CN111178694A - Improved job shop scheduling display system based on big data algorithm - Google Patents

Improved job shop scheduling display system based on big data algorithm Download PDF

Info

Publication number
CN111178694A
CN111178694A CN201911274888.7A CN201911274888A CN111178694A CN 111178694 A CN111178694 A CN 111178694A CN 201911274888 A CN201911274888 A CN 201911274888A CN 111178694 A CN111178694 A CN 111178694A
Authority
CN
China
Prior art keywords
module
big data
scheduling
workshop
compiling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201911274888.7A
Other languages
Chinese (zh)
Inventor
吴慧
陈虎威
刘振斌
李福乐
尹晓翠
许洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Agricultural University
Original Assignee
Qingdao Agricultural University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Agricultural University filed Critical Qingdao Agricultural University
Priority to CN201911274888.7A priority Critical patent/CN111178694A/en
Publication of CN111178694A publication Critical patent/CN111178694A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an improved job shop scheduling display system based on big data algorithm, comprising a shop plan scheduling module and a big data acquisition module, wherein the output end of the shop plan scheduling module is the big data acquisition module, the shop plan scheduling module is electrically connected with the big data acquisition module, and the output end of the big data acquisition module is a scheduling scheme compiling module, the big data acquisition module is added in the system, so that the whole production shop can collect and summarize each information through the big data acquisition module and carry out classification processing, then the classified data is subjected to report generation, then the scheduling scheme is drawn according to the compiled report, and then the report after drawing can be adopted one step by one step according to the scheme during production, this may make scheduling more reasonable.

