CN110761402A - 一种房建楼板同层滞后同步施工的混凝土浇筑施工方法 - Google Patents
一种房建楼板同层滞后同步施工的混凝土浇筑施工方法 Download PDFInfo
- Publication number
- CN110761402A CN110761402A CN201910958209.1A CN201910958209A CN110761402A CN 110761402 A CN110761402 A CN 110761402A CN 201910958209 A CN201910958209 A CN 201910958209A CN 110761402 A CN110761402 A CN 110761402A
- Authority
- CN
- China
- Prior art keywords
- floor
- concrete
- formwork
- nth
- pouring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 83
- 238000010276 construction Methods 0.000 title claims abstract description 37
- 238000009415 formwork Methods 0.000 claims abstract description 129
- 230000001360 synchronised effect Effects 0.000 claims abstract description 10
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 9
- 239000010959 steel Substances 0.000 claims abstract description 9
- 238000000034 method Methods 0.000 claims description 18
- 238000005192 partition Methods 0.000 claims description 7
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 230000003111 delayed effect Effects 0.000 claims 5
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims 3
- 238000005266 casting Methods 0.000 claims 1
- 230000002787 reinforcement Effects 0.000 description 9
- 238000010586 diagram Methods 0.000 description 3
- 230000008521 reorganization Effects 0.000 description 3
- 239000002699 waste material Substances 0.000 description 3
- 238000009435 building construction Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000012805 post-processing Methods 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/16—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
- E04B1/161—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material with vertical and horizontal slabs, both being partially cast in situ
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/02—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for rooms as a whole by which walls and floors are cast simultaneously, whole storeys, or whole buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910958209.1A CN110761402B (zh) | 2019-10-10 | 2019-10-10 | 一种房建楼板同层滞后同步施工的混凝土浇筑施工方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910958209.1A CN110761402B (zh) | 2019-10-10 | 2019-10-10 | 一种房建楼板同层滞后同步施工的混凝土浇筑施工方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN110761402A true CN110761402A (zh) | 2020-02-07 |
| CN110761402B CN110761402B (zh) | 2020-12-29 |
Family
ID=69331619
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910958209.1A Active CN110761402B (zh) | 2019-10-10 | 2019-10-10 | 一种房建楼板同层滞后同步施工的混凝土浇筑施工方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110761402B (zh) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111809866A (zh) * | 2020-08-25 | 2020-10-23 | 惠玉清 | 一种混凝土剪力墙大型钢模板悬空校正固定支模法 |
| CN111877777A (zh) * | 2020-08-25 | 2020-11-03 | 惠玉清 | 一种预设定位块及其施工法 |
| CN112096072A (zh) * | 2020-08-21 | 2020-12-18 | 上海欧跃建筑安装工程有限公司 | 用于造楼机的梁板滞后墙柱同层同步混凝土浇注方法 |
| CN113338610A (zh) * | 2021-07-01 | 2021-09-03 | 广州市黄埔建筑工程总公司 | 一种房建楼板同层滞后同步施工的混凝土浇筑施工方法 |
