CN110414908A - Project examination method, air control approval system and medium based on air control approval system - Google Patents
Project examination method, air control approval system and medium based on air control approval system Download PDFInfo
- Publication number
- CN110414908A CN110414908A CN201910308031.6A CN201910308031A CN110414908A CN 110414908 A CN110414908 A CN 110414908A CN 201910308031 A CN201910308031 A CN 201910308031A CN 110414908 A CN110414908 A CN 110414908A
- Authority
- CN
- China
- Prior art keywords
- approval
- examination
- node
- target
- approver
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Engineering & Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Economics (AREA)
- Marketing (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of project examination methods based on air control approval system, project examination method based on air control approval system is the following steps are included: when information is completed in the examination & approval for receiving item file, information is completed according to examination & approval and determines current approval node, and determines the user for submitting item file;The target approval process where current approval node is determined according to user, and target approval node is determined in target approval process according to current approval node, wherein, contain multiple approval nodes with examination & approval sequence in target approval process, target approval node is next approval node of current approval node;Item file is transmitted to target approval node, and sends examination & approval prompt information to the corresponding target approver of target approval node, so that target approver examines item file according to examination & approval prompt information.Invention additionally discloses a kind of air control approval system and media.The examination & approval of project of the present invention are high-efficient.
Description
Technical field
The present invention relates to project examination technical field more particularly to a kind of project examination sides based on air control approval system
Method, air control approval system and medium.
Background technique
In face of the modern society of high speed development, good project chance is transient, but foundation and implementation of project etc. is equal
It is examined.
Traditional project examination process is examined and is examined by papery, and item file submits lack of standardization, examination & approval related personnel
Excessively, interactions among persons are mostly and link up under line, and the trace processing of important decision is signed by paper document, so that
There is height dependence paper, large labor intensity, process imprecision, task execution and be not easy to implement, examine in traditional project examination process
The monitoring of batch process is not in place, the problems such as can not effectively measuring process-time and can not effectively counting process cost, from
And cause project examination process cumbersome and examine cycle time it is long, cause the examination & approval efficiency of project lower.
Summary of the invention
The main purpose of the present invention is to provide a kind of project examination methods based on air control approval system, air control examination & approval system
System and medium, it is intended to solve the problems, such as that the examination & approval efficiency of project is lower.
To achieve the above object, the present invention provides a kind of project examination method based on air control approval system, described to be based on
The project examination method of air control approval system the following steps are included:
When information is completed in the examination & approval for receiving item file, information is completed according to the examination & approval and determines current examination & approval section
Point, and determine the user for submitting the item file;
The target approval process where the current approval node is determined according to the user, and according to the current examination & approval
Node determines target approval node in the target approval process, wherein has in the target approval process containing multiple
The approval node of examination & approval sequence, the target approval node are next approval node of the current approval node;
The item file is transmitted to target approval node, and to the corresponding target approver of the target approval node
Examination & approval prompt information is sent, so that the target approver examines the item file according to the examination & approval prompt information
Batch.
In one embodiment, described that target approval process where the current approval node is determined according to the user
Step includes:
Obtain the user information of the user;
Determining each approval process with the user information correlation;
According to the file type of the item file and the current approval node, in each approval process really
Set the goal approval process.
In one embodiment, after the described the step of item file is transmitted to target approval node, further includes:
Determine the corresponding setting approver of the target approval node;
Judge whether the setting approver's is in running order;
When the setting approver is not in working condition, the corresponding Deputy of the setting approver is determined;
The Deputy is determined as the corresponding target approver of the target approval node, and is executed described to institute
State the step of corresponding target approver of target approval node sends examination & approval prompt information.
In one embodiment, after the step of determination setting approver corresponding Deputy, further includes:
Determine the corresponding power to examine and approve projects of the Deputy and examination & approval effective period of time;
According to the power to examine and approve projects and the examination & approval effective period of time, judge the Deputy to the item
Whether mesh file has examination & approval qualification;
When the Deputy has examination & approval qualification to the item file, executes described examine to the target and save
The corresponding target approver of point sends the step of examination & approval prompt information;
It is associated to the setting approver when the Deputy does not have examination & approval qualification to the item file
Terminal sends examination & approval prompt information.
In one embodiment, it before described the step of determining current approval node according to examination & approval completion information, also wraps
It includes:
In the foundation request for receiving approval process, request approval process information is established according to described, wherein examine
Batch procedure information include each approval node to be established and each corresponding approver of approval node to be established,
Examination & approval sequence and examination & approval content;
Approval process is established according to the approval process information, by the approval process and sends the use for establishing request
Family association.
In one embodiment, described the step of establishing approval process according to the approval process information, includes:
Determine each corresponding first pass icon of approval node to be established;
Successively according to the corresponding approver of approval node to be established and examination & approval content, examined for described to be established
Approver and the examination & approval content of the corresponding first pass icon setting of node are criticized, to obtain second procedure icon;
According to the corresponding examination & approval sequence of each approval node to be established, each second flow chart target is determined
Examination & approval sequence, to establish approval process.
