CN111878124A - 隧道初期支护稳定拱架可调式支垫设备 - Google Patents
隧道初期支护稳定拱架可调式支垫设备 Download PDFInfo
- Publication number
- CN111878124A CN111878124A CN202010840594.2A CN202010840594A CN111878124A CN 111878124 A CN111878124 A CN 111878124A CN 202010840594 A CN202010840594 A CN 202010840594A CN 111878124 A CN111878124 A CN 111878124A
- Authority
- CN
- China
- Prior art keywords
- wedge block
- stable
- block
- lifting
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/18—Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
- E21D11/183—Supporting means for arch members, not provided for in E21D11/22
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
Abstract
本发明公开了隧道初期支护稳定拱架可调式支垫设备,在底座四周分别固定支撑板,在支撑板内的底座上设置固定楔块及稳定块,螺杆外套装压缩弹簧同时穿过支撑板与稳定块并丝扣连接活动楔块,升降楔块设置在活动楔块与稳定块上并连接升降台板,升降台板下面四周设置防护罩并套接在支撑板外围。其底座、支撑板、防护罩与升降台板为矩形或圆柱形。本发明设计结构合理,符合机械原理,机械性能稳定,操作简便,安全性能高,稳定性能强。施工时不需要其它辅助设备,动力源小,可确保拱架底部支垫踏实稳固,并承载初期支护拱架喷射混凝土后产生的荷载,接触面大,升降调节方便。
Description
技术领域
本发明涉及一种隧道初期支护稳定拱架的专用支垫,具体是一种隧道初期支护稳定拱架可调式支垫设备,属于施工机械领域。
背景技术
随着国家基础建设快速的发展,对施工的质量及生产安全提出了更严格的要求,特别是对隧道施工过程中的质量卡控要求更高,建筑施工企业提出精细化管理,向管理要效益,在施工过程中保证质量的前提下,努力争取提高作业效率,降低施工作业人员的劳动强度。在隧道初期支护施工中,要求将拱架确定标高后始终保持平衡稳定,如果拱架底部支垫不实甚至悬空,在施工喷射混凝土时会使拱架的重量增加,由于正在施工的初期支护系统中拱架锁脚锚管中的水泥浆液和喷射混凝土尚未形成必要强度,所以会导致拱架底部的压力增大而发生下沉,严重时会使拱架产生变形侵限、喷射混凝土变形开裂,甚至可能会导致初期支护失稳,形成重大质量问题和安全隐患,一旦发生事故将危机施工人员生命安全,同时会给施工企业造成较大的经济损失。所以隧道初期支护要根据拱架拱脚底部与导坑台阶底部围岩距离在拱架底部放置安全有效的支垫设备。
在现阶段采用新奥法施工的隧道初期支护拱架安装工程时,通常需要多名施工人员采用人力悬空抬高或降低拱架,再用槽钢或其他材质垫块塞入拱架底部和围岩之间进行临时支垫,以达到拱架设计标高要求。在调整好拱架高度后在每榀拱架下部安装锁脚锚管两根,插入围岩3m-4m后进行注浆,最后将锁脚锚管与拱架牢固焊接在一起进行固定,确保在喷注混凝土的过程中拱架整体不下沉。使用这种方法存在以下弊端:由于施工现场初期支护拱脚底部土方超挖现象普遍存在,地表地层土质松软程度不一,现场很难备用高度合适的材料进行支垫;拱架在安装时依靠人力抬升难以精确调整标高,甚至需要多次反复调试,同时需要施工人员多,劳动强度大,施工效率低。在目前现有的隧道施工机具装备中,尚未发现一种具有一定支承刚度,能起到稳定初期支护拱架作用并进行适度调节高度的专用支垫。
发明内容
本发明的目的是克服目前隧道拱架安装施工过程中依靠人力悬空抬高或降低拱架进行临时支垫存在的缺陷,从而公开一种隧道初期支护稳定拱架可调式支垫设备。本发明是通过以下技术方案实现的:
在底座上面四周分别固定支撑板,在左侧支撑板内的底座上设置固定楔块,在固定楔块上连接稳定块,支撑板与稳定块上分别对应开有通孔,活动楔块中心开有中空螺纹,螺杆外套装压缩弹簧同时穿过支撑板与稳定块并丝扣连接活动楔块,升降楔块设置在活动楔块与稳定块上并连接升降台板,升降台板下面四周设置防护罩并套接在支撑板外围。
本发明的底座、支撑板、防护罩与升降台板为矩形或圆柱形。
本发明设计结构合理,符合机械原理,机械性能稳定,操作简便,安全性能高,稳定性能强。施工时不需要其它辅助设备,动力源小,一名施工人员就可以操作,可确保拱架底部支垫踏实稳固,并承载初期支护拱架喷射混凝土后产生的荷载,接触面大,升降调节方便,既不影响其它工序的施工作业,又可以重复使用,是一种符合质量安全要求的隧道初期支护稳定拱架的可调式支垫设备。
附图说明
附图1为本发明的主视局部剖面结构示意图。附图2为本发明的左视结构示意图。附图标记名称:底座1,固定楔块2,支撑板3,螺杆4,压缩弹簧5,稳定块 6,升降楔块7,升降台板8,活动楔块9,防护罩10。
具体实施方式
以下结合实施例及附图对本发明做进一步详细描述:
本发明是通过以下技术方案实现的:
在底座1上面四周分别固定支撑板3,在左侧支撑板3内的底座1上设置固定楔块2,在固定楔块2上设置稳定块6,支撑板3与稳定块6上分别对应开有通孔,活动楔块9中心开有中空螺纹,螺杆4外套装压缩弹簧5同时穿过支撑板3与稳定块6并丝扣连接活动楔块9,升降楔块7设置在活动楔块9与稳定块6上并连接升降台板8,升降台板8下面四周设置防护罩10并套装在支撑板3外围。本发明的底座1、支撑板3、防护罩10与升降台板8为矩形。
本发明在使用时首先对其高度进行调整,旋转螺杆使活动楔块向外移动,致使升降楔块和升降台板下降,当拱架底部与台阶围岩之间距离允许时将本发明放置在拱架拱脚部位,此时旋转螺杆使升降台板与拱架连接板紧密贴合保持拱架平衡稳定,安装完成后应对拱架底部与本发明进行包裹覆盖,然后进行混凝土喷射施工,喷射施工完成后反向旋转螺杆,取出本发明备用。
Claims (3)
