CN109025343A - A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile - Google Patents
A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile Download PDFInfo
- Publication number
- CN109025343A CN109025343A CN201810523682.2A CN201810523682A CN109025343A CN 109025343 A CN109025343 A CN 109025343A CN 201810523682 A CN201810523682 A CN 201810523682A CN 109025343 A CN109025343 A CN 109025343A
- Authority
- CN
- China
- Prior art keywords
- hollowing
- ceramic tile
- tile
- engineering
- displacement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000006073 displacement reaction Methods 0.000 title claims abstract description 12
- 239000000919 ceramic Substances 0.000 claims abstract description 38
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 18
- 238000004140 cleaning Methods 0.000 claims abstract description 11
- 238000000034 method Methods 0.000 claims abstract description 11
- 238000005336 cracking Methods 0.000 claims abstract description 8
- 239000011449 brick Substances 0.000 claims abstract description 7
- 239000003795 chemical substances by application Substances 0.000 claims abstract description 7
- 238000010276 construction Methods 0.000 claims abstract description 7
- 239000004744 fabric Substances 0.000 claims abstract description 7
- 238000009413 insulation Methods 0.000 claims abstract description 5
- 229920000642 polymer Polymers 0.000 claims abstract description 4
- 239000000843 powder Substances 0.000 claims abstract description 4
- 238000007761 roller coating Methods 0.000 claims abstract description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 239000000463 material Substances 0.000 description 13
- 239000002585 base Substances 0.000 description 4
- 239000004568 cement Substances 0.000 description 4
- 229910052573 porcelain Inorganic materials 0.000 description 3
- 239000011083 cement mortar Substances 0.000 description 2
- 238000001764 infiltration Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 229920000715 Mucilage Polymers 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 239000003513 alkali Substances 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000003365 glass fiber Substances 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 238000010257 thawing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0296—Repairing or restoring facades
Abstract
Engineering method is repaired in a kind of hollowing displacement of hollowing outdoor tile disclosed by the invention, include the following steps: (1) hollowing checking step: in the step, being hammered into shape with hollowing and tap determining hollowing range and draw the outer surface of wall range that should be cut and root out with marking pen;(2) it cuts and roots out hollowing ceramic tile step: first being cut the outdoor tile edge for the outer surface of wall range that should be cut and root out that step (1) determines with cutting machine in the step, then dig shovel outer surface of wall with tool until rooting out clean;(3) base cleaning step;(4) base and the two-way attachment of increase interface processing step: are reinforced rooting out part roller coating interfacial agents;(5) screed and levelling step are painted: using 3-5mm below polymer mortar or the levelling original powder brush layer of inorganic heat insulation mortar or inorganic mortar upper surface;(6) cracking resistance enhancement layer construction procedure: decorative mortar linked network is used on screed-coat and fixes screen cloth with anchor bolt after linked network;(7) furring brick step.
Description
Technical field
The present invention relates to external wall ceramic tile hollowing recovery technique field, in particular to a kind of hollowing of hollowing outdoor tile
Engineering method is repaired in displacement.
Background technique
Exterior-wall heat insulation facing pastes ceramic tile, the materials category rigid material such as mosaic, and heat preservation layer material is flexible material, and two kinds
The technical performance indexs difference such as coefficient of expansion of the material of different attribute is larger.Especially traditional handicraft pastes ceramic tile cement element
The brickwork joint of ash, when summer temperature reaches 35 DEG C, insulating layer of external wall temperature may be up to 70 DEG C -- and 80 DEG C, chance of dashing forward rainfall moment temperature can
It is reduced to 10 DEG C -- 20 DEG C, 50 DEG C of the temperature difference -- 60 DEG C.The biggish two kinds of materials of two kinds of coefficient of expansion difference are bonded together, Shi Erjiu
Be bound to cause cement element ash ceramic tile seam cracking.Winter porcelain will certainly just occur after freeze thawing in rainwater infiltration crack when snowing
Brick hollowing falls off, and causes the safety accident for killing people, injuring people by a crashing object.The serious safety for threatening living environment.
