cleaning opening at the moment is the vibrating opening.
The construction column and wall building block synchronous construction method has the advantages that synchronous construction of the construction column and wall building blocks is achieved through application of the formwork removal-free construction column cement formwork, construction procedures of construction column formwork installation and concrete pouring can be completed only by masonry workers, if the construction column reinforcing steel bars are formed and distributed, the construction procedures of construction column reinforcing steel bars can be completed synchronously, construction procedures of splicing of construction column edge sealing pulp laths, formwork worker formwork installation, concrete pouring, formwork worker formwork removal, concrete chiseling repair and the like which are necessary in a traditional construction process are eliminated, construction progress is greatly accelerated, labor cost is effectively reduced, formwork loss, waste and rubbish after formwork removal are eliminated, quality is reliable, construction is safe, energy is saved, environment is protected, and pain points and difficulties of all main bodies of construction engineering are really solved.
Drawings
The invention is further illustrated with reference to the following figures and examples.
FIG. 1 is a schematic diagram of a concrete form structure of a straight constructional column A1 according to the invention.
FIG. 2 is a schematic diagram of a concrete form structure of a straight constructional column A2 according to the invention.
FIG. 3 is a schematic diagram of a B-shaped cement formwork structure of a I-shaped constructional column of the present invention.
FIG. 4 is a schematic diagram of a cross-shaped construction post type A1 cement formwork structure of the present invention.
FIG. 5 is a schematic diagram of a cross-shaped construction post type A2 cement formwork structure of the present invention.
FIG. 6 is a schematic diagram of a cross-shaped construction column B-type cement formwork structure of the present invention.
FIG. 7 is a schematic diagram of a T-shaped constructional column A1 type cement formwork structure of the present invention.
FIG. 8 is a schematic diagram of the construction of a T-shaped constructional column A2 type cement formwork.
FIG. 9 is a schematic diagram of the construction of the B-shaped cement formwork of the T-shaped constructional column of the present invention.
FIG. 10 is a schematic diagram of a corner type construction column A1 type concrete form structure of the present invention.
FIG. 11 is a schematic diagram of a corner type construction post type A2 concrete form structure of the present invention.
FIG. 12 is a schematic view of a B-type concrete form structure of a corner type constructional column according to the invention.
FIG. 13 is a schematic diagram of the edge type constructional column type A1 cement formwork structure of the present invention.
FIG. 14 is a schematic diagram of the edge type constructional column type A2 cement formwork structure of the present invention.
FIG. 15 is a schematic diagram of the construction of the B-type cement formwork of the edge-type constructional column of the present invention.
FIG. 16 is a schematic view of the building of a linear structural column cement form of the present invention.
FIG. 17 is a schematic representation of the building of a cross-shaped construction column cement form of the present invention.
FIG. 18 is a schematic view of the building of the T-shaped constructional column cement formwork group of the invention.
FIG. 19 is a schematic view of the assembly of corner type construction columns and cement formworks of the present invention.
FIG. 20 is a schematic representation of the building of the edge type constructional column cement formwork set of the present invention.
FIG. 21 is a schematic view of the construction of the I-shaped structural column of the present invention with a wall attached.
FIG. 22 is a schematic view of the construction and molding of the wall and the secondary structure of the present invention.
FIG. 23 is a schematic view of the bell-mouth turnaround concrete pour bucket of the present invention installed.
FIG. 24 is a schematic view of a bell-mouth turnover concrete pouring hopper of the present invention.
In the figure, 1, a centering line, 2, a cleaning opening, 3, a straight constructional column A1 type cement template, 4, a straight constructional column A2 type cement template, 5, a reinforced armpit, 6, a cement template centering hole, 7, a straight constructional column B type cement template, 9, a floor slab, 10, building blocks, 11, a mortar joint, 12, a leveling layer, 13, a wall body tie bar, 14, constructional column reinforcing steel bars, 15, constructional column positions, 23, a flat belt or a ring beam, 24, wall body reserved plugging height, 30, sill coping, 32, a window lintel, 33, a door lintel, 34, an anticorrosive wood wedge, 35, a bell mouth turnover type concrete pouring hopper, 38, a cross constructional column A1 type cement template, 39, a cross constructional column A2 type cement template, 40, a cross constructional column B type cement template, 41, a wing plate, 42, a peripheral opening, 43, a T constructional column A1 type cement template, 44, a cement template 2, 45. the concrete feeding device comprises a T-shaped constructional column B-shaped cement template, 46-corner constructional column A1-shaped cement template, 47-corner constructional column A2-shaped cement template, 48-corner constructional column B-shaped cement template, 49-edge constructional column A1-shaped cement template, 50-edge constructional column A2-shaped cement template, 51-edge constructional column B-shaped cement template, 52-self-tapping fixing point, 53-plugging plate, 55-turning plate turning fixing pin, 56-placing plate, 57-self-tapping reserved opening, 58-turning plate turning fixing hole, 59-concrete feeding port turning plate and 60-concrete feeding hopper.
Detailed Description
Taking the most common structural column with 240 x 240mm cross-sectional dimension as an example
The first embodiment is as follows: construction of straight constructional column
As shown in fig. 1, 2, 3, 16, 21, 22, 23, 24, comprising the steps of,
design and manufacture of cement formwork for straight constructional column
Designing and industrially customizing a linear constructional column A1 type cement template 3, a linear constructional column A2 type cement template 4 and a linear constructional column B type cement template 7, wherein the wall thickness is 15mm, and the following requirements are met:
the height of the straight constructional column A1 type cement template 3 and the height of the straight constructional column A2 type cement template 4 are 240mm, the length of the short side is 240mm, and the length of the long side is 370mm, so that the requirement that the racking width at two sides of the constructional column is not less than 60mm is met; the cleaning opening 2 of the A2 type cement formwork 4 of the I-shaped constructional column is centrally and downwardly arranged along the long side direction, and the size is 100 x 100 mm;
the length, width and height of the B-shaped cement template 7 of the I-shaped constructional column are 240 × 240 mm;
one end of each of the I-shaped constructional column A1 type cement formwork 3, the I-shaped constructional column A2 type cement formwork 4 and the I-shaped constructional column B type cement formwork 7 is open so as to be installed through constructional column reinforcing steel bars 14 conveniently, and a 100 x 100mm cement formwork centering hole 6 is formed in the middle of the end, opposite to the open end, so that post-construction column cast-in-place concrete is embedded and fixed with a wall body through the hole;
all the straight constructional column A1 type cement templates 3, the straight constructional column A2 type cement templates 4 and the straight constructional column B type cement templates 7 have to be provided with a centering line 1 on one outer side surface to ensure accurate installation and positioning;
all the I-shaped constructional column A1 type cement formworks 3, I-shaped constructional column A2 type cement formworks 4 and I-shaped constructional column B type cement formworks 7 are provided with reinforcing armpits 5 at the ends of the formwork walls, and the width of the reinforcing armpits is 25mm, so that the mortar bonding strength between the cement formworks and the wall building blocks 10 is enhanced, and the embedding and fixing effect with post-cast concrete (similar to a tenon) is achieved.
When the concrete is customized in a factory, a certain number of the I-shaped constructional column A2 type cement templates 4 are configured according to the principle that the total number is more than 15%, and the requirements of concrete top surface bottom swinging, building and cleaning during the staged concrete pouring are met.
Wall body and straight-line-shaped constructional column paying-off and anchoring steel bar reservation
Positioning and paying off are carried out before the construction of the straight constructional column, and the position 15 of the constructional column and the bottom elevation of the flat belt or the ring beam are accurately determined according to drawing design and specification requirements; according to the elevation of the bottom of the beam, the elevation of the floor slab 9 and the elevation of the bottom of the flat belt or ring beam, the reserved plugging height 24 (adjustable) of the wall body and the elevation of the top of the mortar leveling layer are calculated and determined according to the principle of the positive modulus of the height of the wall body building blocks (the height of the building blocks plus the thickness of the mortar joints 11), and then the wall body tie bars 13 and the flat belt or ring beam are planted and the anchoring steel bars are planted.