Description

Improved job shop scheduling display system based on big data algorithm
Technical Field
The invention belongs to the technical field related to a workshop scheduling system, and particularly relates to an improved job workshop scheduling display system based on a big data algorithm.
Background
The job shop scheduling plays an important role in optimizing configuration and scientific operation of resources, is a key for enterprises to realize stable and efficient operation of manufacturing systems, and is mainly applied to emergency command centers, duty rooms, emergency centers, mines, emergency vehicles and the like. The touch screen dispatching desk is configured, so that a user can carry out emergency notification and command issuing in the fastest and most effective way, and the state of a notified object can be visually displayed.
The prior workshop scheduling display system technology has the following problems: the existing workshop scheduling display system generally schedules according to field conditions through a dispatcher when scheduling, and does not have a scheduling scheme which is timely compiled on the spot according to various information acquired by big data, so that a source cannot be well found to be radically treated when problems occur in actual scheduling, and the problem that the scheduling cannot work quickly is possibly caused.
Disclosure of Invention
The invention aims to provide an improved job shop scheduling display system based on a big data algorithm, so as to solve the problem that the subsequent work cannot be well carried out due to the fact that the conventional shop scheduling display system proposed in the background art cannot comprehensively summarize according to big data.
In order to achieve the purpose, the invention provides the following technical scheme: an improved job shop scheduling display system based on big data algorithm comprises a shop planning scheduling module and a big data acquisition module, wherein the output end of the shop planning scheduling module is a big data acquisition module, the shop planning scheduling module is electrically connected with the big data acquisition module, the output end of the big data acquisition module is a scheduling scheme compiling module, the big data acquisition module is electrically connected with the scheduling scheme compiling module, the output end of the scheduling scheme compiling module is a workshop schedule inquiring module, the scheduling scheme compiling module is electrically connected with the workshop schedule inquiring module, the output end of the workshop schedule inquiring module is a material shortage module, the material shortage module is provided with two output ends, one of the material shortage modules is determined to be a material reporting shortage module, and the other negative output end of the material shortage module is a damage module, whether damage the module and be provided with two outputs altogether, whether damage one of them definite output of module is the organizational maintenance module, whether damage the module whether the other negative output of module is the productivity not enough module, whether the productivity is not enough the module and be provided with two outputs altogether, whether the productivity is not enough one of them definite output of module is the organizational progress adjustment module, whether the productivity is not enough the other negative output of module is for carrying out workshop scheduling work module, whether the productivity is not enough the module and carry out workshop scheduling work module electric connection.
Preferably, the scheduling scheme compiling module comprises a compiling output and input module, a report generating and analyzing module, a measure taking module for a workshop master, a planner progress adjusting module and a production scheduler scheduling module, wherein the output end of the compiling output and input module is the report generating and analyzing module, the output end of the report generating and analyzing module is the measure taking module for the workshop master, the output end of the measure taking module for the workshop master is the planner progress adjusting module, the output end of the planner progress adjusting module is the production scheduler scheduling module, and the scheduling scheme compiling module is electrically connected with the workshop progress inquiring module.
Preferably, the inside of the big data acquisition module is provided with a plurality of sub-modules, and the plurality of sub-modules inside the big data acquisition module are respectively a model optimization sub-module, a result evaluation sub-module, a decision support sub-module, a big data analysis sub-module and an application feedback sub-module.
Preferably, the report starved article generation module generates a report of starved articles when reporting is performed, the report starved article generation module reports to a production scheduler office for reporting, and the report starved article generation module is responsible for distributing starved articles.
Preferably, the organization maintenance module needs to generate a report of equipment maintenance when maintenance is performed, the organization maintenance module reports to a production dispatcher office for reporting, and the organization maintenance module is responsible for maintaining damaged equipment.
Preferably, the scheduling scheme compiling module receives data from the big data acquisition module, the scheduling scheme compiling module sends the received data to the interior of the workshop progress inquiring module, and the scheduling scheme compiling module and the workshop progress inquiring module are sending and receiving ends.
Preferably, the scheduling scheme compiling module is used for planning to execute, executing to check and checking to improve, and the scheduling scheme compiling module and the workshop schedule inquiring module are compared with each other to improve.
Preferably, the report generated by the compiling output and input module needs to be stored in a database, the compiling output and input module needs to be opened and browsed only by approval of a master of a workshop, and the compiling output and input module is divided into a document file and a data file.
Compared with the prior art, the invention provides an improved job shop scheduling display system based on a big data algorithm, which has the following beneficial effects:
according to the invention, the big data acquisition module is added in the system, so that the big data acquisition module can be used for acquiring and summarizing all information in the whole production workshop and classifying the information, then the classified data is subjected to report generation, then the scheduling scheme is drawn according to the compiled report, and then the report after drawing can be used for acquiring the information in one step according to the scheme during production, so that the scheduling can be more reasonable, and the problem that the subsequent work cannot be well developed due to the fact that the conventional workshop scheduling display system cannot summarize the whole aspect of the big data is solved.