In one embodiment, described to send examination & approval prompt information to the corresponding target approver of the target approval node
After step, further includes:
When not receiving the examination & approval completion information that the target approver sends in preset duration, the examination & approval of Xiang Suoshu target
People retransmits examination & approval prompt information.
In one embodiment, described that target approval process where the current approval node is determined according to the user
After step, further includes:
Determine the current approval node whether be the target approval process last approval node;
When the current approval node is the last approval node of the target approval process, Xiang Suoshu user-association
Terminal sends the prompt information that project examination passes through;
When the current approval node is not the last approval node of the target approval process, execute described according to institute
State the step of current approval node determines target approval node in the target approval process.
To achieve the above object, the present invention also provides a kind of air control approval system, the air control approval system includes processing
Device, memory and it is stored in the project examination program that can be run on the memory and on the processor, the project is examined
Criticize each step that the project examination method based on air control approval system as described above is realized when program is executed by the processor
Suddenly.
To achieve the above object, the present invention also provides a kind of medium, the media storage has project examination program, the item
The each of the project examination method based on air control approval system as described above is realized when mesh examination and approval procedures are executed by the processor
A step.
Project examination method based on air control approval system, air control approval system and medium provided by the invention, air control are examined
The system of criticizing completes information according to examination & approval and determines current approval node when information is completed in the examination & approval for receiving item file, and really
Surely the user for submitting item file, determines the target approval process where current approval node further according to user, and then according to working as
Preceding approval node determines that target approval node, target approval node are the lower first sentence of current approval node in target approval process
Node is criticized, item file is finally sent to target approval node and is sent to the corresponding target approver of target approval node
Prompt information is examined, so that target approver examines item file according to examination & approval prompt information.Due to the examination & approval of project
It is examined on line by air control approval system, it, can effective metric terms examination & approval so that the approval process of project can be monitored
Process and the cost for counting process;In addition, sending item file to next node when an approval node completes examination & approval
To continue the examination & approval of project, without line send a notice next node approver carry out project examination, approval process node it
Between interval time it is short, save the cycle duration of project examination, improve the examination & approval efficiency of project;Finally, due to approver
The item file of electronic document is examined, without carrying out project examination using paper, avoids passing through paper approval process
Middle paper sheet break cause the project examination time it is increased happen, the examination & approval convenient for approver to project.
Detailed description of the invention
Fig. 1 be the present embodiments relate to air control approval system hardware structural diagram;
Fig. 2 is that the present invention is based on the flow diagrams of the project examination method first embodiment of air control approval system;
Fig. 3 is the refinement flow diagram of step S20 in Fig. 2;
Fig. 4 is that the present invention is based on the flow diagrams of the project examination method second embodiment of air control approval system;
Fig. 5 is that the present invention is based on the flow diagrams of the project examination method 3rd embodiment of air control approval system.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific embodiment
It should be appreciated that described herein, specific examples are only used to explain the present invention, is not intended to limit the present invention.
The primary solutions of the embodiment of the present invention are: when information is completed in the examination & approval for receiving item file, according to institute
It states examination & approval completion information and determines current approval node, and determine the user for submitting the item file;It is determined according to the user
Target approval process where the current approval node, and according to the current approval node in the target approval process
Determine target approval node, wherein contain multiple approval nodes with examination & approval sequence, the mesh in the target approval process
Mark next approval node that approval node is the current approval node;The item file is transmitted to target examination & approval section
Point, and examination & approval prompt information is sent to the corresponding target approver of the target approval node, so that the target approver root
The item file is examined according to the examination & approval prompt information.
It is examined on the line for passing through air control approval system due to the examination & approval of project, so that the approval process of project can be monitored,
Can effective metric terms examination & approval process and count the cost of process;In addition, when approval node completes examination & approval, i.e., to
Next node sends item file to continue the examination & approval of project, carries out item without the send a notice approver of next node of line
Mesh is examined, and the interval time between approval process node is short, is saved the cycle duration of project examination, is improved the examination & approval of project
Efficiency;Finally, due to approver examines the item file of electronic document, without carrying out project examination using paper,
Avoid passing through paper sheet break in paper approval process cause the project examination time it is increased happen, convenient for approver to project
Examination & approval.
As a kind of implementation, air control approval system can be as shown in Figure 1.
For the embodiment of the present invention what is involved is air control approval system, air control approval system includes: processor 101, such as
CPU, memory 102, communication bus 103,.Wherein, communication bus 103 is for realizing the connection communication between these components.
Memory 102 can be high speed RAM memory, be also possible to stable memory (non-
), such as magnetic disk storage volatilememory.As shown in Figure 1, as in a kind of memory 102 of computer storage medium
It may include project examination program;And processor 101 can be used for calling the project examination program stored in memory 102, and
Execute following operation:
When information is completed in the examination & approval for receiving item file, information is completed according to the examination & approval and determines current examination & approval section
Point, and determine the user for submitting the item file;
The target approval process where the current approval node is determined according to the user, and according to the current examination & approval
Node determines target approval node in the target approval process, wherein has in the target approval process containing multiple
The approval node of examination & approval sequence, the target approval node are next approval node of the current approval node;
The item file is transmitted to target approval node, and to the corresponding target approver of the target approval node
Examination & approval prompt information is sent, so that the target approver examines the item file according to the examination & approval prompt information
Batch.
