CN110877190A - 大断面矮型单箱多室钢塔端面机加工工艺 - Google Patents

大断面矮型单箱多室钢塔端面机加工工艺 Download PDF

Info

Publication number
CN110877190A
CN110877190A CN201910896007.9A CN201910896007A CN110877190A CN 110877190 A CN110877190 A CN 110877190A CN 201910896007 A CN201910896007 A CN 201910896007A CN 110877190 A CN110877190 A CN 110877190A
Authority
CN
China
Prior art keywords
steel tower
section
face
short single
box multi
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910896007.9A
Other languages
English (en)
Other versions
CN110877190B (zh
CN110877190A8 (zh
Inventor
孙蕾蕾
黄鑫
袁俊
王岁利
余超
朱静静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Baoji Bridge Group Co Ltd
China Railway Baoji Bridge Yangzhou Co Ltd
Original Assignee
China Railway Baoji Bridge Group Co Ltd
China Railway Baoji Bridge Yangzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Baoji Bridge Group Co Ltd, China Railway Baoji Bridge Yangzhou Co Ltd filed Critical China Railway Baoji Bridge Group Co Ltd
Priority to CN201910896007.9A priority Critical patent/CN110877190B/zh
Priority claimed from CN201910896007.9A external-priority patent/CN110877190B/zh
Publication of CN110877190A publication Critical patent/CN110877190A/zh
Publication of CN110877190A8 publication Critical patent/CN110877190A8/zh
Application granted granted Critical
Publication of CN110877190B publication Critical patent/CN110877190B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Milling Processes (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种大断面矮型单箱多室钢塔端面机加工工艺,具体包括以下工艺流程:⑴两个大块体分别进行机加工;⑵两个大块体翻身90°,然后与承压板参与整体组焊;⑶整个节段组焊并检测合格后,以修整后的横基线为基准划上端口水平铣面的加工位置线,进行水平铣面的加工。⑷该大断面矮型单箱多室钢塔端面机加工工艺,实现了端面机加工平面度要求,同时极大的降低了风险、节约了大量工装胎架的生产成本,取得了一定的经济效益。优点:一是极大的降低了制作过程的安全风险;二是可以较大的保证平面度要求;三是可以减少大量的辅助工装;四是实现了降本增效的目的。

Description

大断面矮型单箱多室钢塔端面机加工工艺
技术领域
本发明涉及一种大断面矮型单箱多室钢塔端面机加工工艺,该工艺将大断面矮型单箱多室钢塔结构,分体加工两大块体、最后整体水平铣面的工艺方法,可广泛应用于大断面矮型单箱多室钢塔端面的机加工。
背景技术
以前的钢塔断面较小、吨位较轻,原有的钢塔钢混结合段上端口加工方法,一种方法是采用钢塔节段每个零部件分别与承压板组焊后,整体翻身90°后卧位采用落地镗铣床机加工上端口,这种方法极易由于承压板太重而产生失稳现象。另一种方法就是钢塔节段组焊成整体(不含承压板),首先进行两端头机加工后再立着与承压板组焊,这种方法不易保证上端口的平面度要求,见图8和9。原钢混结合段加工方法存在的问题:
⑴ 第一种方法,立式组焊,需要翻身90°机加工端面。翻身、厂内倒运(头重脚轻结构)、机加工时支撑等过程安全风险极高。
⑵ 第二种方法,钢塔节段不含承压板整体机加工,断面太大、高度太高,厂内倒运、机加工支撑等过程也存在很大的安全风险;同时塔段机加工后再与承压板组焊,上端口的平面度精度很难达到设计要求。
⑶ 前两种方法均需要加工制作很大吨位的工装胎架,以防止失稳倾覆,保证安全施工。
发明内容
设计目的:避免背景技术中的不足之处,设计一种既无需很大吨位的工装胎架防止钢塔节段失稳倾覆,又能保证安全施工的大断面矮型单箱多室钢塔端面机加工工艺。
设计方案:随着桥梁钢结构大型化、工厂化、装配化的应用和发展,大断面钢结构桥塔也应运而生。特别是独柱形钢塔的普遍采用,断面尺寸不断加大,重量随之大幅增加,给钢塔制造带来挑战,尤其是给端面金属接触传力的钢塔端面机加工带来很大困难。其中钢混结合段,往往都是断面最大、吨位最重且高度较小的一种塔段,即大断面矮型单箱多室钢塔结构。钢混结合段截面尺寸达十几米、吨位达到五六百吨,但是钢塔柱的高度确很小仅五米左右。对于这样的一个整体结构,如果要采用传统方法,直接翻身90°后用落地镗铣床进行机加工端面不能采用的原因:一是翻身后截面太高十几米,长度太短五米左右,翻身、厂内倒运(头重脚轻结构)、机加工支撑过程中,存在极大的安全风险;二是现有的机加工设备满足不了一次成型加工;三是需要制作的辅助工装量特别大。
本发明将整个节段端面分开成两个大的块体,分别进行机加工端面,这样的端面轮廓高度尺寸减少一半,重量约减少一半,极大的降低了安全风险。两个块体机加工后翻身90°与承压板一起参与整体节段的组焊,最后进行整体水平铣面。整体水平铣面既能保证最后整体端口的平面度要求,又避免了安全隐患。
技术方案:一种大断面矮型单箱多室钢塔端面机加工工艺,包括整个节段,其特征是:将整个节段端面分开成两个大的块体,分别进行机加工端面,两个块体机加工后翻身90°与承压板一起参与整体节段的组焊,最后进行整体水平铣面。
本发明与背景技术相比,一是极大的降低了制作过程的安全风险;二是可以较大的保证平面度要求;三是可以减少大量的辅助工装;四是实现了降本增效的目的。
附图说明
图1 是大断面矮型单箱多室钢塔端面机加工工艺实物流程示意图。
图2是两个大块体机加工示意照片。
图3是两个大块体检测示意照片。
图4是两个大块体翻身90°示意照片,其中一个大照片块体翻身90°后组装。
图5是两个大块体翻身90°后与承压板参与整体组焊示意照片。
图6是图5整体组焊后水平铣面工装示意照片。
图7是图5整体组焊后水平铣面示意照片。
图8和图9是背景技术示意照片。
具体实施方式
下面以大桥主桥钢塔柱的实施来说明大断面矮型单箱多室钢塔端面机加工工艺:钢混结合段下端口截面:10740mmX17420mm;上端口截面:9203mmX14924mm;吨位达到587t,但是钢塔柱的高度仅5.1m。这样的一个整体结构,采用宽体多室异型钢塔端面机加工工艺,可以极大的降低了制作过程中的安全风险。既能保证最后整体端口的平面度要求,又避免了安全隐患。
具体工艺介绍:
通过将整个节段端面分开成两个大的块体,分别进行机加工端面,这样的端面轮廓尺寸为:高4800mmX宽16000mmX长5100mm,重量约230t,极大的降低了安全风险。两个块体机加工后翻身90°与承压板一起参与整体节段的组焊,最后进行整体水平铣面。整体水平铣面既能保证最后整体端口的平面度要求,又避免了安全隐患。
(1)两个大块体分别进行机加工和检测,见图2和图3。
(2)两个大块体翻身90°,然后与承压板参与整体组焊,见图4和图5。
(3)整个节段组焊并检测合格后,以修整后的横基线为基准划上端口水平铣面的加工位置线,进行水平铣面的加工。由于端口宽度较宽,需要分六次进行定位铣面,以修整后的横基线为基准划上端口水平铣面的加工位置线,见图6和图7。整个节段组焊并检测合格后(检测内容较多:包括焊缝外观、焊缝无损检测、块体与承压板的密贴度、箱口尺寸等),以修整后的横基线为基准划上端口水平铣面的加工位置线,进行水平铣面的加工。
(4)该大断面矮型单箱多室钢塔端面机加工工艺,实现了端面机加工平面度要求,同时极大的降低了风险、节约了大量工装胎架的生产成本,取得了一定的经济效益。
本发明的制作技术条件:
1. 分体式机加工时注意两大块体的各自加工精度。
2. 分体式块体翻身时注意吊耳的位置和受力需求。
3. 分体式机加工时注意下侧布置液压千斤顶的位置和受力要求。
4. 两大块体翻身与承压板组成节段时,要保证两大块体的基线一致,以及上端口的错台量。
5. 整体水平铣面时,要保证整体端面的平面度和见光度。
需要理解到的是:上述实施例虽然对本发明的设计思路作了比较详细的文字描述,但是这些文字描述,只是对本发明设计思路的简单文字描述,而不是对本发明设计思路的限制,任何不超出本发明设计思路的组合、增加或修改,均落入本发明的保护范围内。

Claims (4)