Drawings
FIG. 1 is a schematic diagram of a workshop scheduling display system according to the present invention;
FIG. 2 is a block diagram illustrating a scheduling scheme of the present invention;
in the figure: 1. a workshop planning and scheduling module; 2. a big data acquisition module; 3. a scheduling scheme module is compiled; 31. compiling an output and input module; 32. a report generation and analysis module; 33. a measure module is adopted by a master in the workshop; 34. a planner adjustment progress module; 35. a production dispatcher scheduling module; 4. a workshop progress inquiry module; 5. whether a material shortage module exists; 6. reporting a material shortage module; 7. organizing a maintenance module; 8. an organization schedule adjustment module; 9. a workshop scheduling work module is carried out; 10. a productivity deficiency module; 11. whether the module is damaged.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides a technical solution: an improved job shop scheduling display system based on a big data algorithm comprises a shop planning scheduling module 1 and a big data acquisition module 2, wherein the output end of the shop planning scheduling module 1 is the big data acquisition module 2, a plurality of sub-modules are arranged inside the big data acquisition module 2, the plurality of sub-modules inside the big data acquisition module 2 are respectively a model optimization sub-module, a result evaluation sub-module, a decision support sub-module, a big data analysis sub-module and an application feedback sub-module, the shop planning scheduling module 1 is electrically connected with the big data acquisition module 2, the output end of the big data acquisition module 2 is a scheduling scheme compiling module 3, the scheduling scheme compiling module 3 receives data from the big data acquisition module 2, the scheduling scheme compiling module 3 sends the received data to the interior of an inquiry shop progress module 4, and therefore the data can be better sent and received, the scheduling scheme compiling module 3 and the workshop progress inquiring module 4 are sending and receiving terminals, the scheduling scheme compiling module 3 comprises a compiling output and input module 31, a report generating and analyzing module 32, a workshop master taking measure module 33, a planner progress adjusting module 34 and a production dispatcher scheduling module 35, the output end of the compiling output and input module 31 is the report generating and analyzing module 32, a report generated by the compiling output and input module 31 needs to be stored in a database, the compiling output and input module 31 can be opened and browsed only by the approval of the workshop master, so that the compiling output and input module 31 has better confidentiality, the work of confidentiality can be better performed, the compiling output and input module 31 is divided into a document file and a data file, the output end of the report generating and analyzing module 32 is the workshop master taking measure module 33, an output of the plant owner action taken module 33 is a planner adjustment progress module 34,
an improved job shop scheduling display system based on big data algorithm comprises a production scheduler scheduling module 35 as an output end of a planner progress adjusting module 34, a scheduling scheme compiling module 3 electrically connected with a workshop schedule inquiring module 4, a big data collecting module 2 electrically connected with the scheduling scheme compiling module 3, a workshop schedule inquiring module 4 as an output end of the scheduling scheme compiling module 3, a workshop schedule inquiring module 4 electrically connected with the scheduling scheme compiling module 3, a material shortage inquiring module 5 as an output end of the workshop schedule inquiring module 4, two output ends of the material shortage inquiring module 5, a material shortage reporting module 6 as one output end of the material shortage module 5, a report form of material shortage objects required to be generated when the material shortage reporting module 6 reports, and the material shortage reporting module 6 reports to the production scheduler office for reporting, the material shortage reporting module 6 is responsible for distributing materials lacking, whether the other negative output end of the material shortage module 5 is the damaged module 11 or not, the damaged module 11 is provided with two output ends, whether one of the determined output ends of the damaged module 11 is the organization maintenance module 7 or not, the organization maintenance module 7 needs to generate a report of maintenance equipment when maintenance is carried out, the organization maintenance module 7 reports to a production dispatcher office for reporting, so that better work can be carried out, the organization maintenance module 7 is responsible for maintaining the damaged equipment, the scheduling scheme compiling module 3 is scheduled to be executed, executed to be checked and checked to be improved, so that the scheme can be compiled better under the action of the scheduling scheme compiling module 3, and the scheduling scheme compiling module 3 is compared with the workshop schedule inquiring module 4 for improvement, whether damage module 11's another negative output is whether insufficient productivity module 10, whether insufficient productivity module 10 is provided with two outputs altogether, whether insufficient productivity module 10's one of them confirms that the output is organization progress adjustment module 8, whether insufficient productivity module 10's another negative output is for carrying out workshop scheduling work module 9, whether insufficient productivity module 10 with carry out workshop scheduling work module 9 electric connection.
The working principle and the using process of the invention are as follows: when a system for scheduling a workshop is adopted, the big data acquisition module 2 is firstly used for acquiring and managing information of various types of work in the whole workshop, the big data acquisition module 2 is added in the system, so that the big data acquisition module 2 can be used for acquiring and summarizing the information in the whole workshop and carrying out classification processing, then the classified data is subjected to report generation, then the scheduling scheme is drawn according to the formulated report, then the report after drawing can be used for carrying out one-step acquisition according to the scheme in the production process, so that the scheduling can be more reasonable, then the scheduling scheme is formulated through the scheduling scheme formulation module 3, the output and input module 31 is formulated firstly, and the report generation and analysis module 32 is carried out according to the formulation output and input module 31, then the data is sent to the interior of a workshop master taking measure module 33 to establish a scheduling scheme, then the data is further sent to a production scheduler scheduling module 35 to be implemented, then a workshop progress module 4 is inquired, whether the material shortage exists is checked according to a compiled report corresponding to the workshop progress, if the material shortage exists, the data is reported to a workshop master office through a reporting material shortage module 6 to be reported, if the material shortage does not exist, whether the damaged equipment exists is detected, if the damaged equipment exists, the equipment is maintained and detected through an organization maintenance module 7, if the damaged equipment does not exist, whether the productivity is insufficient is checked, if the productivity is insufficient, the scheduling work can be carried out through a workshop scheduling work module 9, and therefore the system is used.