Wall and straight constructional column construction
For the unidirectional straight wall and the straight constructional column, after all constructional column reinforcing steel bars 14 at the constructional column position 15 in each construction section are installed and qualified by inspection, synchronous construction of the straight constructional column and the wall body is started. During construction, the thickness of the mortar (fine aggregate concrete) leveling layer 12 at the bottom of the wall body is determined in advance according to setting-out, if the thickness is within 30mm, the mortar can be used for leveling, and if the thickness is larger than or equal to 30mm, the fine aggregate concrete is used for leveling. Then, a linear constructional column A2 type cement formwork 4 (provided with a cleaning opening) provided with a cleaning opening is built at the position 15 of the constructional column, the structural column steel bar 14 is penetrated through the opening of the linear constructional column A2 type cement formwork 4 to be built and bonded to the floor, and then a linear constructional column B type cement formwork 7 is built on the linear constructional column A2 type cement formwork 4, but the opening part of the linear constructional column B type cement formwork 7 and the opening part of the linear constructional column A2 type cement formwork 4 (provided with the cleaning opening) are required to be installed in a reverse direction, and the alignment of the centering line 1 is ensured.
And then building the wall blocks 10 on two sides of the linear constructional column, after two pieces of the wall blocks 10 are built, returning to the position 15 of the constructional column, then building a linear constructional column A1 type cement formwork 3 (without a cleaning opening), wherein the opening direction of the linear constructional column A1 type cement formwork 3 (without the cleaning opening) is the same as that of the lower linear constructional column A2 type cement formwork 4 (with the cleaning opening), then building a linear constructional column B type cement formwork 7 according to the principle that the opening direction is reverse, then building the wall blocks 10 on two sides of the linear constructional column, and sequentially and alternately performing according to two pieces of circulation steps until a construction section needing concrete pouring is reached.
When concrete of a concrete constructional column needs to be poured in stages, such as a concrete flat belt or ring beam 23, a windowsill coping 30, a window lintel 32, a door lintel 33 and the like, floor ash and sundries at a cleaning opening 2 are removed in advance, the concrete is blocked after the cleaning is completely removed, because the height modulus of the wall building block 10 is basically the same as that of a cement formwork of the straight constructional column, the thickness of a mortar joint 11 is also the same, and every two bricks are constructed in a cycle, the wall building block 10 and the mortar joint 11 thereof can play a role in blocking an opening or a reserved hole of the straight constructional column, and then the concrete flat belt or ring beam 23, the windowsill coping 30, the window lintel 32, the door lintel 33 and other special formworks of horizontal members are matched, so that the synchronous pouring of the concrete of the horizontal member and the concrete of the straight constructional column can be completely realized, and a small hole with the diameter of 5mm needs to be drilled in situ at the part of the upper corner of a long-side cement formwork (A type) at a, the concrete pouring device is used as a grout overflow hole and an air outlet when concrete is poured, and is also used as an inspection opening of the concrete filling degree of the constructional column, and when the concrete overflows from the grout overflow hole, the concrete can be plugged in time by using an adhesive tape.
When constructional column is under construction to the wall body top, should set up anticorrosive wooden wedge 34 in the both sides of top constructional column cement template, firstly play the effect in shutoff cement template side gap, secondly play the effect that compresses tightly the wall body and prevent the wall body disturbance, thirdly play the effect of fixed horn mouth turnover formula concrete placement fill 35, then the concrete that can pour the constructional column. The concrete of the constructional column is poured by adopting special constructional column concrete pouring equipment.
If the concrete of the constructional column is poured without subsection, when the constructional column needs to be poured to the wall top at one time, a concrete vibrating opening is arranged at the position of two cement templates which are away from the lower part of the wall top, the cement template of the constructional column at the vibrating opening can adopt a straight constructional column A2 type cement template 4 (provided with a cleaning opening), and the cleaning opening 2 is the vibrating opening at the moment. The concrete vibration of the constructional column between the vibrating opening and the top of the wall body can be carried out by adopting a manual vibration mode.
And after the construction of the wall body and the straight constructional column of each construction section is finished, knocking and inspecting the grout overflow hole part by adopting a drum hammer, and checking the compactness of concrete.
Example two: construction of cross-shaped constructional column
As shown in fig. 4, 5, 6, 17, 21, 22, 23, 24, comprising the steps of,
design and manufacture of cement formwork for cross constructional column
Designing and factory-customizing a cross constructional column A1 type cement template 38 (no peripheral cleaning opening is reserved), a cross constructional column A2 type cement template 39 (a peripheral cleaning opening is reserved) and a cross constructional column B type cement template 40, wherein the wall thickness is 15mm, and the following requirements are met:
one side of the A1 type cement template 38 of the cross constructional column (a peripheral cleaning opening is not reserved) is completely open so as to be convenient for installation through constructional column reinforcing steel bars 14, and the other three sides are centrally provided with a 100 x 100mm cement template central hole 6 so as to be convenient for embedding and fixing post-construction column cast-in-place concrete with a wall body through the hole; wing plates 41 are arranged at the corners of four faces of a cross constructional column A1 type cement template (no peripheral cleaning opening is reserved), the height of each wing plate 41 is 240mm, the length of each wing plate is 60mm, and the thickness of each wing plate is 15 mm;
one side of a cross-shaped constructional column A2 type cement template 39 (a peripheral cleaning opening is reserved) is completely open so as to be convenient for installation through constructional column reinforcing steel bars 14, a cleaning opening 2 with the size of 100 x 100mm is arranged at the center and below the other three sides of the cross-shaped constructional column A2 type cement template, and the cleaning opening 2 has the functions of cleaning sundries and embedding and fixing constructional column post-cast concrete with a wall body through the cleaning opening 2; wing plates 41 are arranged at the corners of four faces of a cross constructional column A2 type cement template 39 (reserved peripheral cleaning openings) in two directions, the bottoms of the wing plates 41 are suspended in the air to reserve peripheral cleaning openings 42, the suspension height is 100mm, the height of the wing plates 41 is 140mm, the length is 60mm, and the thickness is 15 mm;
the length, width and height of the B-shaped cement template 40 of the cross-shaped constructional column are 240 x 240mm, one surface of the B-shaped cement template is completely open so as to be installed by penetrating through the constructional column reinforcing steel bars 14, and the other three surfaces of the B-shaped cement template are centrally provided with a 100 x 100mm cement template central hole 6 so as to facilitate the post-cast concrete of the constructional column to be embedded and fixed with a wall body through the hole;
all the cross-shaped constructional column A1 type cement formworks 38, the cross-shaped constructional column A2 type cement formworks 39 and the cross-shaped constructional column B type cement formworks 40 have to be provided with a centering line 1 on one outer side surface to ensure accurate installation and positioning.
When the cement formwork is customized in a factory, a certain number of cross-shaped constructional column A2 type cement formworks 39 (reserved peripheral cleaning openings) are arranged according to the principle that the total number is more than 15%, the reserved peripheral cleaning openings 42 are positioned below all the wing plates 41, and the reserved height is 100 mm.
Wall and cross constructional column paying-off and anchoring steel bar reservation (the step is the same as the construction method in the straight constructional column)
Construction of wall and cross constructional column
For the cross wall and the cross constructional column in the longitudinal and transverse directions, after all constructional column reinforcing steel bars 14 at the constructional column position 15 in each construction section are installed and qualified by inspection, synchronous construction of the cross constructional column and the wall is started. During construction, the thickness of the mortar (fine aggregate concrete) leveling layer 12 at the bottom of the wall body is determined in advance according to setting-out, if the thickness is within 30mm, the mortar can be used for leveling, and if the thickness is larger than or equal to 30mm, the fine aggregate concrete is used for leveling. Then, a first leather cross-shaped constructional column A2 type cement formwork 39 is built at the constructional column position 15 (a peripheral cleaning opening is reserved), the first leather cross-shaped constructional column A2 type cement formwork is built to penetrate through constructional column steel bars 14 through the opening of the first leather cross-shaped constructional column A2 type cement formwork 39 to be built and bonded to the floor 9, then, a cross-shaped constructional column B type cement formwork 40 is built on the first leather cross-shaped constructional column A2 type cement formwork 39 is built to penetrate through constructional column steel bars 14 through the opening of the first leather cross-shaped constructional column A2 type cement formwork 40 to be bonded with the lower cross-shaped constructional column A2 type cement formwork 39 (a peripheral cleaning opening is reserved), but the opening.
