CN111877063A - 铁路施工用装置 - Google Patents

铁路施工用装置 Download PDF

Info

Publication number
CN111877063A
CN111877063A CN202010791856.0A CN202010791856A CN111877063A CN 111877063 A CN111877063 A CN 111877063A CN 202010791856 A CN202010791856 A CN 202010791856A CN 111877063 A CN111877063 A CN 111877063A
Authority
CN
China
Prior art keywords
supporting
nut
sleeper
rolling unit
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010791856.0A
Other languages
English (en)
Other versions
CN111877063B (zh
Inventor
那玉金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010791856.0A priority Critical patent/CN111877063B/zh
Publication of CN111877063A publication Critical patent/CN111877063A/zh
Application granted granted Critical
Publication of CN111877063B publication Critical patent/CN111877063B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/16Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

本发明公开了一种铁路施工用装置,包括多个滚动单元组,每个滚动单元组包括两个升降座和一个滚动轴,两个升降座分别通过螺纹连接在轨枕一端相邻的两个轨枕螺栓上,所述滚动轴通过两端部设有的轴承架设在两个升降座之间,在多个滚动单元组形成的有坡度的支撑平面上转运钢轨。其有益技术效果是:在多个滚动单元组形成的有坡度的支撑面上转运钢轨,钢轨利用斜坡可以轻松的转移到施工现场,具有使铁路检修换轨加快施工进度、减少运输成本、降低劳动强度、省工省时的特点。