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides an improved job shop scheduling display system based on big data algorithm, includes workshop planning scheduling module (1) and big data acquisition module (2), its characterized in that: the output end of the workshop planning and scheduling module (1) is a big data acquisition module (2), the workshop planning and scheduling module (1) is electrically connected with the big data acquisition module (2), the output end of the big data acquisition module (2) is a scheduling scheme compiling module (3), the big data acquisition module (2) is electrically connected with the scheduling scheme compiling module (3), the output end of the scheduling scheme compiling module (3) is a workshop schedule inquiring module (4), the scheduling scheme compiling module (3) is electrically connected with the workshop schedule inquiring module (4), the output end of the workshop schedule inquiring module (4) is a material shortage inquiring module (5), the material shortage inquiring module (5) is provided with two output ends, one of the material shortage inquiring module (5) determines that the output end is a material shortage reporting module (6), whether the other negative output end of the material shortage module (5) is the damaged module (11), whether the damaged module (11) is provided with two output ends, whether one of the determined output ends of the damaged module (11) is the organization maintenance module (7), whether the other negative output end of the damaged module (11) is the insufficient productivity module (10), whether the insufficient productivity module (10) is provided with two output ends, whether one of the determined output ends of the insufficient productivity module (10) is the organization progress adjustment module (8), whether the other negative output end of the insufficient productivity module (10) is the workshop scheduling work module (9), and whether the insufficient productivity module (10) is electrically connected with the workshop scheduling work module (9).
2. The improved job shop scheduling display system based on big data algorithm according to claim 1, wherein: the system is characterized in that the scheduling scheme compiling module (3) comprises a compiling output and input module (31), a generating and analyzing report module (32), a workshop master taking measure module (33), a planner adjusting progress module (34) and a production scheduler scheduling module (35), the output end of the compiling output and input module (31) is the generating and analyzing report module (32), the output end of the generating and analyzing report module (32) is the workshop master taking measure module (33), the output end of the workshop master taking measure module (33) is the planner adjusting progress module (34), the output end of the planner adjusting progress module (34) is the production scheduler scheduling module (35), and the dispatching scheme compiling module (3) is electrically connected with the workshop inquiring progress module (4).
3. The improved job shop scheduling display system based on big data algorithm according to claim 1, wherein: the big data acquisition module (2) is internally provided with a plurality of sub-modules, and the plurality of sub-modules in the big data acquisition module (2) are respectively a model optimization sub-module, a result evaluation sub-module, a decision support sub-module, a big data analysis sub-module and an application feedback sub-module.
4. The improved job shop scheduling display system based on big data algorithm according to claim 1, wherein: the report starved article generation method comprises the steps that a report form of starved articles needs to be generated when reporting is carried out by the report starved article generation module (6), the report starved article generation module (6) reports to a production dispatcher office for reporting, and the report starved article generation module (6) is responsible for distributing starved articles.
5. The improved job shop scheduling display system based on big data algorithm according to claim 1, wherein: the organization maintenance module (7) needs to generate a report form for maintaining equipment when maintenance is carried out, the organization maintenance module (7) reports to a production dispatcher office for reporting, and the organization maintenance module (7) is responsible for maintaining damaged equipment.
6. The improved job shop scheduling display system based on big data algorithm according to claim 1, wherein: the scheduling scheme compiling module (3) receives data from the big data acquisition module (2), the scheduling scheme compiling module (3) sends the received data to the interior of the workshop progress inquiring module (4), and the scheduling scheme compiling module (3) and the workshop progress inquiring module (4) are mutually a sending and receiving end.
7. The improved job shop scheduling display system based on big data algorithm according to claim 1, wherein: the scheduling scheme compiling module (3) is used for planning to execute, executing to check and checking to improve, and the scheduling scheme compiling module (3) and the workshop schedule inquiring module (4) are compared with each other to improve.
8. The improved job shop scheduling display system based on big data algorithm according to claim 2, wherein: the report form generated by the compiling output and input module (31) needs to be stored in a database, the compiling output and input module (31) can be opened and browsed only by the approval of a master in a workshop, and the compiling output and input module (31) is divided into a document file and a data file.
CN201911274888.7A 2019-12-12 2019-12-12 Improved job shop scheduling display system based on big data algorithm Withdrawn CN111178694A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911274888.7A CN111178694A (en) 2019-12-12 2019-12-12 Improved job shop scheduling display system based on big data algorithm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911274888.7A CN111178694A (en) 2019-12-12 2019-12-12 Improved job shop scheduling display system based on big data algorithm