Then, building the wall blocks 10 on two sides of the cross-shaped constructional column, after two layers of the wall blocks 10 are built, returning to the position 15 of the constructional column, then building the cross-shaped constructional column A1 type cement formwork 38 (no peripheral cleaning opening is reserved), wherein the opening direction of the cross-shaped constructional column A1 type cement formwork 38 (no peripheral cleaning opening is reserved) is consistent with the opening direction of the cross-shaped constructional column A2 type cement formwork 39 (no peripheral cleaning opening is reserved), and then building the cross-shaped constructional column B type cement formwork 40 on the cross-shaped constructional column A1 type cement formwork according to the principle that the opening direction is reverse, and ensuring that the centering line 1 is aligned. And then returning to build the wall building blocks 10 on the two sides of the cross constructional column, and sequentially and alternately performing the building according to the step of two-step one-cycle until the construction section needing to be poured with concrete is reached.
The rest steps are the same as the construction method of the straight constructional column.
Example three: t-shaped constructional column construction
As shown in fig. 7, 8, 9, 18, 21, 22, 23, 24, comprising the steps of,
design and manufacture of cement formwork for T-shaped constructional column
Designing and industrially customizing a T-shaped constructional column A1 type cement formwork 43 (without a cleaning opening), a T-shaped constructional column A2 type cement formwork 44 (with a cleaning opening) and a T-shaped constructional column B type cement formwork 45, wherein the wall thickness is 15mm, and the rest parts of the T-shaped constructional column A1 type cement formwork 43, the T-shaped constructional column A2 type cement formwork 44 and the T-shaped constructional column B type cement formwork 45 are the same as the straight constructional column cement formwork except for the following requirements:
two wing plates 41 are additionally arranged on the outer side surfaces of the T-shaped constructional column A1 type cement template 43 and the T-shaped constructional column A2 type cement template 44 in the T-shaped tail end direction, the length of each wing plate is 60mm, the distance from the outer edge of the template is 60mm, and the height of each wing plate is 240 mm;
a cement formwork centering hole 6 with the diameter of 100 x 100mm is formed in the center of one face, provided with the wing plate 41, of the T-shaped constructional column A1 type cement formwork 43 and the T-shaped constructional column A2 type cement formwork 44, so that post-construction column poured concrete can be embedded and fixed with a wall body through the hole;
a cement template central hole 6 with the diameter of 100mm is arranged in the middle of the B-shaped cement template 45 of the T-shaped constructional column and the surface (namely the tail end direction of the T-shaped wall) opposite to the opening of the B-shaped cement template, wherein the surface is adjacent to the central hole, so that the post-cast concrete of the constructional column is embedded and fixed with the wall body through the hole.
Wall and T-shaped constructional column paying-off and anchoring steel bar reservation (the step is the same as the construction method in the straight constructional column)
Construction of wall and T-shaped constructional column
And for the T-shaped crossed wall and the T-shaped constructional column in the longitudinal and transverse directions, after all constructional column reinforcing steel bars 14 at the constructional column position 15 in each construction section are installed and qualified by inspection, synchronous construction of the T-shaped constructional column and the wall is started. During construction, the thickness of the mortar (fine aggregate concrete) leveling layer 12 at the bottom of the wall body is determined in advance according to setting-out, if the thickness is within 30mm, the mortar can be used for leveling, and if the thickness is larger than or equal to 30mm, the fine aggregate concrete is used for leveling. Then, a first skin T-shaped constructional column A2 type cement formwork 44 (provided with a cleaning opening) is built at the position 15 of the constructional column, so that the direction of a wing plate 41 of the first skin T-shaped constructional column A2 type cement formwork is consistent with the direction of the tail end of the T-shaped constructional column, the first skin T-shaped constructional column A2 type cement formwork is laid and bonded to the floor slab 9 through the opening of the first skin T-shaped constructional column A2 type cement formwork, then a T-shaped constructional column B type cement formwork 45 is built on the first skin T-shaped constructional column A2 type cement formwork, the first skin T-shaped constructional column A2 type cement formwork is bonded to the lower T-shaped constructional column A2 type cement formwork 44 (provided with the cleaning opening of the first skin.
Then, building the wall blocks 10 on two sides of the T-shaped constructional column, after two pieces of the wall blocks 10 are built, returning to the constructional column position 15, then building the cement formwork 43 (without a cleaning opening) of the T-shaped constructional column A1, wherein the opening direction of the cement formwork 43 (without the cleaning opening) of the T-shaped constructional column A1 is consistent with the opening direction of the cement formwork 44 (with the cleaning opening) of the T-shaped constructional column A2, then building the cement formwork 45 of the T-shaped constructional column B on the cement formwork according to the principle that the opening direction is reverse, and ensuring that the centering lines 1 are aligned. And then returning to build the wall building blocks 10 on the two sides of the T-shaped constructional column, and sequentially and alternately performing the construction according to the two-layer-one-cycle pace until the construction section needing to be poured with concrete is reached.
The rest steps are the same as the construction method of the straight constructional column.
Example four: construction of corner-type structural column
As shown in fig. 10, 11, 12, 19, 21, 22, 23, 24, the following steps are included,
design and manufacture of cement formwork for corner-type constructional column
Designing and factory-customizing a corner type constructional column A1 type cement template 46 (without a cleaning opening), a corner type constructional column A2 type cement template 47 (with a cleaning opening) and a corner type constructional column B type cement template 48, wherein the wall thickness is 15mm, and the following requirements are met:
the height of a corner constructional column A1 type cement formwork 46 (without a cleaning opening) and the height of a corner constructional column A2 type cement formwork 47 (with a cleaning opening) are 240mm, the corner constructional column A1 type cement formwork and the cleaning opening are arranged in an L shape, the size of a long side is 300mm, the size of a short side is 240mm, one end of the short side is completely opened so as to be convenient to penetrate through constructional column reinforcing steel bars 14 for installation, and a cement formwork central hole 6 with 100mm is arranged in the center of one side which is adjacent to and perpendicular to the opening part so as to be convenient for embedding and fixing post-poured concrete of the constructional column with a wall body;
the length, width and height of the B-shaped cement template 48 of the corner-shaped constructional column are 240 x 240mm, one end of the B-shaped cement template is completely open so as to be convenient for installation through constructional column reinforcing steel bars 14, and a 100 x 100mm cement template central opening 6 is arranged in the center of any surface adjacent to the opening direction so as to be convenient for embedding and fixing post-construction column cast-in-place concrete with a wall body through the opening;
the corner structural column a2 type cement formwork 47 (provided with a cleaning opening) should be provided with a cleaning opening of 100 × 100mm below the center of the straight formwork wall next to the opening direction.
Centering lines 1 must be arranged on certain outer side surfaces of all the corner type constructional column A1 type cement templates 46, the corner type constructional column A2 type cement templates 47 and the corner type constructional column B type cement templates 48 so as to ensure accurate installation and positioning;
all of the corner type structural column a1 type cement forms 46, corner type structural column a2 type cement forms 47 and corner type structural column B type cement forms 48 are provided with reinforcing armpits 5 at the ends of the form walls thereof, and have a width of 25mm, so as to enhance the mortar bonding strength between the cement forms and the wall blocks 10, and at the same time, to perform a caulking function (like a tenon) with post-cast concrete.
When the concrete is customized in a factory, a certain number of corner-type constructional column A2 type cement templates 47 (provided with cleaning openings) are configured according to the principle that the total number is more than 15%, and the requirements of concrete top swing bottom building and cleaning during the stage concrete pouring are met.