1.一种大断面矮型单箱多室钢塔端面机加工工艺,包括整个节段,其特征是:将整个节段端面分开成两个大的块体,分别进行机加工端面,两个块体机加工后翻身90°与承压板一起参与整体节段的组焊,最后进行整体水平铣面。
2.根据权利要求1所述的大断面矮型单箱多室钢塔端面机加工工艺,其特征是:整个节段组焊并检测合格后,检测内容:包括焊缝外观、焊缝无损检测、块体与承压板的密贴度、箱口尺寸,以修整后的横基线为基准划上端口水平铣面的加工位置线,进行水平铣面的加工。
3.根据权利要求1所述的大断面矮型单箱多室钢塔端面机加工工艺,其特征是:端口宽度宽,需要分六次进行定位铣面,以修整后的横基线为基准划上端口水平铣面的加工位置线。
4.根据权利要求1所述的大断面矮型单箱多室钢塔端面机加工工艺,其特征是:大断面矮型单箱多室钢塔是指钢混结合段钢混结合段截面尺寸达十几米以上、吨位达到500-600吨以上,而钢塔柱的高度却在4.5-5.5米之间。
CN201910896007.9A 2019-09-22 大断面矮型单箱多室钢塔端面机加工工艺 Active CN110877190B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910896007.9A CN110877190B (zh) 2019-09-22 大断面矮型单箱多室钢塔端面机加工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910896007.9A CN110877190B (zh) 2019-09-22 大断面矮型单箱多室钢塔端面机加工工艺

Publications (3)

Publication Number Publication Date
CN110877190A true CN110877190A (zh) 2020-03-13
CN110877190A8 CN110877190A8 (zh) 2024-07-19
CN110877190B CN110877190B (zh) 2024-10-29

Family

ID=

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111648245A (zh) * 2020-05-21 2020-09-11 中交二公局第二工程有限公司 一种斜拉桥钢混结合段超大面积灌浆施工方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101011781A (zh) * 2006-06-03 2007-08-08 中铁宝桥股份有限公司 桥梁钢塔柱制造过程中焊接变形控制方法
JP2008121190A (ja) * 2006-11-08 2008-05-29 Juichi Yamauchi 道路橋の荷重支持型伸縮装置
CN102864742A (zh) * 2012-09-05 2013-01-09 广东省公路勘察规划设计院股份有限公司 一种斜拉桥先滑后固型组合钢锚箱锚固装置及其施工方法
CN103934631A (zh) * 2013-12-31 2014-07-23 中铁四局集团钢结构有限公司 一种大型索塔钢锚箱加工方法
CN203946776U (zh) * 2014-02-26 2014-11-19 武船重型工程股份有限公司 钢塔承压板翻身吊装夹具
CN105002830A (zh) * 2015-08-05 2015-10-28 武船重型工程股份有限公司 一种钢塔小节段的制造方法
CN106400675A (zh) * 2016-08-31 2017-02-15 中交公局第三工程有限公司 一种钢锚箱及其安装方法
WO2018068117A1 (pt) * 2016-10-11 2018-04-19 Protende Sistemas E Métodos De Construções Ltda. Torre de concreto estrutural e método de montagem
CN108726348A (zh) * 2018-03-31 2018-11-02 浙江交工集团股份有限公司 一种管廊节段平卧预制翻转起吊方法
CN216607835U (zh) * 2019-09-22 2022-05-27 中铁宝桥集团有限公司 大断面矮型单箱多室钢塔

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101011781A (zh) * 2006-06-03 2007-08-08 中铁宝桥股份有限公司 桥梁钢塔柱制造过程中焊接变形控制方法
JP2008121190A (ja) * 2006-11-08 2008-05-29 Juichi Yamauchi 道路橋の荷重支持型伸縮装置
CN102864742A (zh) * 2012-09-05 2013-01-09 广东省公路勘察规划设计院股份有限公司 一种斜拉桥先滑后固型组合钢锚箱锚固装置及其施工方法
CN103934631A (zh) * 2013-12-31 2014-07-23 中铁四局集团钢结构有限公司 一种大型索塔钢锚箱加工方法
CN203946776U (zh) * 2014-02-26 2014-11-19 武船重型工程股份有限公司 钢塔承压板翻身吊装夹具
CN105002830A (zh) * 2015-08-05 2015-10-28 武船重型工程股份有限公司 一种钢塔小节段的制造方法
CN106400675A (zh) * 2016-08-31 2017-02-15 中交公局第三工程有限公司 一种钢锚箱及其安装方法
WO2018068117A1 (pt) * 2016-10-11 2018-04-19 Protende Sistemas E Métodos De Construções Ltda. Torre de concreto estrutural e método de montagem
CN108726348A (zh) * 2018-03-31 2018-11-02 浙江交工集团股份有限公司 一种管廊节段平卧预制翻转起吊方法
CN216607835U (zh) * 2019-09-22 2022-05-27 中铁宝桥集团有限公司 大断面矮型单箱多室钢塔