In one embodiment, processor 101 can be used for calling the project examination program stored in memory 102, and hold
The following operation of row:
Obtain the user information of the user;
Determining each approval process with the user information correlation;
According to the file type of the item file and the current approval node, in each approval process really
Set the goal approval process.
In one embodiment, processor 101 can be used for calling the project examination program stored in memory 102, and hold
The following operation of row:
Determine the corresponding setting approver of the target approval node;
Judge whether the setting approver's is in running order;
When the setting approver is not in working condition, the corresponding Deputy of the setting approver is determined;
The Deputy is determined as the corresponding target approver of the target approval node, and is executed described to institute
State the step of corresponding target approver of target approval node sends examination & approval prompt information.
In one embodiment, processor 101 can be used for calling the project examination program stored in memory 102, and hold
The following operation of row:
Determine the corresponding power to examine and approve projects of the Deputy and examination & approval effective period of time;
According to the power to examine and approve projects and the examination & approval effective period of time, judge the Deputy to the item
Whether mesh file has examination & approval qualification;
When the Deputy has examination & approval qualification to the item file, executes described examine to the target and save
The corresponding target approver of point sends the step of examination & approval prompt information;
It is associated to the setting approver when the Deputy does not have examination & approval qualification to the item file
Terminal sends examination & approval prompt information.
In one embodiment, processor 101 can be used for calling the project examination program stored in memory 102, and hold
The following operation of row:
In the foundation request for receiving approval process, request approval process information is established according to described, wherein examine
Batch procedure information include each approval node to be established and each corresponding approver of approval node to be established,
Examination & approval sequence and examination & approval content;
Approval process is established according to the approval process information, by the approval process and sends the use for establishing request
Family association.
In one embodiment, processor 101 can be used for calling the project examination program stored in memory 102, and hold
The following operation of row:
Determine each corresponding first pass icon of approval node to be established;
Successively according to the corresponding approver of approval node to be established and examination & approval content, examined for described to be established
Approver and the examination & approval content of the corresponding first pass icon setting of node are criticized, to obtain second procedure icon;
According to the corresponding examination & approval sequence of each approval node to be established, each second flow chart target is determined
Examination & approval sequence, to establish approval process.
In one embodiment, processor 101 can be used for calling the project examination program stored in memory 102, and hold
The following operation of row:
When not receiving the examination & approval completion information that the target approver sends in preset duration, the examination & approval of Xiang Suoshu target
People retransmits examination & approval prompt information.
In one embodiment, processor 101 can be used for calling the project examination program stored in memory 102, and hold
The following operation of row:
Determine the current approval node whether be the target approval process last approval node;
When the current approval node is the last approval node of the target approval process, Xiang Suoshu user-association
Terminal sends the prompt information that project examination passes through;
When the current approval node is not the last approval node of the target approval process, execute described according to institute
State the step of current approval node determines target approval node in the target approval process.
The present embodiment is according to above scheme, and air control approval system is when information is completed in the examination & approval for receiving item file, root
Information is completed according to examination & approval and determines current approval node, and determines the user for submitting item file, works as former trial further according to user's determination
The target approval process where node is criticized, and then determines target examination & approval section in target approval process according to current approval node
Point, target approval node are next approval node of current approval node, and item file is finally sent to target approval node
And examination & approval prompt information is sent to the corresponding target approver of target approval node, so that target approver prompts according to examination & approval
Information examines item file.It is examined on the line for passing through air control approval system due to the examination & approval of project, so that project is examined
Batch list can be monitored, can effective metric terms examination & approval process and count the cost of process;In addition, in an approval node
It when completing examination & approval, i.e., sends item file to next node to continue the examination & approval of project, sends a notice next section without line
The approver of point carries out project examination, and the interval time between approval process node is short, saves the cycle duration of project examination,
Improve the examination & approval efficiency of project;Finally, due to which approver examines the item file of electronic document, without using paper
Zhang Jinhang project examination, avoid passing through paper sheet break in paper approval process cause the project examination time it is increased happen,
Examination & approval convenient for approver to project.
Based on the hardware architecture of above-mentioned air control approval system, propose that the present invention is based on the project examination sides of air control approval system
The embodiment of method.
It is that the present invention is based on the first embodiment of the project examination method of air control approval system, the bases referring to Fig. 2, Fig. 2
In air control approval system project examination method the following steps are included:
Step S10 completes information according to the examination & approval and determines currently when information is completed in the examination & approval for receiving item file
Approval node, and determine the user for submitting the item file;
In the present invention, executing subject is air control approval system.User can log in air control when needing to carry out project examination
Approval system, and item file is submitted, in the present invention, project refers to air control project, and air control approval system is to be based on
Snaker workflow is transformed the workflow automation system with extension on its basis.