Wall and corner type constructional column paying-off and anchoring reinforcement reservation (the step is the same as the construction method in the straight constructional column)
Construction of wall and corner constructional column
And for the corner crossed wall body and the corner constructional column in the longitudinal and transverse directions, after all constructional column reinforcing steel bars 14 at the constructional column position 15 in each construction section are installed and qualified by inspection, synchronous construction of the corner constructional column and the wall body is started. During construction, the thickness of the mortar (fine aggregate concrete) leveling layer 12 at the bottom of the wall body is determined in advance according to setting-out, if the thickness is within 30mm, the mortar can be used for leveling, and if the thickness is larger than or equal to 30mm, the fine aggregate concrete is used for leveling. Then, a first skin corner type constructional column A2 type cement formwork 47 (provided with a cleaning opening) is built at the constructional column position 15, so that the opening direction of the first skin corner type constructional column A2 type cement formwork is aligned with the transverse wall body, the first skin corner type constructional column A2 type cement formwork passes through the constructional column reinforcing steel bars 14 through the opening of the first skin corner type constructional column A2 type cement formwork to be built and bonded to the floor slab 9, then, a corner type constructional column B type cement formwork 48 is built on the first skin corner type constructional column A2 type cement formwork so that the opening direction of the first skin corner type constructional column A2 type cement formwork is aligned with the longitudinal wall body, namely, the opening direction of the corner type constructional column A2 type cement formwork 47 (provided with the cleaning opening) is vertical to the opening direction of the corner.
Then, building the wall blocks 10 on two sides of the corner constructional column, after two layers of the wall blocks 10 are built, returning to the position 15 of the constructional column, and then building a cement formwork 46 (without a cleaning opening) of the corner constructional column A1, wherein the opening direction of the cement formwork 46 (without the cleaning opening) of the corner constructional column A1 is consistent with the opening direction of the cement formwork 47 (with the cleaning opening) of the corner constructional column A2, and then building a cement formwork 48 of the corner constructional column B on the cement formwork according to the principle that the opening directions are perpendicular, and ensuring that the alignment lines 1 are aligned. And then returning to build the wall building blocks 10 on the two sides of the T-shaped constructional column, and sequentially and alternately performing the construction according to the two-layer-one-cycle pace until the construction section needing to be poured with concrete is reached.
The rest steps are the same as the construction method of the straight constructional column.
Example five: edge type constructional column construction 1
As shown in fig. 13, 14, 15, 20, 21, 22, 23, 24, the following steps are included,
designing and factory-customizing an edge type constructional column A1 type cement template 49 (without a cleaning opening), an edge type constructional column A2 type cement template 50 (with a cleaning opening) and an edge type constructional column B type cement template 51, wherein the wall thickness is 15mm, and the following requirements are met:
the height of the A1 type cement formwork 49 (without a cleaning opening) of the edge type constructional column and the A2 type cement formwork 50 (with a cleaning opening) of the edge type constructional column are 240mm, the size of the long side is 300mm, the size of the short side is 240mm, one end of the short side is completely opened, and the cleaning opening of the A2 type cement formwork 50 of the edge type constructional column is centrally arranged along the direction of the long side and is arranged downwards so as to be convenient to penetrate through the constructional column reinforcing steel bars 14 for installation;
the edge type constructional column B type cement template 51 has the length, width and height dimensions of 240 x 240mm, and one end is completely open so as to be convenient for installation through constructional column reinforcing steel bars 14;
no matter the edge type constructional column is provided with the cement formwork centering hole in the edge type constructional column A1 type cement formwork 49, the edge type constructional column A2 type cement formwork 50 and the edge type constructional column B type cement formwork 51, but all the cement formworks are provided with the reinforcing armpits 5 at the end parts of the formwork walls, the width of the reinforcing armpits is 25mm, the mortar bonding strength between the cement formworks and the wall building blocks 10 is enhanced, and meanwhile, the embedding effect (similar to a tenon) of post-cast concrete is achieved. The centering line 1 must be arranged on one outer side surface of all the cement formworks 49, 50 and 51 of the A1 type of edge constructional column, the A2 type of edge constructional column and the B type of edge constructional column to ensure accurate installation and positioning.
When the concrete is customized in a factory, a certain number of edge type constructional column A2 type cement templates 50 (provided with cleaning openings) are configured according to the principle that the total number is more than 15%, and the requirements of concrete top surface bottom swinging masonry and cleaning during the stage concrete pouring are met.
Wall and edge type constructional column paying-off and anchoring steel bar reservation (the step is the same as the construction method in the straight constructional column)
Wall and edge type constructional column construction
When the constructional column is required to be arranged at the edge of the wall body, after all the constructional column steel bars 14 at the constructional column position 15 in each construction section are installed and qualified by inspection, synchronous construction of the edge type constructional column and the wall body is started. During construction, the thickness of the mortar (fine aggregate concrete) leveling layer 12 at the bottom of the wall body is determined in advance according to setting-out, if the thickness is within 30mm, the mortar can be used for leveling, and if the thickness is larger than or equal to 30mm, the fine aggregate concrete is used for leveling. Then, a first skin edge type constructional column A2 type cement formwork 50 (provided with a cleaning opening) is built at the constructional column position 15, the opening direction of the first skin edge type constructional column A2 type cement formwork is aligned with the wall body direction, the first skin wall block 10 is built, after the first skin wall block 10 is built, a second skin edge type constructional column B type cement formwork 51 is built at the constructional column position 15 and returns, after the first skin wall block is built, the opening direction of the first skin wall block is aligned with the wall body direction, the first skin wall block passes through the constructional column steel bars 14 through the opening, the first skin wall block is firmly bonded with the underlying skin edge type constructional column A2 type cement formwork 50 (provided with the cleaning opening) through the opening, the alignment of the centering line 1 is ensured, then, the second skin wall block 10 is built, after the second skin wall block 10 is completed, the third skin edge type constructional column A1 type cement formwork 49 (not provided with the cleaning opening) is built at the constructional column position 15, then the third, and after the construction, returning to the position 15 of the constructional column to build a fourth skin edge type constructional column B type cement template 51, wherein the opening directions of all the cement templates are aligned to the same direction of the wall body, and sequentially and alternately performing the construction according to the one-skin-cycle pace until the construction section needing to be poured with concrete is reached.
The rest steps are the same as the construction method of the straight constructional column.
Example six: edge type constructional column construction 2
In order to save resources, the edge type constructional column A1 type cement formwork 49 and the edge type constructional column A2 type cement formwork 50 can be replaced by a straight type constructional column A1 type cement formwork 3 and a straight type constructional column A2 type cement formwork 4, the edge type constructional column B type cement formwork 51 can be replaced by a straight type, T-shaped and corner type B type cement formwork, and before replacement, the cement formworks of the other types of cement formworks are firstly plugged by fine aggregate concrete and then used, the implementation mode of the method is the same as that of the edge type constructional column in the fifth embodiment, only the serrated racking width of the cement formworks and the wall body which are meshed is larger, but the same constructional column requires the serrated racking width to be consistent, namely, the same constructional column either all adopts the edge type constructional column A1 and A2 type cement formworks or all the straight type constructional column A1 and A2 type cement formworks are adopted for replacement, no mix-up is allowed.
As shown in fig. 22, 23 and 24, the bell-mouth-shaped revolving concrete pouring bucket 35 at the top of the constructional column of the present invention is manufactured and installed in the following manner: design and preparation horn mouth turnover formula concrete placement fill 35, the constructional column is built by laying bricks or stones to the back to the summit, and whether this position needs to keep somewhere the serrated raft and confirm most top constructional column template should adopt marginal type constructional column A1 type or B type cement template to build by laying bricks or stones, and uncovered position outwards, also be towards the direction of installation horn mouth turnover formula concrete placement fill, if adopt the cement template of other types, should guarantee that its cement template entrance to a cave 6 can effectively block between two parties.