Traditional ceramic tile hollowing restorative procedure mainly include the following types:
(1) ceramic tile is all rooted out.Ceramic tile is all rooted out with air compressor machine impact drill, the water of 30kg is not less than with every square metre
After cement mortar fills up levelling, then carry out the construction of facing ornament materials.It is time-consuming, take material, be at high cost, and leave a large amount of building
Rubbish.
(2) ceramic tile falls off part sectional repair.After being rooted out to obvious hollowing, loose or dislocation part, with cement mortar or resist
It splits mortar and fills up levelling reparation.Not patched next year falls off again, then studies for a second time courses one has flunked.Many building image patches of present big and medium-sized cities
Equally, one piece shallow one piece deep, seriously affect the beautification and the unsafe hidden danger of living environment of urban construction.
(3) fall off after the repairing of position to ceramic tile, with traditional putty batch scrape it is levelling after, direct spraying finishing material.Smooth
Ceramic tile basal plane on do not do special reinforcement processing, directly construct finishing material in ceramic tile basal plane, caused by consequence be after 2,3 years
Falling off again is formed again.So that the building for spending huge fund decoration is changed so much that one loses one's identity, not only influences urban environment beautification, and
And increase secondary, coating expense again three times.
For this reason, Chinese invention patent publication number CN107338967A discloses a kind of aging blocks outdoor tile facing renewal and reform
New process and new material, new process, the new material of renewal and reform TY-686 flexibility face brick-imitation directly on smooth ceramic tile face,
Its construction technology and the feature of new material are as follows: root out hollowing, ceramic tile-anticracking grout for loosening, falling off fill up it is levelling-apply and seep
The high-strength ceramic tile bonding mucilage-batch compound alkali-resistant glass fiber mesh-anchor studs of ceramic tile cementing mortar of reinforcement liquid-spray are fixed on outer thoroughly
Wall cement basic layer-batch background color filleting rubber cement is levelling-and it applies infiltration and reinforces ground coat enamel-painting flexibility face brick-imitation slurry.The patent of invention is deposited
In reparative processes complexity, the big technical problem of project amount.
Summary of the invention
It is provided aiming at the problem that technical problem to be solved by the present invention lies in the presence of ceramic tile hollowing repair process
A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile.
The technical problems to be solved by the invention can be achieved through the following technical solutions:
A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile, includes the following steps:
(1) hollowing checking step
In the step, is hammered into shape with hollowing and tap determining hollowing range and draw the outer surface of wall that should be cut and root out with marking pen
Range;
(2) it cuts and roots out hollowing ceramic tile step
The outdoor tile for the outer surface of wall range that should be cut and root out for first being determined step (1) with cutting machine in the step
Edge is cut, and then digs shovel outer surface of wall with tool until rooting out clean;
(3) base cleaning step
The step is to clean to have rooted out position;
(4) interface processing step
Base and the two-way attachment of increase are reinforced rooting out part roller coating interfacial agents;
(5) screed and levelling step are painted
Using 3-5mm below polymer mortar or the levelling original powder brush layer of inorganic heat insulation mortar or inorganic mortar upper surface;
(6) cracking resistance enhancement layer construction procedure
Decorative mortar linked network is used on screed-coat and fixes screen cloth with anchor bolt after linked network;
(7) furring brick step
Ceramic tile is pasted using flexible ceramic tile agglomerant, and the flexible flexible water jointing agent with hydrophobicity of apparatus carries out porcelain
Brick carries out jointing processing.
In a preferred embodiment of the invention, in the step (2), hollowing position is rooted out to structure sheaf, to extending out
It roots out to cracking resistance layer surface at exhibition position.
In a preferred embodiment of the invention, described to extend to the outside position in vertical direction not less than hollowing position two
Block ceramic tile, horizontal direction are not less than one block of hollowing position ceramic tile, can guarantee that ceramic tile hollowing is rooted out thoroughly in this way, are convenient for and former metope
Linking.