Project needs to carry out the examination & approval of multiple nodes, each approval node is provided with corresponding approver, and each careful
Criticizing node has corresponding examination & approval sequence, each approval node, the corresponding approver of each approval node and examination & approval sequence structure
At approval process.Item file can be sent to first approval node of approval process by air control approval system, and to first
The corresponding approver of approval node sends examination & approval prompt information, is examined according to examination & approval prompt information item file in approver
After batch, approval node completes information to the examination & approval that air control approval system sends item file.It is understood that the project of transmission text
It is current approval node that the approval node of information is completed in the examination & approval of part.
User registers with account on air control approval system, and air control approval system can be determined according to the account information of user
Submit the user of item file.
Step S20 determines the target approval process where the current approval node according to the user, and according to described
Current approval node determines target approval node in the target approval process, wherein contains in the target approval process
Multiple approval nodes with examination & approval sequence, the target approval node are next examination & approval section of the current approval node
Point;
Air control approval system can determine the approval process where current approval node according to user, specifically, referring to figure
The step of target approval process where the current approval node is determined according to the user in 3, i.e. step S20 include:
Step S21 obtains the user information of the user;
Step S22, determining each approval process with the user information correlation;
Step S23, according to the file type of the item file and the current approval node, in each examination & approval
Target approval process is determined in process.
Air control approval system has been user setting, and multiple approval processes, different approval processes correspond to the different business of user
Demand, and each approval process is correspondingly arranged a kind of item file table, user can fill in item file table
To obtain item file.
The multiple approval processes of the user information correlation of user in air control approval system, air control approval system can be according to users
Information determines that the corresponding each approval process of user, user information can be the account of user, the information such as identity card.Each project
Documentation form has corresponding identity, and identity can characterize the type of item file table, therefore, can be according to item
The identity of mesh file is identified project the file type of file, so according to file type and current target node determine with
The associated approval process of item file, and using the approval process as target approval process.
Contain multiple approval nodes in target approval process, in the examination & approval of current approval node finished item file, needs
Carry out the project examination of next approval node.And each approval node in target approval process has corresponding examination & approval suitable
Sequence is examined further according to the examination & approval sequence of current approval node in target in this regard, can determine the corresponding examination & approval sequence of current approval node
It criticizes and determines next approval node in node, next approval node is target approval node.For example, current approval node
The corresponding serial number 2 of examination & approval sequence, then the approval node of the corresponding serial number 3 of examination & approval sequence is target approval node, sequence
Number smaller, the more early carry out project examination of the corresponding approval node of serial number.
The item file is transmitted to target approval node by step S30, and to the corresponding mesh of the target approval node
It marks approver and sends examination & approval prompt information, so that the target approver is according to the examination & approval prompt information to the item file
It is examined.
After approval node of identifying project, item file is transmitted to target approval node, and to target approval node pair
The target approver answered sends examination & approval prompt information, so that target approver logs in air control approval system according to examination & approval prompt information
Carry out the examination & approval of item file.Target examines the approver of artificial target approval node setting.
Information is completed in the examination & approval that air control approval system does not receive the item file of target approver transmission in preset duration
When, air control approval system sends examination & approval prompt information to target approver again.
Air control approval system is equipped with secretarial job platform module, and secretarial job platform module has the effect that
1), material upload: user can upload project related data in the arbitrary node of approval process, to secretarial job platform mould
Block is synchronized to after the approval in the displaying of project details.The function is in order to which business team can mention at any time in project review process
For supplementary material, the multi-faceted displaying contents of a project improve project percent of pass.
2), data verification: secretarial job platform module is initiated the attachment that team's lock is submitted to project and is audited, and project is avoided
The random additions and deletions of team have been filed on project data, improve accuracy and safety during project examination.
3), examination & approval are reminded: secretarial job platform module can carry out mail reminder to the personnel of untreated task for a long time, avoid
Because individual factor leads to entire approval process time lag, examination & approval efficiency is effectively improved.
Air control approval system is equipped with authority management module, so that air control approval system has complete rights management, it can be right
Menu permission, function privilege, data permission, login IP and landing time are managed;Focus on legal power safety, it is illegal to refuse all
Access.
Air control approval system is additionally provided with approval module, and pending examination & approval can be shown by approval module and have done examination & approval, are had
Body:
1), pending examination & approval: display active user's Pending tasks list, user can click corresponding task name and check task details
And examination & approval history, backstage, task automatic flow to next approval node and postal are committed to after filling in approval results collection suggestions made after examination
Part notifies next approver.
2), done examination & approval: display active user has done task list, and user can click corresponding task name and check task details
And examination & approval history.Convenient for user tracking project examination progress and approver to the examination & approval duration of project and examination & approval task amount
Data statistics and analysis.
It should be noted that current approval node may be the last one node in target approval process.Therefore, true
After the approval process that sets the goal, further determine that current approval node whether be in target approval process the last one examination & approval section
Point, if it is not, the determination of target approval node is then carried out, if so, sending the information that project examination is completed to user.