Publications (1)

Publication Number Publication Date
CN111178694A true CN111178694A (en) 2020-05-19

Family

ID=70647250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911274888.7A Withdrawn CN111178694A (en) 2019-12-12 2019-12-12 Improved job shop scheduling display system based on big data algorithm

Country Status (1)

Country Link
CN (1) CN111178694A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100217418A1 (en) * 2009-02-25 2010-08-26 Siemens Aktiengesellschaft Method and system for scheduling a manufacturing process
CN204347599U (en) * 2015-01-21 2015-05-20 河南中维电子科技有限公司 A kind of industrial processes Control management system
CN107422714A (en) * 2017-09-22 2017-12-01 山东华兴纺织集团有限公司 Ring ingot intelligence spinning management system and management method
CN107679820A (en) * 2017-08-30 2018-02-09 深圳市易联智道科技有限公司 Construction Schedule management method
CN107679727A (en) * 2017-09-26 2018-02-09 武汉名广科技有限公司 A kind of quality management and material dispatch system based on big data
CN109754176A (en) * 2018-12-28 2019-05-14 四川华信工程造价咨询事务所有限责任公司 A kind of project cost progress control system
CN109840690A (en) * 2018-12-29 2019-06-04 国网山东省电力公司日照供电公司 A kind of artificial intelligence electric power first-aid system and method based on big data

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100217418A1 (en) * 2009-02-25 2010-08-26 Siemens Aktiengesellschaft Method and system for scheduling a manufacturing process
CN204347599U (en) * 2015-01-21 2015-05-20 河南中维电子科技有限公司 A kind of industrial processes Control management system
CN107679820A (en) * 2017-08-30 2018-02-09 深圳市易联智道科技有限公司 Construction Schedule management method
CN107422714A (en) * 2017-09-22 2017-12-01 山东华兴纺织集团有限公司 Ring ingot intelligence spinning management system and management method
CN107679727A (en) * 2017-09-26 2018-02-09 武汉名广科技有限公司 A kind of quality management and material dispatch system based on big data
CN109754176A (en) * 2018-12-28 2019-05-14 四川华信工程造价咨询事务所有限责任公司 A kind of project cost progress control system
CN109840690A (en) * 2018-12-29 2019-06-04 国网山东省电力公司日照供电公司 A kind of artificial intelligence electric power first-aid system and method based on big data

Similar Documents

Publication Publication Date Title
CN108320069B (en) Production and manufacturing execution system
CN108614526B (en) Reconfigurable production process management system
Younus et al. MES development and significant applications in manufacturing-A review
CN104751269A (en) Engineering maintenance scheduling management system
Qing et al. Quality risk management model for railway construction projects
CN109858786B (en) Electromechanical device management system based on Internet of things
CN110399363B (en) Problem data full life cycle data quality management method and system
CN107527154A (en) A kind of management planning and scheduling and executing system for being used for the scene of manufacturing
CN111932129A (en) Equipment digital maintenance management and control system
CN115392771A (en) Enterprise efficiency management system and method in park
CN110675011A (en) Imaging method and use method of supplier portrait of material equipment in power industry
Mleczko Manufacturing documentation for the high-variety products
CN201741274U (en) Dynamic data acquisition unit used in manufacture industry production process
CN103616853A (en) Turnout production plan execution system and working method
CN111178694A (en) Improved job shop scheduling display system based on big data algorithm
CN107730081A (en) A kind of data acquisition analysis method and system based on RFID technique
CN203909555U (en) Track switch production plan execution system
Ullah et al. Industrial Energy Management System: Design of a Conceptual Framework Using IoT and Big Data
CN115712636A (en) Electric power planning data acquisition method based on big data analysis
CN111523828B (en) Self-adjusting center system of transport vehicle of mobile substation
CN114139849A (en) Management platform applied to flow supervision and overall planning of building industry
CN111429154A (en) Traceable system for cable product production and inspection procedures
CN106503875A (en) A kind of propulsion project management method of Computer systems
Fuqiang et al. Research on MES system based on production management of railway vehicle reducer
Sun et al. Analysis and design of the logistics system for rope manufacturing plant

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20200519