Description

铁路施工用装置
技术领域
本发明涉及铁路检修技术领域,尤其是一种铁路施工用装置。
背景技术
在铁路检修换轨施工中,转运钢轨是一项重要工作内容。有些施工项目由于地形地貌原因,例如矿井、隧道、桥梁等,大型装载机不能将钢轨运达施工现场,或者只能将钢轨卸在较远的位置,这就需要将钢轨转运到准确位置。现有技术中,多为使用一些简单器具和工具转运钢轨,需要施工人员多,劳动强度高。因此,利用工地现场条件因地制宜的转运钢轨,是节省劳动力,提高施工效率的有效途径。
发明内容
本发明所要解决的技术问题是提供一种铁路施工用装置,可以在有坡度的支撑平面上转运钢轨,具有加快施工进度、减少运输成本、降低劳动强度、省工省时的特点。
为解决上述技术问题,本发明所采用的技术方案是:一种铁路施工用装置,包括多个滚动单元组, 每个滚动单元组包括两个升降座和一个滚动轴,两个升降座分别通过螺纹连接在轨枕一端相邻的两个轨枕螺栓上,所述滚动轴通过两端部设有的轴承架设在两个升降座之间,在多个滚动单元组形成的有坡度的支撑平面上转运钢轨。
上述的一种铁路施工用装置,所述的升降座包括支撑螺母和支撑块;所述支撑螺母内设有通孔,所述通孔设有与轨枕螺栓配套的内螺纹,支撑螺母的下部外周面设有外六角形面,支撑螺母的上部为圆筒,支撑螺母与轨枕螺栓配合连接,所述支撑块的底面设有第一盲孔并套装在圆筒上,在支撑块的上部设有U形槽,所述滚动轴通过两端的轴承架设在相邻的两个支撑块的U形槽内。
上述的一种铁路施工用装置, 所述的升降座包括支撑螺母和支撑块;所述支撑螺母内设有第二盲孔,所述第二盲孔设有与轨枕螺栓配套的内螺纹, 支撑螺母的下部外周面设有外六角形面,支撑螺母的上部为圆顶,支撑螺母与轨枕螺栓配合连接,所述支撑块的底面设有第一盲孔并套装在圆顶上,在支撑块的上部设有U形槽,所述滚动轴通过两端的轴承架设在相邻的两个支撑块的U形槽内。
上述的一种铁路施工用装置,所述U形槽内设有轴承限位槽,所述滚动轴上设有两个钢轨限位环。
本发明提供的一种铁路施工用装置,设置包括多个滚动单元组,每个滚动单元组包括两个升降座和一个滚动轴,两个升降座分别通过螺纹连接在轨枕一端相邻的两个轨枕螺栓上,所述滚动轴通过两端部设有的轴承架设在两个升降座之间,在多个滚动单元组形成的有坡度的支撑面上转运钢轨。本发明的有益技术效果是:在多个滚动单元组形成的有坡度的支撑面上转运钢轨,钢轨利用斜坡可以轻松的转移到施工现场,具有使铁路检修换轨加快施工进度、减少运输成本、降低劳动强度、省工省时的特点。
附图说明
图1为本发明中实施例一的结构示意图:
图2为图1的俯视图;
图3为图1中支撑块的结构示意图;
图4为图3的俯视图;
图5为本发明的使用结构示意图;
图6为图5的俯视图;
图7为本发明中实施例二的结构示意图。
其中:1、支撑螺母;2、外六角形面;3、圆筒;4、支撑块;5、U形槽;6、轴承;7、滚动轴;8、第一盲孔;9、通孔;10、轴承限位槽;11、钢轨;12、轨枕螺栓;13、轨枕;14、第二盲孔;15、钢轨限位环;16、圆顶。
具体实施方式
为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明的一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动的前提下所获得的所有其他实施例,都属于本发明保护的范围。
如图1~7所示,本发明的实施例如下:
实施例一:(见图1-6)一种铁路施工用装置,包括多个滚动单元组, 每个滚动单元组包括两个升降座和一个滚动轴7,两个升降座分别通过螺纹连接在轨枕13一端相邻的两个轨枕螺栓12上,所述滚动轴7通过两端部设有的轴承6架设在两个升降座之间,在多个滚动单元组形成的有坡度的支撑平面上转运钢轨。所述的升降座包括支撑螺母1和支撑块4;所述支撑螺母1内设有通孔9,所述通孔9设有与轨枕螺栓12配套的内螺纹,支撑螺母1的下部外周面设有外六角形面2,支撑螺母1的上部为圆筒3,支撑螺母1与轨枕螺栓12配合连接,所述支撑块4的底面设有第一盲孔8并套装在圆筒3上,在支撑块4的上部设有U形槽5,所述滚动轴7通过两端的轴承6架设在相邻的两个支撑块4的U形槽5内。所述U形槽5内设有轴承限位槽10,所述滚动轴7上设有两个钢轨限位环15。本实施例的使用方法:一,在各轨枕13相同端的轨枕螺栓12上连接支撑螺母1,把支撑块4放在支撑螺母1上,使第一盲孔8套装在圆筒3上,把滚动轴7架设在两个相邻支撑块4的U形槽5上,注意要使轴承6进入轴承限位槽10内。二,用扳手调整支撑螺母1的高度,使滚动轴7保持水平。三,用扳手调整各滚动单元的高度,使各滚动单元组形成带有坡度的支撑平面。四,把钢轨11放到滚动轴7上,只需一两个人轻轻推动钢轨11即可前行。五,钢轨11到达第二个支撑平面时停止前进,用千斤顶将钢轨11前端部顶起并落在第二个支撑平面的起始滚动单元上,用扳手调整各滚动单元的高度,使各滚动单元组形成第二个带有坡度的支撑平面,可以推动钢轨11继续前行。轴承限位槽10的作用是防止轴承6移位,使滚动轴7稳定转动。钢轨限位环15可以防止钢轨在移动时产生偏移,保证钢轨直行。
实施例二:(见图7)一种铁路施工用装置,包括多个滚动单元组, 每个滚动单元组包括两个升降座和一个滚动轴7,两个升降座分别通过螺纹连接在轨枕13一端相邻的两个轨枕螺栓12上,所述滚动轴7通过两端部设有的轴承6架设在两个升降座之间,在多个滚动单元组形成的有坡度的支撑平面上转运钢轨。所述的升降座包括支撑螺母1和支撑块4;所述支撑螺母1内设有第二盲孔14,所述第二盲孔14设有与轨枕螺栓12配套的内螺纹, 支撑螺母1的下部外周面设有外六角形面2,支撑螺母1的上部为圆顶16,支撑螺母1与轨枕螺栓11配合连接,所述支撑块4的底面设有第一盲孔8并套装在圆顶16上,在支撑块4的上部设有U形槽5,所述滚动轴7通过两端的轴承6架设在相邻的两个支撑块4的U形槽5内。所述U形槽5内设有轴承限位槽10,所述滚动轴7上设有两个钢轨限位环15。本实施例的使用方法与实施例一的不同是:由于支撑螺母1的底面设有第二盲孔14,圆顶16可以防止支撑螺母1旋转过低,使轨枕螺栓11顶起支撑块4,从而保证支撑块4始终在安全稳定的高度位置上。
据上述说明书的揭示和教导,本发明所属领域的技术人员还可以对上述实施方式进行适当的变更和修改。因此,本发明并不局限于上面揭示和描述的具体实施方式,对本发明的一些修改和变更也应当落入本发明的权利要求的保护范围内。此外,尽管本说明书中使用了一些特定的术语,但这些术语只是为了方便说明,并不对本发明构成任何限制。

Claims (4)

