CN112065087A - Indoor wall surface renovation decoration process - Google Patents

Indoor wall surface renovation decoration process Download PDF

Info

Publication number
CN112065087A
CN112065087A CN202010763834.3A CN202010763834A CN112065087A CN 112065087 A CN112065087 A CN 112065087A CN 202010763834 A CN202010763834 A CN 202010763834A CN 112065087 A CN112065087 A CN 112065087A
Authority
CN
China
Prior art keywords
wall surface
layer
putty
scraping
coating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010763834.3A
Other languages
Chinese (zh)
Inventor
汤尊秋
汤海虹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qiuzun Shanghai Design Decoration Engineering Co ltd
Original Assignee
Qiuzun Shanghai Design Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qiuzun Shanghai Design Decoration Engineering Co ltd filed Critical Qiuzun Shanghai Design Decoration Engineering Co ltd
Priority to CN202010763834.3A priority Critical patent/CN112065087A/en
Publication of CN112065087A publication Critical patent/CN112065087A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0296Repairing or restoring facades

Abstract

The invention belongs to the field of indoor coating, and particularly relates to an indoor wall surface renovating and decorating process, which comprises the following steps: step one, base layer processing; step two, brushing glue; step three, laying a first layer of grids; coating a first layer of anti-crack mortar; laying a second layer of grid cloth; coating a second layer of anti-crack mortar; step seven, reinforcing the anchoring nails; step eight, painting paint: comprises priming paint brushing and finish paint brushing. According to the invention, the attachments on the foundation wall surface are not required to be completely eradicated, and only the soft part is required to be cleaned, so that the construction time is greatly saved, the time and the labor are saved, the generation of construction waste is reduced, the transportation cost for cleaning the waste is indirectly reduced, and the cost is saved; in the construction process, the number of times of polishing and leveling is small, and the time is saved; the wall surface is reinforced for many times, and the cracking and falling problems of the wall surface are greatly reduced.