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
吉林;张永利;: "人字型钢塔制造总体工艺设计", 中国工程科学, no. 04, 15 April 2010 (2010-04-15) *
杨维威;: "大吨位三向预应力结构混凝土箱梁0号块施工技术研究", 铁道建筑技术, no. 05, 20 May 2018 (2018-05-20) *
章登精;: "南京长江第三大桥钢塔工程控制技术", 中国铁道科学, no. 04, 15 July 2007 (2007-07-15) *
裴雪峰;张剑峰;车平;: "泰州桥钢塔厚板焊接技术", 电焊机, no. 08, 20 August 2011 (2011-08-20) *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111648245A (zh) * 2020-05-21 2020-09-11 中交二公局第二工程有限公司 一种斜拉桥钢混结合段超大面积灌浆施工方法

Also Published As

Publication number Publication date
CN110877190A8 (zh) 2024-07-19

Similar Documents

Publication Publication Date Title
CN106624631B (zh) 门式起重机主梁轨道安装精度控制方法
CN107931825B (zh) 大型椭球面工件的搅拌摩擦焊拼接工装
CN201074154Y (zh) 自动扶梯桁架分段处的搭接装置
CN107877093B (zh) 一种曲面板加工工装及加工方法
CN212310726U (zh) 一种火车车轮轧制模具下磨板简易拆分装置
CN110877190A (zh) 大断面矮型单箱多室钢塔端面机加工工艺
CN110877190B (zh) 大断面矮型单箱多室钢塔端面机加工工艺
CN216607835U (zh) 大断面矮型单箱多室钢塔
CN201931107U (zh) 大型钻孔装置
CN107513936B (zh) 上字形边主梁结构及制作方法
CN211735107U (zh) 一种钢箱桥梁自由拱度制作调节的工装结构
CN209778242U (zh) 一种大型箱体自动化翻身设备
CN204657366U (zh) 一种用于锻造圆环的成型装置
CN210480234U (zh) 一种焊接型辊臂及其焊接定位工装
CN107023118B (zh) 一种用于桁架层十字形钢柱及其加工工艺
CN213741641U (zh) 一种新型箱体房屋框架顶角件结构
CN102019512B (zh) T形柱对接焊施工方法
CN205629004U (zh) 一种铜止水加工装置
CN113618584B (zh) 一种轨道车辆铝型材自定位打磨工装
CN201677149U (zh) 制造冷床区齿条横移支座的专用工装
CN213979326U (zh) 一种新型箱体房屋框架底角件结构
CN204470896U (zh) 料仓支架焊接工装
CN220787839U (zh) 一种港口机械车间二层吊车梁结构
CN218855298U (zh) 一种生产汽车管件用弯曲装置
CN212494631U (zh) 一种铝合金型材凹陷修复的调校装置

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CI02 Correction of invention patent application

Correction item: Applicant|Address|Applicant

Correct: CHINA RAILWAY BAOJI BRIDGE GROUP Co.,Ltd.|No.4 Huoju Road, hi tech Development Zone, Baoji City, Shaanxi Province 721000|China Railway Baoqiao (Yangzhou) Co.,Ltd.

False: CHINA RAILWAY BAOJI BRIDGE GROUP Co.,Ltd.|No.4 Huoju Road, hi tech Development Zone, Baoji City, Shaanxi Province 721000|China Railway Baoqiao (Yangzhou) Co.,Ltd.

Number: 11-02

Page: The title page

Volume: 36

Correct: CHINA RAILWAY BAOJI BRIDGE GROUP Co.,Ltd.|No.4 Huoju Road, hi tech Development Zone, Baoji City, Shaanxi Province 721000|China Railway Baoqiao (Yangzhou) Co.,Ltd.

False: CHINA RAILWAY BAOJI BRIDGE GROUP Co.,Ltd.|No.4 Huoju Road, hi tech Development Zone, Baoji City, Shaanxi Province 721000|China Railway Baoqiao (Yangzhou) Co.,Ltd.

Number: 11-02

Volume: 36

CI02 Correction of invention patent application
GR01 Patent grant