In technical solution provided in this embodiment, air control approval system completes information in the examination & approval for receiving item file
When, information is completed according to examination & approval and determines current approval node, and determines the user for submitting item file, is worked as further according to user's determination
Target approval process where preceding approval node, and then target examination & approval are determined in target approval process according to current approval node
Node, target approval node are next approval node of current approval node, and item file is finally sent to target examination & approval section
It puts and sends examination & approval prompt information to the corresponding target approver of target approval node, so that target approver mentions according to examination & approval
Show that information examines item file.It is examined on the line for passing through air control approval system due to the examination & approval of project, so that project
Approval process can be monitored, can effective metric terms examination & approval process and count the cost of process;In addition, being saved in an examination & approval
When point completes examination & approval, i.e., item file is sent to continue the examination & approval of project to next node, sent a notice without line next
The approver of node carries out project examination, and the interval time between approval process node is short, when saving the period of project examination
It is long, improve the examination & approval efficiency of project;Finally, due to which approver examines the item file of electronic document, without adopting
Project examination is carried out with paper, avoids passing through the case where paper sheet break in paper approval process causes the project examination time to increase hair
It is raw, the examination & approval convenient for approver to project.
Referring to Fig. 4, Fig. 4 is the present invention is based on the second embodiment of the project examination method of air control approval system, based on the
One embodiment, after the step of item file is transmitted to target approval node in the step S30, further includes:
Step S40 determines the corresponding setting approver of the target approval node;
Step S50 judges whether the setting approver's is in running order;
Step S60 determines the corresponding post of the setting approver when the setting approver is not in working condition
Agent;
The Deputy is determined as the corresponding target approver of the target approval node, and executed by step S70
Described the step of sending examination & approval prompt information to the corresponding target approver of the target approval node.
In the present embodiment, air control approval system is equipped with delegable management module, and approver can pass through delegable mould
Deputy is arranged in block, so that Deputy temporarily carries out the examination & approval of project.
After item file is transmitted to target approval node, air control approval system determines that target approval node is corresponding and sets
Determine approver, and judges whether setting approver is in running order.Itself settable state of approver is set, for example, setting
It is set to working condition, does well outside and state of having a holiday etc..If setting approver is not in working condition, air control examination & approval system
System further determines that whether setting approver is arranged Deputy.If being provided with Deputy, then by Deputy
Examination & approval prompt information is sent as target approver, and to target approver, examination & approval prompt information can pass through mail, short message
Etc. modes pushed.If setting the not set Deputy of approver, approver will be set as target approver, then to
Target approver sends examination & approval prompt information.
Further, the power of examination and approval and examination & approval effective period of time of Deputy's project can be set in approver,
I.e. approver only allows Deputy to examine in some period to certain projects.In this regard, true in air control approval system
Surely when setting approver is provided with Deputy, the corresponding power to examine and approve projects of Deputy and examination & approval are further determined that
Effective period of time, so according to the power to examine and approve projects and examination & approval effective period of time judge Deputy to item file whether
With examination & approval qualification.For example, the power to examine and approve projects of Deputy is to have to the item file of tri- kinds of file types of A, B, C
The power of examination and approval, if the type of current project file is D, then Deputy does not have examination & approval qualification;In current project file
Type be C when, further determine that whether current point in time is in examination & approval effective period of time, if current slot be in examination & approval have
The period is imitated, Deputy has examination & approval qualification, conversely, not having examination & approval qualification then.There is examination & approval money in Deputy
When lattice, then by the Deputy crop target approver, then to target approver send project examination prompt information;It is on-job
When being engaged in agent without examination & approval qualification, then examination & approval prompt information is sent to setting approver, to prompt setting approver to carry out
The examination & approval of item file, alternatively, commission Deputy examines item file again.
In technical solution provided in this embodiment, when sending item file to target approval node, determine that target is examined
The corresponding target approver of node is criticized, so that air control approval system sends examination & approval prompt information to corresponding approver, guarantees item
Mesh can be examined timely.
Referring to Fig. 5, Fig. 5 is the present invention is based on the 3rd embodiment of the project examination method of air control approval system, based on the
Before one or second embodiment, the step S10, further includes:
Step S80 establishes request approval process letter according to described in the foundation request for receiving approval process
Breath, wherein approval process information includes that each approval node to be established and each approval node to be established are corresponding
Approver, examination & approval sequence and examination & approval content;
Step S90 establishes approval process according to the approval process information, by the approval process and sends the foundation
The user-association of request.
In the present embodiment, it is based on MVC framework, uses the common frame such as SpringBoot, Mybatis and interface skill
Art, it will thus provide a kind of patterned method describes and realize that work-flow process, each step of process are patterned with one
Icon indicates that, by the connection to these icons, designer can describe relationship and routing between step.Process is corresponding
Icon can characterize approval node.
Air control approval system can design corresponding icon, actual demand refers to according to the actual demand of business personnel
Each node of project examination, each corresponding approver of node and the corresponding examination & approval content of each node.Further,
Multiple icons are expected on air control approval system in advance, then are connected each icon by actual demand, and configure corresponding examination & approval
Sequentially, and then approval process is established.Each icon is attached by visualization, graphical and pull-alongs, it can be quick
Establish approval process, improve the efficiency of process modeling.In addition, approval process can be carried out according to the actual demand of business personnel
Setting, and crossfire between the corresponding icon of each actual demand, cocurrent, shunting, the quick of interflow (or stream, with stream) is supported to set
It is fixed, and support to stop, selection, forwarding, turn the specific functions setting such as do, act on behalf of, approval process meets the practical need of business personnel
It asks namely air control approval system is the approval process that each business personnel formulates demand.It is looked forward in air control approval system finally, simplifying
The exploitation and maintenance of industry grade software, after system, the code of each approval node of approval process no longer becomes scattered about each mould
In block, when approval node change, need to only it change at one.