| CN114575499A (zh) * | 2022-03-10 | 2022-06-03 | 上海欧跃建筑安装工程有限公司 | 一种房建二次结构与混凝土剪力墙同步浇注施工方法 |
| CN115030511A (zh) * | 2022-07-04 | 2022-09-09 | 山东工业职业学院 | 建筑用楼板浇筑方法 |
| CN119266387A (zh) * | 2024-11-13 | 2025-01-07 | 中铁建工集团有限公司 | 一种基于造楼机的高层建筑施工方法 |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4374634A (en) * | 1979-11-23 | 1983-02-22 | Bernhard Ahl | Device for lifting sliding molds along steel bars for the construction of concrete buildings and the like |
| WO2012088588A1 (en) * | 2010-12-30 | 2012-07-05 | Tikhovskiy Nikolay P | Modular construction system and components and method |
| CN103174292A (zh) * | 2013-03-07 | 2013-06-26 | 山西太行建设开发有限公司 | 框架结构多标号混凝土节点浇筑施工方法 |
| CN204199659U (zh) * | 2014-11-19 | 2015-03-11 | 重庆工商职业学院 | 整体提升式建筑电梯井施工作业系统 |
| CN106869489A (zh) * | 2017-03-21 | 2017-06-20 | 中建三局第建设工程有限责任公司 | 超高层核心筒水平与竖向同步施工顶模系统及施工方法 |
| CN107642194A (zh) * | 2017-11-10 | 2018-01-30 | 宁乡远大住宅工业有限公司 | 一种预制夹心外挂墙板及其结构体系、施工方法 |
| CN110206312A (zh) * | 2019-06-18 | 2019-09-06 | 中国五冶集团有限公司 | 一种混凝土墙体管道施工方法 |
-
2019
- 2019-10-10 CN CN201910958209.1A patent/CN110761402B/zh active Active
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4374634A (en) * | 1979-11-23 | 1983-02-22 | Bernhard Ahl | Device for lifting sliding molds along steel bars for the construction of concrete buildings and the like |
| WO2012088588A1 (en) * | 2010-12-30 | 2012-07-05 | Tikhovskiy Nikolay P | Modular construction system and components and method |
| CN103174292A (zh) * | 2013-03-07 | 2013-06-26 | 山西太行建设开发有限公司 | 框架结构多标号混凝土节点浇筑施工方法 |
| CN204199659U (zh) * | 2014-11-19 | 2015-03-11 | 重庆工商职业学院 | 整体提升式建筑电梯井施工作业系统 |
| CN106869489A (zh) * | 2017-03-21 | 2017-06-20 | 中建三局第建设工程有限责任公司 | 超高层核心筒水平与竖向同步施工顶模系统及施工方法 |
| CN107642194A (zh) * | 2017-11-10 | 2018-01-30 | 宁乡远大住宅工业有限公司 | 一种预制夹心外挂墙板及其结构体系、施工方法 |
| CN110206312A (zh) * | 2019-06-18 | 2019-09-06 | 中国五冶集团有限公司 | 一种混凝土墙体管道施工方法 |
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112096072A (zh) * | 2020-08-21 | 2020-12-18 | 上海欧跃建筑安装工程有限公司 | 用于造楼机的梁板滞后墙柱同层同步混凝土浇注方法 |
| CN112096072B (zh) * | 2020-08-21 | 2022-06-07 | 上海欧跃建筑安装工程有限公司 | 用于造楼机的梁板滞后墙柱同层同步混凝土浇注方法 |
| CN114908969A (zh) * | 2020-08-21 | 2022-08-16 | 上海欧跃建筑安装工程有限公司 | 一种造楼机梁板滞后墙柱同层同步混凝土浇注方法 |
| CN111809866A (zh) * | 2020-08-25 | 2020-10-23 | 惠玉清 | 一种混凝土剪力墙大型钢模板悬空校正固定支模法 |
| CN111877777A (zh) * | 2020-08-25 | 2020-11-03 | 惠玉清 | 一种预设定位块及其施工法 |
| CN113338610A (zh) * | 2021-07-01 | 2021-09-03 | 广州市黄埔建筑工程总公司 | 一种房建楼板同层滞后同步施工的混凝土浇筑施工方法 |
| CN113338610B (zh) * | 2021-07-01 | 2022-06-03 | 广州市黄埔建筑工程总公司 | 一种房建楼板同层滞后同步施工的混凝土浇筑施工方法 |
| CN114575499A (zh) * | 2022-03-10 | 2022-06-03 | 上海欧跃建筑安装工程有限公司 | 一种房建二次结构与混凝土剪力墙同步浇注施工方法 |
| CN114575499B (zh) * | 2022-03-10 | 2024-11-22 | 上海欧跃建筑安装工程有限公司 | 一种房建二次结构与混凝土剪力墙同步浇注施工方法 |
| CN115030511A (zh) * | 2022-07-04 | 2022-09-09 | 山东工业职业学院 | 建筑用楼板浇筑方法 |
| CN115030511B (zh) * | 2022-07-04 | 2025-03-28 | 山东工业职业学院 | 建筑用楼板浇筑方法 |