Description

Indoor wall surface renovation decoration process
Technical Field
The invention belongs to the field of indoor coating, and particularly relates to an indoor wall surface renovating and decorating process.
Background
At present, at the indoor decoration in-process, be the indispensable step to the interior wall application, before the wall applies paint with a brush in the past, often clear away the base course material of original wall is whole, both wastes time and energy, has produced a large amount of building rubbish, influences the efficiency of construction, in addition, there is the wall unevenness in wall application many times, the trouble of polishing many times, the wall consolidates not in place, the wall fracture after the application appears, the problem that drops even.
Disclosure of Invention
In order to solve the technical problem, the invention provides an indoor wall surface renovating and decorating process.
An indoor wall surface renovating and decorating process comprises the following steps:
step one, base layer treatment: the soft part is removed aiming at the falling and peeling of the wall surface, and the firmly attached part is reserved; then the wall surface is brushed with an interface agent by rolling to clean floating ash on the wall surface so as to improve the adhesive force of the wall surface in the subsequent working procedures; then, using repair mortar to perform repair leveling on pits formed by removing soft parts of the wall surface, after leveling, controlling the surface flatness of the wall surface within a range of +/-5 mm, and finally performing pointing treatment on the wire grooves, the holes and the caulking gypsum reserved on the wall surface;
step two, brushing glue: gluing the original wall with glue once;
step three, laying a first layer of grids: paving and reinforcing a first layer of grid cloth on the whole wall coated with the glue;
step four, coating a first layer of anti-crack mortar: coating anti-crack mortar on the first layer of grid cloth, wherein the coating thickness is 3 mm;
step five, laying a second layer of grid cloth: after the first layer of anti-crack mortar is smeared, laying a second layer of grid cloth on the surface of the first layer of anti-crack mortar and reinforcing the second layer of grid cloth;
step six, smearing a second layer of anti-crack mortar: coating anti-crack mortar on the second layer of grid cloth again, wherein the coating thickness is 3 mm;
step seven, reinforcing the anchoring nails: after the second layer of anti-crack mortar is smeared, an anchoring nail is adopted for reinforcement, and the length of the anchoring nail is 60-80 mm; the setting distance range of the anchoring nails is 600 mm-900 mm;
step eight, painting paint: comprises priming paint brushing and finish paint brushing
a. After the steps are completed, performing putty driving and scraping for three times, wherein the putty driving and scraping for the previous time needs to be ensured to be dried before the putty driving and scraping for the next two times, the flatness of the putty driving and scraping for each time is controlled within a range of +/-1 mm, the verticality and the flatness of the wall surface of the putty scraping for each time are controlled by ink lines, the thickness of the second woven putty scraping is not more than 3mm, and the putty driving and scraping for the third time is used for locally leveling the putty driving and scraping for the second time;
b. protecting the place where the primer is jointed before painting the primer, and cleaning floating ash on the wall surface which is subjected to third putty-applying and air-drying;
c. coating a primer;
d. after the primer is coated, coating the finish paint twice, wherein the finish paint needs to be diluted by water before being coated, the water content is not more than 20 percent, the coating sequence of the finish paint is from top to bottom, the finish paint is uniformly coated in the vertical direction, then uniformly coated in the horizontal direction, and finally brushing marks in the vertical direction; the interval time between the second time of painting and the first time of painting is not less than 2 hours;
e. cleaning tools: after the primer or the finish paint is coated, the coating tool needs to be soaked, cleaned and dried by using clean water.
Furthermore, the putty for the third driving and scraping is locally leveled for the putty for the second driving and scraping, a 200-watt bulb or 800-iodine tungsten lamp is adopted to irradiate the side surface of the wall surface of the putty for the second driving and scraping, and the putty for the second driving and scraping is used for leveling.
Furthermore, the grid cloth is made of glass fiber grid cloth.
Further, the anti-crack mortar is flexible anti-crack plastering mortar.
Furthermore, the primer adopts emulsion paint, the painting environment is a closed environment, the temperature of the painting environment is not lower than 10 ℃, and after the primer is painted, the primer is placed for at least 2 hours and then is windowed and ventilated.
Furthermore, the primer or the finish paint is stopped during the painting process, and the corresponding painting tool needs to be soaked in the corresponding paint or clear water in time.
The invention has the advantages that: the attachments on the foundation wall surface do not need to be completely eradicated, and only the soft part needs to be cleaned, so that the construction time is greatly saved, the time and the labor are saved, the generation of construction waste is reduced, the transportation cost for cleaning the waste is indirectly reduced, and the cost is saved; in the construction process, the number of times of polishing and leveling is small, and the time is saved; the wall surface is reinforced for many times, and the cracking and falling problems of the wall surface are greatly reduced.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in detail in the form of an interior wall painting.