Business personnel can log in air control approval system with actual demand, and to send the foundation request of approval process, foundation is asked
The business demand submitted in asking containing business personnel, business demand are to examine setting information, and examination & approval setting information includes each
Approval node and the corresponding approver of each approval node to be established and examination & approval content to be established, air control approval system
Corresponding first pass icon is searched for each approval node to be established, and is examined first pass icon is corresponding to be established
The examination & approval content for criticizing node is associated with approver with the first mutation, to obtain second procedure icon, according to second procedure icon
The examination & approval sequence of corresponding approval node to be established determines second flow chart target examination & approval sequence, then passes through each second procedure
The examination & approval sequence of icon, is attached each second procedure icon, to establish approval process.
Above-mentioned approval process realizes that the examination & approval of process design tool design are flowed by the process design tool of air control approval system
Journey includes two steps, and one is the setting of the attribute of flow setting and process.Wherein,
Flow setting needs design node component, and node component includes: start, end, task, custom, sub-
Process, decision, fork, join respectively correspond beginning, end, task, customized, sub-process, decision, branch, conjunction
And component model.
Attribute configuration is then to carry out attribute configuration to various components model, as follows to the component model specific object that sets a property
Table:
In technical solution provided in this embodiment, the foundation for the approval process that air control approval system is sent according to user is asked
It asks, establishes approval process corresponding to the user, so that approval process meets the self-demand of user.
To achieve the above object, the present invention also provides a kind of air control approval system, the air control approval system includes processing
Device, memory and it is stored in the project examination program that can be run on the memory and on the processor, the project is examined
It criticizes and realizes the project examination method described in embodiment as above based on air control approval system when program is executed by the processor
Each step.
To achieve the above object, the present invention also provides a kind of medium, the media storage has project examination program, described
Project examination method based on air control approval system as described above is realized when project examination program is executed by the processor
Each step.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row
His property includes, so that the process, method, article or the device that include a series of elements not only include those elements, and
And further include other elements that are not explicitly listed, or further include for this process, method, article or device institute it is intrinsic
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do
There is also other identical elements in the process, method of element, article or device.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side
Method can be realized by means of software and necessary general hardware platform, naturally it is also possible to by hardware, but in many cases
The former is more preferably embodiment.Based on this understanding, technical solution of the present invention substantially in other words does the prior art
The part contributed out can be embodied in the form of software products, which is stored in one as described above
In computer readable storage medium (such as ROM/RAM, magnetic disk, CD), including some instructions are used so that a terminal device (can
To be mobile phone, computer, server, air conditioner or the network equipment etc.) execute method described in each embodiment of the present invention.
The above is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair
Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills
Art field, is included within the scope of the present invention.
Claims (10)
1. a kind of project examination method based on air control approval system, which is characterized in that the item based on air control approval system
The mesh measures and procedures for the examination and approval the following steps are included:
When information is completed in the examination & approval for receiving item file, information is completed according to the examination & approval and determines current approval node, and
Determine the user for submitting the item file;
The target approval process where the current approval node is determined according to the user, and according to the current approval node
Target approval node is determined in the target approval process, wherein there are examination & approval containing multiple in the target approval process
The approval node of sequence, the target approval node are next approval node of the current approval node;
The item file is transmitted to target approval node, and is sent to the corresponding target approver of the target approval node
Prompt information is examined, so that the target approver examines the item file according to the examination & approval prompt information.
2. as described in claim 1 based on the project examination method of air control approval system, which is characterized in that described according to
User determines that the step of target approval process where the current approval node includes:
Obtain the user information of the user;
Determining each approval process with the user information correlation;
According to the file type of the item file and the current approval node, mesh is determined in each approval process
Mark approval process.
3. as described in claim 1 based on the project examination method of air control approval system, which is characterized in that described by the item
Mesh file was transmitted to after the step of target approval node, further includes:
Determine the corresponding setting approver of the target approval node;
Judge whether the setting approver's is in running order;
When the setting approver is not in working condition, the corresponding Deputy of the setting approver is determined;
The Deputy is determined as the corresponding target approver of the target approval node, and is executed described to the mesh
Mark the step of corresponding target approver of approval node sends examination & approval prompt information.
4. as claimed in claim 3 based on the project examination method of air control approval system, which is characterized in that described in the determination
After the step of setting approver corresponding Deputy, further includes:
Determine the corresponding power to examine and approve projects of the Deputy and examination & approval effective period of time;
According to the power to examine and approve projects and the examination & approval effective period of time, judge the Deputy to the project text
Whether part has examination & approval qualification;
When the Deputy has examination & approval qualification to the item file, execute described to the target approval node pair
The target approver answered sends the step of examination & approval prompt information;
When the Deputy does not have examination & approval qualification to the item file, to the associated terminal of the setting approver
Send examination & approval prompt information.
