CN110761402B - 一种房建楼板同层滞后同步施工的混凝土浇筑施工方法 - Google Patents
一种房建楼板同层滞后同步施工的混凝土浇筑施工方法 Download PDFInfo
- Publication number
- CN110761402B CN110761402B CN201910958209.1A CN201910958209A CN110761402B CN 110761402 B CN110761402 B CN 110761402B CN 201910958209 A CN201910958209 A CN 201910958209A CN 110761402 B CN110761402 B CN 110761402B
- Authority
- CN
- China
- Prior art keywords
- floor
- concrete
- nth
- pouring
- formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/16—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
- E04B1/161—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material with vertical and horizontal slabs, both being partially cast in situ
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/02—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for rooms as a whole by which walls and floors are cast simultaneously, whole storeys, or whole buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910958209.1A CN110761402B (zh) | 2019-10-10 | 2019-10-10 | 一种房建楼板同层滞后同步施工的混凝土浇筑施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910958209.1A CN110761402B (zh) | 2019-10-10 | 2019-10-10 | 一种房建楼板同层滞后同步施工的混凝土浇筑施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110761402A CN110761402A (zh) | 2020-02-07 |
CN110761402B true CN110761402B (zh) | 2020-12-29 |
Family
ID=69331619
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910958209.1A Active CN110761402B (zh) | 2019-10-10 | 2019-10-10 | 一种房建楼板同层滞后同步施工的混凝土浇筑施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110761402B (zh) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114908969A (zh) * | 2020-08-21 | 2022-08-16 | 上海欧跃建筑安装工程有限公司 | 一种造楼机梁板滞后墙柱同层同步混凝土浇注方法 |
CN111809866A (zh) * | 2020-08-25 | 2020-10-23 | 惠玉清 | 一种混凝土剪力墙大型钢模板悬空校正固定支模法 |
CN111877777A (zh) * | 2020-08-25 | 2020-11-03 | 惠玉清 | 一种预设定位块及其施工法 |
CN113338610B (zh) * | 2021-07-01 | 2022-06-03 | 广州市黄埔建筑工程总公司 | 一种房建楼板同层滞后同步施工的混凝土浇筑施工方法 |
CN114575499A (zh) * | 2022-03-10 | 2022-06-03 | 上海欧跃建筑安装工程有限公司 | 一种房建二次结构与混凝土剪力墙同步浇注施工方法 |
CN115030511A (zh) * | 2022-07-04 | 2022-09-09 | 山东工业职业学院 | 建筑用楼板浇筑方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4374634A (en) * | 1979-11-23 | 1983-02-22 | Bernhard Ahl | Device for lifting sliding molds along steel bars for the construction of concrete buildings and the like |
WO2012088588A1 (en) * | 2010-12-30 | 2012-07-05 | Tikhovskiy Nikolay P | Modular construction system and components and method |
CN103174292A (zh) * | 2013-03-07 | 2013-06-26 | 山西太行建设开发有限公司 | 框架结构多标号混凝土节点浇筑施工方法 |
CN204199659U (zh) * | 2014-11-19 | 2015-03-11 | 重庆工商职业学院 | 整体提升式建筑电梯井施工作业系统 |
CN106869489A (zh) * | 2017-03-21 | 2017-06-20 | 中建三局第建设工程有限责任公司 | 超高层核心筒水平与竖向同步施工顶模系统及施工方法 |
CN107642194A (zh) * | 2017-11-10 | 2018-01-30 | 宁乡远大住宅工业有限公司 | 一种预制夹心外挂墙板及其结构体系、施工方法 |
CN110206312A (zh) * | 2019-06-18 | 2019-09-06 | 中国五冶集团有限公司 | 一种混凝土墙体管道施工方法 |
-
2019