The indoor decoration wall surface renovation decoration specifically comprises the following steps:
step one, base layer treatment: the soft part is removed aiming at the falling and peeling of the wall surface, and the firmly attached part is reserved; then the wall surface is brushed with an interface agent by rolling to clean floating ash on the wall surface so as to improve the adhesive force of the wall surface in the subsequent working procedures; then, using repair mortar to perform repair leveling on pits formed by removing soft parts of the wall surface, after leveling, controlling the surface flatness of the wall surface within a range of +/-5 mm, and finally performing pointing treatment on the wire grooves, the holes and the caulking gypsum reserved on the wall surface;
step two, brushing glue: gluing the original wall with glue once;
step three, laying a first layer of grids: paving and reinforcing a first layer of glass fiber mesh cloth on the whole wall coated with the glue;
step four, coating a first layer of anti-crack mortar: coating flexible anti-crack coating mortar on the first layer of grid cloth, wherein the coating thickness is 3 mm;
step five, laying a second layer of grid cloth: after the first layer of anti-crack mortar is smeared, laying a second layer of glass fiber mesh cloth on the surface of the first layer of anti-crack mortar and reinforcing the glass fiber mesh cloth;
step six, smearing a second layer of anti-crack mortar: coating flexible anti-crack surface mortar on the second layer of grid cloth again, wherein the coating thickness is 3 mm;
step seven, reinforcing the anchoring nails: after the second layer of anti-crack mortar is smeared, an anchoring nail is adopted for reinforcement, and the length of the anchoring nail is 60-80 mm; the setting distance range of the anchoring nails is 600 mm-900 mm;
step eight, painting paint: comprises priming paint brushing and finish paint brushing
a. After the steps are completed, performing putty removing and scraping for three times, wherein the putty removing and scraping for the previous time needs to be ensured to be dried before the putty removing and scraping for the next time, the surface smoothness of the putty removed and scraped for each time is controlled within a range of +/-1 mm, the verticality and the smoothness of the wall surface subjected to putty scraping for each time are controlled by ink lines, the thickness of the second woven putty removing and scraping is not more than 3mm, the putty removed and scraped for the third time is the local leveling of the putty removed and scraped for the second time, the wall surface subjected to putty removing and scraping for the second time is irradiated by the side surface of a 200-watt bulb or an 800-iodine tungsten lamp, and the putty removed and scraped for the second time is filled and leveled by the putty;
b. protecting the place where the primer is jointed before painting the primer, and cleaning floating ash on the wall surface which is subjected to third putty-applying and air-drying;
c. coating a primer, wherein the primer is emulsion paint, the coating environment is a closed environment, the temperature of the coating environment is not lower than 10 ℃, and after the primer is coated, the primer is placed for at least 2 hours and is windowed and ventilated;
d. after the primer is coated, coating the finish paint twice, wherein the finish paint needs to be diluted by water before being coated, the water content is not more than 20 percent, the coating sequence of the finish paint is from top to bottom, the finish paint is uniformly coated in the vertical direction, then uniformly coated in the horizontal direction, and finally brushing marks in the vertical direction; the interval time between the second time of painting and the first time of painting is not less than 2 hours;
e. cleaning tools: after the primer or the finish paint is coated, the coating tool needs to be soaked, cleaned and dried by using clean water.
In the process of painting the primer or the finish paint, the phenomenon of pause occurs, and the corresponding painting tool needs to be soaked in the corresponding paint or clear water in time.
The flexible anti-crack plastering mortar is used as the anti-crack mortar, and the material is mainly used for an anti-crack protective layer on the surface of the heat-insulating layer; the material is mainly prepared from high-elasticity latex, Portland cement and various anti-cracking auxiliary materials by a special process. The material has excellent crack resistance and good impact resistance, permeability resistance and waterproof performance; the product has excellent elasticity and flexibility, changes the weak point of easy cracking, adds fibers with different lengths and elastic moduli in cement mortar, controls the deformation force of the mortar, and has the advantages that the anti-cracking protective layer of the moisture retention series propagation outside the outer wall of the polystyrene granule of the rubber powder is formed by compounding polymer fiber cement mortar and glass fiber network cloth or an electroplating welding wire mesh, can bear large damage deformation caused by external force collision, and enhances the shock resistance of the protective layer; the material has weather resistance, durability, water resistance, permeability resistance and shrinkage resistance, is simple and convenient in construction process and easy to operate, belongs to green environment-friendly building materials, and is safe and nontoxic.