5. as described in claim 1 based on the project examination method of air control approval system, which is characterized in that described according to
Examination & approval were completed before the step of information determines current approval node, further includes:
In the foundation request for receiving approval process, request approval process information is established according to described, wherein examination & approval stream
Journey information includes each approval node to be established and each corresponding approver of approval node to be established, examination & approval
Sequence and examination & approval content;
Approval process is established according to the approval process information, by the approval process and sends the user pass for establishing request
Connection.
6. as claimed in claim 5 based on the project examination method of air control approval system, which is characterized in that described according to
The step of approval process information establishes approval process include:
Determine each corresponding first pass icon of approval node to be established;
Successively according to the corresponding approver of approval node to be established and examination & approval content, for the examination & approval section to be established
The approver of the corresponding first pass icon setting of point and examination & approval content, to obtain second procedure icon;
According to the corresponding examination & approval sequence of each approval node to be established, each second flow chart target examination & approval are determined
Sequentially, to establish approval process.
7. as described in claim 1 based on the project examination method of air control approval system, which is characterized in that described to the mesh
The corresponding target approver of mark approval node sent after the step of examination & approval prompt information, further includes:
When not receiving the examination & approval completion information that the target approver sends in preset duration, Xiang Suoshu target approver weight
It is new to send examination & approval prompt information.
8. such as the described in any item project examination methods based on air control approval system of claim 1-7, which is characterized in that described
After the step of determining the target approval process where the current approval node according to the user, further includes:
Determine the current approval node whether be the target approval process last approval node;
When the current approval node is the last approval node of the target approval process, the terminal of Xiang Suoshu user-association
Send the prompt information that project examination passes through;
When the current approval node is not the last approval node of the target approval process, executes and described work as according to
Preceding approval node determines the step of target approval node in the target approval process.
9. a kind of air control approval system, which is characterized in that the air control approval system includes processor, memory and is stored in institute
The project examination program that can be run on memory and on the processor is stated, the project examination program is held by the processor
Each step such as the described in any item project examination methods based on air control approval system of claim 1-8 is realized when row.
10. a kind of medium, which is characterized in that the media storage has project examination program, and the project examination program is described
The each of such as described in any item project examination methods based on air control approval system of claim 1-8 is realized when processor executes
Step.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910308031.6A CN110414908A (en) | 2019-04-16 | 2019-04-16 | Project examination method, air control approval system and medium based on air control approval system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910308031.6A CN110414908A (en) | 2019-04-16 | 2019-04-16 | Project examination method, air control approval system and medium based on air control approval system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110414908A true CN110414908A (en) | 2019-11-05 |
Family
ID=68357631
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910308031.6A Pending CN110414908A (en) | 2019-04-16 | 2019-04-16 | Project examination method, air control approval system and medium based on air control approval system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110414908A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111091348A (en) * | 2019-12-06 | 2020-05-01 | 南通中实纺织交易市场有限公司 | Method for online generation of transaction contract |
CN111143866A (en) * | 2019-12-27 | 2020-05-12 | 远光软件股份有限公司 | Permission changing method, device, equipment and medium based on multi-scene mode |
CN111192004A (en) * | 2019-12-12 | 2020-05-22 | 北京城乡建设集团有限责任公司 | Method for displaying current to-do task and subsequent to-do workflow |
CN111639907A (en) * | 2020-05-13 | 2020-09-08 | 广州国音智能科技有限公司 | Process management method, device, equipment and computer storage medium |
CN112308522A (en) * | 2020-11-02 | 2021-02-02 | 济南福卡斯信息科技有限公司 | Method and system for generating reverse scheduling period of project approval task and server |
CN112330458A (en) * | 2021-01-07 | 2021-02-05 | 深圳华锐金融技术股份有限公司 | Wind control processing method, device, equipment and storage medium based on wind control platform |
CN112801511A (en) * | 2021-01-29 | 2021-05-14 | 贵州惠智电子技术有限责任公司 | High-efficiency file processing system based on priority mode |
CN113435845A (en) * | 2021-06-29 | 2021-09-24 | 平安科技(深圳)有限公司 | Approval process optimization method, device, equipment and storage medium |
CN114912901A (en) * | 2022-05-31 | 2022-08-16 | 东风商用车有限公司 | Approval process optimization method, device, equipment and storage medium |
CN115018388A (en) * | 2022-08-05 | 2022-09-06 | 广东咏声动漫股份有限公司 | Multi-user parallel approval method and system for animation project |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015005934A (en) * | 2013-06-21 | 2015-01-08 | コニカミノルタ株式会社 | Approval system and approval method |
CN104599078A (en) * | 2015-02-03 | 2015-05-06 | 浪潮(北京)电子信息产业有限公司 | Data stream processing method and system |
CN106779430A (en) * | 2016-12-23 | 2017-05-31 | 重庆足下科技有限公司 | The method and management equipment of a kind of Work Process Management |
CN108090744A (en) * | 2017-12-29 | 2018-05-29 | 北京致远互联软件股份有限公司 | Flow executing method, equipment and the medium that natural person participates in |
CN108156123A (en) * | 2016-12-02 | 2018-06-12 | 航天星图科技(北京)有限公司 | A kind of integration information management server |
CN108256810A (en) * | 2016-12-28 | 2018-07-06 | 平安科技(深圳)有限公司 | Insurance business approval process treating method and apparatus |
-
2019
- 2019-04-16 CN CN201910308031.6A patent/CN110414908A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015005934A (en) * | 2013-06-21 | 2015-01-08 | コニカミノルタ株式会社 | Approval system and approval method |
CN104599078A (en) * | 2015-02-03 | 2015-05-06 | 浪潮(北京)电子信息产业有限公司 | Data stream processing method and system |
CN108156123A (en) * | 2016-12-02 | 2018-06-12 | 航天星图科技(北京)有限公司 | A kind of integration information management server |
CN106779430A (en) * | 2016-12-23 | 2017-05-31 | 重庆足下科技有限公司 | The method and management equipment of a kind of Work Process Management |
CN108256810A (en) * | 2016-12-28 | 2018-07-06 | 平安科技(深圳)有限公司 | Insurance business approval process treating method and apparatus |
CN108090744A (en) * | 2017-12-29 | 2018-05-29 | 北京致远互联软件股份有限公司 | Flow executing method, equipment and the medium that natural person participates in |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111091348A (en) * | 2019-12-06 | 2020-05-01 | 南通中实纺织交易市场有限公司 | Method for online generation of transaction contract |
CN111192004A (en) * | 2019-12-12 | 2020-05-22 | 北京城乡建设集团有限责任公司 | Method for displaying current to-do task and subsequent to-do workflow |
CN111143866A (en) * | 2019-12-27 | 2020-05-12 | 远光软件股份有限公司 | Permission changing method, device, equipment and medium based on multi-scene mode |
CN111143866B (en) * | 2019-12-27 | 2022-02-15 | 远光软件股份有限公司 | Permission changing method, device, equipment and medium based on multi-scene mode |
CN111639907A (en) * | 2020-05-13 | 2020-09-08 | 广州国音智能科技有限公司 | Process management method, device, equipment and computer storage medium |
CN112308522A (en) * | 2020-11-02 | 2021-02-02 | 济南福卡斯信息科技有限公司 | Method and system for generating reverse scheduling period of project approval task and server |
CN112330458A (en) * | 2021-01-07 | 2021-02-05 | 深圳华锐金融技术股份有限公司 | Wind control processing method, device, equipment and storage medium based on wind control platform |
CN112801511A (en) * | 2021-01-29 | 2021-05-14 | 贵州惠智电子技术有限责任公司 | High-efficiency file processing system based on priority mode |
CN113435845A (en) * | 2021-06-29 | 2021-09-24 | 平安科技(深圳)有限公司 | Approval process optimization method, device, equipment and storage medium |
CN114912901A (en) * | 2022-05-31 | 2022-08-16 | 东风商用车有限公司 | Approval process optimization method, device, equipment and storage medium |
CN115018388A (en) * | 2022-08-05 | 2022-09-06 | 广东咏声动漫股份有限公司 | Multi-user parallel approval method and system for animation project |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110414908A (en) | Project examination method, air control approval system and medium based on air control approval system | |
CN106971273B (en) | Transformer substation acceptance workflow control system and control method with intelligent alarm prompt | |
CN107679818A (en) | Software project management method, terminal and computer-readable recording medium | |
CN110471834B (en) | Credit card simulation test method under multi-transaction channel and related equipment | |
CN107133776A (en) | A kind of mobile security supervisory systems | |
CN106096872A (en) | A kind of factory's substandard product report processing system and method | |
CN109726071A (en) | System failure processing method, device, equipment and storage medium | |
CN112698971A (en) | Rule engine based parameter conversion method, device, equipment and medium | |
CN107423223A (en) | Test and management system | |
CN114138639A (en) | Robot process automation management system and method | |
CN108764810A (en) | Method, control device and the storage medium of task management | |
CN109636142A (en) | A kind of technique head detecting method and device based on MES | |
CN106940643A (en) | Logical APP systems between the police and the people | |
CN108288146A (en) | Trend of work supervisory methods and storage medium | |
CN109218407A (en) | Code management-control method and terminal device based on log monitoring technology | |
CN113205278A (en) | Intelligent inspection system for building engineering quality | |
CN110555271A (en) | Auxiliary assembly method and device | |
CN110322143A (en) | Model entity management method, device, equipment and computer storage medium | |
CN107170218B (en) | Remote assistance method and system for debugging fire alarm system | |
CN107124459A (en) | It is controllable in sequence of threads evaluation and test middleware based on cloud platform | |
CN109726975A (en) | Project development method, apparatus, equipment and readable storage medium storing program for executing based on workflow | |
RU47114U1 (en) | PROJECT MANAGEMENT SYSTEM | |
CN107341645A (en) | Demand of human resources information processing method, device, computer equipment and storage medium | |
CN103457957B (en) | A kind of network penetration test macro and method with adaptation function | |
CN106355084A (en) | Android group authority management method and system based on callback mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191105 |
|
RJ01 | Rejection of invention patent application after publication |