1.一种铁路施工用装置,其特征在于:包括多个滚动单元组, 每个滚动单元组包括两个升降座和一个滚动轴(7),两个升降座分别通过螺纹连接在轨枕(13)一端相邻的两个轨枕螺栓(12)上,所述滚动轴(7)通过两端部设有的轴承(6)架设在两个升降座之间,在多个滚动单元组形成的有坡度的支撑平面上转运钢轨。
2.根据权利要求1所述的一种铁路施工用装置,其特征在于:所述的升降座包括支撑螺母(1)和支撑块(4);所述支撑螺母(1)内设有通孔(9),所述通孔(9)设有与轨枕螺栓(12)配套的内螺纹,支撑螺母(1)的下部外周面设有外六角形面(2),支撑螺母(1)的上部为圆筒(3),支撑螺母(1)与轨枕螺栓(12)配合连接,所述支撑块(4)的底面设有第一盲孔(8)并套装在圆筒(3)上,在支撑块(4)的上部设有U形槽(5),所述滚动轴(7)通过两端的轴承(6)架设在相邻的两个支撑块(4)的U形槽(5)内。
3.根据权利要求1所述的一种铁路施工用装置, 其特征在于:所述的升降座包括支撑螺母(1)和支撑块(4);所述支撑螺母(1)内设有第二盲孔(14),所述第二盲孔(14)设有与轨枕螺栓(12)配套的内螺纹, 支撑螺母(1)的下部外周面设有外六角形面(2),支撑螺母(1)的上部为圆顶(16),支撑螺母(1)与轨枕螺栓(11)配合连接,所述支撑块(4)的底面设有第一盲孔(8)并套装在圆顶(16)上,在支撑块(4)的上部设有U形槽(5),所述滚动轴(7)通过两端的轴承(6)架设在相邻的两个支撑块(4)的U形槽(5)内。
4.根据权利要求2或3所述的一种铁路施工用装置, 其特征在于:所述U形槽(5)内设有轴承限位槽(10),所述滚动轴(7)上设有两个钢轨限位环(15)。
CN202010791856.0A 2020-08-08 2020-08-08 铁路施工用装置 Active CN111877063B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010791856.0A CN111877063B (zh) 2020-08-08 2020-08-08 铁路施工用装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010791856.0A CN111877063B (zh) 2020-08-08 2020-08-08 铁路施工用装置

Publications (2)

Publication Number Publication Date
CN111877063A true CN111877063A (zh) 2020-11-03
CN111877063B CN111877063B (zh) 2021-12-21

Family

ID=73211117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010791856.0A Active CN111877063B (zh) 2020-08-08 2020-08-08 铁路施工用装置

Country Status (1)

Country Link
CN (1) CN111877063B (zh)

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2535293A1 (fr) * 1982-10-28 1984-05-04 Socar Procede et installation pour le stockage d'objets a manutention automatisee
CN1364133A (zh) * 1999-07-23 2002-08-14 喷泉专利公司 存放和运输大型容器的设备
CA2435744A1 (en) * 2002-07-23 2004-01-23 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. A method of loading a loading train
CN101718064A (zh) * 2009-11-23 2010-06-02 株洲新通铁路装备有限公司 一种铁路钢轨扣件回收作业车及换轨扣件回收作业方法
ES2387428A1 (es) * 2012-06-01 2012-09-21 Ferrovial Agromán S.A. Soporte provisional para la descarga guiada y la colocación de vías de ferrocarril
CN202809415U (zh) * 2012-10-16 2013-03-20 孙晓伟 铁路道岔整体纵移装置
CN103057886A (zh) * 2013-01-16 2013-04-24 高士甲 一种重力贯通自移式轻便出货集约仓储货架
CN103711049A (zh) * 2013-12-27 2014-04-09 新余钢铁集团有限公司 一种移轨器
CN103835199A (zh) * 2014-02-22 2014-06-04 冯世英 立柱式轨枕临时支撑器的制造方法
CN104878665A (zh) * 2015-06-12 2015-09-02 孙晓伟 铁路道岔整体纵移装置及其纵移方法
CN105307958A (zh) * 2013-03-28 2016-02-03 费拉格有限公司 导轨式输送装置和具有这种输送装置的输送系统
CN206915208U (zh) * 2017-06-22 2018-01-23 上海道宏自动化设备有限公司 重力式输送机构
CN207828715U (zh) * 2017-12-14 2018-09-07 孝感航科机电科技有限公司 一种钢轨拖拉装置
CN109881584A (zh) * 2019-03-04 2019-06-14 中交上海航道局有限公司 一种支架顶托
CN109881583A (zh) * 2019-02-25 2019-06-14 中交上海航道局有限公司 一种可调节倾斜角度的支架顶托
CN209162551U (zh) * 2019-04-19 2019-07-26 孙康 一种可移动式轨道交通铺设钢轨支撑架
CN209178743U (zh) * 2018-09-25 2019-07-30 中铁十六局集团铁运工程有限公司 枕上放散双向小滚筒