In addition, when the paint constructor removes floating ash and putties at high positions, the safety of the paint constructor is ensured, for example, a split heads, a scaffold and a springboard are strictly used, the constructor is strictly prohibited from stepping on wood, and for example, when the floor or floor tiles are constructed, the split heads are bound to protect the feet of the split heads for use when the paint is constructed again. Moreover, when the putty scraper or the paint brush is used, other objects are prevented from being polluted as much as possible, and the construction process and the site are kept clean.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. An indoor wall surface renovating and decorating process is characterized by comprising the following steps:
step one, base layer treatment: the soft part is removed aiming at the falling and peeling of the wall surface, and the firmly attached part is reserved; then the wall surface is brushed with an interface agent by rolling to clean floating ash on the wall surface so as to improve the adhesive force of the wall surface in the subsequent working procedures; then, using repair mortar to perform repair leveling on pits formed by removing soft parts of the wall surface, after leveling, controlling the surface flatness of the wall surface within a range of +/-5 mm, and finally performing pointing treatment on the wire grooves, the holes and the caulking gypsum reserved on the wall surface;
step two, brushing glue: gluing the original wall with glue once;
step three, laying a first layer of grids: paving and reinforcing a first layer of grid cloth on the whole wall coated with the glue;
step four, coating a first layer of anti-crack mortar: coating anti-crack mortar on the first layer of grid cloth, wherein the coating thickness is 3 mm;
step five, laying a second layer of grid cloth: after the first layer of anti-crack mortar is smeared, laying a second layer of grid cloth on the surface of the first layer of anti-crack mortar and reinforcing the second layer of grid cloth;
step six, smearing a second layer of anti-crack mortar: coating anti-crack mortar on the second layer of grid cloth again, wherein the coating thickness is 3 mm;
step seven, reinforcing the anchoring nails: after the second layer of anti-crack mortar is smeared, an anchoring nail is adopted for reinforcement, and the length of the anchoring nail is 60-80 mm; the setting distance range of the anchoring nails is 600 mm-900 mm;
step eight, painting paint: comprises priming paint brushing and finish paint brushing
a. After the steps are completed, performing putty driving and scraping for three times, wherein the putty driving and scraping for the previous time needs to be ensured to be dried before the putty driving and scraping for the next two times, the flatness of the putty driving and scraping for each time is controlled within a range of +/-1 mm, the verticality and the flatness of the wall surface of the putty scraping for each time are controlled by ink lines, the thickness of the second woven putty scraping is not more than 3mm, and the putty driving and scraping for the third time is used for locally leveling the putty driving and scraping for the second time;
b. protecting the place where the primer is jointed before painting the primer, and cleaning floating ash on the wall surface which is subjected to third putty-applying and air-drying;
c. coating a primer;
d. after the primer is coated, coating the finish paint twice, wherein the finish paint needs to be diluted by water before being coated, the water content is not more than 20 percent, the coating sequence of the finish paint is from top to bottom, the finish paint is uniformly coated in the vertical direction, then uniformly coated in the horizontal direction, and finally brushing marks in the vertical direction; the interval time between the second time of painting and the first time of painting is not less than 2 hours;
e. cleaning tools: after the primer or the finish paint is coated, the coating tool needs to be soaked, cleaned and dried by using clean water.
2. The indoor wall surface retreading decoration process according to claim 1, wherein: and the putty for the third driving and scraping is locally leveled for the putty for the second driving and scraping, a 200-watt bulb or 800-iodine tungsten lamp is adopted to irradiate the side surface of the wall surface for the second driving and scraping, and the putty for the second driving and scraping is used for leveling.
3. The indoor wall surface retreading decoration process according to claim 1, wherein: the grid cloth is glass fiber grid cloth.
4. The indoor wall surface retreading decoration process according to claim 1, wherein: the anti-crack mortar is flexible anti-crack plastering mortar.
5. The indoor wall surface retreading decoration process according to claim 1, wherein: the primer adopts emulsion paint, the painting environment is a closed environment, the temperature of the painting environment is not lower than 10 ℃, and after the primer is painted, the primer is placed for at least 2 hours for windowing and ventilation.
6. The indoor wall surface retreading decoration process according to claim 1, wherein: in the process of painting the primer or the finish paint, the phenomenon of pause occurs, and the corresponding painting tool needs to be soaked in the corresponding paint or clear water in time.
CN202010763834.3A 2020-08-01 2020-08-01 Indoor wall surface renovation decoration process Pending CN112065087A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010763834.3A CN112065087A (en) 2020-08-01 2020-08-01 Indoor wall surface renovation decoration process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010763834.3A CN112065087A (en) 2020-08-01 2020-08-01 Indoor wall surface renovation decoration process

