CN111573531A - 塔吊标准节与预埋独立塔腿之间合缝的处理方法 - Google Patents
塔吊标准节与预埋独立塔腿之间合缝的处理方法 Download PDFInfo
- Publication number
- CN111573531A CN111573531A CN202010479303.1A CN202010479303A CN111573531A CN 111573531 A CN111573531 A CN 111573531A CN 202010479303 A CN202010479303 A CN 202010479303A CN 111573531 A CN111573531 A CN 111573531A
- Authority
- CN
- China
- Prior art keywords
- tower
- tower crane
- standard section
- leg
- steel medium
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B24—GRINDING; POLISHING
- B24B—MACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
- B24B1/00—Processes of grinding or polishing; Use of auxiliary equipment in connection with such processes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C2700/00—Cranes
- B66C2700/03—Cranes with arms or jibs; Multiple cranes
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明塔吊标准节与预埋独立塔腿之间合缝的处理方法包括:将塔吊标准节的底面与预埋独立式塔腿的顶面涂有颜色标记料;将塔吊标准节的底面对准预埋独立式塔腿的顶面;测量之间的缝隙,将厚度为上述最大缝隙的钢媒介垫板嵌入到上述缝隙之间;在粘有颜色标记料的钢媒介垫板的上、下两个接触面上进行打磨,重复上述打磨,直到钢媒介垫板两面与塔腿顶面及标准节底面紧密贴合,确保塔吊标准节底面、预埋独立式塔腿顶面与钢媒介垫板两个接触面无缝隙;将打磨好的钢媒介垫板嵌入塔吊标准节底面与预埋独立式塔腿顶面之间,将连接板分别固定在塔吊标准节和预埋独立式塔腿的两侧,用螺栓和螺母将塔吊标准节和预埋独立式塔腿连接在一起。
Description
技术领域
本发明涉及了一种塔吊标准节与预埋独立塔腿之间合缝的处理方法。
背景技术
现设计该造粒厂房外设一座63型塔吊,设计高度40m,20m处设置一道附着。由于此63型塔吊地栓为预埋独立式塔腿,在安装固定后施工混凝土发生扰动,独立式塔腿发生倾斜,在安装标准节时发现标准节与塔腿高强螺栓连接处固定后,标准节与塔腿之间不能整体合缝。
发明内容
本申请的发明目的是解决现有的标准节与塔腿之间不能整体合缝的问题,而提供一种塔吊标准节与预埋独立塔腿之间合缝的处理方法。
为了完成本申请发明目的,本申请采用以下技术方案:
本发明的一种塔吊标准节与预埋独立塔腿之间合缝的处理方法,其中:它包括以下步骤:
(1)、将塔吊标准节的底面与预埋独立式塔腿的顶面涂有颜色标记料;
(2)、用吊车将塔吊标准节吊起,将塔吊标准节的底面对准预埋独立式塔腿的顶面;
(3)、测量塔吊标准节底面与预埋独立式塔腿顶面之间的缝隙,将厚度为上述最大缝隙的钢媒介垫板嵌入到塔吊标准节底面与预埋独立式塔腿顶面之间;
(4)、钢媒介垫板从塔吊标准节底面与预埋独立式塔腿顶面之间取出,观察钢媒介垫板的上、下两个与塔吊标准节底面与预埋独立式塔腿顶面的接触面,在粘有颜色标记料的钢媒介垫板的上、下两个接触面上进行打磨,打磨掉颜色标记料;
(5)、将打磨后的钢媒介垫板再次嵌入到塔吊标准节底面与预埋独立式塔腿顶面之间;重复步骤(4),直到取出钢媒介垫板不粘有颜色标记料为止,确保塔吊标准节底面、预埋独立式塔腿顶面与钢媒介垫板两个接触面紧密结合,无缝隙;
(6)、将打磨好的钢媒介垫板嵌入塔吊标准节底面与预埋独立式塔腿顶面之间,吊车将塔吊标准节放置在钢媒介垫板上,将连接板分别固定在塔吊标准节和预埋独立式塔腿的两侧,用螺栓和螺母将塔吊标准节和预埋独立式塔腿连接在一起。
本发明的一种塔吊标准节与预埋独立塔腿之间合缝的处理方法,其中:所述颜色标记料为朱砂。
本发明的一种塔吊标准节与预埋独立塔腿之间合缝的处理方法具有以下优点:
(1)、采用钢媒介垫板两面打磨的方式,使得钢媒介垫板两面贴合塔吊标准节和预埋独立式塔腿两面的方法,解决了垂直度或者其它原因导致的整体合缝不贴合的技术问题。
(2)、钢媒介垫板采用朱砂标记打磨的方式确保两面打磨的精确性。
(3)、钢媒介垫板的整体不规则打磨形成一个不规则平整度的两向斜面,确保了整个技术的可靠性。
附图说明
图1为本发明的塔吊标准节与预埋独立塔腿之间连接示意图;
图2为图1中的A处的放大示意图。
在图1和图2中,标号1为塔吊标准节;标号2为连接板;标号3为预埋独立式塔腿;标号4为塔吊混凝土基础;标号5为钢媒介垫板。
具体实施方式
如图1和图2所示,本发明的塔吊标准节与预埋独立塔腿之间合缝的处理方法包括以下步骤:
(1)、将塔吊标准节1的底面与预埋独立式塔腿3的顶面涂有朱砂;
(2)、用吊车将塔吊标准节1吊起,将塔吊标准节1的底面对准预埋独立式塔腿3的顶面;
(3)、测量塔吊标准节1底面与预埋独立式塔腿3顶面之间的缝隙,将厚度为上述最大缝隙的钢媒介垫板5嵌入到塔吊标准节1底面与预埋独立式塔腿3顶面之间;
(4)、钢媒介垫板5从塔吊标准节1底面与预埋独立式塔腿3顶面之间取出,观察钢媒介垫板5的上、下两个与塔吊标准节1底面与预埋独立式塔腿3顶面的接触面,在粘有朱砂的钢媒介垫板5的上、下两个接触面上进行打磨,打磨掉朱砂;
(5)、将打磨后的钢媒介垫板5再次嵌入到塔吊标准节1底面与预埋独立式塔腿3顶面之间;重复步骤(4),直到取出钢媒介垫板5不粘有朱砂为止,确保塔吊标准节1底面、预埋独立式塔腿3顶面与钢媒介垫板5两个接触面紧密结合,无缝隙;
(6)、将打磨好的钢媒介垫板5嵌入塔吊标准节1底面与预埋独立式塔腿3顶面之间,吊车将塔吊标准节1放置在钢媒介垫板5上,将连接板2分别固定在塔吊标准节1和预埋独立式塔腿3的两侧,用螺栓和螺母将塔吊标准节1和预埋独立式塔腿3连接在一起。
以上示意性的对本发明及其实施方式进行了描述,该描述没有限制性,附图中所示的也只是本发明的实施方式之一,实际的结构并不局限于此。所以,如果本领域的技术人员受其启示,在不脱离本发明宗旨的情况下,不经创造性地设计出与该技术方案相似的方法及实施例,均应属于本专利的保护范围。
Claims (2)
1.一种塔吊标准节与预埋独立塔腿之间合缝的处理方法,其特征在于:它包括以下步骤:
(1)、将塔吊标准节(1)的底面与预埋独立式塔腿(3)的顶面涂有颜色标记料;
(2)、用吊车将塔吊标准节(1)吊起,将塔吊标准节(1)的底面对准预埋独立式塔腿(3)的顶面;
(3)、测量塔吊标准节(1)底面与预埋独立式塔腿(3)顶面之间的缝隙,将厚度为上述最大缝隙的钢媒介垫板(5)嵌入到塔吊标准节(1)底面与预埋独立式塔腿(3)顶面之间;
(4)、钢媒介垫板(5)从塔吊标准节(1)底面与预埋独立式塔腿(3)顶面之间取出,观察钢媒介垫板(5)的上、下两个与塔吊标准节(1)底面与预埋独立式塔腿(3)顶面的接触面,在粘有颜色标记料的钢媒介垫板(5)的上、下两个接触面上进行打磨,打磨掉颜色标记料;
(5)、将打磨后的钢媒介垫板(5)再次嵌入到塔吊标准节(1)底面与预埋独立式塔腿(3)顶面之间;重复步骤(4),直到取出钢媒介垫板(5)不粘有颜色标记料为止,确保塔吊标准节(1)底面、预埋独立式塔腿(3)顶面与钢媒介垫板(5)两个接触面紧密结合,无缝隙;
(6)、将打磨好的钢媒介垫板(5)嵌入塔吊标准节(1)底面与预埋独立式塔腿(3)顶面之间,吊车将塔吊标准节(1)放置在钢媒介垫板(5)上,将连接板(2)分别固定在塔吊标准节(1)和预埋独立式塔腿(3)的两侧,用螺栓和螺母将塔吊标准节(1)和预埋独立式塔腿(3)连接在一起。
2.如权利要求1所述的塔吊标准节与预埋独立塔腿之间合缝的处理方法,其特征在于:所述颜色标记料为朱砂。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010479303.1A CN111573531A (zh) | 2020-05-29 | 2020-05-29 | 塔吊标准节与预埋独立塔腿之间合缝的处理方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010479303.1A CN111573531A (zh) | 2020-05-29 | 2020-05-29 | 塔吊标准节与预埋独立塔腿之间合缝的处理方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111573531A true CN111573531A (zh) | 2020-08-25 |
Family
ID=72118153
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010479303.1A Pending CN111573531A (zh) | 2020-05-29 | 2020-05-29 | 塔吊标准节与预埋独立塔腿之间合缝的处理方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111573531A (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201896318U (zh) * | 2010-11-24 | 2011-07-13 | 浙江中成建工集团有限公司 | 塔吊基础节与钢格构柱的连接结构 |