Then wedge-shaped anti-corrosion wooden wedges 34 are stuffed into the wall body reserved plugging height 24 (adjustable) range on the two sides of the top cement formwork, then bell-mouth turnover type concrete pouring buckets 35 are installed, and the following requirements are met: the laying plate 56 of the horn-mouth turnover type concrete pouring hopper 35 extends into the top cement formwork reinforcing armpit 5 by at least 20mm, the concrete feed port turnover plate 59 of the concrete feed hopper 60 of the horn-mouth turnover type concrete pouring hopper 35 is turned over in advance, so that the turnover plate turnover fixing hole 58 penetrates through the turnover plate turnover fixing bolt 55 and is fixed, the plugging plate 53 is close to the cement formwork or the wall building block 10 to prevent slurry leakage, and a slurry leakage preventing adhesive tape can be bonded if necessary.
And then the self-tapping preformed hole 57 reserved through the horn-mouth turnover type concrete pouring bucket 35 by adopting self-tapping is fixed on the wedge-shaped anti-corrosion wood wedge 34, and the position is shown as a self-tapping fixed point 52 in the horn-mouth turnover type concrete pouring bucket installation schematic diagram.
The bell-mouth turnover type concrete pouring hopper 35 starts to pour constructional column concrete after being firmly installed through a lower supporting and upper hanging mode through inspection. The concrete pouring of the constructional column is preferably carried out by adopting special concrete conveying equipment, and can also be carried out manually. When the constructional column concrete is poured to the bottom of the horn mouth turnover type concrete pouring hopper 35, the turning plate turning fixing bolt 55 is pulled out, so that the concrete feeding hole turning plate 59 falls down to plug the concrete feeding hole, and then the micro concrete with the residual height at the top is poured manually. And after the concrete pouring is finished and is stopped for a period of time, the self-tapping is removed, the horn mouth turnover type concrete pouring hopper 35 is pulled out, and the concrete is cleaned and then is used in a turnover mode.
The bell-mouth turnover type concrete pouring hopper 35 is in a bell-mouth shape with a large upper opening and a small lower opening, a fixed hanging lug is arranged at the upper end, a shelving shelf is arranged at the lower end, and a turning plate is arranged at the position of a concrete feeding hole so as to facilitate the fixation of the pouring hopper, the feeding and the sealing after the material is full; wedge-shaped anti-corrosion wooden wedges 34 are plugged into the wall body reserved plugging space at the top of the constructional column, the effect of fixing the pouring hopper hangers is achieved, the opening of the constructional column cement formwork plays a role in placing the pouring hopper and placing the shelf, and the feed port plate turnover device plays a role in plugging concrete feeding and full material.

Claims (6)

1. A construction method of a wall-attached constructional column in constructional engineering is characterized in that,
a. designing and factory customizing cement forms for construction columns
One end of the cement template is open so as to be convenient for passing through the constructional column steel bar for installation, and a centering line is arranged on one outer side surface of the cement template so as to ensure accurate installation and positioning;
b. wall body and constructional column paying-off and anchoring steel bar reservation
Positioning and paying off are carried out before constructional column construction, the position of the constructional column, the bottom elevation of a flat belt or a ring beam are determined according to design and standard requirements, the reserved plugging height of the wall body and the top elevation of a mortar leveling layer are calculated and determined according to the beam bottom elevation, the floor elevation and the bottom elevation of the flat belt or the ring beam and the positive modulus principle of the height of the wall body building blocks, and then wall body tie bars and the flat belt or the ring beam are planted and anchoring steel bars are planted;
c. wall and constructional column construction
After all constructional column reinforcing steel bars at the constructional column position in each construction section are installed, synchronous construction of the constructional column and the wall body is started, the thickness of a mortar leveling layer at the bottom of the wall body is determined and leveled, then a cement template with a cleaning opening is built at the constructional column position, the cement template penetrates through the constructional column reinforcing steel bars through the opening to build a bonding floor slab, then another cement template is built on the cement template, and alignment of centering lines on the cement template is ensured;
then, building wall blocks on two sides of the constructional column, after the building of the wall blocks is finished, returning to the position of the constructional column, building another cement template without a cleaning opening, building the wall blocks on two sides of the constructional column, and sequentially and alternately performing building until a construction section needing concrete pouring is reached;
if concrete of a concrete constructional column needs to be poured in stages when a concrete flat belt or a ring beam, a windowsill coping, a window lintel and a door lintel are encountered, firstly, floor ash and sundries at a cleaning opening are removed, the concrete is blocked after the cleaning is finished, small holes are drilled at the upper corner parts of the cement templates at certain intervals to serve as slurry overflow holes and air outlets during concrete pouring, then, the synchronous pouring of horizontal member concrete and constructional column concrete is finished, and when the concrete overflows from the slurry overflow holes, the concrete can be blocked in time by using adhesive tapes;
when the constructional column is constructed to the top of a wall body, arranging anti-corrosion wooden wedges on two sides of a cement template on the top for plugging a gap on the side surface of the cement template, preventing disturbance of the wall body, fixing a horn mouth turnover type concrete pouring hopper and pouring concrete of the constructional column;
if the concrete of constructional column is poured without subsection, when the constructional column needs to be poured to the wall top once, a concrete vibrating opening is arranged at the position of two cement templates which are away from the lower part of the wall top, the cement template at the vibrating opening can adopt a cement template with a cleaning opening, and the cleaning opening at the moment is the vibrating opening.
2. The construction method of a constructional engineering wall-attached constructional column as claimed in claim 1, wherein the constructional column is a straight constructional column, and the construction comprises the following steps:
a. design and manufacture of cement formwork for straight constructional column
Designing and industrially customizing a straight-line constructional column A1 type cement template, a straight-line constructional column A2 type cement template and a straight-line constructional column B type cement template with one open end, wherein a cement template centering hole is formed in the opposite end of the open end in the center, the cleaning hole of the straight-line constructional column A2 type cement template is centrally and downwardly arranged along the long side direction, a centering line is arranged on one outer side of the straight-line constructional column A1 type cement template, the straight-line constructional column A2 type cement template and the straight-line constructional column B type cement template, and a reinforcing axilla is arranged at the end part of the centering line;
b. wall body and straight-line-shaped constructional column paying-off and anchoring steel bar reservation
Positioning and paying off are carried out before the construction of the I-shaped constructional column, the position of the constructional column, the elevation of the flat belt or the ring beam bottom are determined according to drawing design and standard requirements, the reserved plugging height of the wall body and the top elevation of the mortar leveling layer are calculated and determined according to the elevation of the beam bottom, the elevation of a floor slab and the elevation of the flat belt or the ring beam bottom and the principle of positive modulus of the height of the wall body building blocks, and then the wall body tie bars and the flat belt or the ring beam are planted and the anchoring steel bars are planted;
c. wall and straight constructional column construction
After all constructional column reinforcing steel bars at the constructional column position in each construction section are installed, synchronous construction of the I-shaped constructional column and the wall is started, the thickness of a mortar leveling layer at the bottom of the wall is determined and leveled, then an I-shaped constructional column A2 type cement template provided with a cleaning opening is built at the constructional column position, the I-shaped constructional column A2 type cement template penetrates through the constructional column reinforcing steel bars through the opening of the cement template to be built and bonded on a floor slab, then an I-shaped constructional column B type cement template is built on the cement template, the opening part of the I-shaped constructional column B type cement template and the opening part of the I-shaped constructional column A2 type cement template are reversely installed, and alignment of centering lines is ensured;
then, building wall blocks on two sides of the linear constructional column, after two layers of the wall blocks are built, returning to the position of the constructional column, building a linear constructional column A1 type cement template, wherein the opening direction of the linear constructional column A1 type cement template is the same as that of the lower linear constructional column A2 type cement template, building a linear constructional column B type cement template according to the principle that the opening direction is reverse, building wall blocks on two sides of the linear constructional column, and sequentially staggering the wall blocks according to two-layer circulation pace until a construction section needing to be poured with concrete is reached;
if concrete of a concrete constructional column needs to be poured in stages when a concrete flat belt or a ring beam, a windowsill coping, a window lintel and a door lintel are encountered, firstly, floor ash and sundries at a cleaning opening are removed, the concrete is blocked after the cleaning is finished, small holes are drilled at the upper corner parts of the cement templates at certain intervals to serve as slurry overflow holes and air outlets during concrete pouring, then, the synchronous pouring of horizontal member concrete and the concrete of the straight constructional column is finished, and the concrete can be blocked in time by using adhesive tapes when the concrete overflows from the slurry overflow holes;
when the constructional column is constructed to the top of the wall body, arranging anti-corrosion wood wedges on two sides of a cement template of the constructional column at the top for plugging a gap on the side surface of the cement template, pressing the wall body to prevent disturbance of the wall body, fixing a horn mouth turnover type concrete pouring hopper, and then pouring concrete of the constructional column;
if the concrete of constructional column is poured without subsection, when the constructional column needs to be poured to the wall top once, a concrete vibrating opening is arranged at the position of two cement templates which are away from the lower part of the wall top, the cement template at the vibrating opening can adopt a cement template with a cleaning opening, and the cleaning opening at the moment is the vibrating opening.