In a preferred embodiment of the invention, the outer rim for extending to the outside position is serrated, and is convenient for grid cloth
Overlap joint.
In a preferred embodiment of the invention, the outer rim for extending to the outside position should be greater than the outer rim at hollowing position
100mm or more.
Due to using technical solution as above, the present invention has compared with existing ceramic tile hollowing repairs engineering method and repairs work
The advantages that sequence is simple, at low cost, and short time limit, rubbish are few, is not easy occur hollowing again after repairerment.
Detailed description of the invention
Fig. 1 is the schematic diagram that the present invention cut and rooted out hollowing ceramic tile.
Specific embodiment
A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile, includes the following steps:
(1) hollowing checking step
In the step, is hammered into shape with hollowing and tap determining hollowing range and draw the outer surface of wall that should be cut and root out with marking pen
Range;
(2) it cuts and roots out hollowing ceramic tile step
The outdoor tile for the outer surface of wall range that should be cut and root out for first being determined step (1) with cutting machine in the step
Edge is cut, and then digs shovel outer surface of wall with tool until rooting out clean;Referring to Fig. 1, hollowing position 10 is rooted out to structure
Layer, extends to the outside position 20 and roots out to cracking resistance layer surface.Position 20 is extended to the outside in vertical direction not less than hollowing position 10 2
Block ceramic tile, horizontal direction are not less than 10 1 blocks of hollowing position ceramic tile, can guarantee that ceramic tile hollowing is rooted out thoroughly in this way, are convenient for and former wall
The linking in face.The outer rim for extending to the outside position 20 is serrated, and overlaps convenient for grid cloth.The outer rim for extending to the outside position 20 should be big
Outer rim 100mm or more in hollowing position 10.
(3) base cleaning step
The step is to clean to have rooted out position;
(4) interface processing step
Base and the two-way attachment of increase are reinforced rooting out part roller coating interfacial agents;
(5) screed and levelling step are painted
Using 3-5mm below polymer mortar or the levelling original powder brush layer of inorganic heat insulation mortar or inorganic mortar upper surface;
(6) cracking resistance enhancement layer construction procedure
Decorative mortar linked network is used on screed-coat and fixes screen cloth with anchor bolt after linked network;
(7) furring brick step
Ceramic tile is pasted using flexible ceramic tile agglomerant, and the flexible flexible water jointing agent with hydrophobicity of apparatus carries out porcelain
Brick carries out jointing processing.
Claims (5)
1. engineering method is repaired in a kind of hollowing displacement of hollowing outdoor tile, which comprises the steps of:
(1) hollowing checking step
In the step, is hammered into shape with hollowing and tap determining hollowing range and draw the outer surface of wall model that should be cut and root out with marking pen
It encloses;
(2) it cuts and roots out hollowing ceramic tile step
The outdoor tile edge for the outer surface of wall range that should be cut and root out for first being determined step (1) with cutting machine in the step
It is cut, then digs shovel outer surface of wall with tool until rooting out clean;
(3) base cleaning step
The step is to clean to have rooted out position;
(4) interface processing step
Base and the two-way attachment of increase are reinforced rooting out part roller coating interfacial agents;
(5) screed and levelling step are painted
Using 3-5mm below polymer mortar or the levelling original powder brush layer of inorganic heat insulation mortar or inorganic mortar upper surface;
(6) cracking resistance enhancement layer construction procedure
Decorative mortar linked network is used on screed-coat and fixes screen cloth with anchor bolt after linked network;
(7) furring brick step
Ceramic tile is pasted using flexible ceramic tile agglomerant, and apparatus is flexible and the flexible water jointing agent of hydrophobicity carry out ceramic tile into
Row jointing processing.
2. engineering method is repaired in a kind of hollowing displacement of hollowing outdoor tile as described in claim 1, which is characterized in that the step
(2) in, hollowing position is rooted out to structure sheaf, is extended to the outside position and is rooted out to cracking resistance layer surface.