EP2481853A1 (de) * | 2011-01-27 | 2012-08-01 | Liebherr-Werk Biberach GmbH | Fundamentverankerung für Arbeitsmaschine |
CN209636847U (zh) * | 2019-03-05 | 2019-11-15 | 中国建筑第二工程局有限公司 | 一种可调节塔吊基础预埋件精确定位工具 |
CN110745718A (zh) * | 2019-09-19 | 2020-02-04 | 珠海鉴安检测技术有限公司 | 一种塔机的纠偏方法 |
CN110926307A (zh) * | 2019-10-29 | 2020-03-27 | 沪东中华造船(集团)有限公司 | 一种调整垫块的厚度测量方法 |
-
2020
- 2020-05-29 CN CN202010479303.1A patent/CN111573531A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201896318U (zh) * | 2010-11-24 | 2011-07-13 | 浙江中成建工集团有限公司 | 塔吊基础节与钢格构柱的连接结构 |
EP2481853A1 (de) * | 2011-01-27 | 2012-08-01 | Liebherr-Werk Biberach GmbH | Fundamentverankerung für Arbeitsmaschine |
CN209636847U (zh) * | 2019-03-05 | 2019-11-15 | 中国建筑第二工程局有限公司 | 一种可调节塔吊基础预埋件精确定位工具 |
CN110745718A (zh) * | 2019-09-19 | 2020-02-04 | 珠海鉴安检测技术有限公司 | 一种塔机的纠偏方法 |
CN110926307A (zh) * | 2019-10-29 | 2020-03-27 | 沪东中华造船(集团)有限公司 | 一种调整垫块的厚度测量方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4702862B1 (ja) | 構造物用高さ調整支承装置および構造物用支承装置の高さ調整工法 | |
CN101275400A (zh) | 大型轧机的安装方法 | |
CN110409317B (zh) | 一种转体球铰及其安装方法 | |
CN102080417B (zh) | 大型t型套筒螺栓分体埋设施工方法 | |
CN110714621A (zh) | 一种预制立柱吊装过程中的毫米级精准定位系统及其方法 | |
CN111573531A (zh) | 塔吊标准节与预埋独立塔腿之间合缝的处理方法 | |
CN113833220B (zh) | 一种预制清水混凝土外墙挂板连接结构的施工方法 | |
CN213297268U (zh) | 应用于建筑物顶升工程的支撑装置 | |
JP4553978B1 (ja) | 高さ調整対応支承装置 | |
CN114164775A (zh) | 一种基于桥梁轨道消缺顶升工艺的精调复旧方法 | |
CN211286754U (zh) | 一种对拉式钢板剪力墙加固施工结构 | |
CN213204195U (zh) | 一种龙门吊基础 | |
CN101428729A (zh) | 屋架与悬挂式天车轨道的连接装置及安装方法 | |
CN213896733U (zh) | 一种桥梁隔震基础 | |
CN212388279U (zh) | 一种卡槽式橡胶地板砖 | |
WO2021082005A1 (zh) | 轨道结构 | |
CN105369897A (zh) | 一种隔震垫的支座 | |
CN205329708U (zh) | 一种弹簧隔振器安装装置 | |
CN111691638A (zh) | 一种重载型气浮地坪的钢板面层结构及方法 | |
CN207109565U (zh) | 一种无极调高测力球型支座 | |
CN207469113U (zh) | 用于加固桥梁支座的施工设备 | |
CN202323875U (zh) | 一种单挡檐球墨铸铁柱壳系船柱 | |
Shiau et al. | Discussion of pot bearing for concrete bridge | |
CN101831856B (zh) | 气垫车用钢板地坪及施工方法 | |
CN210049275U (zh) | 一种用于橇装式往复压缩机组二次灌装的结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200825 |
|
RJ01 | Rejection of invention patent application after publication |