3. The construction method of a constructional engineering wall-attached constructional column as claimed in claim 1, wherein the constructional column is a cross-shaped constructional column, and the construction comprises the following steps:
a. design and manufacture of cement formwork for cross constructional column
Designing and industrially customizing a cross constructional column A1 type cement template with an opening at one end, a cross constructional column A2 type cement template and a cross constructional column B type cement template, wherein a cement template central hole is formed in the other three sides of the cross constructional column A1 type cement template in the center, wing plates are arranged at the two-way corners of the four sides of the cross constructional column A1 type cement template, cleaning openings are formed in the other three sides of the cross constructional column A2 type cement template in the center and are arranged downwards, wing plates are arranged at the two-way corners of the four sides of the cross constructional column A2 type cement template in the two-way direction, peripheral cleaning openings are reserved at the bottoms of the wing plates in a hanging manner, and cement template central holes are formed in the other three sides of the cross constructional column B type cement template in the center; a centering line is arranged on one outer side of the cross constructional column A1 type cement template, the cross constructional column A2 type cement template and the cross constructional column B type cement template so as to ensure accurate installation and positioning;
b. wall body and cross constructional column paying-off and anchoring steel bar reservation
Positioning and paying off are carried out before construction of the cross constructional column, the position of the constructional column, the elevation of a flat belt or a ring beam bottom are determined according to drawing design and standard requirements, the reserved plugging height of the wall and the top elevation of a mortar leveling layer are calculated and determined according to the elevation of the beam bottom, the elevation of a floor slab and the elevation of the flat belt or the ring beam bottom and the principle of positive modulus of the height of wall building blocks, and then wall tie bars and the flat belt or the ring beam are planted and anchoring steel bars are planted;
c. construction of wall and cross constructional column
After all constructional column reinforcing steel bars at the constructional column position in each construction section are installed, synchronous construction of the cross constructional column and the wall is started, the thickness of a mortar leveling layer at the bottom of the wall is determined and leveled, then a first skin cross constructional column A2 type cement template is built at the constructional column position, a bonding floor slab is built by penetrating the constructional column reinforcing steel bars through the opening of the cement template, a cross constructional column B type cement template is built on the cement template, the opening of the cement template penetrates the constructional column reinforcing steel bars to be bonded with the cross constructional column A2 type cement template below, the opening direction of the cross constructional column B type cement template is reversely installed with the opening direction of the cross constructional column A2 type cement template, and alignment of centering lines is ensured;
then, building wall blocks on two sides of the cross-shaped constructional column, after two layers of the wall blocks are built, returning to the position of the constructional column, then building a cross-shaped constructional column A1 type cement template, wherein the opening direction of the cross-shaped constructional column A1 type cement template is consistent with the opening direction of the cross-shaped constructional column A2 type cement template, building a cross-shaped constructional column B type cement template on the cement template according to the principle that the opening directions are reverse, ensuring that the centering lines are aligned, then returning to build the wall blocks on two sides of the cross-shaped constructional column, and sequentially staggering according to the step of two-layer circulation until a construction section needing to be poured with concrete is reached;
if concrete of a concrete constructional column needs to be poured in stages when a concrete flat belt or a ring beam, a windowsill coping, a window lintel and a door lintel are encountered, firstly, floor ash and sundries at a cleaning opening are removed, the concrete is blocked after the cleaning is finished, small holes are drilled at the upper corner parts of the cement templates at certain intervals to serve as slurry overflow holes and air outlets during concrete pouring, then the synchronous pouring of the horizontal member concrete and the cross constructional column concrete is finished, and the concrete can be blocked in time by using an adhesive tape when the concrete overflows from the slurry overflow holes;
when the constructional column is constructed to the top of the wall body, arranging anti-corrosion wood wedges on two sides of a cement template of the constructional column at the top for plugging a gap on the side surface of the cement template, pressing the wall body to prevent disturbance of the wall body, fixing a horn mouth turnover type concrete pouring hopper, and then pouring concrete of the constructional column;
if the concrete of constructional column is poured without subsection, when the constructional column needs to be poured to the wall top once, a concrete vibrating opening is arranged at the position of two cement templates which are away from the lower part of the wall top, the cement template at the vibrating opening can adopt a cement template with a cleaning opening, and the cleaning opening at the moment is the vibrating opening.
4. The construction method of a constructional engineering wall-attached constructional column as claimed in claim 1, wherein the constructional column is a T-shaped constructional column, and the construction comprises the following steps:
a. design and manufacture of cement formwork for T-shaped constructional column
Designing and industrially customizing a T-shaped constructional column A1 type cement template, a T-shaped constructional column A2 type cement template and a T-shaped constructional column B type cement template with one open end, wherein a cement template centering hole is formed in the opposite end of the open end, the cleaning hole of the T-shaped constructional column A2 type cement template is centrally and downwards arranged along the long side direction, a centering line is arranged on one outer side of the T-shaped constructional column A1 type cement template, the T-shaped constructional column A2 type cement template and the T-shaped constructional column B type cement template, and a reinforcing axilla is arranged at the end part of the centering line;
two wing plates are additionally arranged on the outer side surfaces of the T-shaped tail end directions of the A1 type cement template of the T-shaped constructional column and the A2 type cement template of the T-shaped constructional column, a cement template centering hole is arranged in the center of one surface of the T-shaped constructional column A1 type cement template and the A2 type cement template provided with the wing plates, and a cement template centering hole is arranged in the center of one surface of the T-shaped constructional column B type cement template adjacent to the opening and the opposite surface of the opening;
b. wall body and T-shaped constructional column paying-off and anchoring steel bar reservation
Positioning and paying off are carried out before the construction of the T-shaped constructional column, the position of the constructional column, the elevation of the flat belt or the ring beam bottom is determined according to drawing design and standard requirements, the pre-reserved plugging height of the wall body and the top elevation of the mortar leveling layer are calculated and determined according to the elevation of the beam bottom, the elevation of a floor slab and the elevation of the flat belt or the ring beam bottom and the principle of positive modulus of the height of the wall body building blocks, and then the tie bars of the wall body and the flat belt or the ring beam are planted and the anchoring steel bars are planted;
c. construction of wall and T-shaped constructional column
After all constructional column reinforcing steel bars at the constructional column position in each construction section are installed, synchronous construction of the T-shaped constructional column and the wall body is started, the thickness of a mortar leveling layer at the bottom of the wall body is determined and leveled, then a first leather T-shaped constructional column A2 type cement template is built at the constructional column position, the direction of a wing plate of the first leather T-shaped constructional column A2 type cement template is consistent with the direction of the tail end of the T shape, the first leather T-shaped constructional column A2 type cement template penetrates through the constructional column reinforcing steel bars through the opening of the first leather T-shaped constructional column A2 type cement template and is bonded to a floor slab through the building of the opening of the first leather T-shaped constructional column A2 type cement template, the opening direction of the T-shaped constructional column B type cement template and the opening direction of the T-shaped constructional column A2;
then, building wall blocks on two sides of the T-shaped constructional column, after two layers of the wall blocks are built, returning to the position of the constructional column, then building a1 type cement template of the T-shaped constructional column, wherein the opening direction of the A1 type cement template of the T-shaped constructional column is consistent with the opening direction of the A2 type cement template of the T-shaped constructional column, building a B type cement template of the T-shaped constructional column on the cement template according to the principle that the opening direction is reverse, ensuring that the centering lines are aligned, then returning to build the wall blocks on two sides of the T-shaped constructional column, and sequentially staggering according to the circulation pace of the two layers until the wall blocks reach a construction section needing concrete pouring;
if concrete of a concrete constructional column needs to be poured in stages when a concrete flat belt or a ring beam, a windowsill coping, a window lintel and a door lintel are encountered, firstly, floor ash and sundries at a cleaning opening are removed, the concrete is blocked after the cleaning is finished, small holes are drilled at the upper corner parts of the cement templates at certain intervals to serve as slurry overflow holes and air outlets during concrete pouring, then the synchronous pouring of horizontal member concrete and T-shaped constructional column concrete is finished, and the concrete can be blocked in time by using an adhesive tape when the concrete overflows from the slurry overflow holes;
when the constructional column is constructed to the top of the wall body, arranging anti-corrosion wood wedges on two sides of a cement template of the constructional column at the top for plugging a gap on the side surface of the cement template, pressing the wall body to prevent disturbance of the wall body, fixing a horn mouth turnover type concrete pouring hopper, and then pouring concrete of the constructional column;
if the concrete of constructional column is poured without subsection, when the constructional column needs to be poured to the wall top once, a concrete vibrating opening is arranged at the position of two cement templates which are away from the lower part of the wall top, the cement template at the vibrating opening can adopt a cement template with a cleaning opening, and the cleaning opening at the moment is the vibrating opening.
5. The construction method of a constructional engineering wall-attached constructional column as claimed in claim 1, wherein the constructional column is a corner type constructional column, and the construction comprises the following steps:
a. design and manufacture of cement formwork for corner-type constructional column
Designing and factory-customizing a corner type constructional column A1 type cement template, a corner type constructional column A2 type cement template and a corner type constructional column B type cement template,
the corner type constructional column A1 type cement template and the corner type constructional column A2 type cement template are arranged in an L shape, one end of a short side is completely open, a cement template central hole is formed in one vertical side adjacent to the open position in the middle, one end of a corner type constructional column B type cement template is completely open, a cement template central hole is formed in any side adjacent to the open direction in the middle, a cleaning hole is formed in the corner type constructional column A2 type cement template, a centering line is arranged on one outer side of the corner type constructional column A1 type cement template, the corner type constructional column A2 type cement template and the corner type constructional column B type cement template, and a reinforcing armpit is arranged at the end of the corner type constructional column A2 type cement template;
b. wall body and corner type constructional column paying-off and anchoring steel bar reservation
Positioning and paying off are carried out before the construction of the corner type constructional column, the position of the constructional column, the elevation of a flat belt or a ring beam bottom are determined according to drawing design and standard requirements, the height of a wall body reserved plugging height and the elevation of a mortar leveling layer top are calculated and determined according to the height positive modulus principle of wall body building blocks according to the elevation of the beam bottom, the elevation of a floor slab and the elevation of the flat belt or the ring beam bottom, and then wall body tie bars and the flat belt or the ring beam are planted and anchoring steel bars are planted after the wall body tie bars and the flat belt or the ring beam are;
c. construction of wall and corner constructional column
After all constructional column reinforcing steel bars at the position of a constructional column in each construction section are installed, synchronous construction of the corner constructional column and the wall is started, the thickness of a mortar leveling layer at the bottom of the wall is determined and leveled, then a first skin corner constructional column A2 type cement template is built at the position of the constructional column, the opening direction of the cement template is aligned to a transverse wall, the cement template penetrates through the constructional column reinforcing steel bars through the opening of the cement template and is built and bonded to a floor, then a corner constructional column B type cement template is built on the cement template, the opening direction of the cement template is aligned to a longitudinal wall, namely the opening direction of the corner constructional column A2 type cement template is perpendicular to the opening direction of the corner constructional column B type cement template, the cement template penetrates through the constructional column reinforcing steel bars through the opening of the cement template and is bonded with the corner constructional column A2 type cement template below, and alignment of centering;
then, building wall blocks on two sides of the corner constructional column, after two layers of the wall blocks are built, returning to the position of the constructional column, then building a1 type cement template of the corner constructional column, wherein the opening direction of the A1 type cement template of the corner constructional column is consistent with that of the A2 type cement template of the corner constructional column, building a B type cement template of the corner constructional column on the cement template according to the principle that the opening directions are vertical to each other, ensuring that the centering lines are aligned, then returning to build the wall blocks on two sides of the T-shaped constructional column, and sequentially staggering the wall blocks according to the circulation step of the two layers until the wall blocks reach a construction section needing to be poured with concrete;
if concrete of a concrete constructional column needs to be poured in stages when a concrete flat belt or a ring beam, a windowsill coping, a window lintel and a door lintel are encountered, firstly, floor ash and sundries at a cleaning opening are removed, the concrete is blocked after the cleaning is finished, small holes are drilled at the upper corner parts of the cement templates at certain intervals to serve as slurry overflow holes and air outlets during concrete pouring, then the synchronous pouring of horizontal member concrete and corner type constructional column concrete is finished, and the concrete can be blocked in time by using an adhesive tape when the concrete overflows from the slurry overflow holes;
when the constructional column is constructed to the top of the wall body, arranging anti-corrosion wood wedges on two sides of a cement template of the constructional column at the top for plugging a gap on the side surface of the cement template, pressing the wall body to prevent disturbance of the wall body, fixing a horn mouth turnover type concrete pouring hopper, and then pouring concrete of the constructional column;
if the concrete of constructional column is poured without subsection, when the constructional column needs to be poured to the wall top once, a concrete vibrating opening is arranged at the position of two cement templates which are away from the lower part of the wall top, the cement template at the vibrating opening can adopt a cement template with a cleaning opening, and the cleaning opening at the moment is the vibrating opening.
6. The construction method of a constructional engineering wall-attached constructional column as claimed in claim 1, wherein the constructional column is an edge type constructional column, and the construction comprises the following steps:
a. designing and industrially customizing an edge type constructional column A1 type cement template, an edge type constructional column A2 type cement template and an edge type constructional column B type cement template which are open at one end and are not provided with a cement template central hole, wherein the cleaning port of the edge type constructional column A2 type cement template is centrally arranged and downwards arranged along the long edge direction, a centering line is arranged at one outer side of the edge type constructional column A1 type cement template, the edge type constructional column A2 type cement template and the edge type constructional column B type cement template, and a reinforcing armpit is arranged at the end part of the centering line;
b. wall body and edge type constructional column paying-off and anchoring steel bar reservation
Positioning and paying off are carried out before the construction of the edge type constructional column, the position of the constructional column, the elevation of a flat belt or a ring beam bottom are determined according to drawing design and standard requirements, the reserved plugging height of the wall body and the top elevation of a mortar leveling layer are calculated and determined according to the elevation of the beam bottom, the elevation of a floor slab and the elevation of the flat belt or the ring beam bottom and the principle of positive modulus of the height of the wall body building blocks, and then wall body tie bars and the flat belt or the ring beam are planted and anchoring steel bars are planted;
c. wall and edge type constructional column construction
After all constructional column reinforcing steel bars at the position of a constructional column in each construction section are installed, synchronous construction of an edge type constructional column and a wall body is started, the thickness of a mortar leveling layer at the bottom of the wall body is determined and leveled, then a first skin edge type constructional column A2 type cement template is built at the position of the constructional column, the opening direction of the first skin edge type constructional column A2 type cement template is aligned to the direction of the wall body, the first skin wall body building block penetrates through the constructional column reinforcing steel bars through the opening of the first skin wall body building block to be built and bonded on a floor, then a second skin wall body building block is built after the first skin wall body building block is built, the opening direction of the second skin edge type constructional column B type cement template is also aligned to the direction of the wall body, the second skin wall body building block penetrates through the opening of the first skin body building block to be firmly bonded with the edge type constructional column A2 type cement template of a lower skin, alignment of the centering line is ensured, then the second skin wall body building block, building a third skin wall building block, returning to the position of the constructional column after the third skin wall building block is built, and building a fourth skin edge type constructional column B type cement template, wherein the opening directions of all the cement templates are aligned to the same direction of the wall, and the cement templates are sequentially staggered according to a skin-circulation pace until a construction section needing to be poured with concrete is reached;
if concrete of a concrete constructional column needs to be poured in stages when a concrete flat belt or a ring beam, a windowsill coping, a window lintel and a door lintel are encountered, firstly, floor ash and sundries at a cleaning opening are removed, the concrete is blocked after the cleaning is finished, small holes are drilled at the upper corner parts of the cement templates at certain intervals to serve as slurry overflow holes and air outlets during concrete pouring, then the synchronous pouring of horizontal member concrete and edge type constructional column concrete is finished, and the concrete can be blocked in time by using an adhesive tape when the concrete overflows from the slurry overflow holes;
when the constructional column is constructed to the top of the wall body, arranging anti-corrosion wood wedges on two sides of a cement template of the constructional column at the top for plugging a gap on the side surface of the cement template, pressing the wall body to prevent disturbance of the wall body, fixing a horn mouth turnover type concrete pouring hopper, and then pouring concrete of the constructional column;
if the concrete of constructional column is poured without subsection, when the constructional column needs to be poured to the wall top once, a concrete vibrating opening is arranged at the position of two cement templates which are away from the lower part of the wall top, the cement template at the vibrating opening can adopt a cement template with a cleaning opening, and the cleaning opening at the moment is the vibrating opening.