3. engineering method is repaired in a kind of hollowing displacement of hollowing outdoor tile as claimed in claim 2, which is characterized in that described outside
It extends position and is not less than two blocks of hollowing position ceramic tile in vertical direction, horizontal direction is not less than one block of hollowing position ceramic tile, in this way
It can guarantee that ceramic tile hollowing is rooted out thoroughly, convenient for being connected with former metope.
4. engineering method is repaired in a kind of hollowing displacement of hollowing outdoor tile as claimed in claim 3, which is characterized in that described outside
The outer rim at extension position is serrated, and overlaps convenient for grid cloth.
5. engineering method is repaired in a kind of hollowing displacement of hollowing outdoor tile as claimed in claim 4, which is characterized in that described outside
The outer rim at extension position should be greater than the outer rim 100mm or more at hollowing position.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810523682.2A CN109025343A (en) | 2018-05-28 | 2018-05-28 | A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810523682.2A CN109025343A (en) | 2018-05-28 | 2018-05-28 | A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109025343A true CN109025343A (en) | 2018-12-18 |
Family
ID=64611652
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810523682.2A Pending CN109025343A (en) | 2018-05-28 | 2018-05-28 | A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109025343A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110185276A (en) * | 2019-04-19 | 2019-08-30 | 上海市建筑装饰工程集团有限公司 | The restorative procedure of existing building Countermeasures for Dropping of Face Bricks of Exposed Walls |
CN110185274A (en) * | 2019-04-19 | 2019-08-30 | 上海市建筑装饰工程集团有限公司 | The restorative procedure that existing building exterior wall true stone paint falls off |
CN110185279A (en) * | 2019-04-19 | 2019-08-30 | 上海市建筑装饰工程集团有限公司 | The restorative procedure of existing building sloughing of exterior wall |
CN110552517A (en) * | 2019-02-27 | 2019-12-10 | 谭壮 | reinforcing method for preventing exterior wall tiles from falling off |
CN110821198A (en) * | 2019-10-23 | 2020-02-21 | 浙江勤业建工集团有限公司 | High-rise building external wall thermal insulation mortar falling prevention method |
CN111441608A (en) * | 2020-05-28 | 2020-07-24 | 建修科技有限公司 | Method for repairing bottom of swimming pool |
CN112376932A (en) * | 2020-11-03 | 2021-02-19 | 马鞍山安慧智电子科技有限公司 | Hollowing maintenance robot |
CN112459526A (en) * | 2020-12-03 | 2021-03-09 | 安徽墨砂工程修缮技术有限公司 | Method for repairing external wall thermal insulation hollowing and dropping |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20110054943A (en) * | 2009-11-19 | 2011-05-25 | 심기승 | A manufacture and construction method of remodeling panel for building outside wall |
CN104989071A (en) * | 2015-05-20 | 2015-10-21 | 莆田学院 | Method for paving new ground tiles on original cushion layer |
CN106285037A (en) * | 2016-09-19 | 2017-01-04 | 余春冠 | A kind of finishing material hollowing comes off method for repairing and mending |
CN106760599A (en) * | 2016-12-14 | 2017-05-31 | 四川省爱馨佳建筑装饰工程有限公司 | Sloughing of exterior wall restorative procedure |
-
2018
- 2018-05-28 CN CN201810523682.2A patent/CN109025343A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20110054943A (en) * | 2009-11-19 | 2011-05-25 | 심기승 | A manufacture and construction method of remodeling panel for building outside wall |
CN104989071A (en) * | 2015-05-20 | 2015-10-21 | 莆田学院 | Method for paving new ground tiles on original cushion layer |
CN106285037A (en) * | 2016-09-19 | 2017-01-04 | 余春冠 | A kind of finishing material hollowing comes off method for repairing and mending |
CN106760599A (en) * | 2016-12-14 | 2017-05-31 | 四川省爱馨佳建筑装饰工程有限公司 | Sloughing of exterior wall restorative procedure |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110552517A (en) * | 2019-02-27 | 2019-12-10 | 谭壮 | reinforcing method for preventing exterior wall tiles from falling off |
CN110185276A (en) * | 2019-04-19 | 2019-08-30 | 上海市建筑装饰工程集团有限公司 | The restorative procedure of existing building Countermeasures for Dropping of Face Bricks of Exposed Walls |
CN110185274A (en) * | 2019-04-19 | 2019-08-30 | 上海市建筑装饰工程集团有限公司 | The restorative procedure that existing building exterior wall true stone paint falls off |
CN110185279A (en) * | 2019-04-19 | 2019-08-30 | 上海市建筑装饰工程集团有限公司 | The restorative procedure of existing building sloughing of exterior wall |
CN110821198A (en) * | 2019-10-23 | 2020-02-21 | 浙江勤业建工集团有限公司 | High-rise building external wall thermal insulation mortar falling prevention method |
CN111441608A (en) * | 2020-05-28 | 2020-07-24 | 建修科技有限公司 | Method for repairing bottom of swimming pool |
CN112376932A (en) * | 2020-11-03 | 2021-02-19 | 马鞍山安慧智电子科技有限公司 | Hollowing maintenance robot |
CN112459526A (en) * | 2020-12-03 | 2021-03-09 | 安徽墨砂工程修缮技术有限公司 | Method for repairing external wall thermal insulation hollowing and dropping |
CN112459526B (en) * | 2020-12-03 | 2021-12-14 | 安徽墨砂工程修缮技术有限公司 | Method for repairing external wall thermal insulation hollowing and dropping |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109025343A (en) | A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile | |
CN104018598B (en) | A kind of external wall structure and construction installation method | |
CN109838065B (en) | Floor tile ground paving construction method | |
CN109057385A (en) | Engineering method is repaired in the fixed pin part slip casting of inlet of a kind of hollowing inner-outer wall ceramic tile, stone material | |
CN103321442A (en) | Self-compensating repair structure and process for internal stress cracking of inner wall heat insulating wall surface | |
Lin | Maintainability of facilities: for building professionals | |
CN104746772B (en) | Ash concrete hollow partition board anti-cracking construction method | |
CN109653529A (en) | Historical building clean water brick wall repairs construction method | |
CN111042570B (en) | Repairing construction method for fresh water brick wall of ancient building | |
CN106013509A (en) | Dry-method construction method for high-performance autolaved aerated concrete block wall | |
CN107338967A (en) | A kind of new technology and new material of aging blocks outdoor tile facing renewal and reform | |
CN106121231A (en) | A kind of skyscraper interts cross construction method | |
CN106801517A (en) | A kind of schoolhouse surface consolidation of Prefabricated porous plate brick mixed structure strengthens method | |
CN109184253A (en) | A kind of method for repairing and mending of exterior wall leakage | |
CN102486048A (en) | Construction method for exterior heat preserving wall surface of exterior wall of high-rise building | |
CN207194343U (en) | The tapestry brick paving structure of autoclave aerated concrete building block exterior wall | |
CN101131007A (en) | Preventing method for exterior wall leakage of face tile | |
CN105888084A (en) | Whole outer wall internal thermal insulation system construction method by using enhanced composite thermal insulation material | |
CN110424775A (en) | The mixed structure of wood collects together point pavilion modelled after an antique and its construction method | |
CN109025344A (en) | Engineering method is repaired in the comprehensive slip casting of inlet fixed pin of a kind of hollowing inner-outer wall ceramic tile, stone material | |
CN102182323A (en) | Process for dry laying of autoclaved aerated concrete blocks in low-latitude plateaus | |
CN208534084U (en) | A kind of tile decorative surface point face reinforcing repairerment engineering method anchor studs | |
CN208534936U (en) | A kind of tile decorative surface point face reinforcing repairerment engineering method modified anchor studs | |
CN109537926B (en) | Waterproof and leaking stoppage construction method for building area | |
CN104294968A (en) | Method for producing cast-in-suit cement straw plate solid light energy-saving grouted wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181218 |