Publications (1)

Publication Number Publication Date
CN112065087A true CN112065087A (en) 2020-12-11

Family

ID=73656940

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010763834.3A Pending CN112065087A (en) 2020-08-01 2020-08-01 Indoor wall surface renovation decoration process

Country Status (1)

Country Link
CN (1) CN112065087A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101586401A (en) * 2009-06-22 2009-11-25 中国海洋石油总公司 Method for retreading old porcelain brick wall by paint
US9624664B2 (en) * 2014-01-16 2017-04-18 Jennifer Judd Popcorn ceiling patch
CN107130750A (en) * 2017-06-10 2017-09-05 东莞市华美乐建材超市有限公司 A kind of brushing method of pair of putty layer
CN109025356A (en) * 2018-09-13 2018-12-18 湖南省金海科技有限公司 A kind of exterior wall retrofit coating process
CN109025110A (en) * 2018-08-23 2018-12-18 浙江绿宇装饰有限公司 A kind of exterior coating crack resistence painting technique
CN109424135A (en) * 2017-09-05 2019-03-05 成都美吉房地产营销策划有限公司 The technique that the putty of metope in building is coated

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101586401A (en) * 2009-06-22 2009-11-25 中国海洋石油总公司 Method for retreading old porcelain brick wall by paint
US9624664B2 (en) * 2014-01-16 2017-04-18 Jennifer Judd Popcorn ceiling patch
CN107130750A (en) * 2017-06-10 2017-09-05 东莞市华美乐建材超市有限公司 A kind of brushing method of pair of putty layer
CN109424135A (en) * 2017-09-05 2019-03-05 成都美吉房地产营销策划有限公司 The technique that the putty of metope in building is coated
CN109025110A (en) * 2018-08-23 2018-12-18 浙江绿宇装饰有限公司 A kind of exterior coating crack resistence painting technique
CN109025356A (en) * 2018-09-13 2018-12-18 湖南省金海科技有限公司 A kind of exterior wall retrofit coating process

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张毅: "腻子", 《装饰涂裱工操作技能(初、中级)》 *

Similar Documents

Publication Publication Date Title
CN109838065B (en) Floor tile ground paving construction method
CN103572845B (en) A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof
CN108952041A (en) A kind of external wall Stucco finish structure and its method for repairing and constructing
CN106049539A (en) Building project construction method
CN107044196A (en) A kind of concrete is plastered face emulsion paint brushing technique
CN204826464U (en) Waterproof construction of parapet
CN109025343A (en) A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile
KR101623081B1 (en) Complex waterproofing construction method of building construction
KR100315181B1 (en) Two-Package Type Inorganic Membranous Waterproof Stuff Having Excellent Elasticity, Hybrid Membranous Waterproof Sheet and Construction Method therefor
KR101468017B1 (en) The Outer Wall Repair Method of Brick Building
CN112575979A (en) Construction method of plastering waterproof mortar for building exterior wall
US20060123736A1 (en) System and method for filling joints between exterior cement panels
KR100906565B1 (en) The remodeling method of structure with tiles
CN113006397A (en) Construction method for square leveling of kitchen and bathroom space
KR101047447B1 (en) Method of waterproofing or repair on the dryvit wall
KR100950040B1 (en) A paint composition for repairing the outer wall and repair method by using of it
CN112065087A (en) Indoor wall surface renovation decoration process
KR100993924B1 (en) The method for painting work of floor using incombustible material
KR102525769B1 (en) Coating method for prevention of neutralization and microcrack in a concrete outer wall
CN209958651U (en) Ceramic tile outer wall waterproof construction
CN104695562A (en) Maintenance method for bathroom leakage
KR20060118302A (en) Method for repairing cracks of waterway concrete structure
KR100597176B1 (en) Method for repairing the concrete
KR101820729B1 (en) Repair method of concrete crack
KR101983953B1 (en) Extension of building life and painting cycle by combination of acrylic elastic waterproofing agent and silicone paint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20201211