CN201910822919.1A 2019-09-02 2019-09-02 Construction method of wall-attached constructional column for constructional engineering Pending CN111173198A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910822919.1A CN111173198A (en) 2019-09-02 2019-09-02 Construction method of wall-attached constructional column for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910822919.1A CN111173198A (en) 2019-09-02 2019-09-02 Construction method of wall-attached constructional column for constructional engineering

Publications (1)

Publication Number Publication Date
CN111173198A true CN111173198A (en) 2020-05-19

Family

ID=70617922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910822919.1A Pending CN111173198A (en) 2019-09-02 2019-09-02 Construction method of wall-attached constructional column for constructional engineering

Country Status (1)

Country Link
CN (1) CN111173198A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111678763A (en) * 2020-06-30 2020-09-18 中国二十二冶集团有限公司 Rapid detection template and detection method for concrete pouring compactness of closed space
CN112726878A (en) * 2020-12-30 2021-04-30 甘肃第三建设集团有限公司 Formwork-erecting-free construction method for masonry filler wall constructional column, prefabricated module and mould
CN112982735A (en) * 2021-02-25 2021-06-18 中建八局第四建设有限公司 Construction method for assembling integral ring beam, lintel, waist beam and constructional column
CN114370157A (en) * 2022-01-14 2022-04-19 成都华阳建筑股份有限公司 Construction method for synchronously pouring constructional column and framework without chiseling
CN115142608A (en) * 2022-03-30 2022-10-04 广东华坤建设集团有限公司 Building block assembly for formwork-supporting-free structure and using method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09177240A (en) * 1995-12-27 1997-07-08 Fujita Corp Precast ferro-concrete beam and its installing method
CN203129605U (en) * 2013-02-26 2013-08-14 中国建筑第七工程局有限公司 Concrete pouring hopper for construction column
CN104975716A (en) * 2014-04-02 2015-10-14 江苏南通二建集团有限公司 Construction method for employing dismounting-free formwork in casting constructional column and ring beam concrete
CN206987108U (en) * 2017-07-25 2018-02-09 中国建筑第七工程局有限公司 A kind of embedded combined type exempts from formwork turning wall construction post
CN208072965U (en) * 2018-04-10 2018-11-09 常州工程职业技术学院 A kind of easy opposite joint of constructional column exempts from formwork and spells form unit soon
CN109537808A (en) * 2018-10-26 2019-03-29 中交第航务工程局有限公司 A kind of masonry panel constructional column exempts from the construction method of formwork

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09177240A (en) * 1995-12-27 1997-07-08 Fujita Corp Precast ferro-concrete beam and its installing method
CN203129605U (en) * 2013-02-26 2013-08-14 中国建筑第七工程局有限公司 Concrete pouring hopper for construction column
CN104975716A (en) * 2014-04-02 2015-10-14 江苏南通二建集团有限公司 Construction method for employing dismounting-free formwork in casting constructional column and ring beam concrete
CN206987108U (en) * 2017-07-25 2018-02-09 中国建筑第七工程局有限公司 A kind of embedded combined type exempts from formwork turning wall construction post
CN208072965U (en) * 2018-04-10 2018-11-09 常州工程职业技术学院 A kind of easy opposite joint of constructional column exempts from formwork and spells form unit soon
CN109537808A (en) * 2018-10-26 2019-03-29 中交第航务工程局有限公司 A kind of masonry panel constructional column exempts from the construction method of formwork

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111678763A (en) * 2020-06-30 2020-09-18 中国二十二冶集团有限公司 Rapid detection template and detection method for concrete pouring compactness of closed space
CN112726878A (en) * 2020-12-30 2021-04-30 甘肃第三建设集团有限公司 Formwork-erecting-free construction method for masonry filler wall constructional column, prefabricated module and mould
CN112982735A (en) * 2021-02-25 2021-06-18 中建八局第四建设有限公司 Construction method for assembling integral ring beam, lintel, waist beam and constructional column
CN114370157A (en) * 2022-01-14 2022-04-19 成都华阳建筑股份有限公司 Construction method for synchronously pouring constructional column and framework without chiseling
CN115142608A (en) * 2022-03-30 2022-10-04 广东华坤建设集团有限公司 Building block assembly for formwork-supporting-free structure and using method thereof

Similar Documents

Publication Publication Date Title
CN111173198A (en) Construction method of wall-attached constructional column for constructional engineering
CN101818527B (en) Assembled integral shear wall structure system and construction method thereof
CN108005387B (en) Synchronous construction method for cast-in-place main body of assembled wallboard and short-limb shear wall
CN205653820U (en) Basement post -cast strip advances plugging device
CN102116061A (en) Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure
CN105484391A (en) Construction method for manufacturing heat-preservation waterproof wall through light heat-preservation GRC disassembling-free formworks
CN112144674A (en) Precast concrete reversed ridge and construction method thereof
CN102644382A (en) Mounting technology of large-module wall
CN112575886A (en) Low-level and multi-level fully-prefabricated assembled concrete structure and design, production and installation method
CN210767837U (en) Cross constructional column cement template group
CN205954707U (en) Leading enclosed construction in basement outer wall post -cast strip
CN112982735A (en) Construction method for assembling integral ring beam, lintel, waist beam and constructional column
CN210288465U (en) Assembled retaining wall post-cast strip plugging member
CN210117716U (en) Trapezoidal foundation ditch lateral wall concrete typical forms of elevartor shaft
CN209989847U (en) Shear force wall post-cast strip prefabricated plate closing device
CN210659247U (en) Edge type constructional column cement template group
CN217758964U (en) Basement outer wall post-cast strip closed structure
CN214615420U (en) Manufacturing device for formwork splicing section
CN213773865U (en) Precast concrete reversed bank
CN215671018U (en) Shear force wall layer connects a stubble department reinforced structure
CN210659249U (en) T-shaped constructional column cement template set
CN210659248U (en) Straight-line-shaped constructional column cement template set
CN211774799U (en) Formwork-supporting-free structure for constructional column at joint of T-shaped wall
CN210659246U (en) Corner type constructional column cement template group
CN212295166U (en) Assembly type wall body connecting structure based on ribbed box

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200519

RJ01 Rejection of invention patent application after publication