1.隧道初期支护稳定拱架可调式支垫设备,其特征在于:是在底座(1)上面四周分别固定支撑板(3),在左侧支撑板(3)内的底座(1)上设置固定楔块(2),在固定楔块(2)上设置稳定块(6),支撑板(3)与稳定块(6)上分别对应开有通孔,活动楔块(9)中心开有中空螺纹,螺杆(4)外套装压缩弹簧(5)同时穿过支撑板(3)与稳定块(6)并丝扣连接活动楔块(9),升降楔块(7)设置在活动楔块(9)与稳定块(6)上并连接升降台板(8),升降台板(8)下面四周设置防护罩(10)并套装在支撑板(3)外围。
2.根据权利要求1所述的隧道初期支护稳定拱架可调式支垫设备,其特征在于:其底座(1)、支撑板(3)、防护罩(10)与升降台板(8)为矩形或圆柱形。
3.根据权利要求2所述的隧道初期支护稳定拱架可调式支垫设备,其特征在于:其底座(1)、支撑板(3)、防护罩(10)与升降台板(8)为矩形。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010840594.2A CN111878124A (zh) | 2020-08-20 | 2020-08-20 | 隧道初期支护稳定拱架可调式支垫设备 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010840594.2A CN111878124A (zh) | 2020-08-20 | 2020-08-20 | 隧道初期支护稳定拱架可调式支垫设备 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111878124A true CN111878124A (zh) | 2020-11-03 |
Family
ID=73202981
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010840594.2A Pending CN111878124A (zh) | 2020-08-20 | 2020-08-20 | 隧道初期支护稳定拱架可调式支垫设备 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111878124A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113187519A (zh) * | 2021-06-01 | 2021-07-30 | 重庆大学 | 一种控制隧道开挖围岩体变形的可变预应力支护方法 |
CN113217040A (zh) * | 2021-06-01 | 2021-08-06 | 重庆大学 | 一种控制隧道开挖围岩体变形的可变预应力支护装置 |
-
2020
- 2020-08-20 CN CN202010840594.2A patent/CN111878124A/zh active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113187519A (zh) * | 2021-06-01 | 2021-07-30 | 重庆大学 | 一种控制隧道开挖围岩体变形的可变预应力支护方法 |
CN113217040A (zh) * | 2021-06-01 | 2021-08-06 | 重庆大学 | 一种控制隧道开挖围岩体变形的可变预应力支护装置 |
CN113187519B (zh) * | 2021-06-01 | 2023-03-28 | 重庆大学 | 一种控制隧道开挖围岩体变形的可变预应力支护方法 |
CN113217040B (zh) * | 2021-06-01 | 2023-03-28 | 重庆大学 | 一种控制隧道开挖围岩体变形的可变预应力支护装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105863362B (zh) | 一种用于倾斜输电铁塔的纠偏装置 | |
CN111878124A (zh) | 隧道初期支护稳定拱架可调式支垫设备 | |
CN103938875A (zh) | 单层弦支穹顶地面单体张拉提升施工方法 | |
CN102080357A (zh) | 钢管墩贝雷梁现浇支架整体落梁装置及方法 | |
CN112196582A (zh) | 一种强震深埋软岩地层隧道严重大变形控制方法 | |
CN211258665U (zh) | 一种煤矿用巷道临时支护装置 | |
CN204266132U (zh) | 采用d型梁的铁路框架墩横梁 | |
CN204112242U (zh) | 一种钢管混凝土桁架拱桥吊杆更换专用工具吊杆系统 | |
CN110645022A (zh) | 一种联络通道自锚式模板支架系统及施工方法 | |
CN212428875U (zh) | 隧道初期支护稳定拱架可调式支垫设备 | |
CN105625463A (zh) | 半移动破碎站的基础结构及基础施工方法 | |
CN102296959B (zh) | 电动迈步式竖井模板支护装置 | |
CN215170074U (zh) | 一种隧道初期支护换拱支撑结构 | |
CN206015523U (zh) | 独立式索塔内置钢锚梁精确定位装置 | |
CN113216015B (zh) | 高架桥顶升承台墩柱升级结构的施工方法 | |
CN214362897U (zh) | 一种可重复利用的梁格体系桥纵梁安装及调整平台结构 | |
CN101565953A (zh) | 灌注桩静载试验中桩头的固定方法 | |
CN210622366U (zh) | 一种受损钢筋混凝土柱体的托换处理装置 | |
CN111005324B (zh) | 一种装配式节段箱梁无支架悬吊与锁定施工工法 | |
CN203383563U (zh) | 一种快装式通信铁塔 | |
CN205876344U (zh) | 一种公路隧道衬砌表面粘钢加固装置 | |
CN211004227U (zh) | 一种龙门吊组合式梁装置 | |
CN110733975B (zh) | 一种龙门吊组合式梁装置及安装方法 | |
CN219653713U (zh) | 一种重型桩基钢筋笼定位装置 | |
CN214697047U (zh) | 一种建筑施工墙面加固结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |