CN111827073B - 双幅钢箱梁的顶推施工方法 - Google Patents

双幅钢箱梁的顶推施工方法 Download PDF

Info

Publication number
CN111827073B
CN111827073B CN202010747176.9A CN202010747176A CN111827073B CN 111827073 B CN111827073 B CN 111827073B CN 202010747176 A CN202010747176 A CN 202010747176A CN 111827073 B CN111827073 B CN 111827073B
Authority
CN
China
Prior art keywords
pushing
steel box
box girder
cushion block
jacking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010747176.9A
Other languages
English (en)
Other versions
CN111827073A (zh
Inventor
于长彬
贺常松
田波
董健刚
李惠民
张燕军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN202010747176.9A priority Critical patent/CN111827073B/zh
Publication of CN111827073A publication Critical patent/CN111827073A/zh
Application granted granted Critical
Publication of CN111827073B publication Critical patent/CN111827073B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及钢箱梁施工,特别是一种双幅钢箱梁的顶推施工方法。包括如下步骤:A、搭设施工平台;B、顶推设备的安装;C、进行左幅一段钢箱梁的顶推工作,顶推完成后,用液压千斤顶将钢箱梁顶升3厘米至5厘米;D、将顶推垫块置于钢箱梁的下方,回落液压千斤顶,顶推垫块支撑钢箱梁,使顶推垫块受力;E、通过卷扬机将步履式顶推机拉至右幅,重复步骤C和步骤D,进行同段钢箱梁的顶推;F、来回横向移动步履式顶推机,直至整个左右两幅多段钢箱梁顶推完成。本发明通过使用一套步履设备完成了左右幅钢箱梁的顶推工作,本发明施工简单,投入设备少,自由倒换顶推设备左右幅位置,施工效率高。

Description

双幅钢箱梁的顶推施工方法
技术领域
本发明涉及钢箱梁施工,特别是一种双幅钢箱梁的顶推施工方法。
背景技术
在大型连续钢箱梁顶推施工过程中,由于双幅钢箱梁的特殊结构,其宽度大,采用一般的顶推方法,需要投入的顶推设备多,同时施工工序繁琐,施工成本较高,在钢箱梁顶推完成解除时,需要拆除的时间长;同时由于顶推设备的不同步性,容易造成钢箱梁成桥的误差,无法很好的适应连续双幅钢箱梁的顶推工作。
发明内容
本发明旨在解决上述技术问题而提供一种双幅钢箱梁的顶推施工方法,投入设备少,施工效率高。
本发明解决其技术问题采用的技术方案是:
一种双幅钢箱梁的顶推施工方法,包括如下步骤:
A、搭设施工平台
在永久墩的两侧面设置永久性护栏平台;
B、顶推设备的安装
永久墩的顶面设置多个支座垫石,调平钢板放置在支座垫石的上部,调平钢板的前后两端分别设置横向滑道,横向滑道的上部放置步履式顶推机,支座垫石的前后两端分别端设置顶推垫块和液压千斤顶,永久墩中心的一侧设置卷扬机;
C、进行左幅一段钢箱梁的顶推工作,顶推完成后,用液压千斤顶将钢箱梁顶升3厘米至5厘米;
D、将顶推垫块置于钢箱梁的下方,回落液压千斤顶,顶推垫块支撑钢箱梁,使顶推垫块受力;
E、通过卷扬机将步履式顶推机拉至右幅,重复步骤C和步骤D,进行同段钢箱梁的顶推;
F、来回横向移动步履式顶推机,直至整个左右两幅多段钢箱梁顶推完成。
采用上述技术方案的本发明与现有技术相比,有益效果是:
通过使用一套步履设备完成了左右幅钢箱梁的顶推工作;通过使用横向滑道,使步履设备在左右幅钢箱梁间自由倒换位置,减少了顶推设备的投入;通过使用多个顶推垫块支撑钢箱梁,将单个受力点与整体受力相结合,保证钢箱梁的支撑稳定性;本发明施工简单,投入设备少,自由倒换顶推设备左右幅位置,施工效率高。
进一步的,本发明的优化方案是:
顶推垫块的截面为H形,顶推垫块的两侧的翼缘板之间设有多个筋板。
附图说明
图1是本发明实施例的结构示意图;
图2为图1 的侧面图;
图3是本发明实施例的永久墩的墩顶示意图;
图4是本发明实施例的顶推垫块示意图;
图5是本发明实施例的护栏平台侧面图;
图6是本发明实施例的护栏平台平面图
图中:永久墩1;护栏平台2;连接梁2-1;支座垫石3;调平钢板4;横向滑道5;顶推垫块6;筋板6-1;卷扬机7;步履式顶推机8;液压千斤顶9;钢箱梁10。
具体实施方式
下面结合附图和实施例进一步详述本发明。
参见图1、图2,本实施例是一种双幅钢箱梁的顶推施工方法,按如下步骤进行:
A、搭设施工平台
在永久墩1两侧面的上部设置永久性护栏平台2,两侧的永久性护栏平台2通过连接梁2-1连接,永久性护栏平台2用于顶推过程中施工人员提供行走通道(图5、图6所示);
B、顶推设备的安装
永久墩1的顶面设置多个支座垫石3(图3、图4所示),调平钢板4放置在支座垫石3的上部,调平钢板4靠近支座垫石3的前端,调平钢板4的前后前分别设置横向滑道5,横向滑道5的上部放置步履式顶推机8,支座垫石3的前端设置顶推垫块6,顶推垫块6主要用于顶推过程中钢箱梁10的支撑,支座垫石3的后端设置液压千斤顶9,液压千斤顶9竖向设置,永久墩1中心的一侧设置卷扬机7,卷扬机7为步履式顶推机8横向移动提供动力;
C、进行左幅一段钢箱梁10的顶推工作,操作顶推机8,将该段钢箱梁10顶推到位,顶推完成后,用液压千斤顶9将钢箱梁10顶升3厘米至5厘米;
D、将顶推垫块6置于钢箱梁10的下方,回落液压千斤顶9,顶推垫块6支撑钢箱梁10,使顶推垫块6受力;
E、操作卷扬机7将步履式顶推机8拉至右幅,重复步骤C和步骤D,进行同段钢箱梁10的顶推;
F、来回横向移动步履式顶推机8,重复步骤C、步骤D和步骤E直至整个左右两幅多段钢箱梁10全部顶推完成。
以上所述仅为本发明较佳可行的实施例而已,并非因此局限本发明的权利范围,凡运用本发明说明书及附图内容所作的等效结构变化,均包含于本发明的权利范围之内。

Claims (2)

1.一种双幅钢箱梁的顶推施工方法,包括如下步骤:
A、搭设施工平台
在永久墩的侧面设置永久性护栏平台;
B、顶推设备的安装
永久墩的顶面设置多个支座垫石,调平钢板放置在支座垫石的上部,调平钢板的前后两端分别设置横向滑道,横向滑道的上部放置步履式顶推机,支座垫石的前后两端分别端设置顶推垫块和液压千斤顶,永久墩中心的一侧设置卷扬机;
C、进行左幅一段钢箱梁的顶推工作,顶推完成后,用液压千斤顶将钢箱梁顶升3厘米至5厘米;
D、将顶推垫块置于钢箱梁的下方,回落液压千斤顶,顶推垫块支撑钢箱梁,使顶推垫块受力;
E、通过卷扬机将步履式顶推机拉至右幅,重复步骤C和步骤D,进行同段钢箱梁的顶推;
F、来回横向移动步履式顶推机,直至整个左右两幅多段钢箱梁顶推完成。
2.根据权利要求1所述的种双幅钢箱梁的顶推施工方法,其特征在于:顶推垫块的截面为H形,顶推垫块的两侧的翼缘板之间设有多个筋板。
CN202010747176.9A 2020-07-29 2020-07-29 双幅钢箱梁的顶推施工方法 Active CN111827073B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010747176.9A CN111827073B (zh) 2020-07-29 2020-07-29 双幅钢箱梁的顶推施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010747176.9A CN111827073B (zh) 2020-07-29 2020-07-29 双幅钢箱梁的顶推施工方法

Publications (2)

Publication Number Publication Date
CN111827073A CN111827073A (zh) 2020-10-27
CN111827073B true CN111827073B (zh) 2021-08-24

Family

ID=72920448

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010747176.9A Active CN111827073B (zh) 2020-07-29 2020-07-29 双幅钢箱梁的顶推施工方法

Country Status (1)

Country Link
CN (1) CN111827073B (zh)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101200878A (zh) * 2007-12-28 2008-06-18 中铁四局集团第五工程有限公司 连续梁墩顶节段精确定位装置及其精确定位施工工艺
KR100987262B1 (ko) * 2010-03-12 2010-10-12 이희연 교량보수 작업장치
CN101967800A (zh) * 2010-11-17 2011-02-09 中铁二十四局集团有限公司 钢箱梁的架设顶推滑移方法
KR20120127885A (ko) * 2011-05-16 2012-11-26 주식회사 서영엔지니어링 강합성 교량의 레일형 상부슬래브를 전단연결재용 레일을 이용하여 시공하는 압출가설 장치 및 그 공법
CN209039980U (zh) * 2018-08-21 2019-06-28 沈阳嘉奇液压科技有限公司 一种桥梁顶推机
CN209211291U (zh) * 2018-12-07 2019-08-06 中国水利水电第七工程局有限公司 一种钢箱梁牵引式顶推滑移装置
CN209227396U (zh) * 2018-11-26 2019-08-09 合建卡特工业股份有限公司 一种可移动的步履顶推装置
CN209368698U (zh) * 2018-11-28 2019-09-10 中铁上海工程局集团有限公司 一种步履式顶推施工装置
CN110331670A (zh) * 2019-07-30 2019-10-15 中铁上海工程局集团有限公司 等高双箱组合梁结构拼装工艺

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101200878A (zh) * 2007-12-28 2008-06-18 中铁四局集团第五工程有限公司 连续梁墩顶节段精确定位装置及其精确定位施工工艺
KR100987262B1 (ko) * 2010-03-12 2010-10-12 이희연 교량보수 작업장치
CN101967800A (zh) * 2010-11-17 2011-02-09 中铁二十四局集团有限公司 钢箱梁的架设顶推滑移方法
KR20120127885A (ko) * 2011-05-16 2012-11-26 주식회사 서영엔지니어링 강합성 교량의 레일형 상부슬래브를 전단연결재용 레일을 이용하여 시공하는 압출가설 장치 및 그 공법
CN209039980U (zh) * 2018-08-21 2019-06-28 沈阳嘉奇液压科技有限公司 一种桥梁顶推机
CN209227396U (zh) * 2018-11-26 2019-08-09 合建卡特工业股份有限公司 一种可移动的步履顶推装置
CN209368698U (zh) * 2018-11-28 2019-09-10 中铁上海工程局集团有限公司 一种步履式顶推施工装置
CN209211291U (zh) * 2018-12-07 2019-08-06 中国水利水电第七工程局有限公司 一种钢箱梁牵引式顶推滑移装置
CN110331670A (zh) * 2019-07-30 2019-10-15 中铁上海工程局集团有限公司 等高双箱组合梁结构拼装工艺

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
64m双线简支钢桁梁跨高速公路高位顶推施工技术;靳锐勇;《铁道建筑》;20110615;第15-17页 *
大跨度双线铁路钢桁梁跨线施工技术;李 杨;《铁道建筑》;20081115;第34-36页 *
顶推法架设128m双线简支钢桁梁施工技术;梁辉等;《铁道标准设计》;20120620;第54-58页 *

Also Published As

Publication number Publication date
CN111827073A (zh) 2020-10-27

Similar Documents

Publication Publication Date Title
CN109210274B (zh) 顶管管道对接装置及对接方法
CN104512844A (zh) 特大型轧机牌坊横向滑移、垂直液压顶升吊装方法
CN107059511B (zh) 一种可自行移动钢轨的铺设装置
CN110565983A (zh) 一种建筑物顶升移位方法
CN110541582B (zh) 一种步进式建筑平移方法
CN111827073B (zh) 双幅钢箱梁的顶推施工方法
CN111807290A (zh) 大型设备顶升挪移装置及方法
CN203419675U (zh) 用于提梁机的行车轨道
CN209907206U (zh) 一种哑铃形拱肋安装的辅助装置
CN214362897U (zh) 一种可重复利用的梁格体系桥纵梁安装及调整平台结构
CN213681775U (zh) 一种新型、高效适用于大跨度超重梁的移梁施工系统
CN110359492B (zh) 一种大型预制管廊的施工方法
CN210217757U (zh) 一种超长衬砌台车
CN110645020B (zh) 一种施工设备行走方法
CN112610014A (zh) 一种用于铁路客站改扩建工程的滑移结构及其施工方法
CN211114958U (zh) 一种步进式建筑平移装置
CN110284428B (zh) 一种用于大吨位钢管支架整体拆除的起落架及施工方法
CN203613465U (zh) 滩涂区分离式桥梁合龙后内侧滑移模架拆除装置
CN218596948U (zh) 一种钢桁梁顶推系统
CN220550458U (zh) 一种限高环境下轨道滑移安装板梁的施工装置
CN217974052U (zh) 一种钢箱梁拼接平台
CN113089448B (zh) 一种用于水泥混凝土铺面板拆除的同步顶升装备
CN220813460U (zh) 一种低净空拼宽桥梁横移临时墩辅助支撑系统
CN112921718B (zh) 轻轨轨道梁连续顶升安装装置及其使用方法
CN218147885U (zh) 一种移动式雨水箱涵外模板安装拆卸台车

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 300000 Shuanggang Township, Jinnan District, Tianjin

Applicant after: CHINA RAILWAY 18TH BUREAU GROUP Co.,Ltd.

Applicant after: THE 2ND ENGINEERING CO., LTD OF CHINA RAILWAY 18TH BUREAU GROUP Co.,Ltd.

Applicant after: China Railway 18th Bureau Group South Engineering Co., Ltd

Address before: 064000 No.14 community, Fengrun District, Tangshan City, Hebei Province (No.8, Guanghua Road)

Applicant before: THE 2ND ENGINEERING CO., LTD OF CHINA RAILWAY 18TH BUREAU GROUP Co.,Ltd.

Applicant before: CHINA RAILWAY 18TH BUREAU GROUP Co.,Ltd.

Applicant before: China Railway 18th Bureau Group South Engineering Co., Ltd

GR01 Patent grant
GR01 Patent grant