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2535293A1 (fr) * 1982-10-28 1984-05-04 Socar Procede et installation pour le stockage d'objets a manutention automatisee
CN1364133A (zh) * 1999-07-23 2002-08-14 喷泉专利公司 存放和运输大型容器的设备
CA2435744A1 (en) * 2002-07-23 2004-01-23 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. A method of loading a loading train
CN101718064A (zh) * 2009-11-23 2010-06-02 株洲新通铁路装备有限公司 一种铁路钢轨扣件回收作业车及换轨扣件回收作业方法
ES2387428A1 (es) * 2012-06-01 2012-09-21 Ferrovial Agromán S.A. Soporte provisional para la descarga guiada y la colocación de vías de ferrocarril
CN202809415U (zh) * 2012-10-16 2013-03-20 孙晓伟 铁路道岔整体纵移装置
CN103057886A (zh) * 2013-01-16 2013-04-24 高士甲 一种重力贯通自移式轻便出货集约仓储货架
CN105307958A (zh) * 2013-03-28 2016-02-03 费拉格有限公司 导轨式输送装置和具有这种输送装置的输送系统
CN103711049A (zh) * 2013-12-27 2014-04-09 新余钢铁集团有限公司 一种移轨器
CN103835199A (zh) * 2014-02-22 2014-06-04 冯世英 立柱式轨枕临时支撑器的制造方法
CN104878665A (zh) * 2015-06-12 2015-09-02 孙晓伟 铁路道岔整体纵移装置及其纵移方法
CN206915208U (zh) * 2017-06-22 2018-01-23 上海道宏自动化设备有限公司 重力式输送机构
CN207828715U (zh) * 2017-12-14 2018-09-07 孝感航科机电科技有限公司 一种钢轨拖拉装置
CN209178743U (zh) * 2018-09-25 2019-07-30 中铁十六局集团铁运工程有限公司 枕上放散双向小滚筒
CN109881583A (zh) * 2019-02-25 2019-06-14 中交上海航道局有限公司 一种可调节倾斜角度的支架顶托
CN109881584A (zh) * 2019-03-04 2019-06-14 中交上海航道局有限公司 一种支架顶托
CN209162551U (zh) * 2019-04-19 2019-07-26 孙康 一种可移动式轨道交通铺设钢轨支撑架

Also Published As

Publication number Publication date
CN111877063B (zh) 2021-12-21

Similar Documents

Publication Publication Date Title
CN102019975B (zh) 台车式柔性输送系统及其应用方法
CN107253675A (zh) 一种自行式塔冠吊机
CN111877063B (zh) 铁路施工用装置
CN204747073U (zh) 一种板带轧机agc液压缸更换运送装置
CN203236194U (zh) 用于堆料机悬臂的铰接销轴机构的更换装置
CN206986752U (zh) 拖拉钢桁梁用滚动小车
CN104724433A (zh) 一种大型设备安装挪运方法及所用的挪运小车
CN104550243B (zh) 大型轧机机架牛腿旋转吊装方法
CN110861872B (zh) 一种双工位卷材转运装置及方法
CN203306614U (zh) 圆钢步进上料台架
RU51099U1 (ru) Передвижная буровая установка
CN201660823U (zh) 草皮运输机
CN217026697U (zh) 用于箱涵顶进施工的可调整滑车
CN212714547U (zh) 一种节段预制梁架设调节装置
CN206483814U (zh) 轧钢机下辊压上减速机的更换装置
CN201505794U (zh) 大厚壁大管道的焊接组对和水平度调整装置
CN212642228U (zh) 一种输电塔整塔移动装置
CN111229844B (zh) 棒材冷床移钢装置及其移钢方法
CN211142825U (zh) 一种普适性简易运梁台车
CN201895202U (zh) 行车车轮更换用支架
CN208195238U (zh) 弹簧调整装置
CN206647058U (zh) 一种带压作业多管油管输送机
CN215853272U (zh) 一种可转弯、且可快速拆装的地铁供电设备运输辅助轮
CN216580490U (zh) 一种适用于大型压力钢管的运输台车装置
CN214733892U (zh) 一种双侧固定式行车梁轨道安装运输装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20211203

Address after: 830026 No. 275, Henan West Road, economic and Technological Development Zone, Urumqi City, Xinjiang Uygur Autonomous Region

Applicant after: CHINA RAILWAY 21 BUREAU GROUP NO.1 ENGINEERING CO.,LTD.

Address before: 068250 Sandaowan village, jingoutun Town, Luanping county, Chengde City, Hebei Province

Applicant before: Na Yujin

GR01 Patent grant
GR01 Patent grant