| CN119266387A (zh) * | 2024-11-13 | 2025-01-07 | 中铁建工集团有限公司 | 一种基于造楼机的高层建筑施工方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN110761402B (zh) | 2020-12-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110761402B (zh) | 一种房建楼板同层滞后同步施工的混凝土浇筑施工方法 | |
| CN104631512B (zh) | 吊模法后浇带梁板施工方法 | |
| CN109083658B (zh) | 以钢管混凝土为骨架的隧道二次衬砌结构及其施工方法 | |
| CN106869489A (zh) | 超高层核心筒水平与竖向同步施工顶模系统及施工方法 | |
| CN105507470B (zh) | 一种周边叠合整体装配式楼板及其施工方法 | |
| CN208472973U (zh) | 一种可拆卸式钢筋桁架板端支撑节点结构 | |
| CN201738583U (zh) | 斜向剪力墙模板的组合支撑加固系统 | |
| CN112502335A (zh) | 装配式建筑叠合板的施工方法 | |
| CN103806647A (zh) | 大跨度混凝土双向密肋梁模壳的安装和拆除工艺 | |
| CN103334356A (zh) | 桥式预制钢筋混凝土暗梁板路面体系及其施工方法 | |
| CN107740522A (zh) | 预制再生块体混凝土板和叠合梁的连接结构及其施工方法 | |
| CN108265867A (zh) | 一种板端和板侧不出筋的双向叠合板底板及其施工方法 | |
| CN107989238A (zh) | 一种现浇夹心保温剪力墙结构、装配式建筑及工法 | |
| CN110905113A (zh) | 一种大跨度混凝土穹顶结构施工方法 | |
| CN109594688A (zh) | 一种型钢桁架双皮墙结构及其施工方法 | |
| CN108999326A (zh) | 轻钢格栅混凝土叠合板 | |
| CN204919605U (zh) | 预制装配式钢筋砼地下综合管廊及其生产模具 | |
| CN204435616U (zh) | 桁架钢筋双层纤维石膏板、免拆模板墙体结构 | |
| CN216865649U (zh) | 一种钢筋混凝土双向叠合板用多肋预制底板 | |
| CN107035045A (zh) | 一种预制混凝土双向空心板及其制备方法 | |
| CN107060173B (zh) | 清水混凝土华夫板结构孔内早拆模施工方法 | |
| CN207363074U (zh) | 一种预制再生块体混凝土板和叠合梁的连接结构 | |
| CN112096072B (zh) | 用于造楼机的梁板滞后墙柱同层同步混凝土浇注方法 | |
| CN217652327U (zh) | 一种混凝土后浇带快速封堵装置 | |
| CN217105755U (zh) | 一种混凝土砌块组合保温楼屋面构造 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 201109 floor 3, building B, No. 940 Jianchuan Road, Minhang District, Shanghai Patentee after: Nest Technology (Shanghai) Co.,Ltd. Patentee after: Jiangsu Henggui Chuangke Intelligent Technology Co.,Ltd. Address before: Room 3412, building 3, 1700 Gangyan Road, Gangyan Town, Chongming District, Shanghai Patentee before: Shanghai Ouyue construction and Installation Engineering Co.,Ltd. Patentee before: Jiangsu Henggui Chuangke Construction Engineering Technology Co.,Ltd. |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A Concrete Pouring Construction Method for Delayed Synchronous Construction of Building Floors on the Same Floor Effective date of registration: 20230815 Granted publication date: 20201229 Pledgee: Societe Generale Bank Co.,Ltd. Qingpu Branch of Shanghai Pledgor: Nest Technology (Shanghai) Co.,Ltd.|Jiangsu Henggui Chuangke Intelligent Technology Co.,Ltd. Registration number: Y2023310000465 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20201229 Pledgee: Societe Generale Bank Co.,Ltd. Qingpu Branch of Shanghai Pledgor: Nest Technology (Shanghai) Co.,Ltd.|Jiangsu Henggui Chuangke Intelligent Technology Co.,Ltd. Registration number: Y2023310000465 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A concrete pouring construction method for synchronous construction of building floor slabs on the same floor with lag Granted publication date: 20201229 Pledgee: Societe Generale Bank Co.,Ltd. Qingpu Branch of Shanghai Pledgor: Nest Technology (Shanghai) Co.,Ltd.|Jiangsu Henggui Chuangke Intelligent Technology Co.,Ltd. Registration number: Y2024980045506 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right |