- 2019-10-10 CN CN201910958209.1A patent/CN110761402B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4374634A (en) * | 1979-11-23 | 1983-02-22 | Bernhard Ahl | Device for lifting sliding molds along steel bars for the construction of concrete buildings and the like |
WO2012088588A1 (en) * | 2010-12-30 | 2012-07-05 | Tikhovskiy Nikolay P | Modular construction system and components and method |
CN103174292A (zh) * | 2013-03-07 | 2013-06-26 | 山西太行建设开发有限公司 | 框架结构多标号混凝土节点浇筑施工方法 |
CN204199659U (zh) * | 2014-11-19 | 2015-03-11 | 重庆工商职业学院 | 整体提升式建筑电梯井施工作业系统 |
CN106869489A (zh) * | 2017-03-21 | 2017-06-20 | 中建三局第建设工程有限责任公司 | 超高层核心筒水平与竖向同步施工顶模系统及施工方法 |
CN107642194A (zh) * | 2017-11-10 | 2018-01-30 | 宁乡远大住宅工业有限公司 | 一种预制夹心外挂墙板及其结构体系、施工方法 |
CN110206312A (zh) * | 2019-06-18 | 2019-09-06 | 中国五冶集团有限公司 | 一种混凝土墙体管道施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN110761402A (zh) | 2020-02-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110761402B (zh) | 一种房建楼板同层滞后同步施工的混凝土浇筑施工方法 | |
CN108914965B (zh) | 用于综合管廊的铝合金模板的连续施工方法 | |
CN103089004B (zh) | 组合框模、构件框模、模架结构及其安装和拆卸方法 | |
CN106639317B (zh) | 一种预制装配式建筑成套建造技术 | |
CN111946050A (zh) | 一种应用于装配式工程中的铝合金模板施工方法 | |
CN110043285B (zh) | 市政地下通道二衬施工模板系统及二衬施工方法 | |
CN112627387A (zh) | 预制外墙板不出筋式侧连方法 | |
CN108005286A (zh) | 一种装配式建筑用单向叠合楼面板的施工方法 | |
CN106113230B (zh) | 用于梯段预制的非定型、可周转模板体系及其施工方法 | |
CN108582466A (zh) | 一种预制箱梁钢筋笼胎具 | |
CN103452350B (zh) | 装配式电子厂房及其施工方法 | |
CN103306463B (zh) | 一种金属衬里混凝土风道施工方法 | |
KR20070010449A (ko) | 아치교의 시공 방법 | |
KR100369757B1 (ko) | 아이엘엠용 피씨박스거더 교량제작 거푸집 시스템 및 이를이용한 세그멘트 제작방법 | |
CN210263131U (zh) | 装配式自止水地下管廊构造 | |
CN111809796A (zh) | 一种装配式混凝土叠合梁及其施工方法 | |
CN212154120U (zh) | 一种用于预制装配式建筑的铝合金模板组 | |
CN210713517U (zh) | 一种装配式叠合梁结构 | |
CN109868923B (zh) | 一种散拼木模板清水混凝土施工方法 | |
CN207484795U (zh) | 一种高度集成的单向叠合楼面板 | |
CN217105755U (zh) | 一种混凝土砌块组合保温楼屋面构造 | |
CN114263275B (zh) | 高层装配式钢结构-核心筒同层施工工法 | |
CN210658451U (zh) | 一种明挖法复合装配式地下结构 | |
CN106914984A (zh) | 一种预制复合结构板的施工方法 | |
CN211285212U (zh) | 适用于中小跨径简支梁桥的小箱梁结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 201109 floor 3, building B, No. 940 Jianchuan Road, Minhang District, Shanghai Patentee after: Nest Technology (Shanghai) Co.,Ltd. Patentee after: Jiangsu Henggui Chuangke Intelligent Technology Co.,Ltd. Address before: Room 3412, building 3, 1700 Gangyan Road, Gangyan Town, Chongming District, Shanghai Patentee before: Shanghai Ouyue construction and Installation Engineering Co.,Ltd. Patentee before: Jiangsu Henggui Chuangke Construction Engineering Technology Co.,Ltd. |
|
CP03 | Change of name, title or address | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A Concrete Pouring Construction Method for Delayed Synchronous Construction of Building Floors on the Same Floor Effective date of registration: 20230815 Granted publication date: 20201229 Pledgee: Societe Generale Bank Co.,Ltd. Qingpu Branch of Shanghai Pledgor: Nest Technology (Shanghai) Co.,Ltd.|Jiangsu Henggui Chuangke Intelligent Technology Co.,Ltd. Registration number: Y2023310000465 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |